Beam Shoring
Beam Shoring
Beam Shoring
Perimeter No of days
Section Diameter Length No Piles Depth No of Days No of Days Allowed
M M (Two rigs)
Section -1(R) 600mm 496.00 792 11.5
Section -2(R) 750mm 44.00 65 13.5 86
Section -1(canal) 600mm 410.60 656 13.5
951
ANCHORING
No of No of days
Section Anchor Level Anchor Spacing Anchors No of Days No of Days Allowed
No of days
Pile dia No of piles Depth (Max.) No of Days No of Days Allowed
PILING TESTING
Working Load
Pile dia (tons) Test Load (tons) Nos No of Days No of days Allowed
Working Load Testing
900mm 12 15
Mobilisation Period 15
Perimeter No of days
Section Diameter Length No Piles Depth No of Days No of Days Allowed
M M (Two rigs)
Section -1(R) 600mm 496.00 #REF! 11.5
Section -2(R) 750mm 44.00 266 13.5 130
Section -1(canal) 600mm 410.60 #REF! 13.5
951
ANCHORING
No of No of days
Section Anchor Level Anchor Spacing Anchors No of Days No of Days Allowed
No of days
Pile dia No of piles Depth (Max.) No of Days No of Days Allowed
PILING TESTING
Working Load
Pile dia (tons) Test Load (tons) Nos No of Days No of days Allowed
Working Load Testing
900mm 12 15
Mobilisation Period 15
Telephone 1 16,000
Internet Connection(for 2PCs) 2 44,500
Digital Camera 2 3500 7,000
networking 3
Auto CAD 2 18000 36000
UPS System 3 350 1050
Networking 3 500 1500
Server 1 15000
Sample room
Wooden racks 3 1500 4,500
Pantry(Type-1A & Meeting Room)
Sink and Drainign board 1 1000 1,000
Cooker 1 1500 1,500
Refrigerator 1 8000 8,000
Chilled Water dispenser 1 750 750
Cupboard 1 1500 1,500
Utensils 1 1500 1,500
PRELIMINARIES
4 Provision of Water supply for our works during the ✘ Item 24,000
contract period.
To Collection
407,000
Piling Summary:
Pile Capacity
Pile Type Pile Dia Pile Nos (ton) COL Concret level Toe Level Pilel ength
P1 800 15 380 -12.65 -10.75 -26 13.35
P2 1200 108 800 -17.25 -14.75 -28 10.75
P3 1200 8 770 -13.85 -10.75 -26 12.15
P4 1200 10 770 -13.35 -10.75 -26 12.65
P5 1000 2 550 -12.85 -10.75 -26 13.15
P6 1000 2 400 -12.85 -10.75 -26 13.15
P7 600 21 260 -11.95 -10.75 -26 14.05
166
Reinforcement Shall not be lessthan 1%
Pilel ength
Time Towers
on Plot No 7 and 8, Abu Dhabi, UAE
Shoring
978 20,905 20,445,090
50,000
20,495,090
Piling
6 80,000 480,000
746 18,160 13,547,360
238 23,495 5,591,810
136 26,825 3,648,200
23,267,370
Tesing
12 40,000 480,000
56 4,500 252,000
1,120 30 33,600
168 4,500 756,000
1,521,600
Time Towers
on Plot No 7 and 8, Abu Dhabi, UAE
20,000
216,000
60,000
200,000
288,000
36,000
192,000
102,000
12,000
8,000
200,000
460,000
1,794,000
Site works
8,459,970
20,495,090
23,267,370
1,521,600
53,744,030
53,744,030
1,794,000
55,538,030
Time Towers
on Plot No 7 and 8, Abu Dhabi, UAE
Shoring
978 29,180 28,538,040
50,000
28,588,040
Piling
6 80,000 480,000
746 18,325 13,670,450
238 23,720 5,645,360
136 27,130 3,689,680
23,485,490
Tesing
12 25,000 300,000
56 4,500 252,000
1,120 30 33,600
168 4,000 672,000
1,257,600
Time Towers
on Plot No 7 and 8, Abu Dhabi, UAE
42,000
864,450
172,000
536,000
583,750
270,000
50,000
899,000
3,417,200
Site works
8,384,650
28,588,040
23,485,490
1,257,600
61,715,780
61,715,780
3,417,200
65,132,980
R7 Canal Appartments
on Plot No: 682-1400, 1401, Dubai Sports City, Dubai, UAE
Type-1(Road side) 60cm dia Contiguous Piles Perimeter 496.0 m
Ex.ground Level 23.25 M DMD
No of Reinforced Piles = 792 Nos Excavation Level 13.31 M DMD
No of Non-Reinforced Piles = 0 Nos Toe level 9.75 M DMD
Total Piles = 792 Nos Road side R
Platform level = 21.25 M BM 301 kn.m
Pile Toe Level = 9.75 M S.F 120 Kn
Cut-off level = 20.65 M Anchor 1 160 @ 1.89 m
Concreting level = 21.25 M
Boring Length = 11.500 m
Concreting Length = 11.500 m
Cut-off Length = 10.900 m
Pile Diameter = 0.600 m
Concrete Wastage = 20%
Concrete Cover = 0.075 m
Reinforcement Details
Main Bars Length Over lap Helicals
Type T1 8 T 25 mm , 12 m 0.00 m Type H1 T 10 @ 150 mm 10.90 m
Type T2 8 T 25 mm , 0m 0.00 m Type H2 T 10 @ 150 mm 0.00 m
Type T3 8 T 25 mm , 0m 0.00 m Type H3 T 10 @ 150 mm 0.00 m