Assignment 2
Assignment 2
Assignment 2
Ans: Option (a) Number of scheduled equipment maintenance to be conducted per month
Refer to Lecture 7
6. The effectiveness and the weakness of a risk control system can be measured by
a) Leading and lagging indicators, respectively
b) Lagging and leading indicators, respectively
c) Leading indicators
d) Lagging indicators
Ans: Option (a) Leading and lagging indicators, respectively
Refer to Lecture 7
9. During maintenance of a window pane at height 100ft above the ground, the worker found
working without using belt and hooks is an example of
a) Unsafe Condition
b) Unsafe Act
c) Both (a) and (b)
d) None of the above