Road Slope Protection and Flood Control Pow Template Rev. 9
Road Slope Protection and Flood Control Pow Template Rev. 9
Road Slope Protection and Flood Control Pow Template Rev. 9
Red / Orange
- Flourescent for day
WORKMEN AHEAD 2 pcs - 6m L50 x 50
T1-5 900 X 600 Black use (Short Term) ₱5,500.00 ₱1,360.00 ₱68.00 ₱214.20 ₱7,142.20 6.52
(T1-5) x 3mm
- Flourescent for
night use (Long Term)
SPEED RESTRICTION 600 x 800 Black 240 CDN White Reflectorized 2 pcs - 6m L50 x 50
R4-1 ₱5,400.00 ₱1,360.00 ₱68.00 ₱214.20 ₱7,042.20 6.43
(R4-1) (size B) Circle - 600 dia. RedRed circle- Reflectorized x 3mm
EXECUTIVE SUMMARY
Program of Work
2. PROJECT TITLE : 0
0
0
3. LIMITS :
4. LOCATION : 0
7. SOURCE OF FUNDS : 0
LENARD PANUGALINOG
OIC - Chief Planning & Design Section
DETAILED CALCULATIONS ON COST OF CONSTRUCTION SAFETY AND HEALTH
OUTPUT NO. OF
MAN- SAFETY SAFETY SAFETY WORKING RAIN EAR BODY RUBBER EYE
ITEM NO. DESCRIPTION QUANTITY PER WORKERS PERSONN DAYS LANYARD
DAYS HELMET SHOES VEST GLOVES COATS MUFFS HARNESS BOOTS GOGGLES
HOUR EL
Foreman 1 0 0 0 0 0 0 0 0
Individual Removal of Trees, 150 - 300 mm dia., 1.00
100(3)a1 0.00 Skilled Laborer 1 0 0 0 0 0 0 0 0
Small
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Individual Removal of Trees, 301 - 500 mm dia., 1.00
100(3)a2 0.00 Skilled Laborer 1 0 0 0 0 0 0 0 0
Small
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Individual Removal of Trees, 501 - 750 mm dia., 1.00
100(3)a3 0.00 Skilled Laborer 1 0 0 0 0 0 0 0 0
Small
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Individual Removal of Trees, 751 - 900 mm dia., 1.00
100(3)a4 0.00 Skilled Laborer 1 0 0 0 0 0 0 0 0
Small
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Removal of Actual Structures/Obstruction, 0.10m 60.00
101(3)c2 0.00 Skilled Laborer 0 0 0 0 0 0 0 0
thk., ACP
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(3)b2 Removal of Actual Structures/Obstruction, 0.20m thic 0.00 46.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(3)b3 Removal of Actual Structures/Obstruction, 0.23m thic 0.00 40.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(3)b4 Removal of Actual Structures/Obstruction, 0.25m thic 0.00 37.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(3)b5 Removal of Actual Structures/Obstruction, 0.28m thic 0.00 33.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(4)a1 Removal of Actual Structures/Obstruction, 610mm di 0.00 6.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(4)a2 Removal of Actual Structures/Obstruction, 760mm di 0.00 5.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(4)a3 Removal of Actual Structures/Obstruction, 910mm di 0.00 4.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(4)a4 Removal of Actual Structures/Obstruction, 1070mm d 0.00 4.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
101(4)a5 Removal of Actual Structures/Obstruction, 1220mm d 0.00 3.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
102(4) Surplus Unclassified Excavation 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
103(1)a Structure Excavation, Common Soil 0.00 20.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 3 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
103(1)b Structure Excavation, Soft Rock 0.00 14.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 3 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
103(6)a Pipe culverts and drain excavation, Common Soil 0.00 20.00 Skilled Laborer 0 0 0 0 0 0 0 0 0
Unskilled Laborer 3 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
103(6)b Pipe culverts and drain excavation, Soft Rock 0.00 14.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 3 0 0 0 0 0 0 0 0
Foreman 2 0 0 0 0 0 0 0 0
104(1)a Embankment from Roadway Excavation, Common Soi 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
104(2)a Embankment from borrow, Common Soil 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
105(1)a Subgrade Preparation (Common Material) 0.00 300.00
105(1)a Subgrade Preparation (Common Material) 0.00 300.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
200(1) Aggregate Subbase Course 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
201(1) Aggregate Base Course 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
300(1) Gravel Surface Course 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
300(2) Crushed Aggregate Surface Course 0.00 50.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - MC - Cut-back Asphalt, 0.30
301(1)a 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 30
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - MC - Cut-back Asphalt, 0.30
301(1)b 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 70
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - MC - Cut-back Asphalt, 0.30
301(1)c 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 250
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - MC - Cut-back Asphalt, 0.30
301(1)d 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 800
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - MC - Cut-back Asphalt, 0.30
301(1)e 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 3000
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - RC - Cut-back Asphalt, 150.00
301(2)a 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 70
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - RC - Cut-back Asphalt, 0.30
301(2)b 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 250
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - RC - Cut-back Asphalt, 0.30
301(2)c 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 800
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Prime Coat - RC - Cut-back Asphalt, 0.30
301(2)d 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Grade 3000
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 0.30
302(1)a 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
70
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 0.30
302(1)b 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
250
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 0.30
302(1)c 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
800
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 0.30
302(1)d 0.00 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
3000
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
302(2) Emulsified Asphalt 0.00 428.57 Skilled Laborer 0 0 0 0 0 0 0 0 0 0
Unskilled Laborer 3 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Wearing Course, Hot- 285.51
310(1)a 0.00 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Laid, 30mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Wearing Course, Hot- 214.13
310(1)b 0.00 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Laid, 40mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Wearing Course, Hot- 171.30
310(1)c 0.00 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Laid, 50mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Binder Course, Hot- 285.51
310(2)a 0.00 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Laid, 30mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Binder Course, Hot- 214.13
310(2)b 0.00 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Laid, 40mm thk.
Bituminous Concrete Surface Binder Course, Hot- 214.13
310(2)b 0.00
Laid, 40mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Bituminous Concrete Surface Binder Course, Hot- 171.30 Skilled Laborer
310(2)c 0.00 4 0 0 0 0 0 0 0 0 0
Laid, 50mm thk.
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Portland Cement Concrete Pavement (Unreinforced), 80.50 Skilled Laborer
311(1)b1 0.00 4 0 0 0 0 0 0 0 0 0
0.20m thk., 14 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0 CEDRICK DURANTE:
Foreman 1 0 0 0 0 0 0 0 0 0 Isame ang values sa 311
Portland Cement Concrete Pavement (Unreinforced), 80.50 Skilled Laborer
311(1)b2 0.00 4 0 0 0 0 0 0 0 0 0 need unifrom
0.20m thk., 7 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0 CEDRICK DURANTE:
Foreman 1 0 0 0 0 0 0 0 0 0 Isame ang values sa 311
Portland Cement Concrete Pavement (Unreinforced), 70.00 Skilled Laborer
311(1)c1 0.00 4 0 0 0 0 0 0 0 0 0 need unifrom
0.23m thk., 14 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Portland Cement Concrete Pavement (Unreinforced), 57.50 Skilled Laborer
311(1)e1 0.00 4 0 0 0 0 0 0 0 0 0
0.28m thk., 14 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Portland Cement Concrete Pavement (Unreinforced), 53.67 Skilled Laborer
311(1)f1 0.00 4 0 0 0 0 0 0 0 0 0
0.30m thk., 14 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
Portland Cement Concrete Pavement (Reinforced), 6.00 Skilled Laborer
311(2)f1 0.00 4 0 0 0 0 0 0 0 0 0
0.30m thk., 14 days
Unskilled Laborer 12 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
404(1)a Reinforcing Steel, Grade 40 0.00 180.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 8 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0 0
405(1)a3 Structural Concrete, 20.68MPa (Class A) - 28 Days 0.00 1.40 Skilled Laborer 4 0 0 0 0 0 0 0 0 0
Unskilled Laborer 8 0 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
500(3)b1 Lined Canal, Concrete, Rectangular 0.00 1.75 Skilled Laborer 3 0 0 0 0 0 0 0 0
Unskilled Laborer 8 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
500(1)b1 Pipe Culverts, 610mm Ø, Class IV RCPC 0.00 1.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
500(1)b3 Pipe Culverts, 910mm Ø, Class IV RCPC 0.00 1.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
500(1)b5 Pipe Culverts, 1220mm Ø, Class IV RCPC 0.00 1.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
505(2)a Grouted Riprap, Class A 0.00 1.25 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 8 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
506(1) Stone Masonry 0.00 1.60 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 8 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
509(1)b1 Sheet Piles, Steel (Slope Protection) 0.00 10.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
603(3)a1 Metal Guardrail (Metal Beam) Including Post, Single 0.00 4.20 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 4 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
607(3)b Internally Illuminated (Solar) Pavement Levelled Mark 0.00 4.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
612(1) Reflectorized Thermoplastic Pavement Markings (Whit 0.00 25.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 6 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
612(2) Reflectorized Thermoplastic Pavement Markings (Yell 0.00 25.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 6 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
618(1) Reflectorized Thermoplastic Rumble Strips 0.00 25.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
Unskilled Laborer 6 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Single Arm 8m-Pole Solar LED Roadway Lighting, 1.00 Skilled Laborer
624(9)a1 0.00 2 0 0 0 0 0 0 0 0
60W, 1.5m Mast Arm Length, 250kph Wind Speed
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Single Arm 8m-Pole Solar LED Roadway Lighting, 1.00 Skilled Laborer
624(9)a1 0.00 2 0 0 0 0 0 0 0 0
120W, 1.5m Mast Arm Length, 250kph Wind Speed
Unskilled Laborer 2 0 0 0 0 0 0 0 0
Foreman 1 0 0 0 0 0 0 0 0
Single Arm 12m-Pole Solar LED Roadway Lighting, 1.00
624(9)a4 0.00 Skilled Laborer 2 0 0 0 0 0 0 0 0
120W, 1.5m Mast Arm Length, 250kph Wind Speed
Unskilled Laborer 2 0 0 0 0 0 0 0 0
A. TOTAL PERSONNEL/MAN-DA 465 0 0 0 0 0 0 0 0 0 0 0 0
B. SERVICE LIFE, days 730.00 365.00 180.00 3.00 730.00 730.00 730.00 730.00 365.00 60.00
C. PURCHASE COST, Php 952.00 980.00 455.00 39.25 300.00 676.00 1,100.00 1,263.85 345.00 111.00
D. UNIT COST/MAN-DAYS (C/B) 1.30 2.68 2.53 13.08 0.41 0.93 1.51 1.73 0.95 1.85
E. DIRECT COST FOR PPE's (D x A(Man-days)) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
FORM POW-2015-01-00
PROGRAM OF WORKS/BUDGET COST
ORIGINAL
Date
Project : Appropriation : 50,000,000.00
Source of Fund :
Target Start Date : Upon Approval
Project ID : Total Project Duration : 178 C.D.
Location :
Project Description : Road Widening (PCCP) - National Primary Road
Road Length : 2632.00 m
Total Road Lane Length : m
Inner Road Width : m
Total Road Lane Length : lane-m
Outer lane width : m
Inner Road Width : m
Road Width : 6.70 m
Pavement Thickness : 0.30 m
Shouldering Width : 0.00 m
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
TEDDIE B. YAP LENARD PANUGALINOG Name & Signature NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
ENGINEER I ENGINEER II Position Title OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Planning & Design Section OIC - Chief Planning & Design Section Planning Division
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
FORM ABC-2015-02-00
0
0
0
0
AS SUBMITTED - 25.00% - - - -
PART C EARTHWORK
AS EVALUATED
AS SUBMITTED - 20.00% - - - -
PART D SUBBASE AND BASE COURSE
AS EVALUATED
AS SUBMITTED - 20.00% - - - -
PART E SURFACE COURSES
AS EVALUATED
AS SUBMITTED - 20.00% - - - -
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED
AS SUBMITTED - 20.00% - - - -
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
TEDDIE B. YAP LENARD PANUGALINOG Name & Signature NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
ENGINEER I ENGINEER II Position Title OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
Planning & Design Section OIC - Chief Planning & Design Section Planning Division
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
PART A FACILITIES FOR THE ENGINEER
AS SUBMITTED 1.00 L.S. 118,720.24 25% 29,680.06 7,420.02 37,100.08 155,820.32 155,820.32
A.1.1(3) Construction of Field Office for The Engineer
AS EVALUATED
AS SUBMITTED 6.83 month 171,901.81 25% 42,975.45 10,743.86 53,719.31 225,621.12 33,033.84
A.1.1(16) Operation and Maintenance of Field Office for the Engineer
AS EVALUATED
AS SUBMITTED 1.00 Unit 1,200,000.00 0% - 60,000.00 60,000.00 1,260,000.00 1,260,000.00
A.1.2 (3) Provision of 4x2 Pickup Type Service Vehicle for the Engineer
AS EVALUATED
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer AS SUBMITTED - month - 0% - - - - #DIV/0!
A.1.2(2)
on Bare Rental Basis AS EVALUATED
Operation and Maintenance of 4x4 Pick Up Type Service Vehicle AS SUBMITTED - month - 25% - - - - #DIV/0!
A.1.2(5)
for the Engineer AS EVALUATED
Provision of Survey Equipment for the Assistance to the AS SUBMITTED - L.S. - 25% - - - - #DIV/0!
A.1.3(2)
Engineer AS EVALUATED
AS SUBMITTED 1,490,622.05 72,655.51 78,163.88 150,819.39 1,641,441.44
TOTAL OF PART A
AS EVALUATED
PART B OTHER GENERAL REQUIREMENTS
AS SUBMITTED - L.S. - 25% - - - - #DIV/0!
B.3 Permits and Clearances
AS EVALUATED
AS SUBMITTED 1.00 L.S. 141,072.00 25% 35,268.00 8,817.00 44,085.00 185,157.00 185,157.00
B.4(10) Miscellaneous Survey and Staking
AS EVALUATED
AS SUBMITTED 3.00 each 13,972.17 25% 3,493.04 873.26 4,366.30 18,338.47 6,112.82
B.5 Project Billboard/Sign Board
AS EVALUATED
AS SUBMITTED 1.00 L.S. 128,142.84 25% 32,035.71 8,008.93 40,044.64 168,187.48 168,187.48
B.7 (2) Occupational Safety and Health Program
AS EVALUATED
AS SUBMITTED 6.83 month 310,675.12 10% 31,067.51 17,087.13 48,154.64 358,829.76 52,537.30
B.8 (1) Traffic Management
AS EVALUATED
AS SUBMITTED 1.00 L.S. 162,642.12 0% - 8,132.11 8,132.11 170,774.23 170,774.23
B.9 Mobilization/Demobilization
AS EVALUATED
AS SUBMITTED 1.00 L.S. 101,110.46 25% 25,277.62 6,319.40 31,597.02 132,707.48 132,707.48
B.12 Removal and Relocation of Utilities
AS EVALUATED
AS SUBMITTED 857,614.71 127,141.88 49,237.83 176,379.71 1,033,994.42
TOTAL OF PART B
AS EVALUATED
PART C EARTHWORK
AS SUBMITTED - each - 25% - - - - #DIV/0!
100(3)a1 Individual Removal of Trees, 150 - 300 mm dia., Small
AS EVALUATED
AS SUBMITTED - each - 25% - - - - #DIV/0!
100(3)a2 Individual Removal of Trees, 301 - 500 mm dia., Small
AS EVALUATED
AS SUBMITTED - each - 25% - - - - #DIV/0!
100(3)a3 Individual Removal of Trees, 501 - 750 mm dia., Small
AS EVALUATED
AS SUBMITTED - each - 25% - - - - #DIV/0!
100(3)a4 Individual Removal of Trees, 751 - 900 mm dia., Small
AS EVALUATED
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
AS SUBMITTED - l.s. - 25% - - - - #DIV/0!
101(1) Removal of Structures and Obstructions
AS EVALUATED
Removal of Actual Structures/Obstruction, 0.20m thick, PCCP AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
101(3)b2
(Unreinforced) AS EVALUATED
Removal of Actual Structures/Obstruction, 0.23m thick, PCCP AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
101(3)b3
(Unreinforced) AS EVALUATED
Removal of Actual Structures/Obstruction, 0.25m thick, PCCP AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
101(3)b4
(Unreinforced) AS EVALUATED
Removal of Actual Structures/Obstruction, 0.28m thick, PCCP AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
101(3)b5
(Unreinforced) AS EVALUATED
Removal of Actual Structures/Obstruction, 0.30m thick, PCCP AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
101(3)b6
(Unreinforced) AS EVALUATED
AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
101(3)c2 Removal of Actual Structures/Obstruction, 0.10m thk., ACP
AS EVALUATED
AS SUBMITTED - ea - 25% - - - - #DIV/0!
101(4)a1 Removal of Actual Structures/Obstruction, 610mm dia., RCPC
AS EVALUATED
AS SUBMITTED - ea - 25% - - - - #DIV/0!
101(4)a2 Removal of Actual Structures/Obstruction, 760mm dia., RCPC
AS EVALUATED
AS SUBMITTED - ea - 25% - - - - #DIV/0!
101(4)a3 Removal of Actual Structures/Obstruction, 910mm dia., RCPC
AS EVALUATED
AS SUBMITTED - ea - 25% - - - - #DIV/0!
101(4)a4 Removal of Actual Structures/Obstruction, 1070mm dia., RCPC
AS EVALUATED
AS SUBMITTED - ea - 25% - - - - #DIV/0!
101(4)a5 Removal of Actual Structures/Obstruction, 1220mm dia., RCPC
AS EVALUATED
AS SUBMITTED - cu.m. - 25% - - - - #DIV/0!
102(4) Surplus Unclassified Excavation
AS EVALUATED
AS SUBMITTED 0.00 cu.m. - 25% - - - - #DIV/0!
103(1)a Structure Excavation, Common Soil
AS EVALUATED
AS SUBMITTED 0.00 cu.m. - 25% - - - - #DIV/0!
103(1)b Structure Excavation, Soft Rock
AS EVALUATED
AS SUBMITTED 0.00 cu.m. - 25% - - - - #DIV/0!
103(3) Foundation Fill
AS EVALUATED
AS SUBMITTED 0.00 cu.m. - 25% - - - - #DIV/0!
103(6)a Pipe culverts and drain excavation, Common Soil
AS EVALUATED
AS SUBMITTED 0.00 cu.m. - 25% - - - - #DIV/0!
103(6)b Pipe culverts and drain excavation, Soft Rock
AS EVALUATED
AS SUBMITTED - cu.m. - 25% - - - - #DIV/0!
104(1)a Embankment from Roadway Excavation, Common Soil
AS EVALUATED
AS SUBMITTED - cu.m. - 25% - - - - #DIV/0!
104(2)a Embankment from borrow, Common Soil
AS EVALUATED
AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
105(1)a Subgrade Preparation (Common Material)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
105(1)a Subgrade Preparation (Common Material)
AS EVALUATED
AS SUBMITTED - - - - -
TOTAL OF PART C
AS EVALUATED
PART D SUBBASE AND BASE COURSE
AS SUBMITTED - cu.m. - 25% - - - - #DIV/0!
200(1) Aggregate Subbase Course
AS EVALUATED
AS SUBMITTED - cu.m. - 25% - - - - #DIV/0!
201(1) Aggregate Base Course
AS EVALUATED
AS SUBMITTED - - - - -
TOTAL OF PART D
AS EVALUATED
PART E SURFACE COURSES
AS SUBMITTED - cu.m - 25% - - - - #DIV/0!
300(1) Gravel Surface Course
AS EVALUATED
AS SUBMITTED - cu.m - 25% - - - - #DIV/0!
300(2) Crushed Aggregate Surface Course
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(1)a Bituminous Prime Coat - MC - Cut-back Asphalt, Grade 30
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(1)b Bituminous Prime Coat - MC - Cut-back Asphalt, Grade 70
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(1)c Bituminous Prime Coat - MC - Cut-back Asphalt, Grade 250
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(1)d Bituminous Prime Coat - MC - Cut-back Asphalt, Grade 800
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(1)e Bituminous Prime Coat - MC - Cut-back Asphalt, Grade 3000
AS EVALUATED
AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
301(2)a Bituminous Prime Coat - RC - Cut-back Asphalt, Grade 70
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(2)b Bituminous Prime Coat - RC - Cut-back Asphalt, Grade 250
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(2)c Bituminous Prime Coat - RC - Cut-back Asphalt, Grade 800
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
301(2)d Bituminous Prime Coat - RC - Cut-back Asphalt, Grade 3000
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
302(1)a Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 70
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
302(1)b Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 250
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
302(1)c Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 800
AS EVALUATED
AS SUBMITTED - mt - 25% - - - - #DIV/0!
302(1)d Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 3000
AS EVALUATED
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
302(2) Emulsified Asphalt
AS EVALUATED
Bituminous Concrete Surface Wearing Course, Hot-Laid, 30mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(1)a
thk. AS EVALUATED
Bituminous Concrete Surface Wearing Course, Hot-Laid, 40mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(1)b
thk. AS EVALUATED
Bituminous Concrete Surface Wearing Course, Hot-Laid, 50mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(1)c
thk. AS EVALUATED
Bituminous Concrete Surface Binder Course, Hot-Laid, 30mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(2)a
thk. AS EVALUATED
Bituminous Concrete Surface Binder Course, Hot-Laid, 40mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(2)b
thk. AS EVALUATED
Bituminous Concrete Surface Binder Course, Hot-Laid, 50mm AS SUBMITTED - sq.m - 25% - - - - #DIV/0!
310(2)c
thk. AS EVALUATED
Portland Cement Concrete Pavement (Unreinforced), 0.20m AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(1)b1
thk., 14 days AS EVALUATED
Portland Cement Concrete Pavement (Unreinforced), 0.20m AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(1)b2
thk., 7 days AS EVALUATED
Portland Cement Concrete Pavement (Unreinforced), 0.23m AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(1)c1
thk., 14 days AS EVALUATED
Portland Cement Concrete Pavement (Unreinforced), 0.28m AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(1)e1
thk., 14 days AS EVALUATED
Portland Cement Concrete Pavement (Unreinforced), 0.30m AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(1)f1
thk., 14 days AS EVALUATED
Portland Cement Concrete Pavement (Reinforced), 0.30m thk., AS SUBMITTED - sq.m. - 25% - - - - #DIV/0!
311(2)f1
14 days AS EVALUATED
AS SUBMITTED - - - - -
TOTAL OF PART E
AS EVALUATED
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CEBU 4TH DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VII
Poblcion, Dalaguete, Cebu
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
0
0
0
0
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 178 Calendar Days
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
Single Arm 12m-Pole Solar LED Roadway Lighting, 120W, 1.5m AS SUBMITTED - each - 25% - - - - #DIV/0!
624(9)a4
Mast Arm Length, 250kph Wind Speed AS EVALUATED
AS SUBMITTED - - - - -
TOTAL OF PART H
AS EVALUATED
AS SUBMITTED 2,348,236.76 199,797.39 127,401.71 327,199.10 2,675,435.86
GRAND TOTAL
AS EVALUATED
Preparation and Submission: Evaluation:
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost:
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
Source: Cebu 4th DEO Jursidiction
Paved Flat to Flat Paved from DEO going to project site = Distance, D= 19.00 km
Free Hauling (5km) free hauling distance= 5.00 km
Net Hauling Distance = 14.00 km
Total Rate of Cargo Truck for One Cycle = 783 per hour x 0.74 hours = 576.36
Laborer for loading & Unloading = 2 Laborers x 54.98 /hour x 0.74 = 80.94
Total Rate of Cargo Truck for One Cycle = 783 per hour x 0.35 hours = 275.62
Laborer for loading & Unloading = 2 Laborers x Labor Rates x 0.35 = 38.71
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
Source: Tagbilaran City, Bohol
Paved Flat to Flat Paved from DEO going to project site = Distance, D= 89.00 km
free hauling distance= 5.00 km
Net Hauling Distance = 84.00 km
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
Source: Cansibu-an Quarry, Cansibuan, Antequera, Bohol
Paved Flat to Flat Paved from Quarry going to project site = Distance, D= 12.40 km
free hauling distance= 5.00 km
Net Hauling Distance = 7.40 km
Location:
I. Equipment
1.00 unit Dumptruck (20 cu.m.) @P 13,597.68 = P 13,597.68
II. Labor
1.00 unit Laborer @P 482.47 = P 482.47
Hauling Equiptment Used: Dumptruck 10.00 cu.m. (Loading Capacity: 300 bags/trip)
Average Hauling Distance = 40.12 km - from source to site
Less Free Hauling Distance = 5.00 km
Hauling Distance = 35.12 km
I. Equipment
II. Labor
Total Unit Price of Cement = Pick-up Price + Hauling Price per Bag
= 233.00 + 42.92
= 275.92 /bag
Hauling Equiptment Used: Dumptruck 10.00 cu.m. (Loading Capacity: 300 bags/trip)
Average Hauling Distance = 123.10 km - from source to site
Less Free Hauling Distance = 5.00 km
Hauling Distance = 118.10 km
I. Equipment
II. Labor
Total Unit Price of Reinforcing Steel = Pick-up Price + Hauling Price per kilogram
= 65.00 + 1.04
= 66.04 /kg.
Paved Roads
Hauling Equiptment Used: Cargo Truck Loading Capacity 10 pc/trip
Average Hauling Distance = 40.12 km - from source to site
Less Free Hauling Distance = - km
Hauling Distance = 40.12 km
Unpaved Roads
Hauling Equiptment Used: Cargo Truck Loading Capacity 10 pc/trip
Average Hauling Distance = - km - from source to site
Less Free Hauling Distance = - km
Hauling Distance = - km
Manual Hauling
Average Hauling Distance = - km - from truck to actual work site
Manual Loading Capacity = 1.00 pcs/load (0.25pcs/ load per labor)
Manpower = 4.00 Laborer (1 Gang = 1 Leadman and 4 Laborer)
Loading Time = - hr
Unloading Time = - hr
No. of Truck Cycle per day = 1.19 cycle (8 Working Hours per day/Total Cycle Time)
No. of Manual Hauling per day = - cycle (8 Working Hours per day/Total Cycle Time)
Output of Manual Labor per day = - pcs/day (hrs/cycle divided by Manual Loading Capacity)
B. Detailed Unit Price for Hauling:
I. Equipment
II. Labor
8.76 kms.
26.41 kms.
DEO OFFICE
K0084+000
5.05 km from source
SOURCE : PMSC
K0089+050
42.95 kms.
PROJECT SITE
K0131+000 - K0133+000
42.95 km from source
0
0
0
0
ITEMIZED BREAKDOWN
DIRECT COST
TOTAL UNIT COST
QUANTITY % DIRECT COST
(DIRECT+INDIRECT)
ITEM NO. DESCRIPTION UNIT TOTAL UNIT COST
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALAUTED AS SUBMITTED AS EVALAUTED
A.1.1(3) Construction of Field Office for The Engineer 1.00 L.S. 118,720.24 118,720.24 155,820.32 5.06
B.4(10) Miscellaneous Survey and Staking 1.00 L.S. 141,072.00 141,072.00 185,157.00 6.01
B.5 Project Billboard/Sign Board 3.00 each 13,972.17 4,657.39 6,112.82 0.60
B.7 (2) Occupational Safety and Health Program 1.00 L.S. 128,142.84 128,142.84 168,187.48 5.46
B.8 (1) Traffic Management 6.83 month 310,675.12 45,486.84 52,537.30 13.23
B.12 Removal and Relocation of Utilities 1.00 L.S. 101,110.46 101,110.46 132,707.48 4.31
PART C EARTHWORK
103(6)a Pipe culverts and drain excavation, Common Soil - cu.m. - #DIV/0! #DIV/0! 0.00
103(6)b Pipe culverts and drain excavation, Soft Rock - cu.m. - #DIV/0! #DIV/0! 0.00
104(2)a Embankment from borrow, Common Soil - cu.m. - #DIV/0! #DIV/0! 0.00
TOTAL OF PART C - -
PART D SUBBASE AND BASE COURSE
TOTAL OF PART D - -
TOTAL OF PART E - -
405(1)a3 Structural Concrete, 20.68MPa (Class A) - 28 Days - cu.m. - #DIV/0! #DIV/0! 0.00
TOTAL OF PART G - -
TOTAL OF PART H - -
Operation and Maintenance of Field Office for the As Submitted 7.32 6.83 month - - 25,168.64 171,901.81 - - 25,168.64 171,901.81 25% 42,975.45 10,743.86 225,621.12 33,033.84
A.1.1(16)
Engineer As Evaluated
New Added Item
Provision of 4x2 Pickup Type Service Vehicle for the As Submitted 51.10 1.00 Unit - - - - 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00 0% - 60,000.00 1,260,000.00 1,260,000.00
A.1.2 (3)
Engineer As Evaluated
Provision of 4x4 Pick Up Type Service Vehicle for the As Submitted - - month - - - - 51,013.00 - #DIV/0! - 0% - - - #DIV/0!
A.1.2(2)
Engineer on Bare Rental Basis As Evaluated
Operation and Maintenance of 4x4 Pick Up Type Service As Submitted - - month 7,197.60 - 18,778.20 - - - #DIV/0! - 25% - - - #DIV/0!
A.1.2(5)
Vehicle for the Engineer As Evaluated
Provision of Survey Equipment for the Assistance to the As Submitted - - L.S. 1,400,000.00 - - - - - #DIV/0! - 25% - - - #DIV/0!
A.1.3(2)
Engineer As Evaluated
As Submitted 63.48 45,506.34 187,315.01 1,257,800.70 1,490,622.05 72,655.51 78,163.88 1,641,441.44
TOTAL OF PART A
As Evaluated
PART B OTHER GENERAL REQUIREMENTS
As Submitted - - L.S. - - - - - - #DIV/0! - 25% - - - #DIV/0!
B.3 Permits and Clearances
As Evaluated
As Submitted 6.01 1.00 L.S. 141,072.00 141,072.00 - - - - 141,072.00 141,072.00 25% 35,268.00 8,817.00 185,157.00 185,157.00
B.4(10) Miscellaneous Survey and Staking
As Evaluated
As Submitted 0.60 3.00 each 4,186.91 12,560.73 427.71 1,283.13 42.77 128.31 4,657.39 13,972.17 25% 3,493.04 873.26 18,338.47 6,112.82
B.5 Project Billboard/Sign Board
As Evaluated
As Submitted 5.46 1.00 L.S. - - 128,142.84 128,142.84 0.00 - 128,142.84 128,142.84 25% 32,035.71 8,008.93 168,187.48 168,187.48
B.7 (2) Occupational Safety and Health Program
As Evaluated
As Submitted 13.23 6.83 month 18,758.20 128,118.51 25,168.64 171,901.81 1,560.00 10,654.80 45,486.84 310,675.12 10% 31,067.51 17,087.13 358,829.76 52,537.30
B.8 (1) Traffic Management
As Evaluated
As Submitted 6.93 1.00 L.S. - - - - 162,642.12 162,642.12 162,642.12 162,642.12 0% - 8,132.11 170,774.23 170,774.23
B.9 Mobilization/Demobilization
As Evaluated
As Submitted 4.31 1.00 L.S. 101,110.46 101,110.46 - - 0.00 - 101,110.46 101,110.46 25% 25,277.62 6,319.40 132,707.48 132,707.48
B.12 Removal and Relocation of Utilities
As Evaluated
As Submitted 36.52 382,861.70 301,327.78 173,425.23 857,614.71 127,141.88 49,237.83 1,033,994.42
TOTAL OF PART B
As Evaluated
PART C EARTHWORK
As Submitted - - each 100.00 - 101.34 - 1,104.57 - #DIV/0! - 25% - - - #DIV/0!
100(3)a1 Individual Removal of Trees, 150 - 300 mm dia., Small
As Evaluated
As Submitted - - each 100.00 - 205.75 - 2,181.26 0.00 #DIV/0! - 25% - - - #DIV/0!
100(3)a2 Individual Removal of Trees, 301 - 500 mm dia., Small
As Evaluated
As Submitted - - each 100.00 - 1,022.61 - 10,962.02 0.00 #DIV/0! - 25% - - - #DIV/0!
100(3)a3 Individual Removal of Trees, 501 - 750 mm dia., Small
As Evaluated
As Submitted - - each 100.00 - 2,048.29 - 21,896.17 0.00 #DIV/0! - 25% - - - #DIV/0!
100(3)a4 Individual Removal of Trees, 751 - 900 mm dia., Small
As Evaluated
As Submitted - - l.s. - - 538,296.76 - 2,470,576.64 - #DIV/0! - 25% - - - #DIV/0!
101(1) Removal of Structures and Obstructions
As Evaluated
Removal of Actual Structures/Obstruction, 0.20m thick, As Submitted - - sq.m - - 228.85 - 6,444.18 - #DIV/0! - 25% - - - #DIV/0!
101(3)b2
PCCP (Unreinforced) As Evaluated
Removal of Actual Structures/Obstruction, 0.23m thick, As Submitted - - sq.m - - 228.85 - 6,444.18 - #DIV/0! - 25% - - - #DIV/0!
101(3)b3
PCCP (Unreinforced) As Evaluated
Removal of Actual Structures/Obstruction, 0.25m thick, As Submitted - - sq.m - - 228.85 - 6,444.18 - #DIV/0! - 25% - - - #DIV/0!
101(3)b4
PCCP (Unreinforced)
0
0
0
0
FORM POW-2015-01C-00
Removal of Actual Structures/Obstruction, 0.28m thick, As Submitted - - sq.m - - 228.85 - 6,444.18 - #DIV/0! - 25% - - - #DIV/0!
101(3)b5
PCCP (Unreinforced) As Evaluated
Removal of Actual Structures/Obstruction, 0.30m thick, As Submitted - - sq.m - - 228.85 - 6,444.18 - #DIV/0! - 25% - - - #DIV/0!
101(3)b6
PCCP (Unreinforced) As Evaluated
Removal of Actual Structures/Obstruction, 0.10m thk., As Submitted - - sq.m. - - 228.85 - 6,515.08 - #DIV/0! - 25% - - - #DIV/0!
101(3)c2
ACP As Evaluated
Removal of Actual Structures/Obstruction, 610mm dia., As Submitted - - ea - - 228.85 - 3,874.90 - #DIV/0! - 25% - - - #DIV/0!
101(4)a1
RCPC As Evaluated
Removal of Actual Structures/Obstruction, 760mm dia., As Submitted - - ea - - 228.85 - 3,874.90 - #DIV/0! - 25% - - - #DIV/0!
101(4)a2
RCPC As Evaluated
Removal of Actual Structures/Obstruction, 910mm dia., As Submitted - - ea - - 228.85 - 3,874.90 - #DIV/0! - 25% - - - #DIV/0!
101(4)a3
RCPC As Evaluated
Removal of Actual Structures/Obstruction, 1070mm dia., As Submitted - - ea - - 228.85 - 3,874.90 - #DIV/0! - 25% - - - #DIV/0!
101(4)a4
RCPC As Evaluated
Removal of Actual Structures/Obstruction, 1220mm dia., As Submitted - - ea - - 228.85 - 3,874.90 - #DIV/0! - 25% - - - #DIV/0!
101(4)a5
RCPC As Evaluated
As Submitted - - cu.m. - - 228.85 - 11,844.32 - #DIV/0! - 25% - - - #DIV/0!
102(4) Surplus Unclassified Excavation
As Evaluated
As Submitted - - cu.m. - - 289.16 - 7,976.94 0.00 #DIV/0! - 25% - - - #DIV/0!
103(1)a Structure Excavation, Common Soil
As Evaluated
As Submitted - - cu.m. - - 289.16 - 8,212.17 0.00 #DIV/0! - 25% - - - #DIV/0!
103(1)b Structure Excavation, Soft Rock
As Evaluated
As Submitted - - cu.m. 1,740.03 - 349.47 - 224.06 0.00 #DIV/0! - 25% - - - #DIV/0!
103(3) Foundation Fill
As Evaluated
As Submitted - - cu.m. - - 289.16 - 5,248.71 0.00 #DIV/0! - 25% - - - #DIV/0!
103(6)a Pipe culverts and drain excavation, Common Soil
As Evaluated
As Submitted - - cu.m. - - 289.16 - 6,758.64 0.00 #DIV/0! - 25% - - - #DIV/0!
103(6)b Pipe culverts and drain excavation, Soft Rock
As Evaluated
As Submitted - - cu.m. - - 418.79 - 15,358.44 0.00 #DIV/0! - 25% - - - #DIV/0!
104(1)a Embankment from Roadway Excavation, Common Soil
As Evaluated
As Submitted - - cu.m. 1,891.34 - 228.85 - 5,865.84 0.00 #DIV/0! - 25% - - - #DIV/0!
104(2)a Embankment from borrow, Common Soil
As Evaluated
As Submitted - - sq.m. - - 228.85 - 5,865.84 - #DIV/0! - 25% - - - #DIV/0!
105(1)a Subgrade Preparation (Common Material)
As Evaluated
As Submitted - - - - - - - -
TOTAL OF PART C
As Evaluated
PART D SUBBASE AND BASE COURSE
As Submitted - - cu.m. 2,430.03 - 228.85 - 5,865.84 - #DIV/0! - 25% - - - #DIV/0!
200(1) Aggregate Subbase Course
As Evaluated
As Submitted - - cu.m. 2,119.53 - 228.85 - 5,865.84 - #DIV/0! - 25% - - - #DIV/0!
201(1) Aggregate Base Course
As Evaluated
As Submitted - - - - - - - -
TOTAL OF PART D
As Evaluated
PART E SURFACE COURSES
As Submitted - - cu.m 2,093.08 - 228.85 - 5,865.84 0.00 #DIV/0! - 25% - - - #DIV/0!
300(1) Gravel Surface Course
As Evaluated
As Submitted - - cu.m 2,120.68 - 228.85 - 5,865.84 0.00 #DIV/0! - 25% - - - #DIV/0!
300(2) Crushed Aggregate Surface Course
0
0
0
0
FORM POW-2015-01C-00
Bituminous Prime Coat - MC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(1)c
250 As Evaluated
Bituminous Prime Coat - MC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(1)d
800 As Evaluated
Bituminous Prime Coat - MC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(1)e
3000 As Evaluated
As Submitted - - sq.m - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(2)a Bituminous Prime Coat - RC - Cut-back Asphalt, Grade 70
As Evaluated
Bituminous Prime Coat - RC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(2)b
250 As Evaluated
Bituminous Prime Coat - RC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(2)c
800 As Evaluated
Bituminous Prime Coat - RC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
301(2)d
3000 As Evaluated
As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
302(1)a Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 70
As Evaluated
As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
302(1)b Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 250
As Evaluated
As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
302(1)c Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 800
As Evaluated
Bituminous Tack Coat - RC - Cut-back Asphalt, Grade As Submitted - - mt - - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
302(1)d
3000 As Evaluated
As Submitted - - sq.m 95.59 - 289.16 - 1,445.93 0.00 #DIV/0! - 25% - - - #DIV/0!
302(2) Emulsified Asphalt
As Evaluated
Bituminous Concrete Surface Wearing Course, Hot-Laid, As Submitted - - sq.m 1,125.77 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(1)a
30mm thk. As Evaluated
Bituminous Concrete Surface Wearing Course, Hot-Laid, As Submitted - - sq.m 1,490.88 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(1)b
40mm thk. As Evaluated
Bituminous Concrete Surface Wearing Course, Hot-Laid, As Submitted - - sq.m 1,871.21 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(1)c
50mm thk. As Evaluated
Bituminous Concrete Surface Binder Course, Hot-Laid, As Submitted - - sq.m 1,125.77 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(2)a
30mm thk. As Evaluated
Bituminous Concrete Surface Binder Course, Hot-Laid, As Submitted - - sq.m 1,490.88 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(2)b
40mm thk. As Evaluated
Bituminous Concrete Surface Binder Course, Hot-Laid, As Submitted - - sq.m 1,871.21 - 903.67 - 9,661.50 0.00 #DIV/0! - 25% - - - #DIV/0!
310(2)c
50mm thk. As Evaluated
New Added Item
Portland Cement Concrete Pavement (Unreinforced), As Submitted - - sq.m. 1,445.13 - 1,144.91 - 17,212.64 0.00 #DIV/0! - 25% - - - #DIV/0!
311(1)b1
0.20m thk., 14 days As Evaluated
Portland Cement Concrete Pavement (Unreinforced), As Submitted - - sq.m. 1,445.89 - 1,144.91 - 17,212.64 0.00 #DIV/0! - 25% - - - #DIV/0!
311(1)b2
0.20m thk., 7 days As Evaluated
Portland Cement Concrete Pavement (Unreinforced), As Submitted - - sq.m. 1,654.26 - 1,144.91 - 17,212.64 0.00 #DIV/0! - 25% - - - #DIV/0!
311(1)c1
0.23m thk., 14 days As Evaluated
Portland Cement Concrete Pavement (Unreinforced), As Submitted - - sq.m. 2,001.91 - 1,144.91 - 17,212.64 - #DIV/0! - 25% - - - #DIV/0!
311(1)e1
0.28m thk., 14 days
0
0
0
0
FORM POW-2015-01C-00
Portland Cement Concrete Pavement (Unreinforced), As Submitted - - sq.m. 2,143.00 - 1,144.91 - 17,212.64 - #DIV/0! - 25% - - - #DIV/0!
311(1)f1
0.30m thk., 14 days As Evaluated
Portland Cement Concrete Pavement (Reinforced), 0.30m As Submitted - - sq.m. 5,899.26 - 1,144.91 - 1,392.31 - #DIV/0! - 25% - - - #DIV/0!
311(2)f1
thk., 14 days As Evaluated
As Submitted - - - - - - - -
TOTAL OF PART E
As Evaluated
Metal Guardrail (Metal Beam) Including Post, Single, W- As Submitted - - lm 2,425.34 - 505.95 - 685.33 0.00 #DIV/0! - 25% - - - #DIV/0!
603(3)a1
Beam As Evaluated
As Submitted - - ea 13,743.01 - 307.09 - 376.60 0.00 #DIV/0! - 25% - - - #DIV/0!
605(6)e2 Hazard Markers, 600x800mm, Chevron Signs
As Evaluated
Internally Illuminated (Solar) Pavement Levelled Marker/ As Submitted - - each 8,264.48 - 385.33 - 2,646.91 - #DIV/0! - 25% - - - #DIV/0!
607(3)b
Stud Flush Type G105 (Bi-Directional) As Evaluated
As Submitted - - each 35.00 - - - 1,352.20 - #DIV/0! - 25% - - - #DIV/0!
611(1) Trees (Furnishing and Transplanting)
As Evaluated
As Submitted - - sq.m. 429.05 - 626.57 - 1,788.93 - #DIV/0! - 25% - - - #DIV/0!
612(1) Reflectorized Thermoplastic Pavement Markings (White)
As Evaluated
As Submitted - - sq.m. 496.27 - 626.57 - 1,788.93 - #DIV/0! - 25% - - - #DIV/0!
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow)
As Evaluated
As Submitted - - m² 429.05 - 626.57 - 1,788.93 - - - 25% - - - #DIV/0!
618(1) Reflectorized Thermoplastic Rumble Strips
As Evaluated
Single Arm 8m-Pole Solar LED Roadway Lighting, 60W, As Submitted - - each 120,031.35 - 385.33 - 1,671.07 - #DIV/0! - 25% - - - #DIV/0!
624(9)a1
1.5m Mast Arm Length, 250kph Wind Speed As Evaluated
Single Arm 8m-Pole Solar LED Roadway Lighting, 120W, As Submitted - - each 126,411.35 - 385.33 - 1,671.07 0.00 #DIV/0! - 25% - - - #DIV/0!
624(9)a1
1.5m Mast Arm Length, 250kph Wind Speed As Evaluated
Single Arm 12m-Pole Solar LED Roadway Lighting, 120W, As Submitted - - each 134,871.35 - 385.33 - 1,671.07 0.00 #DIV/0! - 25% - - - #DIV/0!
624(9)a4
1.5m Mast Arm Length, 250kph Wind Speed As Evaluated
As Submitted - - - - - - - -
TOTAL OF PART G
0
0
0
0
FORM POW-2015-01C-00
FORM POW-2015-01B-00
MINIMUM EQUIPMENT REQUIREMENT
Number of Number of
No. Equipment Description Capacity No. Equipment Description Capacity
Equipment Equipment
1 4x4 Pick-Up Type Service Vehicle 1 31 Cutting Outfit 1
PROJECT NAME : 0
0
0
LOCATION : 0
Formula :
C.D. = ( Dh - Dl ) x ( Ap - Al)
+ Dl
( Ah - Al )
Where :
Dh = 196
Dl = 148
Ah = 100,000,000.00
Al = 50,000,000.00
Ap = 50,000,000.00
= 148
= 148 Total Working Days
BACKUP COMPUTATION
PART C - EARTHWORK
ITEM 100(3)a1 Individual Removal of Trees, 150 - 300 mm dia., Small
No of Trees ea
ITEM 100(3)a2 Individual Removal of Trees, 301 - 500 mm dia., Small
No of Trees ea
ITEM 100(3)a3 Individual Removal of Trees, 501 - 750 mm dia., Small
No of Trees ea
ITEM 100(3)a4 Individual Removal of Trees, 751 - 900 mm dia., Small
No of Trees ea
ITEM 101(1) Removal of Structures and Obstructions
L.S L.S
BACKUP COMPUTATION
BACKUP COMPUTATION
0.00 mt
ITEM 302(1)b Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 250
0.00 mt
ITEM 302(1)c Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 800
0.00 mt
ITEM 302(1)d Bituminous Tack Coat - RC - Cut-back Asphalt, Grade 3000
0.00 mt
ITEM 302(2) Emulsified Asphalt
Area 0.00 0.00 0.00 m²
ITEM 310(1)a Bituminous Concrete Surface Wearing Course, Hot-Laid, 30mm thk.
0.00 m²
ITEM 310(1)b Bituminous Concrete Surface Wearing Course, Hot-Laid, 40mm thk.
0.00 m²
ITEM 310(1)c Bituminous Concrete Surface Wearing Course, Hot-Laid, 50mm thk.
0.00 m²
ITEM 310(2)a Bituminous Concrete Surface Binder Course, Hot-Laid, 30mm thk.
0.00 m²
ITEM 310(2)b Bituminous Concrete Surface Binder Course, Hot-Laid, 40mm thk.
0.00 m²
ITEM 310(2)c Bituminous Concrete Surface Binder Course, Hot-Laid, 50mm thk.
0.00 m²
ITEM 311(1)b1 Portland Cement Concrete Pavement (Unreinforced), 0.20m thk., 14 days
Area 0.00 0.00 0.00 m²
ITEM 311(1)b2 Portland Cement Concrete Pavement (Unreinforced), 0.20m thk., 7 days
Area 0.00 0.00 0.00 m²
ITEM 311(1)c1 Portland Cement Concrete Pavement (Unreinforced), 0.23m thk., 14 days
Area 0.00 0.00 0.00 m²
ITEM 311(1)e1 Portland Cement Concrete Pavement (Unreinforced), 0.28m thk., 14 days
Area 0.00 0.00 0.00 m²
ITEM 311(1)f1 Portland Cement Concrete Pavement (Unreinforced), 0.30m thk., 14 days
Area 0.00 0.00 0.00 m²
ITEM 311(2)f1 Portland Cement Concrete Pavement (Reinforced), 0.30m thk., 14 days
Area 0.00 0.00 0.00 m²
BACKUP COMPUTATION
Number of Pipes 0 ea
ITEM 500(1)b3 Pipe Culverts, 910mm Ø, Class IV RCPC
Number of Pipes 0 ea
ITEM 500(1)b5 Pipe Culverts, 1220mm Ø, Class IV RCPC
Number of Pipes 0 ea
ITEM 500(3)b1 Lined Canal, Concrete, Rectangular
Length 0.00 lm
ITEM 505(2)a Grouted Riprap, Class A
Total Volume 0.00 m³
ITEM 506(1) Stone Masonry
Total Volume 0.00 m³
Slope Protection
Height 0.00 m
Base 0.00 m
Cross section 1 0.00 m²
Cross section 2 0.00 m²
Cross section 3 0.00 m²
Total Area 0.00 m²
Length 0.00 m
Volume 0.00 m³
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total 0 0
INPUT VALUE
DERIVATION OF HAULING COST FOR AGGREGATES MATERIALS
Project: 0
0
0
Location: 0
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
ESTIMATED TRAVEL SPEED, LOADING/UNLOADING & ALLOWANCE FOR DELAY
I. Labor
1.00 unit Laborer per day 482.48 = P 482.48
Project: 0
0
0
Location: 0
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
ESTIMATED TRAVEL SPEED, LOADING/UNLOADING & ALLOWANCE FOR DELAY
I. Labor
2.00 unit Laborer x Total Cycle Time T per day 482.48 = P 964.96
Project: 0
0
0
Location: 0
FORMULA: T = D/R
Where: T = Time, Time of travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)
ESTIMATED TRAVEL SPEED, LOADING/UNLOADING & ALLOWANCE FOR DELAY
I. Labor
4.00 unit Laborer x Total Cycle Time T per day 482.48 = P 6,025.88
CU.M.
CU.M.
CU.M. ₱1,000.00
CU.M. ₱1,000.00
CU.M. ₱900.00
CU.M. ₱630.00
CU.M. ₱610.00
CU.M. ₱787.00
CU.M. ₱682.00
CU.M. ₱765.00
CU.M. ₱683.00
CU.M. ₱631.00
CU.M. ₱525.00
CU.M. ₱589.00
CU.M. ₱800.00
CU.M. ₱607.00
CU.M. ₱590.00
CU.M. ₱569.00
CU.M. ₱545.00
CU.M. ₱788.00
CU.M. ₱732.00
CU.M. ₱714.00
CU.M. ₱787.00
CU.M. ₱733.00
CU.M. ₱810.00
CU.M. ₱820.00
CU.M. ₱640.00
CU.M. ₱685.00
CU.M. ₱5,350.00
CU.M. ₱5,560.00
CU.M. ₱5,850.00
CU.M. ₱7,649.50
CU.M. ₱5,450.00
CU.M. ₱5,650.00
CU.M. ₱5,950.00
CU.M. ₱8,672.38
CU.M. ₱5,600.00
CU.M. ₱5,800.00
CU.M. ₱5,730.00
CU.M. ₱6,916.50
LTR ₱115.00
LNM ₱65.00
LNM ₱47.00
LNM ₱56.00
LNM ₱62.00
LNM ₱65.00
LNM ₱72.00
LNM ₱75.00
LNM ₱1,365.00
LNM ₱1,623.00
LNM ₱1,942.00
LNM ₱1,733.00
LNM ₱2,049.00
LNM ₱2,255.00
KG ₱78.00
KG ₱78.00
LNM ₱1,627.00
LNM ₱1,750.00
LNM ₱1,950.00
LNM ₱2,056.00
LNM ₱2,200.00
LNM ₱2,300.00
LNM ₱2,654.00
LNM ₱3,054.00
KG ₱77.00
KG ₱100.00
KG ₱68.00
KG ₱68.00
LNM ₱14,057.05
LNM ₱16,399.89
LNM ₱18,742.74
LNM ₱21,085.58
LNM ₱23,428.42
LNM ₱25,771.26
LNM ₱28,114.11
LNM ₱30,456.95
LNM ₱32,799.79
LNM ₱35,142.64
LNM ₱37,485.48
LNM ₱39,828.32
LNM ₱42,171.16
LNM ₱44,514.01
LNM ₱46,856.85
LNM ₱58,571.06
LNM ₱70,285.28
KG ₱95.00
KG ₱85.00
BAG ₱835.00
GAL/SET ₱3,808.00
KG ₱55.00
KG ₱42.00
KG ₱39.00
KG ₱68.00
KG ₱161.50
KG ₱49.50
BDFT ₱90.00
BDFT ₱88.00
BDFT ₱90.00
BDFT ₱89.00
BDFT ₱87.00
KG ₱50.00
KG ₱78.00
KG ₱130.00
PC ₱5,210.00
KG ₱78.00
PC ₱5,000.00
KG ₱65.00
KG ₱64.46
KG ₱60.00
KG ₱80.00
KG ₱82.50
KG ₱162.00
KG ₱163.00
PC ₱687.00
KG ₱162.00
KG ₱66.23
KG ₱66.00
KG ₱65.00
KG ₱67.45
KG ₱87.00
KG ₱85.00
GAL ₱600.00
KG ₱100.00
KG ₱85.50
PC ₱1,825.00
PC ₱1,500.00
PC ₱580.00
CU.M. ₱1,305.00
CU.M. ₱1,550.00
CU.M. ₱1,600.00
CU.M. ₱1,600.00
CU.M. ₱1,405.00
CU.M. ₱1,456.00
CU.M. ₱1,050.00
BDFT ₱35.00
BDFT ₱65.00
LTR ₱23.00
PC ₱1,100.00
PC ₱1,200.00
PC ₱461.00
PC ₱860.00
PC ₱1,375.00
PC ₱420.00
PC ₱780.00
PC ₱1,080.00
SQM ₱900.00
LNM ₱12,500.00
LNM ₱15,500.00
LNM ₱19,842.00
LNM ₱23,500.00
LNM ₱25,463.00
LNM ₱25,632.00
LNM ₱25,632.00
LNM ₱33,500.00
SET ₱1,800.00
KG ₱60.00
LNM ₱350.00
LNM ₱22.00
PC ₱58.00
SQM ₱720.00
PC ₱7,000.00
PC ₱10,658.00
PC ₱17,065.00
PC ₱2,152.00
PC ₱1,102.00
PC ₱1,230.60
PC ₱1,881.52
PC ₱2,430.12
PC ₱2,800.00
PC ₱3,850.00
PC ₱4,000.00
PC ₱4,201.00
PC ₱5,400.00
PC ₱6,200.00
PC ₱1,500.00
PC ₱1,900.00
PC ₱2,500.00
PC ₱3,400.00
PC ₱4,600.00
PC ₱6,000.00
PC ₱7,400.00
PC ₱8,400.00
PC ₱10,600.00
PC ₱422.00
PC ₱556.00
PC ₱600.00
PC ₱20.00
PC ₱25.00
PC ₱19.00
PC ₱21.00
KG ₱94.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
CU.M. ₱1,200.00
PC ₱1,785.00
PC ₱2,257.00
PC ₱2,300.00
PC ₱2,941.00
PC ₱3,362.00
PC ₱2,046.00
PC ₱2,360.00
PC ₱2,677.00
PC ₱3,045.00
PC ₱3,466.00
PC ₱3,887.00
PC ₱4,306.00
SQM ₱170.00
LNM ₱315.00
LNM ₱367.00
LNM ₱682.00
PC ₱1,627.00
PC ₱1,418.00
PC ₱945.00
PC ₱586.00
PC ₱802.00
PC ₱1,445.00
PC ₱1,850.00
PC ₱3,500.00
PC ₱5,132.00
PC ₱7,150.00
PC ₱11,125.00
PC ₱841.00
PC ₱700.00
PC ₱1,417.00
PC ₱787.00
PC ₱1,000.00
PC ₱1,800.00
LNM ₱300.00
LNM ₱450.00
LNM ₱100.00
LNM ₱242.00
LNM ₱380.00
LNM ₱1,500.00
LNM ₱2,000.00
PC ₱1,500.00
LNM ₱1,950.00
LNM ₱1,500.00
LNM ₱2,300.00
LNM ₱2,600.00
LNM ₱3,400.00
PC ₱50.00
PC ₱90.00
PC ₱100.00
LNM ₱16.00
LNM ₱20.00
LNM ₱123.00
LNM ₱236.00
LNM ₱295.00
LNM ₱430.00
LNM ₱180.00
PC ₱3,200.00
PC ₱8,000.00
PC ₱3,200.00
PC ₱7,880.00
PC ₱3,550.00
PC ₱8,000.00
PC ₱3,856.00
PC ₱7,880.00
PC ₱7,500.00
PC ₱7,880.00
PC ₱3,250.00
PC ₱3,500.00
PC ₱6,000.00
PC ₱7,512.00
PC ₱7,600.00
PC ₱12,000.00
PC ₱13,256.00
PC ₱22,000.00
PC ₱5,000.00
PC ₱5,500.00
PC ₱21,000.00
BAG ₱2,625.00
LTR ₱180.00
LTR ₱180.00
KG ₱95.18
PC ₱75.00
BAG ₱1,848.00
BAG ₱1,700.00
LTR ₱855.00
LTR ₱1,052.00
PC ₱657.00
PC ₱557.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱667.00
PC ₱665.00
PC ₱667.00
PC ₱667.00
PC ₱700.00
CU.M. ₱550.00
SQM ₱100.00
PC ₱100.00
PC ₱60.00
PC ₱120.00
PC ₱350.00
BAG ₱1,350.00
BAG ₱1,200.00
LTR ₱55.00
LTR ₱55.00
LTR ₱350.00
PC ₱150.00
SQM ₱126.00
SQM ₱126.00
LNM ₱225.00
LNM ₱225.00
SQM ₱68.00
SQM ₱68.00
SQM ₱68.00
₱315.00
₱247.00
₱220.00
MTON
MTON ₱125,000.00
MTON ₱47,252.00
MTON
MTON
MTON
MTON
MTON
MTON
MTON ₱146,000.00
MTON
MTON
MTON
MTON ₱95,000.00
MTON ₱95,000.00
MTON ₱130,055.61
MTON ₱130,055.61
MTON ₱6,231.35
MTON ₱14,000.00
PC ₱80.00
PC ₱95.00
PC ₱105.00
PC ₱115.00
PC ₱165.00
PC ₱210.00
PC ₱330.00
PC ₱330.00
LTR ₱100.00
BAG ₱280.00
LTR ₱50.00
BAG ₱370.00
LTR ₱74.00
BAG ₱350.00
LTR ₱115.00
BAG ₱475.00
LTR ₱70.00
BAG ₱250.00
LTR ₱120.00
BAG ₱540.00
LTR ₱95.00
BAG ₱450.00
BAG ₱54.00
LTR ₱125.00
GAL ₱843.00
GAL ₱821.25
GAL ₱731.25
GAL ₱750.00
GAL ₱650.00
GAL ₱450.00
GAL ₱558.00
GAL ₱1,200.00
GAL ₱1,057.50
PC ₱103.25
PC ₱85.00
PC ₱60.00
LTR ₱154.20
LTR ₱447.50
KG ₱224.00
KG/M2
BDFT ₱36.00
BDFT ₱20.00
BDFT ₱90.00
BDFT ₱60.00
BDFT ₱90.00
BDFT ₱60.00
BDFT ₱90.00
BDFT ₱55.00
LTR ₱1.00
LTR ₱200.00
LTR ₱65.48
LTR ₱69.80
LTR ₱64.48
LTR ₱59.98
LTR ₱78.50
LTR ₱95.45
LTR ₱225.00
LTR ₱255.00
LTR ₱252.50
LTR ₱300.00
LTR ₱250.00
LTR ₱250.00
LTR ₱350.00
LTR ₱666.60
SET ₱9,000.00
SET ₱6,950.00
SET ₱7,000.00
SET ₱8,500.00
PC ₱350.00
PC ₱426.00
PC ₱598.00
PC ₱894.00
PC ₱1,485.00
PC ₱2,278.00
PC ₱2,458.00
PC ₱3,933.00
PC ₱4,500.00
PC ₱5,487.00
PC ₱32.00
PC ₱46.90
PC ₱69.72
PC ₱135.93
PC ₱140.00
PC ₱144.00
PC ₱190.00
PC ₱124.00
PC ₱280.00
PC ₱52.00
PC ₱64.60
PC ₱95.60
PC ₱185.50
PC ₱273.50
PC ₱586.50
PC ₱748.95
PC ₱1,232.87
PC ₱25.00
PC ₱33.00
PC ₱50.00
PC ₱96.75
PC ₱130.50
PC ₱147.00
PC ₱190.00
PC ₱273.00
PC ₱22.00
PC ₱26.00
PC ₱35.00
PC ₱63.00
PC ₱87.00
PC ₱209.00
PC ₱312.00
PC ₱488.50
PC ₱100.00
PC ₱107.00
PC ₱112.00
PC ₱275.00
PC ₱245.00
PC ₱396.00
PC ₱420.00
PC ₱795.00
PC ₱25.00
PC ₱25.00
PC ₱30.00
PC ₱38.00
PC ₱60.00
PC ₱73.00
PC ₱76.00
PC ₱90.00
PC ₱110.00
PC ₱148.00
PC ₱190.00
PC ₱308.50
PC ₱350.00 ₱116.67
PC ₱420.00
PC ₱620.00
PC ₱680.00
PC ₱726.00
PC ₱8.00
PC ₱8.50
PC ₱12.70
PC ₱23.00
PC ₱44.00
PC ₱50.00
PC ₱60.00
PC ₱62.00
PC ₱92.00
PC ₱20.00
PC ₱18.00
PC ₱28.00
PC ₱64.30
PC ₱77.00
PC ₱14.00
PC ₱29.00
PC ₱20.00
PC ₱48.85
PC ₱42.00
PC ₱56.00
PC ₱37.00
PC ₱51.00
PC ₱80.65
PC ₱35.00
PC ₱63.00
PC ₱105.00
PC ₱82.00
PC ₱100.00
PC ₱125.00
PC ₱158.00
PC ₱164.00
PC ₱195.00
PC ₱51.00
PC ₱100.00
PC ₱120.00
PC ₱160.00
PC ₱195.00
PC ₱200.00
PC ₱80.00
PC ₱155.00
PC ₱244.00
PC ₱142.00
PC ₱194.00
PC ₱264.00
PC ₱37.00
PC ₱51.00
PC ₱82.60
PC ₱36.00
PC ₱63.25
PC ₱63.00
PC ₱14.00
PC ₱15.00
PC ₱23.00
PC ₱34.00
PC ₱61.35
PC ₱100.00
PC ₱94.00
SET ₱1,769.00
SET ₱380.00
SET ₱17,000.00
KG ₱175.00
SET ₱2,299.00
PC ₱329.00
SET ₱297.00
SQFT ₱600.00
PC ₱385.00
PC ₱134.00
PC ₱1,700.00
CAN ₱195.00
ROLL ₱44.00
PC ₱30.45
KG ₱37.00
KG ₱110.00
LNFT ₱60.00
LNFT ₱27.00
LNFT ₱33.00
PC ₱170.00
PC ₱100.00
PC ₱195.00
KG ₱80.00
PR ₱100.00
ROLL ₱1,733.00
SET ₱1,600.00
SET ₱2,500.00
GAL ₱500.00
KG ₱125.00
KG ₱90.00
SQM ₱900.00
SQM ₱1,778.00
SQM ₱5,775.00
SQM ₱4,850.00
SQM ₱7,035.00
SQM ₱2,100.00
SQM ₱2,500.00
SQM ₱3,265.00
SQM ₱2,100.00
SQM ₱2,100.00
SQM ₱787.00
SQM ₱525.00
SQM ₱630.00
SQM ₱5,150.00
SQM ₱5,890.00
SQM ₱378.00
SQM ₱397.00
SQM ₱420.00
LNM ₱445.00
LNM ₱240.00
LNM ₱395.00
LNM ₱115.00
LNM ₱205.00
LNM ₱115.00
SET ₱1,500.00
SQM ₱750.00
SQM ₱850.00
SQM ₱1,500.00
SQM ₱825.00
SQM ₱310.00
SQM ₱350.00
SQM ₱385.00
LGHT ₱215.00
LGHT ₱504.00
LGHT ₱726.00
PR ₱8.00
PR ₱11.30
PR ₱18.00
PC ₱191.00
PC ₱100.00
PC ₱137.80
PC ₱182.00
PC ₱33.25
PC ₱10.80
PC ₱14.50
PC ₱16.00
PC ₱14.00
PC ₱26.00
PC ₱4.00
PC ₱11.00
PC ₱13.00
PC ₱39.00
PC ₱34.00
PC ₱59.00
PC ₱65.00
PC ₱350.00
PC ₱710.00
SET ₱1,785.00
SET ₱2,153.00
PC ₱65.00
PC ₱98.00
PC ₱35.00
PC ₱41.00
PC ₱72.00
M ₱47.00
M ₱22.00
M ₱33.00
M ₱54.00
M ₱32.00
SET ₱100.00
SET ₱150.00
SET ₱180.00
SET ₱165.00
SET ₱141.00
SET ₱350.00
SET ₱450.00
SET ₱1,350.00
SET ₱1,550.00
SET ₱580.00
PC ₱48.00
SET ₱1,200.00
SET ₱1,500.00
SET ₱420.00
SET ₱465.00
SET ₱950.00
SET ₱600.00
SET ₱1,050.00
SET ₱995.00
SET ₱1,300.00
SET ₱1,050.00
SET ₱1,295.00
SET ₱248.00
SET ₱1,890.00
SET ₱1,300.00
SET ₱6,620.00
SET ₱19,230.00
SET ₱2,760.00
SET ₱3,600.00
SET ₱197.00
SQM ₱6.00
SQM ₱8.00
SQM ₱56.00
SQM ₱60.00
UNIT ₱750,000.00
UNIT ₱18,700.00
UNIT ₱21,000.00
UNIT ₱26,938.00
LIST OF EQUIPMENT ADOPTED IN THE STANDARD DUPA FOR ROAD, BRIDGE AND BUILDING (LOW & HIGH RISE)
CONSTRUCTION COST ESTIMATION MANUALS WITH MAKE, MODEL, CAPACITY AND OPERATED RENTAL RATE
PER HOUR BASED ON THE PREVAILING ACEL EQUIPMENT GUIDEBOOK, EDITION 26
14.7 Tower Lights Tower Height = 28ft, No. of Lights = 4 x 1000 watts, hp = 10.50,
Generator = 5 kW ₱ 260.86 ₱ 260.86 0 0 0 0 0.0000 0 59.98 0.00 225 0.00 ₱ 260.86
LIST OF EQUIPMENT ADOPTED IN THE STANDARD DUPA FOR ROAD, BRIDGE AND BUILDING (LOW & HIGH RISE)
CONSTRUCTION COST ESTIMATION MANUALS WITH MAKE, MODEL, CAPACITY AND OPERATED RENTAL RATE
PER HOUR BASED ON THE PREVAILING ACEL EQUIPMENT GUIDEBOOK, EDITION 26
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
-
-
-
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Cargo Truck/Service Truck, All Models, 9-10 mt, 270Hp 1 4.00 P 18,834.69 P 75,338.76
Dump Truck (12 yd³) 1 4.00 P 21,825.84 P 87,303.36
`
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
TEDDIE B. YAP CEDRICK FLOYD A. DURANTE
ENGINEER I ENGINEER II
0
0
0
0
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM-POW-2015-01D-00
ITEM NO. : 311(1)b2
DESCRIPTION : Portland Cement Concrete Pavement (Unreinforced), 0.20m thk., 7 days
Quantity : 0.00 length = 3,492.00 lm
Output per hour - As Submitted : 80.50 sq.m.
Output per hour - As Evaluated :
No. of
Designation No. of Hours Hourly Rate Amount
A.1 Person
Labor
Prepared by : Checked/Reviewed by :
TEDDIE B. YAP CEDRICK FLOYD A. DURANTE
ENGINEER I ENGINEER II
0
0
0
0
DETAILED UNIT PRICE ANALYSIS (DUPA)
FORM-POW-2015-01D-00
ITEM NO. : 311(1)c1
DESCRIPTION : Portland Cement Concrete Pavement (Unreinforced), 0.23m thk., 14 days
Quantity : 0.00 length = 3,492.00 lm
Output per hour - As Submitted : 70.00 sq.m.
Output per hour - As Evaluated :
No. of
Designation No. of Hours Hourly Rate Amount
A.1 Person
Labor
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
F.1 Materials
LUMBER GOOD 4 uses bd-ft. 6.67 P 65.00 P 108.33
PLYWOOD MARINE (0.0125m
x 1.2m x 2.44m) 4 uses pc. 0.38 P 860.00 P 80.63
1 kg./100 bd.ft of
COMMON NAILS ASSORTED Lumber) kg. 0.07 P 85.50 P 5.73
PORTLAND CEMENT with haulage cost bag 2.76 P 263.70 P 726.48
FINE AGGREGATES with haulage cost cu.m. 0.15 P 2,669.07 P 387.02
GRAVEL G1 with haulage cost cu.m. 0.29 P 2,518.07 P 730.24
GI TIE WIRES #16 2% of RSB kg. 0.51 P 85.00 P 43.47
REINFORCING STEEL BARS
with haulage cost
DEFORMED GRADE 40 kg. 25.57 P 68.41 P 1,749.42
STRUCTURAL STEEL ANGULAR BAR (A36) kg. 2.88 P 65.00 P 187.20
Sub-Total for F.1 - As Submitted P 4,018.52
F.2 Materials
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Freight and Handling Cost, Visayas Area pc. 1.000 P 75.00 P 75.00
Diamond Core Bit DD-B 150mm/45mm + UCL
pc. 0.002 P 16,000.00 P 32.00
(Coring Plate)
Connection End BI-1 (Coring Blade) pc. 0.010 P 8,000.00 P 80.00
CONCRETE EPOXY (A & B) liter 0.040 P 3,808.00 P 152.32
Water liter 3.330 P 1.00 P 3.33
Miscellaneous (1% of Materials) P 81.83
Prepared by : Checked/Reviewed by :
Cargo Truck/Service Truck, All Models, 2-5 mt, 160 Hp 1 0.25 P 1,445.02 P 361.25
Water Truck/Pump, All Models, 16,000 L, 360Hp 1 0.25 P 3,963.80 P 990.95
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
Prepared by : Checked/Reviewed by :
DESCRIPTION : Single Arm 8m-Pole Solar LED Roadway Lighting, 60W, 1.5m Mast Arm Length, 250kph Wind Speed
Quantity : 0.00
Output per hour - As Submitted : 1.00 each - lm
Output per hour - As Evaluated :
No. of
Designation No. of Hours Hourly Rate Amount
A.1 Person
Labor
Foreman 1 1 P 108.23 P 108.23
Skilled Laborer 2 1 P 78.24 P 156.48
Unskilled Laborer 2 1 P 60.31 P 120.62
8m Mounting Height Pole with 1.5 Single Mast Arm set 1.00 P 40,500.00 P 40,500.00
- Round Steel Tapered Post: Bot-200mmØ, Top-100mmØ, 8000mm Height Amount divided by uses
- Thickness: 4.0mm indicateddivided
Amount in the by uses
Amount divided by in
uses
specification
indicated the
- Base Plate: 20mm x 400mm x 400mm indicated specification
in the
- Stiffener Plate: 16mm x 200mm x 100mm x 20mm, Hot Dip Galvanized specification
- Anchor Bolt: 19mm x 508mm OAL Bend 50mm Triple Nuts and Double Flat
Washers
DESCRIPTION : Single Arm 8m-Pole Solar LED Roadway Lighting, 120W, 1.5m Mast Arm Length, 250kph Wind Speed
Quantity : 0.00
Output per hour - As Submitted : 1.00 each - lm
Output per hour - As Evaluated :
No. of
Designation No. of Hours Hourly Rate Amount
A.1 Person
Labor
Foreman 1 1 P 108.23 P 108.23
Skilled Laborer 2 1 P 78.24 P 156.48
Unskilled Laborer 2 1 P 60.31 P 120.62
DESCRIPTION : Single Arm 12m-Pole Solar LED Roadway Lighting, 120W, 1.5m Mast Arm Length, 250kph Wind Speed
Quantity : 0.00
Output per hour - As Submitted : 1.00 each - lm
Output per hour - As Evaluated :
No. of
Designation No. of Hours Hourly Rate Amount
A.1 Person
Labor
Foreman 1 1 P 108.23 P 108.23
Skilled Laborer 2 1 P 78.24 P 156.48
Unskilled Laborer 2 1 P 60.31 P 120.62
12m Mounting Height Pole with 1.5 Single Mast Arm set 1.00 P 48,960.00 P 48,960.00
- Height: 12m
- Thickness: 5.0mm
- Type: Tapered
- Material: Hot Dipped Galvanized - Powdercoated White with Engineering
Grade Reflective Band
- Capacity: 100kg: ± 207kph wind
- Weight: 145kg Amount divided b
number of uses
- Free: Anchor Bolt Set