Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

EC380D - Engine, Installing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Service Information

Document Title: Function Group: Information Type: Date:


Engine, installing 210 Service Information 12/12/2022
Profile:
EXC, EC380D L [GB]

Engine, installing
Op nbr 210-072

Total procedure time (hr): 6.50

Tools:
9998257 Lifting tool
9998547 Lifting tool
Tech Tool Service Tool

1. Connect the lifting device to the engine and lower the engine into the engine compartment.

Figure 1

Engine weight: 1,400 kg (3,086 lbs)

2. Install the engine mounting screws. See Engine mounting, tightening torque.
NOTE!
Pay attention to the positioning of the brackets, cushions, and mounting screws (front/rear) when assembling.

3. Connect the main wire harness connectors and install the cover.

Figure 2
1. Cover
2. Connector
3. Clamp

4. Connect the connectors to the fuel filter and the water separator.

Figure 3

1. Connector

5. Connect the starter motor wire harness.

Figure 4

1. Starter motor
2. Wire harness
6. Connect the engine oil remote hoses.

Figure 5

1. Engine oil remote hose

7. Connect the cab heater hose to the engine block.

Figure 6

1. Cab heater hose

8. Install the air conditioner compressor and belt


Connect the wire-harness connector

Figure 7
1. Air conditioner compressor
2. Alternator/compressor belt
3. Connector

9. Install the muffler and exhaust pipe


Fix the muffler with U-bolts.
Tightening torque: see Inlet and exhaust system, tightening torques.

Figure 8

1. Muffler
2. Exhaust pipe
3. Turbocharger

10. Connect the air inlet hose and install the clamps.
Tightening torque: see Inlet and exhaust system, tightening torques.

Figure 9

1. Exhaust pipe
2. Clamp
3. Air inlet hose

11. Install the foot step


Figure 10

12. Connect the wire-harness connector on the inlet air sensor.

Figure 11

1. Inlet air temperature/pressure sensor


2. Connector

13. Connect the fuel line hoses.

Figure 12

1. Fuel hose

14. Install the P.T.O (Power Take Off) pump and connect the hoses.
Figure 13

1. Hose
2. Screw
3. PTO pump

15. Install the pump room covers.

Figure 14

1. Pump room cover

16. Install the main pump. See Hydraulic pump, replacing.

17. Install the shroud to the radiator assembly.

18. Connect the radiator under hose and charge air cooler tube.
Tightening torque: see Cooling system, tightening torques.
Figure 15

1. Charge air cooler tube


2. Radiator hose (under)

19. Connect the charge air cooler tube and the radiator hoses.
Tightening torque: see Cooling system, tightening torques.

Figure 16

1. Charge air cooler tube


2. Radiator breathing hose
3. Radiator hose. (upper)

20. Install the expansion tank and connect the hoses and connectors.
Figure 17

1. Connector
2. Hose

21. Install the engine hood with engine room cowl frame.

Figure 18

22. Install the muffler hood, radiator hood and the engine hood rear cover.

23. Fill the coolant. See Coolant, change.

NOTE!
If the machine has been equipped with a new or overhauled engine, the central system must be updated and the control unit’s
software bust be programmed.

24. Start VCADS Pro and run 17057-3 Central systems, updating, replace component.

25. Start VCADS Pro and run 28423-3 MID 128 ECU, programming.

26. Bleed the fuel system. See Fuel system, bleeding.

27. Start the engine, warm up, and check that there are no leaks.

28. Install the engine room under covers.