Saep 334
Saep 334
Saep 334
1 Scope............................................................. 2
2 Definitions....................................................... 2
3 Applicable Documents.................................... 4
4 Engineering Drawing Access......................... 5
5 Requesting Drawing Number......................... 8
6 Retrieving Existing Drawing........................... 8
7 Tag Number................................................. 10
8 Plant Number............................................... 13
9 Project Proposal........................................... 15
10 Drawing Cancellation................................... 15
11 Demolition Drawing...................................... 16
12 As-Built......................................................... 16
13 Certification.................................................. 17
14 DCC Number Formats.................................. 19
15 Submittal...................................................... 20
16 Overdue Drawings....................................... 23
17 EK&RD Acceptance..................................... 26
18 Vendor Drawings.......................................... 26
1 Scope
1.1 This procedure governs the retrieval, certification and submittal of Saudi
Aramco Engineering and Vendor Drawings electronically. Refer to Appendix A
for the flow of activities of this procedure.
1.2 Per this procedure, all Engineering Drawings developed (if new) and/or revised
(if existing) by Saudi Aramco organizations or by others for Saudi Aramco,
must be developed or revised by means of Saudi Aramco approved electronic
software and formats as specified in the Saudi Aramco Engineering Standard
SAES-A-202 and this SAEP.
2 Definitions
As-Built Drawing: an Engineering drawing that has been revised to reflect actual field
conditions after the completion of construction. Additions or changes to a drawing
resulting from facility modification must also be verified as ‘As-Built’ and referenced to
the Job Order (JO) in case of PMT, Engineering Work Order (EWO) in case of Design
office and organization code in case of operation.
DCC Number: is a unique number that identifies a specific DCC for the purpose of
cross-referencing the certified DCC against the Engineering Drawings covered by that
DCC. It also acts as a log number for the permanent archival of the DCC with EK&RD.
Demolition Drawing: is any existing drawing that shows the extent of the demolition
work to be done. For more details refer to Section 11 of this procedure.
Page 2 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Drawing Index File: refers to electronic data file containing information related to
Engineering Drawings. The Drawing Index File is prepared by the Design Agency
(PMT) responsible for the development of the drawings, and is used for archival of
drawing information into iPlant.
Integrated Plant – iPlant: is the sole corporate Saudi Aramco Engineering drawing,
Tags and Data Management system that contains all approved and certified engineering
drawings and their data that are collected from the inception of the company. It is an
automated system designed for administration and control of Saudi Aramco engineering
drawings, Tags and data in a centralized library. This allows the users to query, view,
print, retrieve and submit engineering and vendor drawings in addition of allowing them
to retrieve new engineering drawing numbers, tag numbers, create new sheet numbers
and to perform job tracking/creation functions. Refer to iPlant Users Guide for
operational details.
Overdue Drawings: The existing drawings checked out for revision or issued as new
drawing numbers for creating drawings through iPlant and are not submitted to system
as used or unused after completion of the project. As built drawings shall be readily
available in iPlant to support Saudi Aramco infrastructure.
Page 3 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Project Management Team (PMT): refers to the Saudi Aramco organization that
contracts engineering, procurement and/or construction work to outside contractors
under their supervision.
Proponent or OEO: Shall means all Saudi Aramco operating engineering organizations
including engineering services (OEO) are responsible for operation, maintenance,
engineering, safety and protection of a Saudi Aramco facilities, equipment or properties.
Responsible Engineering Office or REO: Is a Saudi Aramco “office” that has been
entrusted with the production or revision of an Engineering Drawing. Non-Saudi
Aramco firms or companies are not allowed to be the designated REO. Certain
individuals within the REO shall be authorized to track issued existing Engineering
Drawings and Facility Data.
Revision Validation: Refers to the area on the title block of the drawings identifying
the approval/certification requirements of a specific revision of an Engineering Drawing
are covered by an approved DCC.
Saudi Aramco: shall mean Saudi Arabian Oil Company and its affiliated companies,
including, but not limited to Aramco Overseas Company (AOC) and Aramco Services
Company (ASC).
3 Applicable Documents
The requirements contained in the following documents and forms apply, to the extent
specified in this procedure:
Page 4 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
The Corporate Engineering Drawing Library “iPlant” is the single system that controls
and administers all Saudi Aramco engineering drawings and Tags. It allows authorized
users such as Project Management Teams, Design Groups and Operation Organizations to
initiate and process drawing transactions such as; request new drawing numbers, retrieve
existing drawings for revision and submit certified drawings. Engineering drawings and
data shall be accessed through iPlant systems only. The access shall be limited to those
who have been granted authorization from their management via an approved automated
electronic form SA-9601-ENG.
SA-9601-ENG Hard Copy Form should be used on cases that the user request access to
an information not according to Saudi Aramco organization structure. For non-Saudi
Aramco personnel (Saudi Aramco LDAP) are required.
4.1 Accessing Engineering Drawings and Data for Information Purposes (QVP)
Page 5 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
4.1.2 Saudi Aramco employees who fail to submit their drawing access form
through system must have their manual drawing access request form
SA-9601-ENG signed by their Division Heads to access the drawings of
their organizations. Access to Engineering Drawings under the
responsibility of other organizations requires the approval of the
requesting employee’s Department Head or Project Manager in case of
PMT. In addition, the requestor will have QVP access to library and
standard drawings. Refer to Section 4.3 for Signature Authority Table
Summary.
4.2.1 PMT Mobilization: the Project Manager for the subject BI shall request
assignment of an iPlant Project manager for the subject BI by submitting
the automated form SA-9601-ENG to EK&RD. Refer to the table in
Section 4.3 for approval authority. All the applicable organizations for
the subject BI shall be listed in the form.
4.2.2 iPlant Project Manager Authority: The iPlant Project manager shall
be authorized to create jobs and Drawing Completion Certificate “DCC”
workflows (Job Orders or Engineering Work Orders). Moreover, the
iPlant Project manager shall be able to add or remove iPlant revision
controllers, assign jobs, request bulk of drawing numbers, return drawing
numbers, and track overdue drawings.
Page 6 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Page 7 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Note: OEO user having privilege of revision controller can revise only the drawings under his
own organization’s responsibility. Special access can be requested by OEO user for
BI/JO/EWO or other OEO as project manager / revision control.
5.2 REO must return all unused drawing numbers through iPlant. Numbers retained
by REO after completion of a project will be treated as overdue drawings.
5.3 Any Saudi Aramco engineering office or Project Management Team (PMT) that
has been issued an engineering drawing number will assume the role as REO.
This REO will be held accountable for the proper production and control of the
drawings until formally submitted to EK&RD.
Note: Documents such as: Material take-off sheets, Construction Specifications,
Operating Specifications/Instructions, Technical Specification, Painting
Specifications, Inspection Records, Equipment List, Construction Schedule,
Construction Bar Charts, Cover Sheets, Calculation Sheets, Meter Reading
Tables, Manuals, Design Criteria, Sketches, Requisitions, Quotations, Spare Part
Lists, Performance/Calibration Curves, Purchase Orders, Installation Witness
Reports, will not be assigned an engineering drawing numbers. However, if these
drawings are considered critical to the operation organization, these drawings
SHALL BE assigned engineering drawing numbers after consulting Drawing
Management Unit Supervisor and submitted for archival into the iPlant.
6.1.1 All revision number requests shall be processed on-line through iPlant.
The revision number is composed of two or three-characters (the first
two digits are numeric and the third is alpha code, if applicable), used to
identify the approved changes on a drawing.
Page 8 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
6.1.3 The first certified and approved issue of a new drawing must be revision
“00.” The Initials of approvers must appear in the title block.
All projects weather LSTK or non LSTK shall submit all key drawings
as Issued for Construction IFC with revision “00” at the 60% completion
of the project.
6.1.4 The REO must use the revision number(s) assigned to the existing
drawing(s) for a particular project (Job Order or EWO) and shall not use
them for any other job.
6.1.5 Only one revision number shall be issued at one time for one job
(Job Order or EWO). A revision for the same job shall be issued upon
submittal of the previously issued revision for that job; revision number
shall be requested through iPlant. Each revision level must be
individually recorded into iPlant.
Exception:
6.1.6 If it is determined that for some reason, a drawing does not need to be
revised after a revision number has been issued, then that revision
number must immediately be returned by the requestor or Project
Manager through iPlant.
6.1.8 The iPlant Project Manager is responsible for requesting drawings for the
projects assigned to him.
Page 9 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
7 Tag Number
7.1 Requirements
For wellhead platforms, trains and units, etc., where identical tags are
used for each facility and a platform prefix or unit number, etc., is applied
to make each facility unique.
7.1.5 Unused Tag numbers shall not be recorded/shown as “spare or not used”
on the respective schedules. All unused numbers must be returned using
iPlant.
A four character alpha-numeric (one alpha and three numeric digits) number to
be used as an increment number of a non-procurement purchase/requisition
Page 10 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
7.3.2 Building numbers within process plant boundaries are assigned by the
Plant Management. Residential Building numbers are assigned by the
respective Community Services organizations.
7.4.1 For the purpose of identification, all cables and conduits excluding single
and interconnecting wiring are assigned special codes. Refer to
Engineering Standard SAES-P-104 for complete instructions related to
cables and conduits.
7.4.2 Cable and Conduit Schedule (CCS) must be prepared for the assigned
tag numbers on Form SA-2864-ENG.
7.4.3 User(s) shall use the existing Cable and Conduit Schedule (CCS)
drawing by revising the existing sheet or adding new drawing/sheet.
7.5.2 Data Sheet (Mandatory) and Safety Instruction Sheet (if applicable)
drawing numbers shall be completed for each tag.
7.5.3 Auxiliary or secondary equipment shall have the same sequence number
as the primary equipment having the corresponding marking, i.e., for
Pump G-0012, Motor GM-0012, Gear GG-0012.
Page 11 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
7.5.4 The Suffix Letter is used only to distinguish between two pieces of
identical equipment at one location for same process. For example, in
the case of two pumps for one tank, G-0012A and G-0012B.
7.6.1 Electrical Equipment Tag Numbers are assigned to the equipment listed
on Standard Drawing AE-036411 Sheet 003.
7.6.2 The tag numbers are controlled in numeric sequence for each voltage code
per each equipment type (marking) per each power source (normally
Substation) in each plant. For offshore platforms the switchgear Van tag
number will be used as feeder source instead of substation.
7.6.3 Reference drawing number for drawings such as One Line Diagram,
Inter Connection Diagram, etc., must be entered when requesting
electrical equipment.
7.7.2 In a given measurement or control loop, all instruments are assigned the
same Identification Numbers. To distinguish two similar instruments in
the same loop, an alpha character will be added at the end of the
Identification Number.
7.7.3 Instrument Installation Schedule (IIS) must be prepared for the assigned
tag numbers for each category of instruments on forms SA-2781A-ENG
to SA-2781E-ENG, SA-2799-ENG, and SA-7076-ENG.
7.7.4 User(s) shall use the existing Instrument Installation Schedule (IIS)
drawing of respective category by revising the existing sheet or adding
new drawing/sheet.
Page 12 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
7.8.2 Piping with threaded connections and plumbing do not require line
numbers unless deemed necessary by the PMT or Proponent for
operating or maintenance.
7.8.3 Line Designation Table (LDT) must be prepared for the assigned line
numbers on form SA-2824-ENG.
7.8.4 User(s) shall use the existing Line Designation Table (LDT) drawing by
revising the existing sheet or adding new drawing/sheet.
7.8.5 Line numbers must include line designation as outlined per Line Class
Designator System, SAES-L-105 Item 7 and Standard Drawing
AD-036204.
8 Plant Number
8.1.1 The issue and control of Saudi Aramco Plant Numbers is the
responsibility of EK&RD. A complete listing of currently assigned plant
numbers with descriptions is available on reports in iPlant.
8.1.2 To apply for a new Plant Number, a request letter from the Division
Head or above of the Operations Engineering organization must be
submitted to EK&RD stating the following information:
a) Name of requesting operations organization, Org. code and mailing
address.
b) Operation’s representative name and phone number.
c) Approved BI & JO numbers.
d) New facility name (max. 35 characters).
Page 13 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Page 14 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
b) The proposed owner shall revise the drawing that includes changing
the plant number and plant description in the title block.
c) The proposed owner shall indicate in the revision description
“CHANGED PLANT FROM XXX to YYY” along with other
As-Built revisions, if any.
d) Approval of both Operation organizations is required on the DCC
even for Non-Key drawings.
e) Plant number on Instrument Installation Schedules, Cable and
Conduit Schedules, Line Designation Tables and Instrument Loop
Diagrams should not be changed without EK&RD prior approval.
f) The present owner shall submit the drawing through iPlant on a
separate DCC.
g) iPlant data will be modified with the new plant number by EK&RD.
9 Project Proposal
9.1 Existing engineering Drawings may be used for Project proposal purposes by
utilizing electronic copies of these drawings from iPlant and removing all the
information (e.g., plant number, drawing number, revision number, certification
information, etc.) related to the original drawing.
9.2 Engineering Drawings developed for project proposal purposes may be assigned
Engineering Drawing and Tag Numbers. These numbers can be further used for
the detailed design. Project Proposal follows the same process as Detail Design
to reduce rework at later stages.
9.3 When the Job Number is not available for a drawing/tag number during request,
it can be requested under the BI directly without specifying the Job Number.
At the time of submittal, the Job Number shall be assigned to the drawings/tag
numbers.
10 Drawing Cancellation
10.1 Drawings being cancelled shall follow the same procedures and levels of
certification and approval as followed for revised drawings:
a) A drawing sheet can be revised as cancelled by a revision controller.
Reactivation of sheets will be the responsibility of EK&RD given enough
justification from operations.
b) A new As-Built revision must be requested in order to cancel a drawing.
Page 15 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
11 Demolition Drawing
11.1 Demolition drawings shall be prepared when absolutely necessary required for
construction project for demolitions only. However, demolition drawings are
treated the same as revising a drawing. Demolition information should never be
shown in the same drawing with new construction information.
11.2 When preparing demolition design drawings, the following steps must be taken:
a) Obtain, through iPlant a design revision (alphanumeric) and electronic file
of the existing drawing(s) to be used for demolition. New drawing numbers
should not be assigned to a demolition drawing.
b) Submit the drawing through iPlant along with other drawings if any.
c) Add in the Title Block:
Word ‘DEMOLITION’ in line 1 of the title block.
12 As-Built
All approved and certified drawings must be updated to reflect the ‘As-Built’ condition
of the facility.
12.1 All As-Built drawings are processed in the same manner as normal drawing
revisions.
12.2 The Operation Engineering Organization for the plant or facility is responsible
for overseeing that the “KEY” drawings are kept updated (As-Built).
Page 16 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
12.3 The drawings can be issued for construction with holds (clouded areas).
These drawings must be revised to As-Built condition and certified.
12.4 Design, project and construction drawings shall be submitted to EK&RD with
revision number assigned from iPlant immediately after the completion of
detailed design project. For a new or existing drawing being brought to a 100%
field verified As-Built condition, a whole numeric revision number shall be
requested.
12.5 If two or more modifications, for different job numbers, are to be made on a
drawing due to: As-Built, Design change, etc., each modification must be
individually recorded and archived with a separate revision number for each job.
12.6 Any changes/redline that occur to the design during construction must be
reflected in the Engineering Drawings Corporate Management System (iPlant)
as a design revision. The OEO and PMT are the parties responsible for
implementing these changes/redline.
12.8 In case of revising a Data Centric drawing, a copy of the original data base is
issued for design or partial as built and saved separately as revisions 01A, 01B,
etc. The REO is responsible for the integrity of the data base and shall merge
the applicable changes under next as-built revision.
13 Certification
13.1 All Saudi Aramco Engineering Drawings must be approved, certified and dated
as required, herein, by means of routing a DCC through the approval process
and completing the title block of each drawing per Appendix B. Uncertified
drawings will not be accepted for inclusion into the corporate drawing system
(iPlant).
13.2 One single project (Job Order or EWO) may have more than one DCC.
Drawings of the same Engineering Discipline (Piping, Mechanical, Electrical,
Page 17 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
13.3 PMT, IDO, and OEO are the three types of organizations that submit and/or
revise drawings using a DCC. The DCCs issued to PMT and IDO organizations
require approvals from the Discipline Project Engineer, Project Manager, and
OEO representative. On the other hand, DCCs issued to OEO organizations
require approvals from the Discipline Engineer and the OEO Supervisor.
Any DCC may require an approval from another Saudi Aramco organization
depending on the content of the drawing. The table in Appendix B lists the
approvals required for a DCC based on the type of organization.
13.4 The Design Agency is responsible for completing the drawing title blocks and
routing the DCC through the approval/certification process. The guidelines
below are to be followed, when applicable, by the Design Agency while
completing this process.
a) A representative from a Saudi Aramco organization (Medical, Security,
Loss Prevention, and/or Fire Protection) may be required to review certain
drawings depending on their content. These drawings shall be determined
by the authorized personnel from the Design Agency.
b) The approvers’ initials that appear on the drawings must match the DCC
approvers’ names.
c) Delegating the approval task to others is not permitted.
13.5 The approval of a DCC affirms that qualified personnel have reviewed the
drawings and that they agree with the design in principle. The DCC approval
does not relieve the Design/Construction Agency of its full responsibility for
compliance with all relevant project scope, standards, procedures, specifications,
codes, contract documents, etc.
13.6 Approval levels for design changes made to previously certified engineering
drawings are the same as for new drawings. Each revision must be individually
approved and certified per this SAEP.
13.7 After a DCC has been approved by all necessary parties, each drawing must
indicate that it is covered by that DCC. For approval and certification
requirements, the “Revision Validation” information must be added to the DCC.
This information includes the following:
a) The revision number of the drawing being certified. Note that new
drawings issued for construction must bear the revision number “00.”
Page 18 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
14.2 For drawings developed by an Internal Design Office (IDO) using EWO, the
DCC number format shall be:
YYaxxx-nnn Example: 04C123-001
YY = Year when an Engineering Work Order (EWO) was
initiated.
a = The IDO alpha office code representing the IDO
office location (e.g., C = Central Area, N = Northern
Area, S = Southern Area, W = Western Area).
xxx = EWO number as assigned and controlled by the IDO.
nnn = Numerical sequential number of the DCC of the
drawings developed under the assigned EWO.
14.3 For drawings developed by a Design Agency (PMT) under a Job Order (JO)
number, the DCC number shall be:
xx-xxxxx-xxxx-nnn Example: 10-12345-1234-001
xx-xxxxx-xxxx = The Job Order number as assigned by SAP.
nnn = Numerical sequential number of the DCC of the
drawings developed under the assigned Job Order.
Page 19 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
15 Submittal
Per this procedure, all key and non-key (new, revised, cancelled and cancelled /
superseded) Saudi Aramco Engineering Drawings must be submitted to iPlant for
permanent retention and management.
15.1 All drawings must be submitted through iPlant. Scanned copy of the DCC shall
be loaded into iPlant during submittal. Each DCC must not exceed 150 drawings
in each submittal, and limited to one submittal. The signed original DCC shall be
mailed to EK&RD for processing and record.
15.2 All Drawings must be prepared, revised and submitted as per Appendix C.
Drawings issued in RASTER format must be made:
15.2.1 VECTOR or HYBRID before being submitted for inclusion into iPlant.
Both files of a HYBRID drawing must be included in the same
submittal. The minimum accepted HYBRID must include the latest
appropriate VECTOR border and title block information. Refer to
SAES-A-202 for more details.
15.3 Drawings issued for revision in VECTOR files must be revised and submitted as
VECTOR only. Unless required in other format as per Appendix C.
15.4.1 The REO shall submit the following completed certified drawings as a
first batch to EK&RD through iPlant:
1) Instrument Installation Schedule (IIS);
2) Cable and Conduit Schedule (CCS);
3) Line Designation Tables (LDT);
4) Equipment Data Sheets (DAT);
5) Safety Instruction Sheet (SIS);
6) Instrument Loop Diagram (ILD).
This is to ensure that all tag numbers assigned for this project are
requested from EK&RD. Also, to avoid ‘after-the fact’ acceptance of
project drawings without checking the tag numbers issued.
Page 20 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
15.4.2 After the acceptance of the first batch of drawings mentioned above,
EK&RD will inform the REO to submit the rest of the project drawings.
15.4.3 At the end of the project, REO must submit to EK&RD the following:
1) Return of un-used drawing numbers through iPlant;
2) Return of un-used revision numbers through iPlant;
3) Return of un-used tag numbers through iPlant system.
15.6 The drawings will not be considered accepted until EK&RD verification is
completed.
15.7 When the drawings are accepted for inclusion into iPlant, the user can check the
status of his submitted drawings on-line. The Saudi Aramco organization
responsible for the development of the drawings must maintain a temporary
backup of all the submitted drawings. When confirmed as accepted, the backups
must, then be deleted unless deemed justified to maintain longer (refer to
SAEP-127).
15.8 Any drawing found not in compliance with the Saudi Aramco CADD standards
and procedures will be returned on-line to the Saudi Aramco Project Manager or
REO for correction through iPlant. After correction, the drawings shall be re-
submitted through iPlant under the same job maintaining the same DCC.
The copy of the DCC shall be submitted along with the transmittal through
iPlant as a second submittal and so on.
15.9 A Drawing Control Sheet must be submitted for each Job Order or EWO.
All engineering drawings (revised and new) for the project must be listed in this
Drawing Control Sheet.
15.10 REO should not release any drawing (CADD file) to other users or for any other
projects. All drawings MUST be requested through IPlant.
15.11 Data-Centric
Page 21 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
SmartPlant P&ID
SmartPlant Instrumentation
SmartPlant Electrical
Plant Design System (PDS 3D)
15.11.3 EK&RD will accept the 2D drawings generated from the Data-Centric
systems as per Appendices C & D of this procedure and SAES-A-202.
The databases shall be delivered to EK&RD to be restored on the
corporate database server and access will be given to the Operation
Engineering Organization. The information related to the database
backup shall be filled in the Database Submittal Form and submitted
along with database backup.
15.11.4 All the converted drawings from the existing format to a Data-Centric
format should be submitted to iPlant in PDF along with the databases
with higher revision number.
15.11.5 PDF (MICROSTATION for PDS only) drawings shall be kept in iPlant
for reference and revision control only while future updates shall be
made from the Data-Centric systems.
15.11.7 EK&RD will lock the submittal/retrieval operations of the old file
format of the drawing types of the plants migrated to Data-Centric.
iPlant will also prevent new inclusion of the drawings of the same
discipline type(s) that had been moved to Data-Centric. Users will
also be notified with a status flag “Data-Centric” during iPlant
drawing submittal for any data-centric plant.
Page 22 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
15.11.9 Operations (OEO) and PMT are jointly responsible for the
engineering drawings contents and associated engineering data that
are generated from the Data Centric systems, while EK&RD will
perform QA/QC for compliance per SAES-A-202 and this procedure.
Non-compliance drawings/data will result in resubmission with
necessary recommendations.
16 Overdue Drawings
Page 23 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Page 24 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Page 25 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
17 EK&RD Acceptance
When a drawing is reviewed and accepted by EK&RD for inclusion into iPlant, EK&RD
Verification is automatically notified into iPlant.
18 Vendor Drawings
18.1 Development
18.2 Certification
18.2.1 All reference vendor drawings must be signed certified by the vendor /
manufacturer and submitted by the Design Agency (PMT) in any
acceptable file format.
Page 26 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Vendor drawings shall be submitted to the iPlant in electronic media only. iPlant
will only support viewing and printing of the following formats; Word, Excel,
AutoCAD, Microstation, PDF, JPG and TIFF.
18.5 Submittal
Page 27 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
18.5.1.5 Tag number: is the tag numbers associated with the vendor
drawings if any.
Drawing number (35) + space + plant no (4) + space + job log no (17)
+ space + description (35) + space + tag no (20) + space + equipment
no (20) + space + vendor name (30).
18.6 Access
18.7 Conversion
Any Vendor Drawing that has been designated by Project Management Team
(PMT) or Proponent as having high significance for continued equipment
operation and having the potential of being revised by Saudi Aramco at any time
in the future shall be converted to Engineering Drawing as per the Saudi
Aramco Engineering Standard SAES-A-202 and this procedure.
18.9 Vendor drawings shall not be reviewed by EK&RD and Drawing Completion
Certificate (DCC) is not required. EK&RD will archive vendor drawings into
iPlant for reference only. The authorized individual who submits the vendor
drawings into iPlant is responsible for the contents of the drawings.
Revision Summary
17 March 2013 Revised the “Next Planned Update.” Reaffirmed the content of the document, and reissued
with minor revisions as mentioned in the Audit report.
Page 28 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Certification
Assign DCC number (item 14)
Sign the DCC (item 13)
Signatories name and date shall be entered in the Design certification and review of
key drawing (if applicable) box on each drawing (item 13.3)
Enter in all certified drawings DCC number and revision number in the revision
validation box (item 13.8)
Submittal
Submit certified drawings through iPlant (item 15)
Send original DCC to EK&RD (item 15)
EK&RD verification
Review for compliance (item 16)
Return Accept
For correction Complete EK&RD verification
Process into iPlant
Archive original DCC
Page 29 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Appendix B - Certification
5. Submittal
The user’s information that is granted authority to submit drawings through iPlant shall
complete this section.
6. EK&RD Acceptance (by EK&RD/Saudi Aramco)
EK&RD recognizes acceptance of the drawing that it is compliant with Saudi Aramco
drawing standards and practices.
Page 30 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
DCC Workflow
See the below diagram for an illustration of the workflow process for completing an
online DCC. See the iPlant User Manual for more details.
Cancel Submittal
Created Pending
Upload Drawing
Create Workflow
Cancel Workflow
Submitted
Approve Workflow
Reject Workflow
Approved Rejected
Page 31 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
6. Required Approvals
There are three types of Design Agencies (PMT, IDO, and OEO) that submit and/or
revise drawings using a DCC. The table below lists the required approvals with respect to
the type of Design Agency.
This section shows the locations of the fields for the approvers on the Drawing Title
Block and the online DCC form when the Design Agency is a PMT or IDO.
7.1.1. Discipline Project Engineer: Type the initial and date of the individual
charged, on behalf of the Design Agency for the correctness of the
engineering design of the drawing. This shall be the same individual that
approves the online DCC.
7.1.2. Certified By: Type the initial and date of the individual bearing the
overall responsibility of the project in the capacity of a Project Manager.
This shall be the same individual that approves the online DCC.
7.1.3. OEO Representative (proponent): Type the initial and date of the
Operation Representative that reviews the drawings. This shall be the
same individual that concurs the online DCC.
(By Saudi Aramco-required on all Key Drawings. Key Drawings must be check-
marked as “REQUIRED”).
7.2.1. Construction Agency: Type the initial and date of the Saudi Aramco
Discipline Project Engineer, familiar with the nature and Company
requirements of the project design, representing the Construction Agency.
This shall be the same individual who approves the online DCC.
Page 32 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
7.2.2. OEO Representative (proponent): Type the initial and date of the
Operation Representative that reviews the drawings. This shall be the
same individual that concurs the online DCC.
7.3. Other (By Saudi Aramco – Key and non-Key Drawings) by:
Type the initial of the “Other” Saudi Aramco Senior Representative from the
Medical, Security, Fire Protection, and/or Loss Prevention on the Drawing Title
Block. This shall be the same individual that approves the online DCC.
7.4.1. Revision number “00” for new drawings or as issued by the iPlant for
existing drawings.
Page 33 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
3.4
3.2 *
3.4.1
3.1.3
3.1.2
3.4.2
3.4
3.1 3.3 **
3.2.2 *
3.1.1
3.1.2 3.2.1 *
3.4.1
Page 34 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
3.1
3.1.1
3.1.2
3.1.3
3.3 3.3
Page 35 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
This section shows the locations of the fields for the approvers on the Drawing Title Block
and the online DCC form when the Design Agency is an OEO.
8.1.1. Discipline Engineer: Type the initial and date of the individual charged,
on behalf of the Operation Engineering Organization for the correctness
of the engineering design of the drawing. This shall be the same
individual that approves the online DCC.
8.1.2. Certified By: Type the initial and date of the OEO Supervisor that is
responsible for the plant or location affected by the drawings being
revised. This shall be the same individual that certifies the online DCC.
(By Saudi Aramco-required on all Key Drawings. Key Drawings must be check-
marked as “REQUIRED”).
Construction Agency: Type the initial and date of the Saudi Aramco
Discipline Project Engineer, familiar with the nature and Company
requirements of the project design, representing the Construction Agency.
This shall be the same individual who approves the online DCC.
8.3. Other (By Saudi Aramco - Key and non-Key Drawings) by:
Type the initial of the “Other” Saudi Aramco Senior Representative from the
Medical, Security, Fire Protection, and/or Loss Prevention on the Drawing Title
Block. This shall be the same individual that approves the online DCC.
8.4.1. Revision number “00” for new drawings or as issued by the iPlant for
existing drawings.
Page 36 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
4.4
4.2 *
4.4.1
3.1.2
4.4.2
3.4
4.1 4.3 **
4.2.1 *
4.1.1
4.1.2
4.4.1
Page 37 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
3.1
4.1.1
4.1.2
3.3
Page 38 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Dwg.
Drawing/Document Type File Format Requirement
Size
Single file for one or
Scope of Work E Microsoft Word
multi-page documents.
Single file for one or
List of Material E Microsoft Word or Excel
multi-page documents.
Engineering Drawings such as:
Safety Instruction Sheet (SIS)
Instrument Installation Schedule (IIS)
Cable and Conduit Schedule (CCS) Single file for each sheet
D, E Microsoft Excel
Line Designation Table (LDT) of drawing.
Equipment Data Sheet
Instrument Specification Sheet (ISS)
Drawing Control Sheet
Single file for each sheet
Other Engineering Drawings A-D MicroStation/AutoCAD
of drawing
Single file for one or
Smart Data Sheets (DAT) D, E Excel
multi-page documents.
Data Centric (Refer to Section 15.11)
Single file for each sheet
such as: A-E PDF Acrobat
of drawing + Database.
Smart Plant PID, Smart Plant electrical
Single file for one or
Data Centric Smart Plant
A-E PDF Acrobat multi-page documents
Instrumentation
per tag + Database.
MicroStation for PDS
Data Centric 3D MODEL A-E Single file + Database
only
Note:
1. All drawings must be prepared and generated using corresponding Saudi Aramco Standard Engineering
Forms.
Page 39 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Page 40 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
2741-3 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2741-4 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2741M-1 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2741M-2 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2741M-3 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2741M-4 E G CSD DATA SHEET - CENTRIFUGAL PUMP - HOR. & VERT. IN-LINE PUMPS EXCEL
2742 E A CSD SAFETY INSTRUCTION SHEET - PUMPS EXCEL
2742M E A CSD SAFETY INSTRUCTION SHEET - PUMPS EXCEL
2748-1 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748-2 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748-3 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748-4 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748M-1 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748M-2 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748M-3 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2748M-4 E G CSD DATA SHEET - CENTRIFUGAL PUMP FOR VERTICAL LINE SHAFT PUMPS EXCEL
2773 E J P&CSD ISS - PRESSURE INSTRUMENTS EXCEL
2773M E J P&CSD ISS - PRESSURE INSTRUMENTS EXCEL
2775 E J P&CSD ISS - BULB TYPE TEMPERATURE INSTRUMENTS EXCEL
2775M E J P&CSD ISS - BULB TYPE TEMPERATURE INSTRUMENTS EXCEL
2777 E J P&CSD ISS - RECEIVING INSTRUMENTS EXCEL
2777M E J P&CSD ISS - RECEIVING INSTRUMENTS EXCEL
2778 E J P&CSD ISS - LOCAL FLOW INSTRUMENTS EXCEL
2778M E J P&CSD ISS - LOCAL FLOW INSTRUMENTS EXCEL
2780 E J P&CSD ISS - BALANCED BRIDGE TYPE TEMP. INSTRUMENTS EXCEL
2780M E J P&CSD ISS - BALANCED BRIDGE TYPE TEMP. INSTRUMENTS EXCEL
2786M E J P&CSD ISS - TRAPS AND DRAINERS EXCEL
2787 E J P&CSD ISS - PRESSURE REGULATORS EXCEL
2787M E J P&CSD ISS - PRESSURE REGULATORS EXCEL
2788 E J P&CSD ISS - DIFFERENTIAL TYPE LEVEL INSTRUMENTS EXCEL
2788M E J P&CSD ISS - DIFFERENTIAL TYPE LEVEL INSTRUMENTS EXCEL
2790 E J P&CSD ISS - VARIABLE AREA FLOW METERS EXCEL
2790M E J P&CSD ISS - VARIABLE AREA FLOW METERS EXCEL
2793M E J P&CSD ISS - DRAFT GAUGES EXCEL
2794 E J P&CSD ISS - SNAP ACTING VALVES EXCEL
2794M E J P&CSD ISS - SNAP ACTING VALVES EXCEL
2811-1 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811-2 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811-3 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811-4 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811M-1 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811M-2 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811M-3 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2811M-4 E K CSD DATA SHEET - STEAM/GAS EXPANSION TURBINE EXCEL
2812-1 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812-2 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
Page 41 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
2812-3 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812-4 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812-5 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812-6 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812-7 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-1 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-2 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-3 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-4 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-5 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-6 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2812M-7 E K CSD DATA SHEET - CENTRIFUGAL COMPRESSORS EXCEL
2821 E A CSD SAFETY INSTRUCTION SHEET - CRITICAL PLANT PIPING EXCEL
2821M E A INSP SAFETY INSTRUCTION SHEET - CRITICAL PLANT PIPING EXCEL
SDS-ME-02821 E A INSP SAFETY INSTRUCTION SHEET - CRITICAL PLANT PIPING EXCEL
2825 B L ENG ISOMETRIC PIPING DETAILS DGN
2825-1 C L ENG ISOMETRIC PIPING DETAILS DGN
2825-2 D L ENG ISOMETRIC PIPING DETAILS DGN
2829 D L CSD PIPING ARRANGEMENT AT PROPORTIONING PUMP EXCEL
2871 B Q ENG STEEL BENDING DETAILS DGN
3063 E A CSD PILE DRIVING RECORD EXCEL
3063M E A CSD PILE DRIVING RECORD EXCEL
3175 E J P&CSD ORIFICE PLATE DETAILS FOR RF FLANGES EXCEL
3175-A E J P&CSD ISS-ORIFICE PLATE DETAIL FOR EXCEL
3176 E J P&CSD ORIFICE PLATE DETAIL - SEGMENTAL EXCEL
3176-A E J P&CSD ORIFICE PLATE DETAIL - RESTRICTION EXCEL
3176M E J P&CSD ORIFICE PLATE DETAIL - SEGMENTAL EXCEL
3177 E J P&CSD ORIFICE PLATE DETAIL - QUADRANT EDGE EXCEL
3185-1 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 001 TO 025 EXCEL
3185-2 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 026 TO 057 EXCEL
3185-3 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 058 TO 084 EXCEL
3185-4 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 101 TO 108C EXCEL
3185-5 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 109 TO 121 EXCEL
3185-6 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 121A TO 135B EXCEL
3185-7 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 136 TO 168 EXCEL
3185-8 E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET - ITEM 169 TO 196 EXCEL
3185-A E J P&CSD INSTRUMENT MATERIAL SUMMARY SHEET EXCEL
3186 E J P&CSD ISS - VIBRATION SWITCHES EXCEL
3186M E J P&CSD ISS - VIBRATION SWITCHES EXCEL
3188 E J P&CSD METER READING TABLES EXCEL
3188M E J P&CSD METER READING TABLES EXCEL
3195 E J P&CSD ISS - PISTON OPERATED VALVES EXCEL
3195M E J P&CSD ISS - PISTON OPERATED VALVES EXCEL
5645-1 E A CSD SAFETY INSTRUCTION SHEET - CROSS COUNTRY PIPELINE - MAIN LINE PIPE EXCEL
5645-2 E A CSD SAFETY INSTRUCTION SHEET - CROSS COUNTRY CRITICAL PIPING EXCEL
5645-3 E A CSD SAFETY INSTRUCTION SHEET - TERMINAL AND BULK PLANT PIPING EXCEL
Page 42 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
SDS-ME-05645 E A CSD SAFETY INSTRUCTION SHEET - TERMINAL AND BULK PLANT PIPING EXCEL
5994 A A ENG PIPING & INSTRUMENT DIAGRAM DGN
5994-1 B A ENG PIPING & INSTRUMENT DIAGRAM DGN
6078 E J P&CSD ISS - FLOW INSTRUMENTS EXCEL
6078M E J P&CSD ISS - FLOW INSTRUMENTS EXCEL
6079 E J P&CSD ISS - LEVEL SWITCHES EXCEL
6079M E J P&CSD ISS - LEVEL SWITCHES EXCEL
6080 E J P&CSD ISS - FILLED SYSTEM TYPE TEMPERATURE SWITCHES EXCEL
6080M E J P&CSD ISS - FILLED SYSTEM TYPE TEMPERATURE SWITCHES EXCEL
6081 E J P&CSD ISS - THERMOCOUPLE/RTD SWITCHES EXCEL
6081M E J P&CSD ISS - THERMOCOUPLE/RTD SWITCHES EXCEL
6225 D J ENG FACE SHEET FOR ‘D’ SIZE DRAWINGS (FOR IIS, CCS & LDT) EXCEL
6227 D P CSD DATA SHEET - MOTOR CONTROLLER(S) NO(S). FOR SUBSTATION NO. EXCEL
6231 E E CSD BOLT AND GASKET LIST EXCEL
6231-M E E CSD BOLT AND GASKET LIST EXCEL
6232 C P CSD LIGHTING PANEL SCHEDULE DGN
6233 D L CSD VALVE DATA FOR MOUNTING MOTOR OPERATORS EXCEL
6233-1 E L CSD VALVE DATA SHEET EXCEL
6236 D P CSD MOTOR CONTROL CENTER NO. FOR SUBSTATION NO. __________ EXCEL
6236-M D P CSD MOTOR CONTROL CENTER NO. FOR SUBSTATION NO. __________ EXCEL
6237-1 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6237-2 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6237-3 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6237M-1 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6237M-2 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6237M-3 E K CSD DATA SHEET FOR DIESEL ENGINES EXCEL
6238 E A CSD SAFETY INSTRUCTION SHEET - AIR-COOLED HEAT EXCHANGER EXCEL
6239 E J P&CSD ISS – GENERAL EXCEL
6285 A A ENG PLAN AND PROFILE DGN
6286-1 E K CSD DATA SHEET - RECIPROCATING COMP., PLANT & INST. AIR SERVICE EXCEL
6286-2 E K CSD DATA SHEET - RECIPROCATING COMP., PLANT & INST. AIR SERVICE EXCEL
6286M-1 E K CSD DATA SHEET - RECIPROCATING COMP., PLANT & INST. AIR SERVICE EXCEL
6286M-2 E K CSD DATA SHEET - RECIPROCATING COMP., PLANT & INST. AIR SERVICE EXCEL
6736 D M CSD DATA SHEET FOR OFFSHORE PLATFORM EXCEL
6880-1 E G CSD DATA SHEET - SUBMERSIBLE PUMPS EXCEL
6880-2 E G CSD DATA SHEET - SUBMERSIBLE PUMPS EXCEL
6880M-1 E G CSD DATA SHEET - SUBMERSIBLE PUMPS EXCEL
6880M-2 E G CSD DATA SHEET - SUBMERSIBLE PUMPS EXCEL
7305 E A CSD DATA SHEET - EQUIPMENT NOISE EXCEL
7460 B J ENG INSTRUMENT LOOP DIAGRAM - SIZE ‘B’ DGN
7460-1 C J ENG INSTRUMENT LOOP DIAGRAM - SIZE ‘C’ DGN
7460-2 D J ENG INSTRUMENT LOOP DIAGRAM - SIZE ‘D’ DGN
8001-1 E K CSD DATA SHEET - RECIPROCATING COMPRESSORS PROCESS AIR & GAS EXCEL
8001-2 E K CSD DATA SHEET - RECIPROCATING COMPRESSORS PROCESS AIR & GAS EXCEL
8001-3 E K CSD DATA SHEET - RECIPROCATING COMPRESSORS PROCESS AIR & GAS EXCEL
8001-4 E K CSD DATA SHEET - RECIPROCATING COMPRESSORS PROCESS AIR & GAS EXCEL
Page 43 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
8001M-1 E K CSD DATA SHEET - RECIPROCATING COMP. PROCESS - AIR & GAS SERVICE EXCEL
8001M-2 E K CSD DATA SHEET - RECIPROCATING COMP. PROCESS - AIR & GAS SERVICE EXCEL
8001M-3 E K CSD DATA SHEET - RECIPROCATING COMP. PROCESS - AIR & GAS SERVICE EXCEL
8001M-4 E K CSD DATA SHEET - RECIPROCATING COMP. PROCESS - AIR & GAS SERVICE EXCEL
8002-1 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-2 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-3 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-4 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-5 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-6 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-7 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-8 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002-9 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-1 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-2 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-3 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-4 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-5 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-6 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-7 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-8 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8002M-9 E K CSD DATA SHEET – COMBUSTION GAS TURBINES EXCEL
8003-1 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8003-2 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8003-3 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8003M-1 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8003M-2 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8003M-3 E K CSD DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.) EXCEL
8004-1 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004-2 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004-3 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004-4 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004M-1 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004M-2 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004M-3 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8004M-4 E G CSD DATA SHEET – LUBRICATION, SHAFT SEALING & CONT. OIL SYSTEM EXCEL
8009-1 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009-2 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009-3 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009-4 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009-5 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009-6 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009M-1 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009M-2 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009M-3 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009M-4 E F CSD DATA SHEET - FIRED HEATER EXCEL
Page 44 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
8009M-5 E F CSD DATA SHEET - FIRED HEATER EXCEL
8009M-6 E F CSD DATA SHEET - FIRED HEATER EXCEL
SDS-ME-8009 E F CSD DATA SHEET - FIRED HEATER EXCEL
8010-1 E G CSD DATA SHEET - POSITIVE DISPLACEMENT PUMP EXCEL
8010-2 E G CSD DATA SHEET - POSITIVE DISPLACEMENT PUMP EXCEL
8010M-1 E G CSD DATA SHEET - POSITIVE DISPLACEMENT PUMP EXCEL
8010M-2 E G CSD DATA SHEET - POSITIVE DISPLACEMENT PUMP EXCEL
8012 E K CSD SPECIFICATION FOR COMPRESSED AIR DRYER EXCEL
8014 D Q CSD DATA SHEET – FOUNDATION DESIGN (DYNAMIC DESIGN) EXCEL
8014-M D Q CSD DATA SHEET – FOUNDATION DESIGN (DYNAMIC DESIGN) EXCEL
8020-111 E J P&CSD ISS - FLOW TRANSMITTERS (DIFF. PRESSURE TYPE) EXCEL
8020-111M E J P&CSD ISS - FLOW TRANSMITTERS (DIFF. PRESSURE TYPE) EXCEL
8020-112 E J P&CSD ISS - FLOW TRANSMITTERS-SMART (DIFFERENTIAL PRESSURE) EXCEL
8020-115 E J P&CSD ISS - METERING ORIFICE CALCULATION CONVENTIONAL UNITS EXCEL
8020-115M E J P&CSD ISS - METERING ORIFICE CALCULATION SI UNITS EXCEL
8020-116 E J P&CSD ISS - VENTURI TUBE SPECIFICATION & CALCULATION EXCEL
8020-116M E J P&CSD ISS - VENTURI TUBE SPECIFICATION & CALCULATION EXCEL
8020-117 E J P&CSD ISS - TURBINE METERS EXCEL
8020-117M E J P&CSD ISS - TURBINE METERS EXCEL
8020-118 E J P&CSD ISS - LIQUID POSITIVE DISPLACEMENT METERS EXCEL
8020-119 E J P&CSD ISS - BI-DIRECTIONAL METER PROVER EXCEL
8020-124 E J P&CSD ISS - RESTRICTION ORIFICE CALCULATION AND SPECIFICATION EXCEL
8020-124M E J P&CSD ISS - RESTRICTION ORIFICE CALCULATION AND SPECIFICATION EXCEL
8020-200 E J P&CSD ISS - PRESSURE TRANSMITTERS-SMART (ABS, GAGE, & DP) EXCEL
8020-212 E J P&CSD ISS - PRESSURE AND DIFFERENTIAL PRESSURE GAUGES EXCEL
8020-213-1 E J P&CSD ISS - PRESSURE AND D/P SWITCH EXCEL
8020-213-2 E J P&CSD ISS - PRESSURE AND D/P SWITCH EXCEL
8020-312 E J P&CSD ISS - LEVEL GAUGE GLASSES EXCEL
8020-314 E J P&CSD ISS - LEVEL INSTRUMENTS EXCEL
8020-318 E J P&CSD ISS - AUTOMATIC TANK GAUGING EQUIPMENT EXCEL
8020-319 E J P&CSD ISS - AUTOMATIC TANK GAUGE – RADAR EXCEL
8020-320 E J P&CSD ISS - LEVEL DEVICE, TIME DOMAIN REFLECTOMETER EXCEL
8020-400 E J P&CSD ISS - TEMPERATURE TRANSMITTERS-SMART EXCEL
8020-413 E J P&CSD ISS - MECHANICAL TEMPERATURE SWITCHES EXCEL
8020-415-1 E J P&CSD ISS - THERMOCOUPLE (T/C) ASSEMBLY EXCEL
8020-415-2 E J P&CSD ISS - THERMOCOUPLE (T/C) ASSEMBLY EXCEL
8020-415M-1 E J P&CSD ISS - THERMOCOUPLE (T/C) ASSEMBLY EXCEL
8020-415M-2 E J P&CSD ISS - THERMOCOUPLE (T/C) ASSEMBLY EXCEL
8020-416-1 E J P&CSD ISS - RESISTANCE TEMPERATURE DETECTOR (RTD) EXCEL
8020-416-2 E J P&CSD ISS - RESISTANCE TEMPERATURE DETECTOR (RTD) EXCEL
8020-418-1 E J P&CSD ISS – THERMOWELL EXCEL
8020-418-2 E J P&CSD ISS – THERMOWELL EXCEL
8020-418M-1 E J P&CSD ISS – THERMOWELL EXCEL
8020-418M-2 E J P&CSD ISS – THERMOWELL EXCEL
8020-419-1 E J P&CSD ISS - TEMPERATURE MONITOR EXCEL
8020-419-2 E J P&CSD ISS - TEMPERATURE MONITOR EXCEL
Page 45 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
8020-419M-1 E J P&CSD ISS - TEMPERATURE MONITOR EXCEL
8020-419M-2 E J P&CSD ISS - TEMPERATURE MONITOR EXCEL
8020-511-1 E J P&CSD ISS – CHROMATOGRAPHS EXCEL
8020-511-2 E J P&CSD ISS – CHROMATOGRAPHS EXCEL
8020-512 E J P&CSD ISS - OXYGEN ANALYZER EXCEL
8020-514 E J P&CSD ISS – COMBUSTIBLE GAS AND HYDROGEN SULFIDE MONITORS EXCEL
8020-515 E J P&CSD ISS - MOISTURE ANALYZERS EXCEL
8020-517 E J P&CSD ISS - DENSITY METERS FOR GAS AND LIQUID SERVICE EXCEL
8020-525 E J P&CSD ISS - HYDROCARBON LIQUID SAMPLING SYSTEMS EXCEL
8020-605 E J P&CSD ISS - SURGE RELIEF VALVES EXCEL
8020-611-1 E J P&CSD ISS - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES EXCEL
8020-611-1M E J P&CSD ISS - SAFETY RELIEF VALVES EXCEL
8020-611-2 E J P&CSD ISS - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES EXCEL
8020-611-2M E J P&CSD ISS - SAFETY RELIEF VALVES (CALCULATION) EXCEL
8020-611-3 E J P&CSD ISS - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES EXCEL
8020-611-3M E J P&CSD ISS - SAFETY RELIEF VALVES (CALCULATION) EXCEL
8020-612-1 E J P&CSD ISS - SAFETY RELIEF VALVE S PILOT OPERATED EXCEL
8020-612-2 E J P&CSD ISS - SAFETY RELIEF VALVE S PILOT OPERATED EXCEL
8020-612-3 E J P&CSD ISS - SAFETY RELIEF VALVE S PILOT OPERATED EXCEL
8020-613-1 E J P&CSD ISS - PRESSURE - VACUUM RELIEF VALVES EXCEL
8020-613-2 E J P&CSD ISS - PRESSURE - VACUUM RELIEF VALVES EXCEL
8020-617 E J P&CSD ISS - FLAME MONITORING SYSTEMS EXCEL
8020-623-1 E J P&CSD ISS - PROGRAMMABLE CONTROLLER BASED ESD SYSTEMS EXCEL
8020-623-2 E J P&CSD ISS - PROGRAMMABLE CONTROLLER BASED ESD SYSTEMS EXCEL
8020-625-1 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-625-2 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-625-3 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-625-4 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-625-5 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-625-6 E J P&CSD ISS - MACHINERY PROTECTION SYSTEM EXCEL
8020-634 E J P&CSD ISS - LOCAL ZV CONTROLS EXCEL
8020-711-1 E J P&CSD ISS - GLOBE / ANGLE CONTROL VALVES EXCEL
8020-711-2 E J P&CSD ISS - GLOBE / ANGLE CONTROL VALVES EXCEL
8020-712-1 E J P&CSD ISS - BALL CONTROL VALVES EXCEL
8020-712-2 E J P&CSD ISS - BALL CONTROL VALVES ( SIZING AND NOISE CALCULATIONS) EXCEL
8020-713-1 E J P&CSD ISS - BUTTERFLY/ROTARY PLUG CONTROL VALVES EXCEL
8020-713-2 E J P&CSD ISS - BUTTERFLY/ROTARY PLUG CONTROL VALVES (SIZING & NOISE CALC) EXCEL
8020-716 E J P&CSD ISS - PNEUMATIC ACTUATORS (ON-OFF SERVICE) EXCEL
8020-717 E J P&CSD ISS - HYDRAULIC VALVE ACTUATORS EXCEL
8020-718 E J P&CSD ISS - ELECTRIC MOTOR OPERATED VALVE ACTUATORS EXCEL
8020-815-1 E J P&CSD ISS – ANNUNCIATORS EXCEL
8020-815-2 E J P&CSD ISS – ANNUNCIATORS EXCEL
8020-825 E J P&CSD ISS - ELECTRO-MECHANICAL RELAYS EXCEL
8020-827 E J P&CSD ISS - SOLENOID OPERATED VALVES EXCEL
8020-828 E J P&CSD ISS - TRANSDUCERS (SIGNAL CONVERSION) EXCEL
8020-830 E J P&CSD ISS - PROGRAMMABLE CONTROLLER EXCEL
Page 46 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
8020-831 E J P&CSD ISS - INSTRUMENTATION FOR PACKAGED UNITS EXCEL
8020-913 E J P&CSD ISS - INSTRUMENTATION AND THERMOCOUPLE CABLE EXCEL
8110 A P CSD LOGIC DIAGRAM - SIZE: ‘A’ DGN
8110-1 B P CSD LOGIC DIAGRAM - SIZE: ‘B’ DGN
8110-2 C P CSD LOGIC DIAGRAM - SIZE: ‘C’ DGN
8111 B J ENG INDEX SHEET – INSTRUMENT LOOP DIAGRAM - SIZE: ‘B’ DGN
8111-1 C J ENG INDEX SHEET – INSTRUMENT LOOP DIAGRAM - SIZE: ‘C’ DGN
8111-2 D J ENG INDEX SHEET – INSTRUMENT LOOP DIAGRAM - SIZE: ‘D’ DGN
8114 A P CSD ELECTRICAL LOAD TABULATION DGN
8117M-1 E K CSD DATA SHEET - CENTRIF. FLUOROCARBON REFRIGERATION UNITS EXCEL
8117M-2 E K CSD DATA SHEET - CENTRIF. FLUOROCARBON REFRIGERATION UNITS EXCEL
8118 D A CSD DATA SHEET – HYDROSTATIC TEST REPORT - SUBMARINE PIPELINES EXCEL
8130-1 E K CSD DATA SHEET - SIDE ENTRY MIXER EXCEL
8130-2 E K CSD DATA SHEET - SIDE ENTRY MIXER EXCEL
8130M-1 E K CSD DATA SHEET - SIDE ENTRY MIXER EXCEL
8130M-2 E K CSD DATA SHEET - SIDE ENTRY MIXER EXCEL
8150-1 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150-2 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150-3 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150-4 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150-5 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150-6 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-1 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-2 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-3 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-4 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-5 E K ENG DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8150M-6 E K CSD DATA SHT. - PACKAGED INTEGRALLY GEARED CENT. AIR COMPRESSOR EXCEL
8172 E E CSD DATA SHEET - PLATE AND FRAME TYPE HEAT EXCHANGER EXCEL
8173 E A CSD SAFETY INSTRUCTION SHEET - PLATE TYPE HEAT EXCHANGERS EXCEL
9336 E A CSD SAFETY INSTRUCTION SHEET – COMPRESSORS EXCEL
9524 E P&CSD PROCESS DESIGN DATA SHEET – PACKING EXCEL
9524-1 E P&CSD PROCESS DESIGN DATA SHEET - STREAM COMPOSITION EXCEL
9524-2 E P&CSD PROCESS DESIGN DATA SHEET – TRAYS EXCEL
9527 D D CSD PRESSURE VESSEL DATA SHEET. DGN
SDS-ME-09527 D D CSD PRESSURE VESSEL DATA SHEET. EXCEL
9541 E E CSD DATA SHEET - ELECTRIC HEAT EXCHANGER EXCEL
9543 D F P&CSD DATA SHEET - PRESSURE RELIEF DEVICE - FLARE SYSTEM EXCEL
9544 D F P&CSD FLARE LOAD SUMMARY EXCEL
9547 E F P&CSD DATA SHEET - FLARE TIP EXCEL
9548 E F P&CSD SPECIFICATION SHEET – FLARES EXCEL
9549 E F PCSD DATA SHEET - FLARE KNOCK OUT/SEAL DRUM. EXCEL
9550-1 E F CSD DATA SHEET - WATER TUBE BOILER EXCEL
9550-2 E F CSD DATA SHEET - WATER TUBE BOILER EXCEL
SDS-ME-09550 E F CSD DATA SHEET - WATER TUBE BOILER EXCEL
9561 E F P&CSD DATA SHEET - FLARE PROCESS CONDITION EXCEL
Page 47 of 48
Document Responsibility: Engineering Knowledge and Resources Division SAEP-334
Issue Date: 17 March 2013 Retrieval, Certification and Submittal
Next Planned Update: 17 March 2016 of Saudi Aramco Engineering and Vendor Drawings
Prop.
Form # Size Index Title Format
Dept.
9562 E F P&CSD DATA SHEET - FLARE UTILITIES EXCEL
9570 E A CSD SAFETY INSTRUCTION SHEET - WATER TUBE BOILERS EXCEL
9580 E D CSD DATA SHEET - API 620 STORAGE TANK EXCEL
9594 E ENG DRAWING COMPLETION CERTIFICATE (DCC) WORD
9597-1 E CSD NONMATERIAL REQUIREMENTS FOR BATTERY CHARGER/RECTIFIER EXCEL
The index of face sheets to follow the same discipline (index) for which the face sheet has been made.
Page 48 of 48