TECHNICAL SCHEDULES
JANUARY-2021
6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in
the State of Karnataka on EPC mode under Bharatmala Pariyojna
SCHEDULE - A
(See Clauses 2.1 and 8.1)
SITE OF THE PROJECT
1 The Site
1.1 Site of the Four-Lane Project Highway shall include the land, buildings, structures and road
works as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this
Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2 (i) of this Agreement.
1.4 The alignment plans of the Project highway are specified in Annex-III. In the case of sections
where no modification in the existing alignment of the Project Highway is contemplated, the
alignment plan has not been provided. Alignment plans have only been given for sections where
the existing alignment is proposed to be upgraded. The proposed profile of the Project
Highways shall be followed by the contractor with minimum FRL as indicated in the alignment
plan. The Contractor, however, improve/upgrade the Road Profile as indicated in Annexure-III
based on site/design requirement.
1.5 The status of the environment clearances obtained or awaited is given in Annex-IV.
Annex – I
(Schedule-A)
Site
1. Site
The site of the Four-Lane Project Highway comprises the section of National Highway 48
commencing from existing km 29.435 to existing km 75.000 i.e. Nelamangala to Tumakuru
including Tumakuru Bypass section in the State of Karnataka.
3. Carriageway
The present carriageway of the Project Highway is 4-lane divided carriageway with paved
shoulders on either side. The type of the existing pavement is Flexible.
Existing
S. Design Chainage Carriageway
Chainage Remarks
No. width (m)
From To From To
2 x 9.0m
1 29.435 75.00 29.435 74.168 (Central Median Flexible
of 4.5m)
4. Major Bridges
The Site includes the following Major Bridges:
Type of Structure
S. No. of Spans with Width
Chainage
No Super- span length (m) (m)
Foundation Sub- structure
structure
Nil
Existing
No. of Spans with span ROB/
S. Chainage Type of Structure Width
length (m) RUB
No (km) (m)
Foundation Superstructure
1 50.2 Open RCC Solid Slab (5 x 12.6) & (7 x 12.6) 10.7 & 14 ROB
(2 x 11.5 + 4 x 12.5) &
2 55.8 Open RCC Solid Slab 9.7 & 14 ROB
6 x 12.6
10.0 &
3 64.8 Open RCC Solid Slab (6 x 12.6) & (6 x 12.6) ROB
13.1
6. Grade separators
The Site includes the following grade separators.
7. Minor Bridges
The Site includes the following Minor bridges:
No. of
Type of Structure Width (m)
Spans
Existing
S with
Chainage
No. Sub- span
(km) Foundation Super structure RHS LHS
structure length
(m)
1 32.204 Open RCC Wall type RCC Solid Slab 1 x 8.35 10.5 12.25
2 34.702 Open RCC Wall type RCC Solid Slab 3 x 6.8 14.25 11.9
3 39.924 Open RCC Wall type RCC Solid Slab 2 x 8.5 11.5 13.6
4 43.202 Open RCC Wall type RCC Solid Slab 1 x 10.3 13.7 12.2
5 45.029 Open RCC Wall type RCC Solid Slab 1 x 7.4 12.0 11.6
6 48.704 RCC Box Bridge 2 x 3.2 24.8 24.8
7 50.192 Open RCC Wall type RCC Solid Slab 1 x 11.3 14.2 12.7
8 50.975 RCC Box Bridge 3 x 3.1 13.8 12.7
9 53.374 Open RCC Wall type RCC Solid Slab 1 x 6.9 13.9 11.7
10 60.904 Open RCC Wall type RCC Solid Slab 1 x 6.8 13.9 12.3
11 62.410 RCC Box Bridge 6 x 3.2 14.2 14.2
No. of
Type of Structure Width (m)
Spans
Existing
S with
Chainage
No. Sub- span
(km) Foundation Super structure RHS LHS
structure length
(m)
12 67.040 Open RCC Wall type PSC Voided slab 1 x 20 13.5 13.5
13 67.658 Open RCC Wall type PSC Voided slab 1 x 14 13.5 13.5
14 68.115 RCC Box Bridge 3 x 3.2 13.5 13.5
15 69.008 Open RCC Wall type RCC Solid Slab 1 x 14 13.5 13.5
16 69.115 Open RCC Wall type RCC Solid Slab 1 x 9.2 13.6 13.6
17 69.556 Open RCC Wall type RCC Solid Slab 2 x 6.8 13.5 13.5
18 71.379 Open RCC Wall type RCC Solid Slab Skew 2 x 8.1 13.5 13.5
S.
Locations Remarks
No.
Nil
No. of Spans
Sl. Existing Type of Width
with Span Remarks
No. Chainage Structure (m)
length (m)
1 34.23 RCC Solid Slab 1 x 10.00 2 x 13.5 VUP
2 35.32 RCC Box 1 x 4.00 1 x 7.50 Pedestrian Subway
3 39.35 RCC Box 1 x 4.00 45 Pedestrian Subway
4 40.71 RCC Box 1 x 4.00 45 Pedestrian Subway
5 44.256 RCC Solid Slab 1 x 10.00 2 x 13.6 VUP
6 46.15 RCC Box 1 x 4.00 45 Pedestrian Subway
7 55.927 RCC Solid Slab 1 x 4.1 2 x 14.6 VUP
8 57.65 RCC Box 1 x 4.00 45 Pedestrian Subway
9 63.405 RCC Solid Slab 1 x 12.00 2 x 13.5 Non Vehicular Underpass
10 64.763 RCC Solid Slab 1 x 25.90 2 x 12.8 VUP
11 65.062 RCC Solid Slab 1 x 23.80 2 x 12.5 VUP
12 67.157 RCC Solid Slab 1 x 13.50 2 x 13.5 Non Vehicular Underpass
13 68.271 RCC Solid Slab 1 x 21.00 2 x 12.5 VUP
14 70.137 RCC Solid Slab 1 x 13.60 2 x 13.50 Non Vehicular Underpass
15 71.711 RCC Solid Slab 1 x 22.80 2 x 13.5 VUP
10. Culverts
The Site has the following culverts:
Span / Opening
Sl. Existing
Type of Culvert with span length Width (m)
No. Chainage (km)
(m)
1 29.495 Pipe 1 x 1 dia 24
2 29.761 Pipe 2 x 1 dia 24
Span / Opening
Sl. Existing
Type of Culvert with span length Width (m)
No. Chainage (km)
(m)
3 30.163 Pipe 1 x 1 dia 43
4 30.540 Pipe 3 x 1 dia 22
5 31.490 Pipe 2 x 1 dia 23
6 32.304 Pipe 1 x 1 dia 23
7 33.030 Pipe 2 x 1 dia 24
8 33.492 Pipe 1 x 1 dia 24
9 34.370 Box 1 x 1.5 22.4
10 34.955 L Pipe 1 x 0.6 dia 18
11 34.955 R Pipe 1 x 0.6 dia 18
12 35.086 Slab 1x2 12
13 35.150 Slab 1 x 2.8 9.5
14 35.782 Pipe 1 x 1.2 dia 11
15 35.980 Slab 1 x 5.07 10.5
16 36.066 Slab 1 x 5.07 9
17 36.428 Pipe 2 x 1 dia 23
18 37.572 Pipe 1 x 1 dia 22
19 38.074 Pipe 1 x 1 dia 22
20 39.144 Pipe 2 x 1 dia 22
21 41.815 Pipe 1 x 1 dia 22
22 43.087 Pipe 1 x 1 dia 23
23 43.227 Pipe 1 x 1 dia 23
24 44.190 Pipe 2 x 1 dia 31
25 45.686 Pipe 3 x 1 dia 22
26 46.675 Slab 1x4 22.4
27 47.451 Pipe 1 x 1 dia 20
28 49.600 Pipe 3 x 1 dia 24
29 49.708 Pipe 2 x 1 dia 24
30 50.015 Pipe 3 x 1.2 dia 22
31 51.178 Slab 1x4 22.4
32 51.614 Pipe 5 x 0.8 dia 22
33 51.785 Pipe 3 x 0.9 dia 22
34 52.260 Slab 1x3 22.4
35 52.680 Pipe 3 x 1.2 dia 22
36 52.720 Pipe 1 x 0.6 11
37 53.436 Slab 1 x 1.5 22.4
38 53.773 Slab 1 x 1.1 22.4
39 54.322 Stone Slab 3 x 1.5 22.22
40 54.357 Box 2x3 22.2
41 54.800 Slab 1 x 1.8 22.4
42 54.900 Slab 1x1 22.4
43 55.141 Slab 1x3 22.4
44 55.504 Pipe 1 x 1 dia 20
45 56.370 Pipe 5 x 1.2 dia 23
46 56.660 Pipe 2 x 1 dia 22
47 57.185 Slab 1x3 22.9
48 57.241 Pipe 4 x 1 dia 23
49 57.715 Pipe 1 x 1 dia 22
50 57.905 Pipe 2 x 1 dia 22
51 58.378 Pipe 3 x 1 dia 22
52 58.400 Pipe 1 x 0.6 dia 9
53 58.500 Pipe 1 x 0.6 dia 9
Span / Opening
Sl. Existing
Type of Culvert with span length Width (m)
No. Chainage (km)
(m)
54 58.797 Pipe 3 x 1 dia 22
55 59.794 Pipe 2 x 1 dia 22
56 59.849 Pipe 2 x 1 dia 22
57 60.262 Pipe 1 x 1 dia 22
58 60.808 Pipe 1 x 1 dia 22
59 61.400 Pipe 1 x 1 dia 72
60 62.032 Pipe 1 x 1.2 dia 38
61 62.485 Slab 1 x 6.5 25
62 62.688 Pipe 1 x 1.2 dia 24
63 62.959 Pipe 1 x 1.2 dia 24
64 63.373 Pipe 3 x 1.2 dia 38
65 64.305 Pipe 3 x 0.9 dia 54
66 65.237 Pipe 2 x 0.9 dia 50
67 68.296 Pipe 1 x 1 dia 48
68 68.327 Pipe 1 x 1 dia 48
69 69.203 Pipe 3 x 1.2 dia 40
70 69.276 Pipe 1 x 1 dia 40
71 70.579 Pipe 1 x 1 dia 54
72 70.595 Pipe 1 x 1 dia 54
73 71.017 Pipe 1 x 0.9 dia 39
74 71.670 Pipe 2 x 0.9 dia 48
75 71.725 Pipe 1 x 0.9 dia 50
76 72.790 Pipe 3 x 1 dia 56
77 73.749 Pipe 1 x 1.2. dia 40
78 73.864 Slab 1 x 3.6 56
Sl.
Chainage (Km) Length (m) Left Hand Side Right Hand side
No.
Nil
S. Location Type
No. From km To km Masonry/cc (Pucca) Earthen (Kutcha)
Nil
Existing
Type
Sl. No. Chainage (Km)
From To Junction Cross Road
29 47.00 Y junction To Bharathipura
30 47.69 T Junction To Sompura Industrial Area
31 48.20 T Junction To Village
32 49.32 Y junction To Devara Hosahalli
33 49.95 T Junction To Village
34 51.21 T Junction To Muddanayakanahalli
35 52.03 T Junction To Hosanijagal
36 52.67 T Junction To Rayanapalya
37 54.30 T Junction To Hale Nijagal
38 55.31 T Junction To Nandihalli
39 56.50 Y junction To Devarahalli
40 56.83 T Junction To Chikkahalli
41 58.10 T Junction To Kodihalli
42 58.23 T Junction To Vrdigere
43 59.04 Y junction To Factories
44 59.36 T Junction To Singanahalli Colony
45 59.36 T Junction To Urdigere
46 59.88 T Junction To Factories
47 60.40 T Junction To Village
48 60.40 T Junction To Village
49 61.35 T Junction To Machanahalli
50 62.95 T Junction To Mydala
51 63.90 Y junction To Kyatsandra Town
52 65.30 Y junction To APMC Yard, Tumkur City
53 65.89 Y Junction To Devarayapattana
54 69.00 T Junction To Vaddarahalli
55 72.40 T Junction Inside Industrial Area
56 72.60 T Junction Inside Tumkur City
57 73.73 T Junction To Industrial Area, Tumkur
16. Bypasses
The details of the existing road sections proposed to be bypassed are as follows:
Nil
Existing Design
Chainage Chainage Length (km) Crossings Transformer
S
(km) (km) Remarks
No
33 KV / 33 KV /
From To From To LT LT No Capacity
11 KV 11 KV
16 71.900 72.100 1
17 72.260 72.480 1
18 29.435 74.168 44.733
No
To
in mm
Pumping
Pumping
Gravity
Gravity
With
With
With
With
Flow
Flow
1 46.300 47.580 1.280 @ 47.580 120/315 RHS
2 47.700 48.800 1.100 RHS
@ 48.800 100/315
3 48.800 48.900 0.100 LHS
4 50.300 55.890 5.590 RHS
508,324
5 58.860 59.290 0.430 @ 58.860 LHS
/500
6 59.800 75.000 15.200 @71.700 150/300 LHS
7 62.700 62.950 0.250 @62.950 250/600 RHS
8 63.425 63.600 0.175 @63.600 200/600 RHS
9 63.600 64.050 0.450 200 LHS
10 64.030 64.290 0.260 @64.290 250/600 RHS
11 64.290 64.301 0.011 250 LHS
12 68.450 68.920 0.470 @ 68.920 508 RHS
508,711
13 68.920 70.080 1.160 @ 68.920 LHS
/1200
14 68.940 69.065 0.125 @68.940 300/711 RHS
15 68.940 69.440 0.500 250 LHS
16 69.250 69.452 0.202 250 RHS
17 69.250 69.300 0.050 250 LHS
18 71.360 71.930 0.570 @71.360 350/711 RHS
19 71.360 71.410 0.050 @73+910 200/600 LHS
20 73.910 74.290 0.380 200 RHS
21 73.860 73.910 0.050 200 LHS
Annex-II
(As per Clause 8.3 (i))
(Schedule-A)
The dates on which the Authority shall provide Right of Way of Construction Zone to the
Contractor on different stretches of the Site are stated below:
*The dates specified herein shall in no case be beyond 150 (one hundred and fifty) days after the
Appointed Date.
Annex-III
(Schedule-A)
Alignment Plans
The existing alignment of the project highway shall be modified in the following sections as per the
alignment plan indicated below:
(i) The alignment of the Project Highway is enclosed in alignment plan. Finished road level indicated
in the alignment plan shall be followed by the contractor as minimum FRL. In any case, the
finished road level of the project highway shall not be less than those indicated in the alignment
plan. The contractor shall, however, improve/upgrade the Road profile as indicated in Annex-III
based on site/design requirement.
The length of slip roads proposed in clause 2.8 of Schedule B shall also be incorporated by the
contractor in the profile of the project highway.
(ii) Traffic Signage plan of the Project Highway showing numbers & location of traffic signs is
enclosed. The contractor shall, however, improve/upgrade upon the traffic signage plan as
indicated in Annex-III based on site/design requirement as per IRC:SP:99 & IRC:67.
Annex-IV
(Schedule-A)
Environment Clearances
The project highway is less than 100 km length and does not involve additional Right of Way or land
acquisition more than 40m on existing alignment and 60m on Bypass/Realignments. Therefore, as per
MOEF notification No. S.O.2559(E) dated 22.08.2013, environmental clearance is not required.
SCHEDULE - B
(See Clause 2.1)
Development of the Project Highway shall include design and construction of the Project
Highway as described in this Schedule-B and in Schedule-C.
1.1 Project to be developed in Phases i.e., Phase-1 & Phase-2. Details are given in Annex-I. In case
Authority is unable to hand over the site to the Contractor for construction of Phase-2, then
Project will be closed at the completion of Phase-1 and no compensation for scope reduction,
removal/descope of land under contract shall be applicable. The Contractor will not have any
claim as per Cl. 23.6 (ii) of the Contract Agreement.
These 2 phases are distinct and in the 1st stage, Contractor has to mobilise for Phase-1 only.
Rehabilitation and augmentation shall include Six-Laning with Paved Shoulders and
Strengthening of the Project Highway as described in Annex-I of this Schedule-B and in
Schedule-C.
The Project Highway shall be designed and constructed in conformity with the Specifications
and Standards specified in Annex-I of Schedule-D.
Annex-I
(Schedule-B)
Description of Six Laning with Paved Shoulders
Location
Sl. Built-up stretch Width
From To Length Typical cross section
No. (Township) (m)
(km) (km) (m)
1. 62.040 62.218 23
2. 62.238 62.317 23
3. 62.809 63.084 23
4. 65.100 65.713 23
5. 66.645 66.828 23
6. 66.848 66.878 23
7. 67.172 67.300 23
8. 67.300 67.437 23
9. 67.453 67.700 23
10. Tumakuru 67.700 67.820 23
12,128 Figure - 2.8A
11. Bypass Section 67.830 67.978 23
12. 68.309 68.754 23
13. 68.770 68.897 23
14. 68.907 69.345 23
15. 69.357 69.859 23
16. 70.003 71.179 23
17. 71.197 71.267 23
18. 71.639 72.805 23
19. 73.247 73.460 23
20. 74.020 74.168 23
Phase 2: Provided that in the built-up areas, the width of the carriageway shall be as
specified in the following table:
Location
Sl. Built-up stretch Width
From To Length Typical cross section
No. (Township) (m)
(km) (km) (m)
1. Dodderi 39.440 39.800 360 30
Mahimapura
2. 41.300 41.600 300 30
gate
3. Yedehalli 47.240 47.500 260 30
4. Dobbaspet 49.814 50.000 180 30
Figure - 2.7C
5. Nandihalli 55.380 55.500 120 30
Chikkahallli and
6. 58.060 58.400 340 30
Hirehalli
7. Manchakalkuppe 59.720 60.320 600 30
(b) Except as otherwise provided in this Agreement, the width of the Paved carriageway and
cross-sectional features shall conform to paragraph 1.ii.(a) above.
2. Geometric Design and General Features
(i) General
Geometric design and general features of the Project Highway shall be in accordance with
Section 2 of the Manual.
(ii) Design Speed
The design speed shall be the minimum design speed of 80 km/h and ruling design speed of 100
km/h for plain/ rolling terrain.
(iii) Improvement of the existing road geometrics
Phase 1: In the following sections, where improvement of the existing road geometrics to the
prescribed standards is not possible, the existing road geometrics shall be improved to the extent
possible within the given right of way and proper road signs and safety measures shall be
provided:
Design Chainage Remarks
S.
From Type of Deficiency (Speed in
No. To km
km kmph)
Due to Built-up area on either side & Railway
1 63.55 63.77 line and Pond on RHS, Design speed has 50
been restricted to 50 kmph
Realignments
Phase 1: The existing road shall be improved to the standards as specified in the manual at the
following locations:
Design
S. Chainage Length
Type of Deficiency Remarks
No. From To (km)
km km
Existing alignment at this location is very
ROB
1 64.200 65.100 0.90 close to railway line which is parallel to
Location
project road
Design
S. Chainage Length
Type of Deficiency Remarks
No. From To (km)
km km
Total Length (km) 0.90
Phase 2: The existing road shall be improved to the standards as specified in the manual at the
following locations:
Design
S. Chainage Length
Type of Deficiency Remarks
No. From To (km)
km km
Two separate carriageways as there is built Near
1 34.800 36.150 1.35
up in between left and right carriageway T.Begur
Existing alignment at this location is very
ROB
2 50.000 51.500 1.50 close to railway line which is parallel to
Location
project road
Existing alignment at this location is very
ROB
3 55.500 57.800 2.30 close to railway line which is parallel to
Location
project road on right side
Total Length (km) 5.15
Bypasses
The existing road shall be bypassed to the standards as specified in the manual at the following
locations:
Stretch (Design
S. Length (km) Type of Deficiency Remarks
Chainage)
No.
From km To km
Nil
(a) Phase 1: In built-up sections, footpaths/fully paved shoulders shall be provided in the
following stretches:
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Location
S. Span /opening Type of
(Chainage, Remarks
No (m) Structure
in km)
1 30.600 1 x 15 x5.5 VUP L-Bommanahalli
2 32.100 1 x 15 x 5.5 VUP R-Budihal
3 39.200 1 x 12 x 4.0 LVUP R-Dodderi
L-Kuluvanahalli
4 40.755 1 x 12 x 4.0 LVUP
R- Lekkanahalli
L- Shivagange Road
5 43.055 1 x 20 x 5.5 VUP
R-Guddenahalli
L-Billankote
6 43.400 1 x 15 x 5.5 VUP
R-Totanahalli
L-Srininvaspura Industrial Area
7 45.750 1 x 12 x 4.0 LVUP
R-Hosahalli
8 47.00 2 x 20 x 5.5 Flyover R- Jindal and NH 207
9 52.680 2 x 20 x 5.5 Flyover R-Rayarapalya
10 55.160 1 x 15 x 5.5 VUP R-Nandihalli
10 57.600 1 x 12 x 4.0 LVUP R-Hirehalli Rail Station
11 60.760 1 x 12 x 4.0 LVUP L-HMS College
(b) Lateral clearance: The width of the opening at the Overpasses shall be as follows:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Location
S. Span /opening
(Chainage, Remarks
No (m)
km)
Nil
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Location
S. Span /opening
(Chainage, Remarks
No (m)
km)
1 33.350 2 X 22.7 X 5.5 R-Mylanahalli
T Begur - Connection to
2 35.785 2 X 22.7 X 5.5
NH-207
3 37.305 2 X 22.7 X 5.5 R- Near Medical College
4 48.100 2 X 22.7 X 5.5 R-Sompura Industrial Area
L- Manchkalkuppe Ind area and
5 59.445 2 X 22.7 X 5.5 Pandithnahalli tourist place (Jain
Temple)
Phase 1: Service Roads shall be constructed at the locations and for the lengths indicated below:
Location of Service
Right hand side (RHS)/ Left Length (km)
Sl. road
hand side (LHS)/ or Both of service Remarks
No. From
To (km) sides road
(km)
1 29.435 30.730 Both sides 1.295
Service Road on RHS
varies from 5.50m
upto 7.00m due to
2 30.730 31.550 Both sides 0.820
Protected Forest Land
on RHS
(Ref.:- Figure - 2.7H)
3 31.550 43.100 Both sides 11.55
Service Road Bridge
4 43.100 43.450 RHS 0.350
Proposed on LHS
5 43.450 44.980 Both sides 1.530
Service Road Bridge
6 44.980 45.180 LHS 0.200
Proposed on RHS
7 45.180 48.480 Both sides 3.300
Existing Service road retained
and Also Main Carriageway Existing Dabaspet
8 48.480 50.000 -
below flyover acts as a service Flyover
road
Existing Left Carriageway is Proposed ROB for
9 50.000 51.270 -
modified as Service Road Right Carriageway.
10 50.270 55.370 Both sides 5.100
Existing Left Carriageway is Proposed ROB for
11 55.370 56.050 -
modified as Service Road Right Carriageway.
12 55.050 63.300 Both sides 8.250
Existing Main Carriageway
Proposed Flyover at
13 63.300 64.300 below proposed Flyover is -
Kyatsandra
utilized as Service Road
Existing Left Carriageway is Proposed ROB for
14 64.300 65.100 -
modified as Service Road Right Carriageway.
15 65.100 66.620 Both sides 1.520
Service Road Bridge Proposed Proposed Service
16 66.620 66.920 -
on Both sides Road Major Bridge
17 66.920 67.140 Both sides 0.220
Service Road Bridge Proposed Proposed Service
18 67.140 67.540 -
on Both sides Road Major Bridge
19 67.540 74.168 Both sides 6.628
Sub Total on each side 40.763
Total on both the sides 80.976
(a) Grade separated structures shall be provided as per Paragraph 2.13 of the Manual. The
requisite particulars are given below:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Location Number and
Sl. Type of Width Vertical Approach
(Chainage, length of Remarks
No Structure (m) Clearance gradient
km) spans (m)
13 x 30 + 1 x 3.89% L-Kyathsandra
1 63.760 Fly over 2x 13.5 5.5
40 4.00% R-Siddaganga Mutt
2.51%
2 64.535 VUP 2 x 12.5 1 X 25 5.5 ROB Rider Span
2.58%
2.51%
3 64.825 VUP 2 x 12.5 1 X 25 5.5 ROB Rider Span
2.58%
1.93% R-Antharasanahalli
4 73.800 LVUP 2x 13.5 2 x 12 4
2.48% Industrial Area
Notes: (1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual
site condition. For cross road in skew the proposed structure shall be provided in skew only
(2) The exact location of structures shall be finalized in consultation with the IE and any
change in location shall not be construed as change in the scope of work.
(3) Minimum vertical clearance shall be maintained by re-grading cross roads, if necessary,
along with approaches (by providing same pavement as existing road) as per site condition
as per standard codal provisions. This shall not be construed as change in scope of work.
(4) Adequate lighting, ventilation, provisions for protection against rain, etc. shall be made in
consultation with IE/NHAI.
(5) Pumping arrangements including pumping station, sump etc. for dewatering the Underpass
shall be provisioned as per the requirement in addition to efficient natural drainage system
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Location Number and
Sl. Type of Width Vertical Approach
(Chainage, length of Remarks
No Structure (m) Clearance gradient
km) spans (m)
1.69%
1 30.600 VUP 2 x15.5 1 x 15 5.5 L- Bommanahalli
1.58%
1.58%
2 32.100 VUP 2 x15.5 1 x 15 5.5 R - Budihal
1.58%
0.50%
3 33.350 VOP 1x12 2 X 22.7 5.5 VOP R-Mylanahalli
0.50%
0.03% VOP - T Begur.
4 35.785 VOP 1 x 12 2 X 22.7 5.5
0.03% Connection to NH 207
1.09% VOP – R Near
5 37.305 VOP 1 x 12 2 X 22.7 5.5
1.09% Medical College
1.37%
6 39.200 LVUP 2 x15.5 1 x 12 4 R-Dodderi
0.28%
2.50% L-Kuluvanahalli
7 40.755 LVUP 2 x15.5 1 x 12 4
1.22% R- Lekkanahalli
0.00% L- Shivagange Road
8 43.055 VUP 2 x15.5 1 x 20 5.5
1.11% R-Guddenahalli
Notes: (1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual
site condition. For cross road in skew the proposed structure shall be provided in skew
only
(2) The exact location of structures shall be finalized in consultation with the IE and any
change in location shall not be construed as change in the scope of work.
(3) Minimum vertical clearance shall be maintained by re-grading cross roads, if necessary,
along with approaches (by providing same pavement as existing road) as per site condition
as per standard codal provisions. This shall not be construed as change in scope of work.
(4) Adequate lighting, ventilation, provisions for protection against rain, etc. shall be made in
consultation with IE/NHAI.
(5) Pumping arrangements including pumping station, sump etc. for dewatering the Underpass
shall be provisioned as per the requirement in addition to efficient natural drainage system.
(b) In case of grade separated structures, the type of structure and the level of the Project
Highway and the cross roads shall be as follows:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Span & Length Cross road at
Location Remarks,
S. No. of structure Raised Lowered
(km) Existing Level if any
(m) Level Level
L-Kyathsandra
1 63.760 13 x 30 + 1 x 40 NH-4 Flyover
R-Siddaganga Mutt
2 64.535 1 X 25 ROB Rider Span NH-4 VUP
3 64.825 1 X 25 ROB Rider Span NH-4 VUP
R-Antharasanahalli
4 73.800 2 x 12 NH-4 LVUP
Industrial Area
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Span & Cross road at
Location Remarks,
S. No. Length of Raised Lowered
(km) Existing Level if any
structure (m) Level Level
1 30.600 1 x 15 L- Bommanahalli NH-4 VUP
2 32.100 1 x 15 R - Budihal NH-4 VUP
3 33.350 2 X 22.7 VOP R-Mylanahalli NH-4 VOP
VOP - T Begur.
4 35.785 2 X 22.7 NH-4 VOP
Connection to NH 207
VOP – R Near
5 37.305 2 X 22.7 NH-4 VOP
Medical College
6 39.200 1 x 12 R-Dodderi NH-4 LVUP
L-Kuluvanahalli
7 40.755 1 x 12 NH-4 LVUP
R- Lekkanahalli
L- Shivagange Road
8 43.055 1 x 20 NH-4 VUP
R-Guddenahalli
L-Billankote
9 43.400 1 x 12 NH-4 LVUP
R-Totanahalli
L-Srininvaspura
10 45.750 1 x 12 Industrial Area NH-4 LVUP
R-Hosahalli
11 47.00 2 x 20 R- Jindal and NH 207 NH-4 Flyover
VOP R -Sompura
12 48.100 2 X 22.7 NH-4 VOP
Industrial Area
13 52.68 2 x 20 R-Rayarapalya NH-4 Flyover
14 55.160 1 x 15 R-Nandihalli NH-4 VUP
R-Hirehalli Rail
15 57.600 1 x 12 NH-4 LVUP
Station
VOP- L-
Manchkalkuppe Ind
16 59.445 2 X 22.7 area and NH-4 VOP
Pandithnahalli tourist
place (jain Temple)
17 60.760 1 x 12 L-HMS College NH-4 LVUP
Phase 2:
Design Chainage Typical Cross
Sl. (km) Length
Section as per Remarks
No. (m)
From To manual
1 29.435 30.420 985.00 Figure 2.7A
2 30.420 30.593 173.00 Figure 2.7I Approach
3 30.593 30.607 14.00 Figure 7.8(A) VUP
4 30.607 30.730 123.00 Figure 2.7I Approach
5 30.730 31.550 820.00 Figure 2.7H
6 31.550 32.092 542.00 Figure 2.7I Approach
7 32.092 32.109 17.00 Figure 7.8(A) VUP
8 32.109 32.208 99.00 Figure 2.7I Approach
9 32.208 32.216 8.00 Figure 7.3(A) MNB (Reconstruction)
10 32.216 32.400 184.00 Figure 2.7I Approach
11 32.400 33.344 944.00 Figure 2.7J Approach
12 33.344 33.357 13.00 Figure 7.8(A) VOP
13 33.357 33.840 483.00 Figure 2.7J Approach
14 33.840 34.237 397.00 Retained Approach
15 34.237 34.249 12.00 Retained VUP Retained
16 34.249 34.599 350.00 Retained Approach
17 34.599 34.691 92.00 Figure 2.7A
18 34.691 34.713 22.00 Figure 7.3(A) MNB (widening)
19 34.713 35.240 527.00 Figure 2.5A
20 35.240 35.759 519.00 Figure 2.7J Approach
21 35.759 35.772 13.00 Figure 7.8(A) VOP
22 35.772 36.440 668.00 Figure 2.7J Approach
All intersections and grade separators shall be as per Section 3 of the Manual. Existing
intersections which are deficient shall be improved to the prescribed standards.
Properly designed intersections shall be provided at the locations and of the types and features
given in the tables below:
S. Location of
Type of Intersection Other features
No. Intersection (km)
Major Intersections
1 49.000 At grade Y junction L-To Ramanagara
At grade 3 Legged Junction R-To Doddaballapura
2 49.300
At grade 3 Legged Junction R-To Koratagere
3 63.761 At grade 4 Legged Junction L-To Magadi,
4 66.150 Y junction R-To Gauribidanur
5 71.500 At grade 4 Legged Junction L-To Gubbi
Minor Intersection
1 29.49 Y junction R-To Nelamangala
2 29.99 Y junction R-At Kulimepalya
3 30.39 Y junction L-To Happegowdanapalya
4 30.99 Y junction L-To Bommanahalli
5 31.59 Y junction R-To Ueranangeepura
6 32.51 T Junction R-To Boodihal
7 33.96 T Junction L-To Chamundeshwari Nagar
8 35.2 T Junction R-At T. Begur
9 35.77 Four Legged L-T. Begur,R-Malonagathihalli
10 37.33 T Junction L-To Badayapa Halli
11 37.95 Y junction L-To Thippagondana Halli
12 38.58 Y junction L-Talakere
13 38.58 T Junction R-To Dodderi
14 39.46 Y junction R-To Dodderi
15 40.76 Four Legged L-To Timsandra
S. Location of
Type of Intersection Other features
No. Intersection (km)
R-To Thyamagondlu
16 41.41 Y junction L-To Mahimapura
17 42.66 T Junction R-To Thyamagondlu
L-To Kerekathiganur &
18 43.05 Four Legged Shivaganga
R-To Hanumanthapura
19 43.46 T Junction R-To Gundenahalli
20 43.46 T Junction L-To Aladahalli
21 44.54 T Junction R-To Thyamagondlu
22 44.54 T Junction L-To Village
23 45.64 T Junction R-To Hosahalli
24 46.16 Y junction L-To Kengal Kempahalli
25 46.28 T Junction L-To Avverahalli & Gottigere
26 46.61 Y junction L-To K G Srinivasapura
27 47.07 Y junction R-To Bharathipura
28 47.75 T Junction R-To Sompura Industrial Area
29 48.26 T Junction R-To Village
30 49.39 Y junction L-To Devara Hosahalli
31 50.04 T Junction L-To Village
32 51.28 T Junction R-To Muddanayakanahalli
33 52.1 T Junction R-To Hosanijagal
34 52.8 T Junction R-To Rayanapalya
35 54.37 T Junction L-To Hale Nijagal
36 55.32 T Junction R-To Nandihalli
37 56.58 Y junction R-To Devarahalli
38 56.9 T Junction R-To Chikkahalli
39 58.18 T Junction L-To Kodihalli
40 58.32 T Junction R-To Vrdigere
41 59.11 Y junction L-To Factories
L-To Singanahalli Colony,R-To
42 59.44 Four Legged Junction
Urdigere
43 59.95 T Junction L-To Factories
44 60.48 T Junction L-To Village
45 60.48 T Junction R-To Village
46 61.43 T Junction L-To Machanahalli
47 63.03 T Junction R-To Mydala
48 64 Y junction L-To Kyatsandra Town
49 65.38 Y junction R-To APMC Yard, Tumkur City
50 65.97 Y Junction R-To Devarayapattana
51 69.08 T Junction R-To Vaddarahalli
52 72.48 T Junction R-Inside Industrial Area
53 72.69 T Junction L-Inside Tumkur City
54 73.8 T Junction R-To Industrial Area, Tumkur
Main
Overlay Section Service Road
Sl. Carriageway
Description (km 61.520 to (km 29.500 to
No. (km 29.500 to
km 74.168) km 74.168)
km 61.520)
Design Traffic (msa) 217 90 10
1. Bituminous Concrete (mm) 50 50 30
2. Dense Bituminous Macadam (mm) 110 110 60
3. Granular Material (mm) 100 -- --
4. Cement Treated Base (mm) 150 -- --
5. Cement Treated Sub Base (mm) 250 -- --
6. Wet Mix Macadam (mm) -- -- 250
7. Granular Sub Base (mm) -- -- 200
8. Sub grade (mm) 500 -- 500
Total Thickness (mm) 1160 160 1040
(ii) Type of pavement
Flexible pavement is proposed for main carriageway as well as service/slip roads for the entire
project length except at Toll Plaza approaches, where Rigid Pavement is proposed.
(iii) Design requirements:
(a) Design Period and strategy
Flexible pavement for new pavement or for widening and strengthening of the existing
pavement shall be designed for a minimum design period of 15 years.
Rigid pavement for new pavement shall be designed for a minimum design period of 30
years.
7. Design of Structures
(i) General
(a) All bridges, culverts and structures shall be designed and constructed in accordance with
Section 7 of the Manual and shall conform to the cross- sectional features and other
details specified therein.
(b) Width of the carriageway of new bridges and structures shall be as follows:
S. Width of carriageway and
Bridge at km
No. cross- sectional features
NIL
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
S. No. Location at km Remarks Side
1 62.228 1.75m wide footpath Both Side
2 66.770 1.75m wide footpath Both Side
3 67.340 1.75m wide footpath Both Side
4 67.825 1.75m wide footpath Both Side
5 68.762 1.75m wide footpath Both Side
6 68.902 1.75m wide footpath Both Side
7 69.351 1.75m wide footpath Both Side
8 71.188 1.75m wide footpath Both Side
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual site
condition. For cross road in skew the proposed structure shall be provided in skew only
National Highways Authority of India B - 21
6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in
the State of Karnataka on EPC mode under Bharatmala Pariyojna
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any change in
location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned Authorities
(5) The required length shall also be provided considering the skew of the structure in consultation
with IE and shall not be construed as change of scope
(6) Desilting, Rehabilitation and Rejuvenation works shall be carried for any water bodies,
lake/pond/tank, area, nala streams and shall not be construed as change of scope
(1) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(7) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
S. No. Location at km Remarks Side
1 32.212 1.75m wide footpath Both Side
2 34.702 1.75m wide footpath Both Side
3 39.980 1.75m wide footpath Both Side
4 43.263 1.75m wide footpath Both Side
5 45.093 1.75m wide footpath Both Side
6 48.735 1.75m wide footpath Both Side
7 50.243 1.75m wide footpath Both Side
8 51.046 1.75m wide footpath Both Side
9 53.436 1.75m wide footpath Both Side
10 60.980 1.75m wide footpath Both Side
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual site
condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any change in
location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned Authorities
(5) The required length shall also be provided considering the skew of the structure in consultation
with IE and shall not be construed as change of scope
(6) Desilting, Rehabilitation and Rejuvenation works shall be carried for any water bodies,
lake/pond/tank, area, nala streams and shall not be construed as change of scope
(7) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(8) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
(e) Cross-section of the new culverts and bridges at deck level for the Project Highway shall
conform to the typical cross-sections given in Section 7 of the Manual.
(ii) Culverts
(a) Overall width of all culverts shall be equal to the roadway width of the approaches.
Notes:
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual
site condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by
IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any
change in location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned
Authorities
(5) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(6) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Notes:
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual
site condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by
IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any
change in location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned
Authorities
(5) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(6) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Culvert location Type, span, height and width of
S. No. Repairs to be carried out
(Km) existing culvert (m)
1 62.032 Pipe, 1 x1.2m dia, 38m
Widening, replacement of
2 62.279 Box, 1 x 6.5 x 1.8,25.0m
existing head walls, handrails
3 62.482 Pipe, 1 x1.2m dia, 38.0 m
to Crash barrier, clearing and
4 62.753 Pipe, 1 x1.2m dia, 24.0 m
grubbing, painting etc.
5 63.167 Pipe, 3 x1.2m dia, 24.0 m
Additional new culverts shall be constructed as per particulars given in the table below:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Culvert location
S. No. Span / Opening (m)
(km)
1 32.400 1x4x2.5
2 36.560 1x2x2.5
3 47.620 1x2x2.5
Notes:
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual site
condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any change in
location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned Authorities
(5) The required length shall also be provided considering the skew of the structure in consultation
with IE and shall not be construed as change of scope
(6) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(7) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Culvert location
S. No. Span / Opening (m)
(km)
1 32.400 1x4x2.5
2 36.560 1x2x2.5
3 47.620 1x2x2.5
Notes:
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual site
condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any change in
location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned Authorities
(5) The required length shall also be provided considering the skew of the structure in consultation
with IE and shall not be construed as change of scope
(6) The span and length/Width mentioned are minimum and any Change in length/Width of
culverts shall not be construed as change of scope
(7) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
(e) Repair/Replacement of railing/Parapets, flooring and protection works of the existing culverts
shall be undertaken as follows:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
S. No. Location at km Type of repair required
1 49.711
2 49.771 Clearing of Vegetation, Replacement of
3 50.121 Handrails and any other repair if necessary.
4 61.385
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
(f) Floor protection works shall be carried out as specified in the relevant IRC Codes and
Specifications.
(iii) Bridges
(i) The existing bridges at the following locations shall be re-constructed as new
Structures:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Bridge
S. Salient details of Adequacy or otherwise of the existing
location Remarks
No. existing bridge waterway, vertical clearance, etc*
(Km)
RCC Slab Bridge across Adequate, however reconstruction has
1 32.212 Nala of span been proposed as the Structure is within Reconstruction
1 x 8.35 VUP approach
Adequate, however reconstruction has Reconstruction
RCC Slab Bridge across
2 43.263 been proposed as the Structure is within (2 x 16.0 + 1x
Nala of span 1 x 11.0
VUP approach 11.75)
Adequate, however reconstruction has
RCC Slab Bridge across been proposed as the Structure is within
3 60.98 Reconstruction
Nala of span 1 x 6.80 VUP approach also the condition of the
bridge is poor
(1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual site
condition. For cross road in skew the proposed structure shall be provided in skew only
(2) No. of expansion joints shall be reduced by provision of continuous spans, as directed by IE.
(3) The exact location of structures shall be finalized in consultation with the IE and any change in
location shall not be construed as change in the scope of work.
(4) The Deck level of the above culverts shall be governed by guidelines of Concerned Authorities
(5) The required length shall also be provided considering the skew of the structure in consultation
with IE and shall not be construed as change of scope
(6) The span and length/Width mentioned are minimum and any Change in length/Width of culverts
shall not be construed as change of scope
(7) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
New bridges at the following locations on the Project Highway shall be constructed. GADs
for the new bridges are attached in the drawings folder.
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Location Total
S. No. Remarks, if any
(Km) length (m)
1 43.257 300 LHS service road bridge
2 45.080 200 RHS service road bridge
3 66.770 300 Both Side service road bridges
4 67.340 400 Both Side service road bridges
Notes:
(1) The span mentioned above is clear span measured in square direction only. The
locations, orientation of the above mentioned structures are tentative and may vary as
per the actual site condition. For cross road in skew the proposed structure shall be
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur
bypass
Location Total
S. No. Remarks, if any
(Km) length (m)
Nil
(c) The railings of existing bridges shall be replaced by crash barriers at the following
locations:
S. No. Location at km (Existing Chainage km) Remarks
Nil
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Design Span
Deck width
Sl. No. Chainage in Location Arrangement
(m)
Km (No. x Length m)
Nil
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur
bypass
Design Span Remarks
Deck width
Sl. No. Chainage in Location Arrangement
(m)
Km (No. x Length m)
Near fire station in -
1 65.100 2 x 29.40 3.60
Tumakuru town
To be Extended
As per site
2 47.700 Near Jindal 2 x 10 as per site
condition
condition
Note: * Entire bridge deck including stair & ramps shall be covered with FRP sheet or similar kind of
roofing to protect from rain and sun.
* Sufficient lighting arrangement shall need to be provided using solar lighting system for the foot bridge.
The dimension of the existing structures are tentative and shall be altered as per site condition. Retaining or
demolition of the existing structures shall be carried in concurrence with AE.
The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Location at km
S. No. Remarks
(Existing Chainage km)
1 34.702
2 39.924
3 45.029 Cleaning, Painting, Replacement of wearing
4 48.704 coat, Replacement of Expansion joints,
5 50.192 Replacement of Bearings, Structural repairs
6 50.975 to sub-structure/super-structure, including
strengthening of sub-structure/super-
7 53.374
structure, Repair to flooring and protection
8 62.410
works, Desilting near lakes\ponds\tanks,
9 67.040
Rehabilitation and Rejuvenation of
10 67.658 lakes/ponds/tanks(fencing, providing
11 68.115 sopanam katte, revetment, strengthening of
12 68.115 bund, shifting/reconstruction of weirs sluice
13 69.008 etc,.)
14 69.556
15 71.379
Nil
(iv) Rail-road bridges
(a) Design, construction and detailing of ROB/RUB shall be as specified in Section 7 of the
Manual.
(b) Road over-bridges
Road over-bridges (road over rail) shall be provided at the following level crossings, as
per GAD drawings attached:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Notes: (1) The span mentioned above is clear span measured in square direction only. The locations,
orientation of the above mentioned structures are tentative and may vary as per the actual
site condition. For cross road in skew the proposed structure shall be provided in skew
only
(2) Detailed drawings for the above structures shall be confirmed/ approved with concerned
Railway authorities and IE/NHAI. Any change shall not be construed as change in scope
of work.
(3) The exact location of structures shall be finalized in consultation with the IE and any
change in location shall not be construed as change in the scope of work.
(4) The Deck level of the above Bridges shall be governed by guidelines of Concerned
Authorities.
(5) Adequate lighting, ventilation, provisions for protection against rain, etc. shall be made in
consultation with IE/NHAI.
(6) The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
(7) Instrumentation in the Railway Superstructure across Railway Bridge portion shall be
implemented as per Circular No. NHAI/GM/ROB-RUB/2012 dated 25 Apr 2016 and with
all amendments and additions till date.
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur
bypass
Location of Level Length of bridge Remarks
S. No.
crossing (Chainage km) (m)
1 50.285 76.0
2 55.94 76.0 2 Bridges for MCW
3 64.65 76.0
Notes: (1) The span mentioned above is clear span measured in square direction only.
The locations, orientation of the above mentioned structures are tentative and
may vary as per the actual site condition. For cross road in skew the proposed
structure shall be provided in skew only
(2) Detailed drawings for the above structures shall be confirmed/ approved with
concerned Railway authorities and IE/NHAI. Any change shall not be
construed as change in scope of work.
(3) The exact location of structures shall be finalized in consultation with the IE
and any change in location shall not be construed as change in the scope of
work.
(4) The Deck level of the above Bridges shall be governed by guidelines of
Concerned Authorities.
(5) Adequate lighting, ventilation, provisions for protection against rain, etc. shall
be made in consultation with IE/NHAI.
(6) The construction of structures shall be carried out in phasing manner as per
direction of Authority/AE.
(8) Instrumentation in the Railway Superstructure across Railway Bridge portion
The grade separated structures shall be provided at the locations and of the type and length
specified in paragraphs 2.9 and 3 of this Annex-I.
The existing bridges and structures to be repaired/ strengthened, and the nature and extent of
repairs/strengthening required are given below:
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Location of Bridges
Nature of extent of repairs/ strengthening to be
S. No. (km) (Existing
carried out
Chainage km)
1 34.702
2 39.924 Cleaning, Painting, Replacement of wearing coat,
Replacement of Expansion joints, Replacement of
3 45.029
Bearings, Structural repairs to sub-structure/super-
4 48.704
structure, including strengthening of sub-
5 50.192
structure/super-structure, Repair to flooring and
6 50.975 protection works etc.
7 53.374
Note: The construction of structures shall be carried out in phasing manner as per direction
of Authority/AE.
(b) ROB/RUB
Sl. Nature and extent of repairs
Location of ROB/RUB (km)
No. /strengthening to be carried out
Nil
PHASE 1:
Construction of service roads from design chainage from 29.435 to 74.168 and construction of main
carriage way from design chainage 61.520 to 74.168 including Tumkur bypass
Location of Structure
Sl. Nature and extent of repairs
(Existing Chainage,
No. /strengthening to be carried out
km)
1 62.762
2 63.405
3 64.763
4 65.062
5 66.331
6 67.157
7 68.271
8 70.137
9 71.711
10 73.221
PHASE 2:
Construction of main carriage way from design chainage 29.435 to 61.520 excluding Tumkur bypass
Note: The construction of structures shall be carried out in phasing manner as per direction
of Authority/AE.
(i) Traffic control devices and road safety works shall be provided in accordance with Section 9
National Highways Authority of India B - 35
6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in
the State of Karnataka on EPC mode under Bharatmala Pariyojna
of the Manual.
(ii) Specifications of the reflective sheeting shall be in accordance with Section 9 of the Manual.
9. Roadside Furniture
(i) Roadside furniture shall be provided in accordance with the provisions of the Section 9 of the
Manual.
The lengths/heights provided here are minimum. Any changes is height and length shall not be
construed as change of Scope
The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
The lengths/heights provided here are minimum. Any changes is height and length shall not be
construed as change of Scope
The construction of structures shall be carried out in phasing manner as per direction of
Authority/AE.
No
To
in mm
Pumping
Pumping
Gravity
Gravity
With
With
With
With
Flow
Flow
1 46.300 47.580 1.280 @ 47.580 120/315 RHS
2 47.700 48.800 1.100 RHS
@ 48.800 100/315
3 48.800 48.900 0.100 LHS
4 50.300 55.890 5.590 RHS
508,324
5 58.860 59.290 0.430 @ 58.860 LHS
/500
6 59.800 75.000 15.200 @71.700 150/300 LHS
7 62.700 62.950 0.250 @62.950 250/600 RHS
8 63.425 63.600 0.175 @63.600 200/600 RHS
9 63.600 64.050 0.450 200 LHS
10 64.030 64.290 0.260 @64.290 250/600 RHS
11 64.290 64.301 0.011 250 LHS
12 68.450 68.920 0.470 @ 68.920 508 RHS
508,711
13 68.920 70.080 1.160 @ 68.920 LHS
/1200
14 68.940 69.065 0.125 @68.940 300/711 RHS
15 68.940 69.440 0.500 250 LHS
16 69.250 69.452 0.202 250 RHS
17 69.250 69.300 0.050 250 LHS
18 71.360 71.930 0.570 @71.360 350/711 RHS
19 71.360 71.410 0.050 @73+910 200/600 LHS
20 73.910 74.290 0.380 200 RHS
21 73.860 73.910 0.050 200 LHS
SCHEDULE – C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The Contractor shall construct the Project Facilities in accordance with the provisions of this
Agreement. Such Project Facilities shall include:
(a) Toll Plaza;
(b) Roadside Furniture;
(c) Pedestrian Facilities;
(d) Tree Plantation;
(e) Truck Parking;
(f) Bus-bays and Passenger Shelters;
(g) Rest Areas;
(h) Entry / Exit Ramps
(i) ATMs; and
(j) Operation and Maintenance Centers
(i) Toll Plaza shall be provided at the following location as per provision given in the Manual. However,
minimum 28 (Twenty Eight) number of toll lanes shall be provided at toll plaza location:
Existing Chainage
S. No. Design Chainage (km) Remarks
(km)
Chikkanahalli (Near
1 61.39 61.52
Manchakalkuppe)
Based on the minimum toll lane requirement as given above, toll plaza with all other facilities mentioned
in manual shall be constructed with approval from NHAI.
Minimum requirements of the facilities and equipment for Hybrid ETC System shall be as per NHAI
Policy Circular No. NHAI/13013/2016-17/CO/Hybrid ETC/112716 dated 08.02.2018, including
amendments/addendum, if any.
A separate toilet facility for road users shall be provided on both sides of the toll plaza location along with
parking facility. One toilet block on each direction shall be provided as per drawing at Annex-I of
Schedule-C. These toilet facilities shall follow CPWD specifications for sanitary ware items and fittings
such as EWC, Wash Basin, Wash basin- Under counter, Urinal flat back, PVC Cistern, IWC Orissa Pan,
Flush Valve –CP, Wash Basin pillar cock – CP, Bib Cock –CP, Health Faucet, W/c Bib cock, Wash Basin
angle cock.
Toilet complexes with separate toilets for Men, Women & Physically Handicapped shall be provided on
both sides, as per the directions of NHAI. The toilets shall be well maintained and have continuous water
supply.
Reverse Osmosis plant with continuous water supply shall be provided for supply of safe drinking water
to Road Users. Point of Sale for Fast Tag shall be provided at the Toll Plaza
If required, RE wall/Retaining wall shall be provided at toll plaza locations to restrict the embankment
slope within the right of way.
vi. Barbed wire fencing: Shall be provided for Entire Project highway.
vii. Toe wall: Shall be provided except for the viaducts, built up sections and Cross roads.
viii. Hectometer / Kilometer Stones: Shall be provided for Entire Project highway.
ix. Lighting: Shall be provided in accordance with Section 12 of the Manual.
(c) Pedestrian facilities: shall include the provision of the Pedestrian crossing as per manual.
(e) Truck Parking: Truck Parking shall be provided at following location as per manual:
(h) Rest Areas: Rest Area shall be provided at the following location as per Manual:
(j) Advanced Traffic Management System: The Contractor shall design, install, operate and
maintain Highway Traffic Management System (HTMS)/Advance Traffic Management System
(ATMS) as part of the project facilities as per Manual.
Briefly, the ATMS components to be deployed shall inter alia include:
(i) Video Surveillance System (CCTV PTZ Dome/Fixed Camera)
(ii) Video Incident Detection System
(iii) Vehicle Actuated Radar Speed Displays
(iv) Emergency Road side Telephones
(v) Fixed/Portable Variable Message Sign