Evs Ic Chamber Calculation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Add a little bit of body text

Add a little bit of body text MAIN HOLE COVER&


INVERT LEVEL CALCULATION
FRAME
FINISHED PAVEMENT LVL. FINISHED GR. LVL.

FORMULA :-
IC TO IC DISTANCE /60+INVERT LEVEL
MORTER JOINT TOTAL NUMBER OF IC CHAMBERS:-9
LEVELLING COURSE

IC CHAMBER 1
DISTANCE(M)/60+INVERT LEVEL
14/60+500=730MM
GROUTING BENCHING IC CHAMBER 2
DISTANCE FROM IC1/60+INVERT LEVEL FROM PREVIOUS CALCULATION
8/60+730=863MM
IC CHAMBER 3
CONC
11/60+863=1043MM
IC CHAMBER 4
13/60+1043=1253MM
SECTION AT -AA IC CHAMBER 5
11/60+1253=1433MM
IC CHAMBER 6
6/60+1433=1533MM
IC CHAMBER 7
DROP CHAMBER
IC CHAMBER 8
DISTANCE(M)/60+INVERT LEVEL
12 MM THICK PLASTER WITH
WATER PROOFING COMPOUND
7/60+500=610MM
IC CHAMBER 9
9/60+610=760MM
DROP CHAMBER
16mm ------
BRICK MASONARY IN PLASTER
CEMENT DISCONNECTING CHAMBER
(DISTANCE BETWEEN DISCONNECTING CHAMBER TO SEPTIC TANK/60+THE HIGHEST DEPTH VALUE )
4/60+1533=1593MM
~1.5M DEPTH/ LEVEL OF SEPTIC TANK
PLAN
(INSPECTION CHAMBER)

2/03/24 KUNAL SIRWANI


IC CHAMBER SECTION WITH CALCULATION ------ EVS
SHEET NO 1 DYPSOA