Technical Schedules (A To D) - Barajaguli - Santoshpur
Technical Schedules (A To D) - Barajaguli - Santoshpur
Technical Schedules (A To D) - Barajaguli - Santoshpur
Technical Schedules
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 1
National Highways Authority of India Schedules of Concession Agreement
SCHEDULE- A
(SeeClauses 10.1
SITE OF THE PROJECT
1. The Site
1.1 Site of Highway Section starts from Chainage 31+000kmSontoshpur more ends at
Chainage 48+721 at Barajaguli section of NH-34 in the state of West Bengalshall include
land, buildings, structures & road works as described in Annex – I of this Schedule – A.
1.2 An inventory of the Site including the land, buildings, structures, road works, treesand
any other immovable property on, or attached to, the site shall be prepared jointly by
the Authority Representative & the Concessionaire andsuch inventory shall form part of
the memorandum referred to in clause 10.3.1 of theagreement.
1.3 Additional land required for Rest Area / Wayside Amenities, Traffic Aid post, Medical Aid
post andvehicle rescue post etc. or for construction of works specified in the Change of
Scopeorderissuedunder clause 16.2.3 of this Agreement shall be acquired inaccordance
with the provisions of Clause 10.3.6 of this Agreement. Uponacquisition, such land shall
form part of the Site and vest in the Authority.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 2
National Highways Authority of India Schedules of Concession Agreement
Annex – I
(Schedule-A)
Site for Project
1 31.000 31.000
2 31.207 31.200
3 31.407 31.400
4 31.607 31.600
5 31.809 31.800
6 32.009 32.000
7 32.209 32.200
8 32.409 32.400
9 32.609 32.600
10 32.809 32.800
11 33.009 33.000
12 33.210 33.200
13 33.410 33.400
14 33.610 33.600
15 33.814 33.800
16 34.015 34.000
17 34.231 34.200
18 34.429 34.400
19 34.629 34.600
20 34.833 34.800
21 35.033 35.000
22 35.233 35.200
23 35.433 35.400
24 35.633 35.600
25 35.833 35.800
26 36.038 36.000
27 36.238 36.200
28 36.438 36.400
29 36.638 36.600
30 36.838 36.800
31 37.038 37.000
32 37.238 37.200
33 37.438 37.400
34 37.638 37.600
35 37.839 37.800
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 3
National Highways Authority of India Schedules of Concession Agreement
36 38.039 38.000
37 38.239 38.200
38 38.439 38.400
39 38.639 38.600
40 38.839 38.800
41 39.039 39.000
42 39.239 39.200
43 39.439 39.400
44 39.640 39.600
45 39.840 39.800
46 40.040 40.000
47 40.240 40.200
48 40.440 40.400
49 40.641 40.600
50 40.841 40.800
51 41.041 41.000
52 41.241 41.200
53 41.441 41.400
54 41.641 41.600
55 41.841 41.800
56 42.041 42.000
57 42.241 42.200
58 42.440 42.400
59 42.640 42.600
60 42.840 42.800
61 43.040 43.000
62 43.240 43.200
63 43.440 43.400
64 43.640 43.600
65 43.840 43.800
66 44.041 44.000
67 44.241 44.200
68 44.441 44.400
69 44.641 44.600
70 44.840 44.800
71 45.040 45.000
72 45.240 45.200
73 45.440 45.400
74 45.640 45.600
75 45.840 45.800
76 46.040 46.000
77 46.240 46.200
78 46.440 46.400
79 46.640 46.600
80 46.840 46.800
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 4
National Highways Authority of India Schedules of Concession Agreement
81 47.040 47.000
82 47.240 47.200
83 47.439 47.400
84 47.639 47.600
85 47.839 47.800
86 48.039 48.000
87 48.239 48.200
88 48.440 48.400
89 48.643 48.600
90 48.712 48.679
Sl. No. Existing Chainage (Km) Type of Structure No. of Spans Width (in m)
Nil
7. Minor Bridges: TheSite includes the following Minor bridges:
8. Railway level crossings: The Site includes the following railway level crossings:
Sl. No. Existing Chainage (km) Remarks
Nil
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 5
National Highways Authority of India Schedules of Concession Agreement
10. Crossroads: The Site includes the following Major and Minor Cross Roads:
Major Crossroads:
Existing Chainage Leads to
Sr. Design Chainage Category of
(Km)
No. (Km) Left Right Cross Road
1 40+726 40+685 Noihati Habra MDR
Minor Cross Roads:
Existing Design Leads to
Sr. Category of
Chainage Chainage
No. Left Right Cross Road
(Km) (Km)
1 35+771 35+738 Raypur
2 36+306 36+268 Naihati
3 36+577 36+540
4 39+509 39+470
5 40+708 40+667
6 41+876 41+835
7 42+340 42+300 Mahabatipara Gour Banga road
8 43+755 43+715 Kanchiara village
9 45+590 45+550 Pabdara
10 45+615 45+575 Natungram
11 46+140 46+100
12 47+012 46+972 Paschim Narayanpur
13 48+271 48+232 Kailashbabu road
14 48+309 48+270 Kachua
Existing
Sl. No & Diameter of
Chainage Type of Culvert Width (in m)
No. Pipe (m)
(Km)
1 31+217 Slab 1x2 10.57
2 31+705 Slab 1x2 10.00
3 31+752 Slab 1x2 11.16
4 31+890 Slab 1 x 2.5 11.03
5 32+418 Slab 1x2 10.00
6 32+467 Slab 1x2 11.16
7 32+945 Slab 1 x 2.5 11.51
8 34+395 Slab 1x2 11.93
9 34+855 Slab 1x4 11.43
10 36+535 Slab 1x2 11.53
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 6
National Highways Authority of India Schedules of Concession Agreement
Existing
Sl. No & Diameter of
Chainage Type of Culvert Width (in m)
No. Pipe (m)
(Km)
11 39+682 Slab 1x2 10.15
12 40+255 Slab 1 x 1.5 10.55
13 41+015 Slab 1 x 1.5 10.50
14 42+285 Slab 1 x 1.5 10.18
15 42+890 Slab 1x2 10.00
16 43+112 Slab 1 x 3.0 10.12
17 43+230 Slab 1 x 4.0 9.15
18 43+425 Slab 1 x 2.5 10.47
19 44+140 Slab 1 x 2.0 10.69
20 44+785 Slab 1 x 1.5 10.26
21 45+455 Slab 1 x 2.0 10.00
22 47+645 Slab 1 x 2.0 11.51
23 48+580 Slab 1 x 2.0 40.91
Length
Sl. No. Chainage (Km) Left Hand Side Right Hand side
(m)
Nil
Sl. No. Chainage (Km) Length (m) Left Hand Side Right Hand side
Nil
15. Minor Junctions: The details of the minor junctions are as follows:
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 7
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section). 8
National Highways Authority of India Schedules of Concession Agreement
Electrical Utilities
The site includes the following electrical utilities:
a. Extra High-Tension Lines (EHT Lines)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 9
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 10
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 11
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 12
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 13
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 14
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 15
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 16
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 17
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 18
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 19
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 20
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 21
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 22
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 23
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 24
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 25
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 26
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 27
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 28
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 29
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 30
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 31
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 32
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 33
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 34
National Highways Authority of India Schedules of Concession Agreement
c. Public Health Utilities (Water/ Sewage Pipe Lines): The site includes the following Public Health utilities:
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur
more - Barajaguli Section). 35
National Highways Authority of India Schedules of Concession Agreement
Annex-II
(Schedule-A)
Dates for providing Right of Way
Thedate’sonwhichtheAuthorityshallprovideRightofWaytotheconcessionaireon
differentstretchesof theSitearestated below:
Existing Chainage (Km) Date of
Length
Sl. No Width (m) Providing
From To (km)
ROW
Average On appointed
1 31.000 48.721 17.721
45.00m date
Note:
i. The Authority shall provide the Right of Way not less than 80% (Eighty per cent) of the
total length of project Highway on or before appointed date in compliance to Clause 10.3 of
Agreement. Right of Way of Balance length to be provided within 150 days of appointed date.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
36
National Highways Authority of India Schedules of Concession Agreement
Appendix A-I
INDEX MAP OF PROJECT HIGHWAY
(Schedule –A)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
37
National Highways Authority of India Schedules of Concession Agreement
Appendix A-II
SCHEDULE- B
(SeeClause2.1)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
38
National Highways Authority of India Schedules of Concession Agreement
Development of the Project Highway shall include detailed design, including plan & profile
within available proposed ROW and construction of the Project Highway as described in
Schedule-B and Schedule-C. The alignment plans of the Project Highway are given in Annex-III
of Schedule B which is minimum requirement and are for guidance only. The proposed plan &
profile, locations of different structures/ drains/ service & slip road/ RE walls, chainages of
different structures/ drains/ service & slip road/ RE walls, length of different structures/
drains/ service & slip road/ RE walls etc. of the project highway as indicated in the Schedule
A, Schedule B, Schedule C and their Annexures, shall be treated as an approximate
assessment and as minimum requirement. Based on site/design requirement, the
Concessionaire shall finalize Detailed Project Report (DPR) including plan & profile of the
project highway and submit the same to Independent Engineer for acceptance, before the
start of the execution of project.
Based on accepted DPR including Plan & profile prepared by the Concessionaire, the detailed
work program with Network Method (PERT/CPM) shall be prepared along with commensurate
deployment of all resources and get approved from Independent Engineer before start of civil
work. Any required changes in scope of work given in Schedule B and Schedule C, including
any variation in standard, shall be finalized by both the parties before start of actual civil
work.
Requirement specifically mentioned in Schedule B & C shall prevail over general requirements
given in Manual mentioned in Schedule D.
Development of the Project shall include design and construction of the 2 Lane To 4 Lane
divided carriageway with paved shoulder starts from Chainage 31+000 km Sontoshpur more
ends at Chainage 48+679 at barajaguli section of NH- 34 in the state of West Bengal on EPC
Mode as described in Annexure – I of Schedule- B and in Schedule – C.
The Project Highway shall be designed and constructed in conformity with the Specifications
and Standards specified in Annexure-I of Schedule-D.
Annex-I
(Schedule-B)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
39
National Highways Authority of India Schedules of Concession Agreement
The entire project road is 2-lane. Development of the Project shall include design and
construction of the 2 Lane To 4 Lane divided carriageway with paved shoulder starts from
Chainage 31+000km Sontoshpur more ends at Chainage 48+679 at Barajaguli section Road
of NH- 34in the state of West Bengal on EPC Mode as described in Manual (IRC SP: 84-
2019), Schedule- B & Schedule- C.
The Project Highway shall generally follow the horizontal alignment shown in the plan
specified in Annexure- III of Schedule-B, unless otherwise specified by the Authority.
Notwithstanding anything to the contrary contained in this Agreement or IRC:SP:84, the
proposed plan & profile, locations of different structures/drains/service road/RE walls,
chainages of different structures/drains/service road/RE walls, length of different
structures/drains/service road/RE walls etc. of the project highway as indicated in the
Schedule A, Schedule B, Schedule C and their Annexure shall be treated as minimum
requirement. Based on site/design requirement, the Concessionaire shall finalize their
Detailed Designs (Development Stage) including plan & profile of the project highway and
submit the same to Authority & its Engineer for its Consent/Approval and Safety Audit by
Safety Auditor, before the start of the execution of project. The designs so approved shall
not be in contradiction with the scope of project. For avoidance of doubt, the provisions
mentioned in schedule B & C cannot be changed, only the design of the components is to
be submitted for consent/ approval.
1.1.2 In built-up sections/area the width of paved carriageway shall be 23 metre for four
laning (including paved shoulder and kerb shyness/edge strip).
1.1.3 Except as otherwise provided in this Agreement, the width shall be adjusted to fit
into appropriate plans and cross sections developed in accordance with TCS
enclosed.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
40
National Highways Authority of India Schedules of Concession Agreement
1.2.1 The width of median including kerb shyness shall be 5 metre & 2.5m.
2.2 Terrain and Design Speed:The Project highway passes through plain terrain and road
geometry shall be designed for minimum speed of 100kmph in plain terrain.
2.3.1 The existing road geometrics shall be improved as per the codal provisions.
In the sections, where improvement of the existing road geometrics to the prescribed
standards is not possible, the existing road geometrics shall be improved to the extent
possible within the given right of way and appropriate road signs, pavement markings
and safety measures shall be provided.
2.3.2 The entire cross-sectional elements shall be accommodated in the available/ proposed
ROW. If required, suitable full height retaining structures shall be provided to
accommodate the highway cross section within the available/ proposed ROW.
The details of such sections are mentioned in Schedule-B. In case of any other section not
included in Schedule-B, where retaining structures are to be provided, shall constitute a
Change of Scope.
2.3.3 Realignments:
The existing road shall be improved to the standards as specified in the manual at the
following locations:
Sr. Existing Chainage (Km) Design Chainage (Km) Length (Km)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
41
National Highways Authority of India Schedules of Concession Agreement
2.3.4 Bypasses:
The existing road shall be bypassed to the standards as specified in the manual at the
following locations:
Details of the Right of Way along Project Highways and Side Roads are given in Annexure-II of
Schedule A
2.5.1 The Design Specification of paved shoulder shall conform to the requirementsspecified
in paragraph 5.10 of the manual.
2.5.2 Paved shoulders and strip on median side shall be of same specification and pavement
composition as of main carriageway
2.5.3 In built-up sections, paved shoulder shall be provided width 2.5m.
2.5.5 The Design Specification of paved shoulder shall conform to the requirements specified
in paragraph 5.11 of the manual.
2.5.6 The earthen shoulder of 1.50m width on shoulder side shall be provided with top 150
mm on earthen shoulder with well graded naturals and morrum gravel crust stones or
combination thereof, confirming to Clause 401 of MoRTH specification to fix MBCB and
confirm requirement of MBCB
2.6.1 In case of VUP/ LVUP/ SVUP, the proposed structure, the finish road level in VUP/
LVUP/ SVUP shall be kept 150 mm above the ground level/service road/ cross road
(whichever is higher) to ensure that these VUP/ LVUP/ SVUP don’t become water
accumulation points.
2.6.2 The vertical and horizontal clearance at the underpasses shall be as per Clause 2.10.2
of the manual.
2.7.1 Lateral and vertical clearances for overpasses shall be as per paragraph 2.11 of the
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
42
National Highways Authority of India Schedules of Concession Agreement
Manual.
2.7.2 Lateral clearance: The width of the opening at the Overpasses shall be as follows:
2.8.1 Service Road: The height of embankment of service road shall confirm to clause 4.2.1.
2.8.2 The Service roads shall be constructed at the locations & for the lengths indicated
below:
Service Road:
Design Chainage
Sr. Length (km) Paved Carriageway Width
(Km) Total Remarks
No. including shyness (m)
From To LHS RHS
1 32+050 32+850 800 800 5.50m 1600
2 35+160 37+400 2240 2240 5.50m 4480
3 38+510 39+280 770 770 5.50m 1540
4 40+160 42+390 2230 2230 5.50m 4460
5 43+510 44+150 640 640 5.50m 1280
6 45+170 45+910 740 740 5.50m 1480
7 47+890 48+679 789 789 5.50m 1578
Total Length (m): 16418
2.8.2 NIL
2.8.4Slip Road: The height of embankment of slip road shall confirm to clause 4.2.1 of Manual.
The Slip roads shall be constructed at the locations and for the lengths indicated below:
Slip Road:
Sr. Design Chainage (Km) Length (km) Paved Carriageway Width
Total Remarks
No. From To LHS RHS including shyness (m)
NIL
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
43
National Highways Authority of India Schedules of Concession Agreement
Note:
(i) Above length of the service/slip roads is minimum specified. The actual length of the
service/slip/connecting roads shall be determined by the Concessionaire in accordance
with the approved plan & profile and design approved from theAuthority Engineer. Any
increase/decrease up to 5 percent length from the length specified in this Clause of
Schedule-B shall not constitute a Change of Scope. Any additional length shall be dealt
in Change of Scope.
(ii) The Acceleration, deceleration lane, right turning storage lane, entry/exit lanes shall be
constructed in addition to length given in above table and shall be deemed to be part of
the scope and no Change of Scope shall be considered for the same.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
44
National Highways Authority of India Schedules of Concession Agreement
2.9.6 Flyover
RHS Super
LHS Minimu Skew
Roadw Structu
Design Roadw m Angle
Sr. ay re
Chainage ay Span Arrangement (m) Vertical (to be Remarks
No. Width Provisi
(Km) Width Clearan specifie
(m) on in
(m) ce (m) d)
Median
Nil
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
45
National Highways Authority of India Schedules of Concession Agreement
2.9.8 Details of Ramps, Cross Roads and Connecting Roads at Interchanges (IC)
Description of Ramps,
Carriageway Widths Length
Sr. No. Crossroads and Connecting Remarks
including Kerb Shyness (m)
Roads
Nil
Note:
1) Any variations in the lengths specified in the above table shall not constitute a
Change of Scope
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
46
National Highways Authority of India Schedules of Concession Agreement
2) Lengths mentioned in the above list for cross section types concerned to structures
are inclusive of structure length.
3) Retaining wall/ RE wall shall be provided for full height on all structures.
4) Toe wall(0.6 mt)to be provided where ROW is restricted and water bodies along
the proposed highway on the sections specified in Schedule-B.
5) Chainages may be adjusted according to location of structures as per drawings.
6) Carriageway width tapering shall be provided 1 in 50 as per manual
7) Intermediate Sight Distance (Desirable Minimum Sight Distance) shall be followed
for design of all vertical curves (Summit and Valley Curves) including structures as
well as highways.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
47
National Highways Authority of India Schedules of Concession Agreement
Carriagew Length of
Design
Juncti Leads to Category ay width crossroad to be
Sr. Chaina Median
on of Cross of developed
No. ge Opening
Type Road crossroad
(Km) Left Right LHS RHS
(m)
5 41+835 T No VR 3.75 200m
Gour 200m
Mahaba
6 42+300 T Banga No VR 5.5 200m
tipara
road
Kanchia 200m
7 43+715 T ra No VR 3.0
village
8 45+550 T Pabdara No VR 5.5 200m
Natung
9 45+575 T No VR 5.5 200m
ram
Masunda
nimna
10 46+100 T No VR 3.0 200m
Buniyadi
school
Paschim
11 46+972 T Narayan No VR 3.0 200m
pur
12 48+270 T Kachua No VR 5.5 200m
Note:
(i) Type of Junction to be improved as per manual.
(ii) The contractorshall take up ‘Detailed Engineering study’ to ascertain further details of
all intersections and treatment of the intersections shall be designed in accordance
with the latest guidelines mentioned out in section-3 of the manual. Auxiliary lanes
including storage, acceleration and deceleration lane along with physical islands to be
provided.
The cross road at the junctions which are having a level difference from the main
carriageway, are to be improved at the level of main carriageway for the length of 30
metre and then to be merged with the cross road at the gradient not more than 1:50.
(iii) For minor / major layout for left-in / left out arrangement with physical islands with
hazard marking. Where there is space constraint to provide physical islands, the effect of
junction kept wide opened can be avoided by Ghost Island with marking.
(iv) For U-turn, Self-Regulated U-Turn facility shall be created.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
48
National Highways Authority of India Schedules of Concession Agreement
(i) The contractorshall take up ‘Detailed Engineering study’ to ascertain further details of all
intersections and treatment of the intersections shall be designed in accordance with
the latest guidelines mentioned out in section-3 of manual.
(ii) Junction improvement under grade separators shall be carried out as per manual with
proper entry/exit to crossroads and slip/service roads, etc. Auxiliary lanes
including storage, acceleration and deceleration lane along with physical islands to
be provided.
(iii) Locations of grade-separated structures are indicative. Exact location should be decided
in consultation with Authority Engineer
(iv) Only entry or exit shall be designed at any location( provision of entry/exit by ghost island
not permitted
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
49
National Highways Authority of India Schedules of Concession Agreement
the project. Authority will provide necessary support in executing the tripartite
agreement with NTPC for the same. However, if free of cost Pond Ash is not made
available due to the reasons not attributable to Contractor, then Contractor may use
following sourced material under change of scope :-
Source: work executed with Pond Ash supplied free of cost (Source: Bandel Thermal Power
Plant Distance: 32 Km):
Rate of transportation to vendors is Rs. 6/Cum/km + GST. (as pond ash will be supplied free of
Cost).
The discount , if any, in the quoted rate will apply in COS amount calculation.
5 Pavement design
5.1 Pavement design shall be carried out in accordance with Section 5 of the Manual.
5.3 In order to meet the intended functional requirement of respective pavement layers on
main carriageway, the minimum thickness of respective pavement layers for main
carriageway and connecting crossroads/ service roads/ slip roads/ entry/exit locations,
acceleration/ deceleration lane, right turning lanes shall, however, in no case be less
than as given below:
5.3.1 Main carriageway, paved shoulder, median side paved strip, entry/ exit locations,
acceleration/ deceleration lane, right turning lanes (Flexible) with CTB/CTSB
Minimum Crust Minimum Crust
Pavement Composition Thickness at Left Thickness at Right
Carriageway (mm) Carriageway (mm)
Subgrade 500 500
CTSB 200 200
CTB 145 160
AIL 100 100
DBM 60 80
BC 40 40
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
50
National Highways Authority of India Schedules of Concession Agreement
6 Roadside Drainage
6.1 Drainage system
Drainage system including surface and subsurface drains for the Project Highway including
crossroads shall be provided as per section 6 of the manual. RCC Drain cum footpaths shall
conform to the cross- sectional features and other details as given in Annexures to Schedule-B
and shall be provided as under:
Details of RCC Drain Cum Footpath
Sr. Design Chainage (Km) Length (m) Width of Drain Total Length
No. From To LHS RHS (m) (m)
1 32.050 32.850 32.050 32.850 1 1600
2 35.160 37.400 35.160 37.400 1 4480
3 38.510 39.280 38.510 39.280 1 1540
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
51
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
52
National Highways Authority of India Schedules of Concession Agreement
7 Design of Structures
7.1 General
Project Highway is proposed to be constructed to Four configuration. As such, superstructure
of all bridges, culverts and structures is to be designed for edge movement of the vehicle
considering stitching of new superstructure in future due to widening for additional lane.
Special vehicle loading is to be considered in design of all bridges, culverts and structures.
All structures except wherever expansion joints have been provided, The pavement
layers “wearing course BC & Mastic Asphalt”shall be continued over the structures for
smooth riding quality of the project highway. These structures shall be designed considering
the dead load of pavement (wearing course BC & Mastic Asphalt, etc) layers.
All major structures will be designed preferably as continuous slab to reduce the number
of expansion joints on the MJB/ ROBs/ flyover/ Interchange etc.
7.1.1 All bridges, culverts and structures shall be designed for IRC class Special Vehicle
(SV) loading as per IRC: 6 and constructed in accordance with section-7 of the
manual and shall conform to the cross-sectional features and other details
specified therein.
7.1.2 The overall width of the structures shall be as given in Para 7.3.2 of Annex-I of
Schedule-B.
Details of Structures with footpaths
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the approaches.
The overall width of culverts shall be including width of main carriageway and slip/service
roads/Entry ramps/Exit Ramps/ Acceleration/Deceleration lanes, etc. All culverts shall also
be continued in median and in gap between main carriageway and service road.
7.2.2 New/ Reconstruction of existing RCC pipe culverts:
The existing culverts at the following locations shall be re-constructed as new
culverts(Table needs to be modified in line with the circular):
Culvert
Sl. Design Culvert Skew Span/ New/ Crossing Remarks
No. Chainage Type Angle Opening (m) Reconstruction Type
(Balancing /
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
53
National Highways Authority of India Schedules of Concession Agreement
Stream, etc)
0o
1 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
31+217
o
0
2 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
31+696
0o
3 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
31+743
0o
4 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
31+880
o
0
5 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
32+410
0o
6 Box Culvert 1 X 3.0 X 4.0 Reconstruction Balancing
32+457
0o
7 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
32+938
o
0
8 Box Culvert 1 X 3.0 X 4.0 Reconstruction Balancing
34+365
0o
9 Box Culvert 1 X 5.0 X 3.0 Reconstruction Balancing
34+825
0o
10 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
36+500
0o
11 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
39+642
o
0
12 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
40+215
0o
13 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
40+975
0o
14 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
42+245
o
0
15 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
42+848
0o
16 Box Culvert 1 X 3.0 X 4.0 Reconstruction Balancing
43+072
0o
17 Box Culvert 1 X 4.0 X 4.0 Reconstruction Balancing
43+188
o
0
18 Box Culvert 1 X 3.0 X 4.0 Reconstruction Balancing
43+382
0o
19 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
44+100
0o
20 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
44+745
o
0
21 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
45+415
0o
22 47+605 Box Culvert 1 X 2.0 X 3.0 Reconstruction Balancing
0o
23 48+534 Box Culvert 1 X 2.0 X 2.0 Reconstruction Balancing
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
54
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
55
National Highways Authority of India Schedules of Concession Agreement
7.3 Bridges
7.3.1 Existing bridges to be re-constructed/widened:
(i) Existing bridges proposed for reconstructed as new structures: Nil
(ii) Existing narrow bridges proposed to be retained and widened: Nil
7.3.2 Additional New Bridges
New bridges at the following locations on the Project Highway shall be constructed. GADs for
the new bridges are attached in the drawings folder.
Major Bridges:
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
56
National Highways Authority of India Schedules of Concession Agreement
7.3.3 The railings of existing bridges shall be replaced by crash barriers at the following
locations:
Design Chainage
Sr.No Length (km) Remarks
From To
Nil
7.3.4 The existing bridges/ RoB/ Grade Separators/ RUB retained on the project highway
shall be upgraded and rehabilitation measures/proposals shall be specified as
follows:
Location
Sr. No. Rehabilitation Proposals Remarks
at km
Nil
Note:
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
57
National Highways Authority of India Schedules of Concession Agreement
(i) ROB shall be designed, constructed, and maintained as per the requirements of Railway
authorities. The construction plan shall be prepared in consultation with the
concerned railway authority.
(ii) The ROB shall be constructed and maintained by the concessionaire under supervision of
the Railways.
(iii) All charges payable to the Railways like D&G, Capitalized maintenance, signaling, cabling,
OHE modification, earthing etc. except P&E charges shall be borne by the
Concessionaire.
7.4.3 Road under bridges (road under railway line) shall be provided at the following
level crossings, as per GAD drawings attached:
Sr. Design Proposed Span Name of Total Skew Angle Remarks
No. Chainage Arrangement (m) crossing Width (m)
NIL
Nil
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
58
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
59
National Highways Authority of India Schedules of Concession Agreement
9 Roadside Furniture
9.1 It shall be provided as per the details mentioned in Schedule-C.
10 Hazardous Locations
10.1 The safety barriers shall be provided at the following hazardous location such as ponds,
well, electric sub-station, Electric tower, spilt carriageway, etc.
Location Stretch Type of Safety
Sr. No. LHS/ RHS
From (Km) To (Km) Barrier
NIL
11 Special Requirement:
Retaining Structure and protection works shall be provided at locations as indicated below.
Retaining Wall/Toe Wall
Retaining Type of
Length
Side Height (m) Structure/Toe Safety Remarks
(m)
Wall Barrier
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
60
National Highways Authority of India Schedules of Concession Agreement
Retaining Type of
Length
Side Height (m) Structure/Toe Safety Remarks
(m)
Wall Barrier
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
61
National Highways Authority of India Schedules of Concession Agreement
Retaining Type of
Length
Side Height (m) Structure/Toe Safety Remarks
(m)
Wall Barrier
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
62
National Highways Authority of India Schedules of Concession Agreement
Retaining Type of
Length
Side Height (m) Structure/Toe Safety Remarks
(m)
Wall Barrier
13 Shifting of Utilities
The Concessionaire shall undertake the work of shifting of any utility (including electric lines,
water pipes, gas pipelines and telephone cables) to an appropriate location or alignment, in
accordance with the provisions of contractAgreement.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
63
National Highways Authority of India Schedules of Concession Agreement
Design Barricading
Deployment
Chainage Type –
Traffic of Flagman in
Sr. (Km) Construction III/IV/CC
Diversion Management Habitation/ Remarks
No. Activity Barrier with
Plan Schools/
From To lighting along
Hospital, etc.
barrier
31+000 48+679
ANNEX-III OF SCHEDULE B
(Schedule B)
The plan and profile and General Arrangement Drawing (GAD) of Structures of the project
highway are provided along with bid documents.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
64
National Highways Authority of India Schedules of Concession Agreement
APPENDIX B – II of Annexure – I
(Schedule-B)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
65
National Highways Authority of India Schedules of Concession Agreement
Utility details need to be shifted within the utility corridor of the ROW.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
66
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
67
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
68
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
69
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
70
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
71
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
72
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
73
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
74
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
75
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
76
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
77
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
78
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
79
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
80
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
81
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
82
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
83
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur more
- Barajaguli Section).
84
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur more
- Barajaguli Section).
85
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West Bengal under EPC Mode.(Santoshpur more
- Barajaguli Section).
86
National Highways Authority of India Schedules of Concession Agreement
SCHEDULE –C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The Concessionaire shall construct the project facilities in accordance with the provisions of
this agreement. Such Project facilities shall include:
a)Toll Plaza
b) Roadside furniture
i. Kilometer and Hectometer Stones
ii. Traffic Signs
iii. Overhaed Signs
iv. Road Marking
v. Road Delineators
vi. Reflective Pavement Markers & Solar Studs
vii. Traffic impact attenuators
viii. Boundary wall and fencing
c)Operation and maintenance centers
d) Wayside amenities / service areas
e) Truck lay-byes
f) Bus bay and Bus shelter
g)Pedestrian facilities
h) Highway Lighting
i) Rainwater harvesting
j) Environmental management plant
k) Land scaping and Tree plantation
l) Advanced traffic Management Sysment (ATMS)
m) Highway Patrol Units
n) Emergency medical services
o) Crane service
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
87
National Highways Authority of India Schedules of Concession Agreement
Annexure – II
(Schedule-C)
PROJECT FACILITIES
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annexure-I to form
part of the Project Highway. The Project Facilities shall include:
p) Toll Plaza
q) Roadside furniture
ix. Kilometer and Hectometer Stones
x. Traffic Signs
xi. Overhaed Signs
xii. Road Marking
xiii. Road Delineators
xiv. Reflective Pavement Markers & Solar Studs
xv. Traffic impact attenuators
xvi. Boundary wall and fencing
r) Operation and maintenance centers
s) Wayside amenities / service areas
t) Truck lay-byes
u) Bus bay and Bus shelter
v)Pedestrian facilities
w) Highway Lighting
x) Rainwater harvesting
y)Environmental management plant
z)Land scaping and Tree plantation
aa) Advanced traffic Management Sysment (ATMS)
bb) Highway Patrol Units
cc) Emergency medical services
dd) Crane service
1 Toll Plaza
Tolling system shall be provided in entire length of the project and the same is integrated
with the adjoining packages. The Toll Plazas shall be provided as per NHAI circular No.
17.5.82 dated 24/5/2021 and Schedule D. Minimum Lane requirement in the opening year are
as follows.
Toll Plaza shall be provided confirming to the manual at the following locations:
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
88
National Highways Authority of India Schedules of Concession Agreement
Minimum number of
Location of Toll Plaza (Km) Direction (Entry: to Toll Lanes
highway, Exit: from
S.No Existing Design Highway) Entry Exit
Chainages Chainages
Nil
Note:
(i) The Toll Plaza shall be constructed as per Manual (Schedule D) considering the
modification as per NHAI Circular NHAI/Policy Guidelines/Management of Toll
Plaza/2021 Policy Circular No. 17.5.82 dated 24th May, 2021. However, layout as
mentioned in Schedule-C shall be followed.
(ii) Based on the toll lanes as given above, toll Booth complex, weigh bridges, electrical
systems, and all other facilities required/ mentioned in manual shall be provided as
per specification mentioned in Schedule D
(iii) No. of toll lane specified above are to be provided. The Concessionaire shall design and
provide toll lane as per Manual (Schedule D) & NHAI Circular NHAI/Policy
Guidelines/Management of Toll Plaza/2021 Policy Circular No.17.5.82 dated 24th May,
2021 subject to as specified above.
(iv) All Toll Lanes to be equipped with Hybrid ETC equipment’s as per NHAI/Policy
Guidelines/Management of Toll Plaza/2021 Policy Circular No. 17.5.82 dated 24th May,
2021. DPR consultant to specify details of equipment’s with their numbers.
(v) A separate Highway Nest with toilet facility for road users shall be provided near toll
plaza location along with parking facility. One toilet block on each direction shall be
provided. These toilet facilities shall follow CPWD specifications for sanitary ware
items and fittings such as WC, wash basin, Wash basin-Under counter, Urinal flat back,
PVC Cistern, IWC Orissa Pan, Flush Value –CP, Wash Basin pillar cock-CP, Bib Cock—CP,
Health Faucet, W/c Bib cock, Wash Basin angle cock. One WC shall be provided for
specially challenged persons.
(vi) Point of Sale (POS) with card swapping machines shall be provided.
(vii) Provide Lane markings and Traffic Signs as per IRC: SP: 84-2019, IRC 35 and IRC 67
(viii) Solar panels shall be erected over the either on FOB or over Toll plaza / Admin building to
generate the green energy. Same shall be utilized for toll plaza lighting and other
energy requirement within toll plaza area along with conventional lighting.
(ix) Medium speed Weigh in Motion (MSWIM) devices shall be provided in all toll lanes at Toll
plaza Location. In addition to MSWIM, Static weigh Bridge (SWBs) shall be provided on
each direction as per manual.
(x) Provide Impact Attenuators on Toll Plaza islands in the direction of traffic. Impact
attenuators shall be self-restoring confirm to section 10.6 of IRC SP 99 i.e. Manual of
Specifications and Standards for Expressways.
(xi) Provide Staircase on either side of the FoB at Median Island location by widening the
island appropriately.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
89
National Highways Authority of India Schedules of Concession Agreement
2 Roadside furniture
2.1 Kilometer and Hectometer Stones
S.No. Item Number Remarks
The KM/ Hectometer stones/ marker can be
Kilometer Concrete/ Stones and shall be placed on both outer
1 32 side of the earthen shoulder.
Marker/ Stones
In case KM/ Hectometer marker are to be fixed on
separator between Main Carriageway & Service
Road then these should be fixed as reflective signs.
Hectometer
2 150
Marker/ Stones In case of Access Control Highway/ Expressway,
KM/ Hectometer marker should be fixed as
reflective signs.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
90
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
91
National Highways Authority of India Schedules of Concession Agreement
Number
(DPR Consultant
S.
Road Signs has to give the Remarks
No.
number required
for each sign)
17 Narrow Bridge Ahead Nil
18 Steep Ascent/Descent Nil
20 Reduced Carriageway Nil
21 Start/End of Dual Carriageway Nil
23 Gap in Median Nil
24 Pedestrian Crossing Nil
25 Pedestrian crossing with backing board Nil
26 School Ahead 8
27 Built-Up Area 30
28 Two Way Operation (on main carriageway Nil
/service road
29 Two Way Traffic on Cross Road Ahead Nil
30 Danger Warning Sign Nil
31 Deaf or Blind Persons Likely on Road Ahead Nil
32 Cycle Crossing Nil
33 Cycle Route Ahead (Warning for Cycles on road Nil
Ahead)
34 Dangerous Dip Nil
35 Speed Breaker 59
36 Rumble Strip Nil
37 Rough Road Nil
38 Dangerous Ditch Nil
39 Slippery Road Nil
40 Slippery Road because of Ice Nil
41 Opening or Swing Bridge Nil
42 Overhead Cable Nil
43 Play ground Ahead Nil
44 Quay Side or River Bank Nil
45 Sudden Side Winds Nil
46 Tunnel Ahead Warning Nil
47 Falling Rocks Nil
48 Cattle Crossing Nil
49 Wild Animals likely to be on Road Ahead Nil
50 Queues Likely Ahead Nil
51 Low flying Air Craft Nil
52 Unguarded Railway Crossing Nil
53 Guarded Railway Crossing Nil
54 Crash prone area ahead Nil
55 U-Turn Nil
III Chevron Signs
1 Single Chevron 20
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
92
National Highways Authority of India Schedules of Concession Agreement
Number
(DPR Consultant
S.
Road Signs has to give the Remarks
No.
number required
for each sign)
2 Double Chevron 20
3 Triple Chevron Nil
IV Object Hazard Marker Sign
1 Left/Right side Object Hazard Marker 58
2 Two way Object Hazard Marker Nil
V Informatory/Guide
1 Direction and Place Identification signs 57
2 Stack Type Advance Direction Sign(Shoulder Nil
Mounted)
Stack Type Advance Direction Sign with Nil
3 cautionary / regulatory signs (Shoulder Mounted)
4 Map Type Advance Direction Sign (Shoulder Nil
Mounted)
5 Map Type Advance Direction Sign for Nil
roundabout(Shoulder Mounted)
6 Flag Type Direction Sign Nil
7 Reassurance Sign Nil
8 Place Identification Sign Nil
9 Truck Lay-By Nil
10 Toll Booth Ahead Nil
11 Weigh Bridge Ahead Nil
12 Shoulder Mounted Sign in Advance of a Grade Nil
Separated Junction/Interchange
13 Expressway Sign Nil
14 Gantry Mounted advance Direction Sign Ahead of a Nil Instead of
Flyover in Urban/City Roads continuous
15 Gantry Mounted advance Direction Sign Ahead of a Nil sign board,
Grade Separated Junction Separate sign
16 Gantry Mounted advance Direction Sign Ahead of a At Nil shall be
Grade Intersection provided for
17 Gantry Mounted Advance Direction Sign for Nil each
Interchange information
18 Cantilever Gantry Mounted Advance Direction Sign for Nil
Interchange
19 Lane Dedicated Gantry Sign Nil
20 Definition/Supplementary Plates Nil
21 Tourism Related Sign Nil
22 Tourist Destination Direction Information Signs Nil
Without Photograph
23 Tourist Destination Direction Information Signs Nil
With Photograph
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
93
National Highways Authority of India Schedules of Concession Agreement
Number
(DPR Consultant
S.
Road Signs has to give the Remarks
No.
number required
for each sign)
24 Finger Destination direction Information Sign for Nil
Pedestrians
25 Tourist Map Information Sign Nil
26 Boundary Sign at Entrance to a City/Place Nil
27 Boundary Sign at Entrance to a tourist Nil
Destination
VI Facility Information signs
1 Eating Place Nil
2 Light Refreshment Nil
3 Resting Place Nil
4 First Aid Post Nil
5 Toilet Nil
6 Filling Station (Fuel Pump) 1
7 Hospital 1
9 U-Turn Ahead Nil
10 Pedestrian Subway Nil
11 Police Station Nil
12 Picnic Site Nil
13 Repair Facility Nil
14 Railway Station/Metro Station/Monorail Station Nil
15 Industrial Area Nil
16 Cycle Rickshaw Stand Nil
17 Taxi Stand Nil
18 Auto Rickshaw Stand Nil
19 Home Zone Nil
20 Camp Site Nil
21 Airport Nil
22 Golf Course Nil
23 National Heritage Nil
24 No Through Road Nil
25 No Through Side Road Nil
26 Toll Road Ahead Nil
27 Guide Sign on Toll Lane Portal Nil
28 Country Border Nil
29 Entry Ramp for Expressway Nil
30 Exit Ramp for Expressway Nil
31 Expressway Symbol Nil
32 End of Expressway Nil
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
94
National Highways Authority of India Schedules of Concession Agreement
Number
(DPR Consultant
S.
Road Signs has to give the Remarks
No.
number required
for each sign)
33 Bus Stop Nil
34 Bus Lane Nil
35 Contra Flow Bus Lane Nil
36 Cycle Lane Nil
37 Contra Flow Cycle Lane Nil
38 Holiday Chalets Nil
39 Emergency Exit Nil
VII Other Useful Information Signs Nil
1 Signs For Persons With Disabilities Nil
2 International symbol of Accessibility Nil
3 Parking Information Nil
4 Parking Areas Nil
5 Ramped Entrance to Subway/Over Bridge Nil
Telephone Facilities Nil
7 Toilet Facilities Nil
8 Way Finding Nil
9 Parking Signs Nil
10 Auto Rickshaw Parking Nil
11 Cycle Parking Nil
12 Cycle Rickshaw Parking Nil
13 Scooter and Motorcycle Parking Nil
14 Taxi Parking Nil
15 Park and Ride Nil
16 Parking Restrictions Signs for Traffic Nil
Management
17 Flood Gauge Sign Nil
VIII Route Maker Signs Nil
1 State Highway Route Marker Sign Nil
2 National Highway Route Marker Sign 4
3 Asian Highway Route Marker Sign Nil
4 Expressway Route Marker Sign Nil
Note: The locations of the placement of signages shall be finalized in consultation with
Independent Engineer/ NHAI, as per site requirement.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
95
National Highways Authority of India Schedules of Concession Agreement
Unit
S.No. Item Remarks
Length (m) Number
1 Longitudinal Marking 103552
2 Transverse Marking 14
3 Hazard Marking 10
4 Block Marking 8
5 Arrow Marking 20
6 Directional Marking 6
7 Facility Marking NA
8 Center Line 51776
9 Traffic Lane Lines
10 No Overtaking Lines Nil
11 Warning Lines Nil
12 Border or Edge Lines Nil
Longitudinal Markings for Undivided
13 Nil
Roads
Longitudinal Markings for divided
14 Nil
Roads
Longitudinal Markings for Ramps/Slip
15 Nil
Roads/One Way Streets
16 Stop Line 6
17 Give Way Lines 6
18 Diagonal Markings Nil
19 Chevron Markings 8
20 Continuity Line Nil
21 Word Messages Nil
22 Lane Change Nil
23 Merging/Diverging Markings Nil
24 Hatch Markings Nil
25 Raised Profile Edge Lines Nil
Lane Reduction / Narrowing
26 Situations and Transitions (lane NIl
Balancing)
27 Directional Arrows NIl
28 Mandatory Turn Arrows NIl
29 Guidance Arrows NIl
30 Deflection Arrows NIl
31 Bifurcation Arrows NIl
32 Arrows on Side Road Approaches NIl
33 Arrows on Main Road Approaches NIl
34 Word Messages NIl
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
96
National Highways Authority of India Schedules of Concession Agreement
Unit
S.No. Item Remarks
Length (m) Number
35 Yellow Box Markings NIl
36 Ghost Island 16
37 Marking for Speed Breakers NIl
38 Pedestrian Crossing 8
Markings when highway passes
39 through settlement fig 9.4 of IRC SP NIl
84/87
40 Transverse Bar Markings 8
41 Busbay Marking NIl
42 Truck Lay-by Markings NIl
43 Toll Plaza Marking NIl
44 School Zone Markings NIl
45 Object Markings within Carriageway NIl
Objects Markings Adjacent to
46 NIl
Carriageway
i. Subway Piers, Abutments, Culverts
47 NIl
Head Walls, Concrete Barrier
48 ii. Electrical Poles NIl
49 iii. Guard Rails NIl
50 iv. Trees NIl
51 v. Kerbs NIl
Directional Markings as per
52 NIl
Annexure: A 6
Facility Markings as per Annexure
53 NIl
A.7 of IRC 35
Note: The locations of the marking shall be finalized in consultation with Independent
Engineer/NHAI, as per site requirement.
Number/ Length
S.No. Item Remarks
(m)
1 Roadway Indicators Nil
Median Marker on Median/RCC Barrier (Clause
2 17679
4 of IRC 79 2019)
3 Object Markers
Flexible Object Markers (Clause 6 of IRC 79
17679
2019)
4 i. On Metal Beam/New Jersey Barrier 7386
ii. On Toll Booth/Toll Island Nil
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
97
National Highways Authority of India Schedules of Concession Agreement
Note: The locations of the marking shall be finalized in consultation with Independent
Engineer/NHAI, as per site requirement.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
98
National Highways Authority of India Schedules of Concession Agreement
Chainage /
S.No. Item Remarks
Number
1 Culvert Ends 39
2 Structures Ends 11
Any other location which
3
Safety Hazard
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
99
National Highways Authority of India Schedules of Concession Agreement
5 Truck lay-byes:
5.1 The truck lay-bye shall be provided at below given location and as per the design
mentioned in Schedule-D.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
100
National Highways Authority of India Schedules of Concession Agreement
7 Pedestrian Facilities
Pedestrian Facilities shall be provided in accordance with the Manual of Specifications and
Standards as referred in Clause 9.8 of Schedule D and IRC 103 2022. This shall consist of
footpath (sidewalks), pedestrian guard rails and pedestrian crossing.
The details are as mentioned below:
Chainage (KM)
S.No. Pedestrian facilities Side Remarks
From To
Pedestrian guardrails shall be 150 mm from 32.050 32.850 Both -
Carriageway/Paved Shoulder 36.300 36.610 Side
i. Hazardous Locations on Straight Stretches 41.190 41.640
ii. At Junctions/Intersections 48.580 48.679
1
iii. Schools
iv. Bus Stop/Railway Stations
v. Overpass, Subway
vi. Central Reserve
2 Footpath paving including fixing of Tactile pavers - - - -
Pedestrian Crossing - - - -
i. With Zebra Marking
3 ii. With Tabletop Crossing
iii. At Intersections
iv. At Schools
8 Highway Lighting
The street light poles shall be 1 piece, continuous-tapered, Octagonal poles and shall be
manufactured from one length of steel sheet, formed in continuous tapered tube, with one
continuous arc-welded vertical seam. The minimum wall thickness for lighting poles shall not
be less than 4 mm. The Bottom Diameter shall be minimum 175 mm. The Top Diameter shall
be minimum 75 mm. The door on window of pole shall be antitheft. All electrical cable
should be concealed. All electrical lighting fixers shall be LED. The fixtures shall be
concealed except on poles. Lighting poles shall be fixed on outer side of steel/concrete
barrier. The lighting shall be providing at the following locations: (Clause No. 12.5 IRC: SP:84-
2019/ IRC: SP:87-2019)
Chainage Lighting
Source:
Electricity
S.No. Lighting facilities Side
From To Board/
Generator/
Solar
Toll Plaza area: The lighting in and
around toll plaza, toll booths, office
building, on the approach road, etc.
1 shall be as per Section 12 of the NA NA NA NA
Manual. In addition to at least two
high mast light shall be provided on
either side of toll plaza
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
101
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
102
National Highways Authority of India Schedules of Concession Agreement
9 Rainwater Harvesting
The provision of rainwater harvesting shall be provided at every 500m staggered in the entire
project length and shall be executed as per requirement of IRC SP: 42-2014 and IRC SP: 50-
2013. Additionally, wherever urban drains are provided, which do not have a definite
outfall for discharge of water, at such location one pit for rain water harvesting shall be
provided along the side drains at the lowest point/ where the water stagnates. The type
and location of rain water harvesting is as follows:
Depth of
S.No. Rain water Harvesting Type Chainage Side Recharge
Structure
Nil
Land Nil
2
Scaping
Minimum _____ nos. of
trees of desired type in
two rows per Km. @10 m
c/c near edge of ROW
1 row on each side of on both side (As per
Available open project highway. Schedule D) preferably
3 Plantations
land within ROW local varieties like
mango, Neem,
Sheesham, Babul, Peepal
etc. shall be planted
Drip irrigation system for median plantation by gravity/pressure sources with all necessary
components / systems and emitting devices at plants shall be provided.
The Concessionaire shall maintain the trees and shrubs in good condition during concession
period as per the concession agreement.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
103
National Highways Authority of India Schedules of Concession Agreement
14 Emergency Medical Services (Clause No. 12.11 IRC SP : 84-2019 / IRC SP : 87/2019)
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
104
National Highways Authority of India Schedules of Concession Agreement
SCHEDULE- D
(SeeClause2.1)
D. SPECIFICATIONS AND STANDARDS
1 Construction
The Concessionaires shall comply with the Specifications and Standards set forth in Annex-I of
this Schedule-D for construction of the Project Highway.
2 Design Standards
The Project Highway including Project Facilities shall conform to design requirements set out
in the following documents:
Manual of Specifications & Standards for four laning of Highways IRC: SP: 84-2019, referred to
herein as the manual.
As regards to work of utility shifting, the relevant specifications, relevant rules, regulation
and acts of Utility owning Department / Agencies shall be applicable.
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
105
National Highways Authority of India Schedules of Concession Agreement
Annex – I:
(Schedule-D)
Specifications and Standards for Construction
1. Specifications and Standards
Four – Laning of the Project Highway shall conform to the “Manual of Specifications and
Standards for Four – Laning of Highways” published by the IRC (IRC: SP: 84 -2019), referred to
as Manual and MoRTH Specifications for Road and Bridge Works. Where the specification for a
work is not given, Good Industry Practice shall be adopted to the satisfaction of the
Independent Engineer.
2. Deviations from theSpecifications and Standards
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
106
National Highways Authority of India Schedules of Concession Agreement
Development of 4 lane from km. 31.000 to km. 48.721of NH-34 in district of North 24-Parganas, West
Bengal under EPC Mode.(Santoshpur more - Barajaguli Section).
107