Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

441-9750 Doowon

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

조 정 데 이 터

Ass'y No. : 1 0 1 4 4 1 - 9 7 5 0
Engine Model: C240
INJ. PUMP CALIBRATION DATA A kind of car:
Drawing No. : Company : DAEWOO HEAVY
General Ass'y No. : Date : 1992. 06. 31.
Injection Pump Governor Timing Device
1 0 1 0 4 4 - 9 1 4 0 1 0 5 4 1 9 - 1 0 0 0 1 0 5 6 2 1 - 0 3 7 0
PES4A EP/RSV EP/SCD
1. Test Conditions :
Pump rotation : Clockwise (Viewed from drive side)
Nozzle & Nozzle Holder Ass'y : 105780-8140(BOSCH Type No. EF8511/9A)
Nozzle Holder : 105780-2080(BOSCH Type No. EF8511/9)
Nozzle : 105780-0000(BOSCH Type No.DN12SD12T)
Nozzle opening pressure : 175 Kgf/㎠ Transfer pump pressure : 1.6 Kgf/㎠
Injection pipe : 2 mm × 6 mm × 600 mm Oil temp. : 40℃ +5℃
Test oil : ISO 4113 or SAE Standard test oil(SAE J967D)
Overflow valve opening pressure : Kgf/㎠
2. Injection Timing :
Pre- stroke : No. 1 plunger 3.25 ±0.05 mm
Note : Adjust with control rack position of mm
Injection order : 1 ∼ 3 ∼ 4 ∼ 2 (Interval 90˚±30′)
Plunger are numbered from the Drive side
Tappet clearance : Bolt adjustment type → More than 0.3mm for all cylinders.
Shim adjustment type → Manually rotate the camshaft 2~3 times and
confirm that it rotates smoothly.
3. Injection Quantity :
Adjusting Rack Pump Injection Q'ty Max. var. B.C.S
point position speed (cc/1000st) bet. cyl. Fixed pressure Remarks
(mm) (r/min) ( % ) (mmHg)
A 12.0 1,300 39.2±1.0 ±2.5 Rack
≒9.0 525 9.5±1.1 ±14 Rack
A 12.0 1,300 39.2±1.0 Lever
B 12.9 750 39.3±1.6 ±4 Lever

4. Timing Advance Specification :


Pump Speed
(r/min) 450 ~ 550 800 1,050 1,300
Advance Angle Finish
(˚) Start 1.0±0.5 1.95±0.75 3.3±0.5 (6.0)
DOOWON PRECISION INDUSTRY Co., Ltd.
DPICO Service Department
503-5,SHINSA-DONG,KANGNAM-GU,SEOUL,KOREA TEL:(02)510-7241∼6, FAX:(02)510-7111
3. Governor Adjustment Ass'y No.: 1 0 1 4 4 1 - 9 7 5 0
Unindication of acommon difference the rack : ±0.05
Recommended speed droop adjustment screw position :4
(notches from fully tightened position)

20.0 +1.0 Rack limit:17.5

B
12.9
A
Control Rack Position(mm)

12.0

11.5

8.5 H

6.9

525 (1180) 1435±15


900±30 1300
+20
+10
Pump speed(rpm)
B.C.S. Adjustment Variable speed specification Timing setting
At No.1 plunger beginning of
injection position.
BTDC : 14˚
≒60˚

Coupling key
groove position

Speed Control Lever Angle Load Control Lever Angle Stop Lever Angle

Full speed 。 Nomal



5

±
5

19˚

±
Idling
53˚

4˚±5 。
Stop
24˚±5 。

You might also like