JOB SAFETY ANALYSIS
Required Safety
Work Activity Hazards Present
Measures/PPE
1. Machine/ vehicle/
1. Injury due to 1. Check all machines
Equipment mobilization at defective/ unhealthy and vehicles before entry.
site equipment’s. 1.1 Ensure equipment’s
2. Entry of are certified by Reliance
unauthorized person at P&M dept. prior to
site. mobilization at site.
3. Vehicle may roll. 2. Ensure only authorized
operator/ drivers/ drive
machine/ vehicles.
2.1 check SDP of all
operators and
drivers
3. ensure apply the
parking brake while
in standing position.
3.1 Place blocks in front
and back of the wheel
diagonally opposite to the
flat.
2.Material handling at site 1. Injury/ property 1. Avoid manual handling,
(loading/ unloading, damage due to failure of use mechanical aid, if
shifting of steel,cable tray lifting equipment tools & required ensure use of
,cable,conduit, earthing tackles. proper technique and
strip) specific PPE’s.
1.1 Deploy trade validated
workman.
1.2 Ensure use of third
party certified lifting
tools
pg. 2
JOB SAFETY ANALYSIS
& tackles.
1.3 Selection of crane,
lifting tools & tackles
as per desire load.
1.4 Validated operators,
riggers and banks man
deployed for rigging.
1.5 Use tag line to control
swing of material.
1.6 Maintain good
housekeeping.
1.7 use of specific PPE.
(cut resistance hand
gloves)
3. Mobile Scaffolding 1. Fall of person. 1. Deploy competent
erection and dismantling. 2. Struck by falling person shall
scaffolding improper supervise the
erection, moving or
setup.
Dismantling of
3. Improper access. scaffolding.
4. Sleep & trip wizard. 2. Deploy competent
trade validation
scaffolder for the
scaffolding
erection.
3. Provide a safe
means of
access.
4. Inspect scaffolding
on regular basis
checklist.
4.1 Falling protection is
required if working
above 1.8 mtr
height.
4.2 Look before
you walk.
4.3 Good housekeeping.
4.4 Use all PPE’s
properly.
4.5 Suitable barricade
during erection
and dismantling.
4.6 Scaffolding status
pg. 3
JOB SAFETY ANALYSIS
pg. 4
JOB SAFETY ANALYSIS
6. Cable tray & cable laying in 1. Physical injury due 1. Provide sufficient
trench. trench width in case of
to narrow trench.
person required to work
2.Fall of personal due
in a trench.
to walk in a narrow 2. Ensure proper
trench communication &
coordination of worker
under strict supervision
3. Avoid personal walkingin
a trench till possible.
4.Ensure good
housekeeping inside and
around work area
pg. 5
JOB SAFETY ANALYSIS
7. Hot work grinding. (Steel, 1. Physical injuries due 1. Deploy trade validated
Cable Tray will be grind) to unsafe grinding. workmen.
2. Electrocutions due to 2. Providing adequate
unsafe condition of space for grinding.
grinding or supply 3. Ensuring use of specific
cable. PPE. (leather gloves, apron,
3. Entanglements, contact face shield).
of body parts and ejection 4. Supervision required
of sparks &metal particles during the job.
during grinding work. 5. TBT must be
4. Physical injuries due to conducted on safe
grinding wheel break. Grinding techniques
5. Noise during grindingbefore start the job.
work. 6.Ensure and verify the
6. Fire due to short circuitvalidation of machine/
and grinding sparks. equipment installation.
7. Daily inspection of
electrical installation &
Grinding machine by safety
supervisor operator.
8.Earthing and 30 ma
ELCB for all electrical
installation.
pg. 6