Bhel SG
Bhel SG
Bhel SG
ad-L.n--J
BRBCL- 1 COAL A BCD E FG PURGE
PULV DISCH DAMPER DE FG
BUNKER AS1ASco
ELEVAA-FLAME ELEV-AB-FLAME SEQUENCE
BUNKER MILL OL TEMP BURNER 2 BURNER
501
OL GATE 57.4°C Iso GATTE IsO GATE
DR I GATE
59.3C BURNER BURNERR RE00 Ms. 0OSess
COC ISO GATE IsO GATE STADTSEnUENCE
cURRENT
0.50mA
32.99TPH STOP SFQIIENCE
IGNPER AVAL
FEEDERR
PA HDR TXR 1 10mmWC HAG
OL GATTE 715mmc
OIL SYSHEALTHY PA HDR TR2
PA HDR TR3 716 mmuwC HOT
FEEDERRSA NO LOS TRIP AIR HEADER
DAMPFR BROTREADY PA FAN-A
33mmWvc MILL DP VFNTIURI
SA PULVBOWL DP --
FAN.A
823mmWC CAG
EPB NORMAL PA FAN-B
796 mmWC
ROLLER SETTING
CuRREN 6.35
IHS-
TANK LEVEL
SA FAN.R
176.82 mm
48.53c oUTER SHAFT BRG 45.01c
LUB OIL TEMP 47.23°c 48.08°c
LUB OIL PR LUB OIL FLOW AFT COOLER TANK OIL TEMP
46.44 c 47.32°C
2.10 Ke/CM2 164.88Lpm 34.97°C 37.18°C THRUST BRG
MOTOR BRG TEMP 47.67°C
2.09 KO/cm2 159.95Lpm 36.06 36.86 c NDE 24.51c DE 40.02°C
47.04°C
Clear
SBC PR OLABLFO COAL a SCAN FAN SEAL FAN Last Main Point
NABINAGAR 1
SCAN AIR FANS
ABCPEFG
ARAco
HOL DE FO
PURGE
SCANAIR
FAN A
FROM SCANAIR
ATMOSPHERE FAN B TO AIR CoOLED GUNS
TR
CURRENTT O.00
SCANNER
EMER DAMPER
F
HR
PA
HE
CD
PRD
PRDS
LF
GL
Clear CO
SBC PR oLABLFO cOAL A SCAN FAN Main
FANSEA Last
Point MF
FLAME 1 FOPH SBC-WALL SADC SBC-INDI Close A Ack
Point
PopUps "sg1S CANFAN.MN"
N.AIN.AGAR U=:1|
Recycle Bin maxvUE Editor DOCUMENTS 1OWS2
BRBCL1
SEAL AIR FANS ABCDEFG ou ro PURGE
ARIco
SAF A FAN BRG NDE TEMP 34.32DEO C
SA FANA
|
LO
H2 F
0.05 Amps
FUR.F
HRH F
SAF B FAN BRG NDE TEMP 23.82DEOo c PA HD
SAF B FAN BRG DE TEMP 28.05DEO C HPBP
CD VA
PROS P
PRDS TM
LFO
GL ST PR
Clear COAL
SBC PR OILABLFO cOAL AA SCAN FAN SEALFAN Last Main Point MFT
FLAME FOPH SBC-WALL SADC SBC-INDDI Close Al Ack
Point
1I
Pop Ups "sgiSEALFAN. MN"
SBC (WALLBLOWERS)
BLONER IN REMoTE ALL BLOWER NOT IN HOME AUTO SEQ ON
POSN cOMPLETED
LRSTART RELERsSE NOT AVaL
SBC PR&TEMP CTRLS INTERRUPTED
CUE STERT RELEE NOTEVaL LR&AH BLOWER
SBC IND ICATIONS
12 13 14 1 TPH O TPH
1 5
10 11
26 28
15 16 17 19 20
40 41 42
E 29 30 31 32 33 34
21
22 23 24
35
36 37 38 39
E
54 55 56 44 45 46 47 48 49 50 51 52 53
U
|EH
TR
Le
LEFT SIDE
SB39 FRONT SIDE RIGHT SIDE SB40 REAR SIDE
HZ
DRN TEMP 241 DEGsC
FU
TO IBDT DRN TEMP 241
HRH
oEG PA
TO IBDT
SEQ-P1 SEQ-P2 SEQ-P3 HSEQ-P4 SEQ-P5 SEQ-P6 SEQ-P7
HP
CD
SEQ-P9 START SEQ STOPIRET RESET SEQ PROG CHK SEQ-PB PROS
aLn--J-.
NABINAGAR SBC
ALL BLOWER NOT IN HOME POSN
LR & AH BLOWERS) AUTO SEQ ON
cOMPLETED STARTUP
FROM MAIN STEAM INTERRUPTED
AUX STM
LRELRsTART RELERSE NOT BUA
BLONER IN REMOTE
LEFT SIDE RIGHT SIDE
64 60 H BLRR
-1 TPH STRT REL
TPH AVLBLE
70 66 62 61 65 69 APH-A APH B3
72
SB57
57
7 75
58 73 LSB-47 SB-48 EH
M
M
WALL TRE
74 DRN TEMMP
BLOWERS
SBC INDICATIONS HOME POs HOME PO Le
30 0EGC
SBC PRETEMP CTRLS
Ha
FU
SB25 HRE
PA
TO IBDT 240.930E TO IBDT HE
CD
SEQ-P3
SEQ-P1
SEQ-P9
SEQ-P2
START SEQ STOPIRET l SEQ-P4
RESET SEQPROG CHK
SEQ-P6 SEQ-P6
SEQCHK
SEQ-P7
ENA CHK
SEQ-P8
DISCHK
PRD
PRO
L
SBC
FLAME
PR
1
OLABLFO
FOPH
COAL A
SBC-WALL
sCAN FAN
SADC
SEAL FAN
SBC-INDI
Last
Close
Main
A
Pop Ups sglsBc-LR&A.MN"
7 Clear
Point
Ack
Peint
GL
C MI
S
NABINAGAR U#1
Recycle Bin maxvUE Editor DOCUMENTS 1OWS2
12 16.160.6
25.1%
SB8
10 % LN
M SD21
25.2
STM PR1 LOWHOT END)
RPH
STM PR2 LOWHOT END)
RAPH-B
LOAD
FREQ
247.
SPEED 3o02.
5o.036
|
DX EHC SP 47.9
SB57 TRIP OIL
DRN TEMP LO PR
DX 240 oEGC H2 PR 3.9
DRN TEMP SB40 FUR.PR -9.9
DRN TEMP DX240DEC HRH PR 35.6
30 0EGC SB39 PA HDR 759.2
S:25 HPBP
NTE TTENT cO VAC .106
DOWN PROS PR 12.8
NK PRDS TMP 318.2
sgSBC-PR1.mn" Point
NABINAGAR 1 SECONDARY ADR DAMPER CONTROLS 30.7 % U.OFA
URN-WB DPT
FUR-WB DPT- 107.21
SEL
mmWo SEL OUT 108.23 mmWc
1O0L.OFA, U.OFAA
Auto
Auto
100.09
212% GG
AAUX
AMPER Feed Rate-G tModulating
109.25 mmWe BIAS 5.00% PENINC
FUR-WEB DPT- 0.09
COAL 03:42:
BOILER UX AIR -0.01 TPH Manual 01
LOA 82.65% DEM 21.3%
cONTROL Fe
21.1 FG OlL
FUR-WB SP Modulating
105.00mmwc AUTO
BOILERLOAD ( Feed
32.45
Rate-F
TPH Auto
14.2 % COAL
TG
O.00 % 0.00 %
30 45 60 Feed Rate-C Modulating
CD OIL MU
MS. PR
BOILER LOAD (% 0.0 % cOAL MSTMP
o.00 O.00%
-0.04 TPH Manual EHC SP
FUEL DAMPER TRIP OILL
O.00 % o.00% Feed
BC AUX LO PR
20 Rate-B
Modulating
H2 PR
17.7% cOAL
O.00% FUEL 38.55 TPH FUR.PR
O.00% AIRR
uto
DAMPERR HRH PR
o.00
25 60
33.24 TPH Auto
14.8 %
2 cOAL CD VAC
PROS PR
PRDS TMP
o.00% FEEDER SPEED LFO
GL ST PR
Clear COAL
KAVERI VAIGAI Last Main Point MFT
GANGA YAMUNA GODHAVERI S Ack
BONGAIGAON-1 HPBP SYSTEM
MAIN STEAM LINE BPE1 TEMP TXR
257.6DEc
BPE DoWN STEAM TEME
MS PRESS 253.9 DEo c
BP 1 FAST OPEN
MERGENCY FAS BP 1 PRI cLOSE
OPEN -5.0
0.38%
OIL
PUMP-1
PUMP2
ON OF MCC
SUPPLYUNIT -1
.
LOWLOMHIGHIG
V.
-2.7%
BP2
1.38%
BPE2
BPE2
BPE2 TENMP
Clear
GANGA YAMUNA GODHAVERI KAVERI VAIGAI Last Main
Point
MAS-09
AS-101
AS-102
AS-09 1BV
AS-12
2.06%
XR318.01 DEG C
CD-04
M CD-05
LINE SEL
SP WTR
LINEFROM
CEP DISCH
M TX
SP 318.36 DEG
0.04%
MS LINE
306.58 DEG C
AS-13 48.34 KG/CM2
12.67 Ka/om2 AS-65
HT AUX.
AS-12 IBV
AS-24 M STM STN HDR AS-56
From HT UNIT-2 HDRR
LO
AS-106
STN HD
L
1.96 M
5.39 CD-07 LINE SEL
MAS-105 TXR 12.57 KO/CM
SP 12.57 Ko/cCM
cD-11 M 0.00 DEG c
TO
12.57Kg/em
C EQP
. PI
CD-10 MSTM
AS-22 AS-28 192.03 DEG 0.78% AS-34 EHC
TKR 12.29KG/c S
SP AS-46 TRIP OI
191.92 DEG LT HDR UNIT-1 FROM AUX
HDR
From LT Unit-3
BOILER LO PR
LTAUX STNHOR H2 PR
AS-58 AS-60 FUR.PR
AS-59 AS-03 o.00OEGc23.82Ko/CM HRH PR
PA HDR
ASUZ 0.00 22.88 KG/CM TR HPBP
From LT UNIT-2 HDR 23.19 KoCM cOVAC
PROS PR
TO AG EQuIPMENTOF MAIN
PLANTS TG auILOING PRDS TMP
AS-67 AS-05 LFO
AS-06
GL ST PR
Clear COAL
GANGA YAMUNA GODHAVERI KAVERI VAIGAI Last Main Point MFT
aJ-L n-J-
BRBCL_1 ERV CONTROL ERV CLOSED h MANUAL
PC svo6
S46 S61 SV6-ER LINE ERV PR.SWITCH SETTIN
S62
S 42 s43 FOR ERV OPENING- 164.2 KGK
SH MS-L $45 FOR ERV CLoSING-158BKKGIK
ERV
CLOSED
PC
D
Svo07
MANUAL
ERV CLOSED
PC) CmSvoB
MANUAL
aJL.-
BONGAIGAON 1 SCAPH DRAIN TANK LEVEL CONTROL
LEVEL SET LEVEL SET
aiLAUi mm nAui mm
FOR SPRY
FOR SPRY
PRI SCPH SEC 8OAPH
DRAN TANK
DRANTANK
-1.92MM
ASSC-S9
ASSC-60D
100.0 XR -1.00Man
ASSC-67 ASSC-668
0.1%
99.7
ASSC-70 37.9x
ASSC-62 ASSC-63 ASSC-71
M ASSc-66
MASSC-74
O IBD TAN
O IBD TAN
Clear
SA NGA YAMUNA KAVERI VAIGAI Last Main
GODHAVERI Point
LO23B
1LO24B 0.0
SPEE
FREG
FROM
FROM Os34D STM
AIR HFO os338 AUDK
HDR PR HDR
HDR
HO34A 50.1% TXR 15
KGC2
MS. PR
HFO
HO33A
1HI
HO34CH034E STRAINER DP HIGH
DRAIN OIL MSTMP
|EHC SP
TRTP 0TL
TO HFOTANK HO 62A FROM DRAINSLO PR
34.9% HO HO 61B HO 64 H2 PR
HO408 61A
JL-n--J-*
ONGAIGAON CBD TANK LEVEL CONTROL
VFNT
t LEVEL SET
nAaN NAmm
FOR SPRAY
0.0%
TO LP TO IBD
FLASH TANK TANK
Clear
GANGA YAMUNNA VAIGAI Last Main
GoDHAVERIKAVERI Point
O.0%
M
o.0
M
O.0%
M M
23.% 0.0%
S
HAN34AAO51 HAN3 3AAO51 HAN3 3AA0011 HAN32AAO01 HAN32AAO51 HAN31AAO51 HAN47AAO03
SH I/L
S63
HDR DR H I/LHDR
S61
DR SH DR ISO
S60
LV SH DR ISO VLVSH DR INCH VLY
S58 S59
FSH DR VLV
S5z
RH O/L STRTUP
WENT R6
HAN47AA051
RH 0/L STRTUUP
WENT RZ
Le
SP
M M M M FR
E
M M
-1.0 %
M
MST
EHC
TRIP
LO
H2 P
P
FUR.P
HAN2 7AA001 HAN2 7AA002 HAN30AAD01 HAN3OAAO51 HAN2 8AA001 HAN29AA002 HAN47AA001 HAN47AA002 HRH P
DESH 0/L VENT DESH 0/L
20 VENT SH STRTUP VENT SH STRTUP VEN FSH VENT IS FSHVLY
VENT ISOL R3 R4
S19 S26 TNCH TYPE-S27 VLV S21 S22_ PA HD
M HAN10AAO51
Co I/L HDR DR
HPBP
CD VAC
PRDS P
PROS TM
1.9
VV E18 LFO
GL ST PR
Clear COAL
GANGA YAMUNA GODHAVERI KAVERI VAIGAI Last Main Point MFT
BLOWER
SCANAIR
DISC PR 243.92mmWc
AACT APH-B
TRID ANA TOID START CD-1 CD-2 CD-3 CD-4
sCAN FAN-DO
PURGE REAL
AACTT
TOID 00 Seconds
AIA TDID
AB-1 AB-2 AB-3 AB-4 ABCD EFGCD E PURGE
15.50 Kg/om2
LOTV
15.48 Kg/om2 sCAV
VLV S S sCAV
VLV
34.5 15.48 Kg/om2
REL AVAL
PAIR2 &4
START TIME 000 Secs
LONV1 STOP 205 STOP
205 LONV4
Main Cle
GANGA YAMUNA GODHAVERI KAVERI VAIGAI Last
Poi
COMPLETE
oE FO
PURGE
01Feb23
SG TG BOF ELE
501 STOP 205
SASNV START
REL AVAL REL AVAL LOAD 248.9
SCAV SCAV SPEED 3002.7
HOTV SVLV
49.6 FREQ 50.055
7
2.7
SELECTIONS AsS
HFO HDR TME H2 PR 3.9
LO SELECTED FUR.PR
HFO HDR PR PAIR
STOP TIME
1&3
000 Secs
SCAV
Lv S HRH PR
-22.4
35.9
PA HDR 741.7
PAIR2 &4 HPBP
STOP 000Secs
TIME REL AVAL REL AVAL CO VAC 0.105
HFO SYSTEM STOP 205 STALRT 501 PRDS PRR
HONV1 HONV4 12.6
PRDS TMP 318.2
STEP COMPLETED STEP RESET LFO
HO48A HORV GL ST PR 361.65
Clear COAL 3002.7
GANGA YAMUNA GODHAVERI KAVERII VAIGAI Last Main
L Point MFT
A
MAHANATDHH sINDHU KABINI KARNATAKA| NDIA Close
Pop TE Ack
Point
NABINAGAR U#1
Recycle Bin maxvUEEditor DOCUMENTS 1OWS2
172.16.160.6
Cnva
cONVEYOR A RELNOT AVL cONVEYOR A REL NOT AL
eve level H
OVEYOOR A REL HOT AVI 95SEC ev2 0SEC
Te mn Hi Te m Temn Hi
OSEC OSEC 0SEC
0SEC OSEC OSEC
OSEC O SEC
oSEC
OSEC (Seal INŠTRUMENT AIR PR OK Sea AIR RECIVER TANK PR
Seal
OK
Convev Ar Pressure Hi
Convey Air Pressure Hi ConveyAir Pressure High
Clear
ATT VLVs TURTRIP1 TURTRP2 KAVERI VAIGAI Last Main
Point
Close Al Ack
MAHANATDHH SINDHU KABINI KARNATAKA|| INDIA Point
Pop Ups
"sgimillteject_ Ovenview.mn"