CONCRETE GUTTER 1. MATERIAL AND CONTRUCTION REQUIREMENTS SHALL CONFORM TO NATURAL GRADE LINE
DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES 2013
0.50 CONCRETE CURB
2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC FIBERS (D.O. 95,
SERIES 2005 ) AS ADDITIVE TO CONCRETE MIX.
CONCRETE SIDEWALK 3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED IN THE DESIGN OF 0.50
PAVED ROADS
IF THE FUNCTION IS TO THE FACILITATE THE CHANNELING OF SURFACE
0.36
WATER RUN-OFF
CURB INLET CONCRETE GUTTER
THUS PREVENTING THE EROSION OF SHOULDERS AND SLOPE.
0.15
0.15
4. MINIMUM CURB INLET INTERVAL ("D")10.0METERS IN FLOODED AREAS.
5. MINIMUM CURB INLET INTERVAL ("D")20.0METERS IN OTHER AREAS
0.10 0.10 TYPICAL LAYOUT OF CONCRETE CURB AND GUTTER WITH CURB INLET
0.30 SCALE: 1:100 MTS.
2.20
S =1 : 24
0.21
CONCRETE CURB
0.50 SLOPE 0.8 %
0.36
0.21
0.15
2.80
0.36
0.23
0.21
0.36
0.15
0.60
ITEM UNIT QUANTITY SCALE: 1:10 MTS.
SCALE: 1:10 MTS.
CLASS 'A" CONCRETE cu.m. 0.09
CONCRETE CURB & GUTTER DETAIL "C"
SCALE: 1:10 MTS.
(FOR FUTURE)
2.80
SEE DETAIL "B"
0.50
0.50
SEE DETAIL "A"
B=0.65 H B=0.65 H
0.40
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT CONCRETE CURB AND GUTTER DETAIL
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP
ON EXCAVATION PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 7
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
CONCRETE MEDIAN (ISLAND)
0.05
VARIES
0.20
0.15
ON FILL ON FILL
0.80
1.20
CL OF ISLAND
CL OF ISLAND
1.20
0.15
0.20 0.80 0.20
0.20
0.05
ITEM 104 - EMBANKMENT
PLAN EMBANKMENT COMMON SOIL W/
80 % COMPACTION
VARIES
15 0.03
0.03 15
0.30
0.30
0.30
CARRIAGEWAY
0.58
0.58
0.58
SLOPE 1.5 % SLOPE 1.5 %
0.28
0.28
0.28
CONCRETE MEDIAN (ISLAND)
ITEM 311(1) g1 - PORTLAND CEMENT
CONCRETE PAVEMENT
0.22 0.22 t = 0.33 m.(CARRIAGEWAY)
0.20
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.
ITEM 311(1)g1 - PORTLAND CEMENT
CONCRETE PAVEMENT
t = 0.33 m.(CARRIAGEWAY)
ELEVATION
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF MEDIAN ISLAND
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 8
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
30.00
15.00 CL 15.00
1.40 1.13 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.35 1.50 0.67 2.00 1.13 1.40
BIKE LANE PLANTING SIDEWALK ISLAND INNER LANE OUTER LANE SHOULDER SIDEWALK PLANTING BIKE LANE
STRIP STRIP
SEE DETAIL "A"
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
SLOPE 2.0 % SLOPE 2.0 % SLOPE 0.8 %
SLOPE 0.8 %
Ht = VARIES
Ht = VARIES
S =1 : 24
S =1 : 24
H
H
SECTION "K"
MIN.
MIN.
0.60
0.60
B = 0.65 H SEE DETAIL "A" B = 0.65 H
M K E
1.40
BIKE LANE
2.00 1.13
PLANTING STRIP
SIDEWALK
0.67
100
1.50
ITEM 311(1) g1 - PORTLAND CEMENT
SHOULDER CONCRETE PAVEMENT
t = 0.33 m.(CARRIAGEWAY)
3.35
T R A V E L L E D W A Y CL 30 - 50 PENETRATION ASPHALT
SEAL OR COLD APPLIED LIQUID
RUBBER BASE SEALING COMPOUND
150
3850
T R A V E L L E D W A Y
SLOPE 1.5 % SLOPE 1.5 %
500 .00 METERS 500 .00 METERS
10.00 10.00 10.00 10.00 10.00 10.00
0.20 0.28
1.20
MEDIAN ISLAND MEDIAN ISLAND
20.00 20.00 20.00
0.60
0.60
0.60
3850
T R A V E L L E D W A Y CONSTRUCTION JOINT
150
3.35
T R A V E L L E D W A Y SUB BASE COURSE t = 0.20 m.
L
ITEM 105 - SUB-GRADE
PREPARATION
1.50
SHOULDER
100
0.67
DETAIL "C" CONSTRUCTION/ LONGITUDINAL JOINT
BRGY. ROAD CROSSING
DRIVEWAY/WALK WAY
SIDEWALK
1.13 2.00
PLANTING STRIP
1.40
BIKE LANE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DETAIL "C" CONSTRUCTION/ LONGITUDINAL JOINT
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PLAN ON ISLAND MEDIAN ON U-TURN SLOT
W/ DRIVEWAY AND ROAD CROSSING BRGY. ROAD PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 9
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
0.22
2.00
0.08
0.03
SLOPE 1.5 %
CONCRETE CURB
0.36
0.22
ITEM 311(1) a.3 - PORTLAND CEMENT
CONCRETE PAVEMENT
t = 0.28 m.(CARRIAGEWAY)
f
TOP OF PAVEMENT
16mm 1
6mm 1
6m m
0.17
16mm 1
SLOPE 1.5 % 6mm 1
6mm 16
mm
0.45
S = 12
2.00
LENGTH :1
0.28
MARK 6mm
(M) NON-S
KID PLA
IN CE
W/ GRO MENT FLOO
6mm
a a 0.22 m. OVES R FINIS
LINES H
b 0.15 m. 0.22
c 0.03 m. ITEM 311(1) a.3 - PORTLAND CEMENT
CONCRETE PAVEMENT
d 0.17 m. t = 0.28 m.(CARRIAGEWAY)
e 0.04 m.
1.20
f 0.28 m. CONCRETE CURB SPOT. DET. (GROOVES LINE)
h 0.45 m. SCALE: 1:20 MTS. NOT TO SCALE
PLAN OF CURB CUT -OUT DETAIL "J"
ISOMETRIC WIEW SCALE 1:20MTS.
NOT TO SCALE
0.07
S =1 : 24
0.28
S = 12
:1
0.20
0.28
t = 0.28 m.(CARRIAGEWAY)
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF CONCRETE CURB
DETAILED ENGINEERING DESIGN PLAN FOR SPOT. DET. (GROOVES LINE)
ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SECTION "L" OF CURB CUT - OUT PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 10
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD, ISOMETRIC OF CURB CUT - OUT
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
50 mm Ø G.I. PIPE
0.60
12 mm SQUARE BAR SPACE
@ 200 mm. O.C.
0.20 0.20 0.20
0.30
0.50
0.60
0.05 50 mm Ø G.I. PIPE
0.30
0.05
STONE MASONRY
50 mm Ø G.I. PIPE
FACED OF CURB
50 mm Ø G.I. PIPE
5.00 5.00 5.00 5.00
2.50 TOP OF SIDE WALK
0.05 0.05 12 mm SQUARE BAR SPACED @ 200 mm. O.C. FACED OF CURB
0.60
0.30
50 mm Ø G.I. PIPE
0.15
RAMP SEE DETAIL "R"
M
ELEVATION
SCALE: 1:80 MTS
1.10
CL
CARRIAGEWAY CARRIAGEWAY
3.35
3.0 6.0 3.0
0.15
6.70
3.2mm x 150mm BROKEN WHITE
REFLECTORIZED CENTERLINE
3.50
CARRIAGEWAY CARRIAGEWAY
1.50
CONCRETE SHOULDER SEE DETAIL OF RAMP CONCRETE SHOULDER
0.67
CONCRETE CURB & GUTTER RAMP CONCRETE CURB & GUTTER
1.20
2.0
CONCRETE SIDEWALK CONCRETE SIDEWALK
0.75
1.00
1.13
PLANTING STRIP
1.40
J
BIKE LANE
STONE MASONRY
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT TYPICAL PLAN DETAIL OF PEDESTRIAN CROSSING WITH RAILINGS
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 11
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
0.25 CONCRETE COLLAR
0.25
0.15
100 PIPE DIA.0.15
W CONCRETE COLLAR
FLO
0.15
RCPC
H SLOPE 0.5 %
LENGT RCPC RCPC
PIPE DIA.
FLOW
FOUNDATION FILL,
t=0.15
RCPC
DIA.
0.10
DETAIL "X"
CONCRETE COLLAR
SCALE: 1:60 MTS
ISOMETRIC
NOT TO SCALE
DETAIL "Y"
CL
30.00
15.00 15.00
1.40 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.36 1.50 0.67 2.00 1.40
BIKE LANE SIDEWALK SHOULDER OUTER LANE ISLAND OUTER LANE SHOULDER SIDEWALK BIKE LANE
3.35 0.50 0.50 3.35
INNER LANE INNER LANE
1.13
CONC.MANHOLE CURB AND GUTTER 1.13
PLANTING (FOR FUTURE) SEE DETAIL "B" (FOR FUTURE) PLANTING
SLOPE 2.0 % STRIP STRIP SLOPE 2.0 %
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
SLOPE 2.0 % SLOPE 2.0 % SLOPE 0.8 %
SLOPE 0.8 %
0.30
0.30
min.
min.
Ht = VARIES
Ht = VARIES
S =1 : 24
S =1 : 24
D
D
SEE DETAIL "A"
H
H
D
D
IN
OUT
MIN.
MIN.
0.60
0.30
0.30
0.60
SEE DETAIL "Y"
B = 0.65 H ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE X B = 0.65 H
(FOR FUTURE) SIDE WALK, t=0.10 M.
PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
SIDE WALK, t=0.10 M. (FOR FUTURE) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE (FOR FUTURE) PCCP BIKELANE, t=0.10 M.
ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
PCCP BIKELANE, t=0.10 M. (FOR FUTURE) PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
SEE DETAIL ON ITEM 104 - EMBANKMENT (FROM ROADWAY ITEM 200 - AGGREGATE SUB BASE COURSE,
STONE MASONRY EXCAVATION) SELECTED BORROW MIXED SAND ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
& GRAVEL RIVER MIXED ITEM 104 - EMBANKMENT (FROM ROADWAY
t=0.20M.
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE EXCAVATION) SELECTED BORROW MIXED SAND
PAVEMENT, t= 0.28 m. (SHOULDER) & GRAVEL RIVER MIXED
(FOR FUTURE) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (SHOULDER)
TYPICAL ROADWAY SECTION ON CROSS DRAINAGE, RC PIPE CULVERT W/ (FOR FUTURE)
USING STONE MASONRY HEADWALL AT INLET AND OUTLET, AND MANHOLE , JUNCTION BOX
0 1 2 4
SCALE: 1:75 MTS
SCALE 1:2 MTS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT TYPICAL ROADWAY SECTION CONSTRUCTION OF PCCP ON
DETAILED ENGINEERING DESIGN PLAN FOR CROSS DRAINAGE RC PIPE CULVERT AND SECTIONS ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 12
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II