*(SEE NOTES Nos. 4&5) *(SEE NOTES Nos.

4&5) NOTES:
"D" "D"
CONCRETE GUTTER 1. MATERIAL AND CONTRUCTION REQUIREMENTS SHALL CONFORM TO NATURAL GRADE LINE
DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES 2013
0.50 CONCRETE CURB
2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC FIBERS (D.O. 95,
SERIES 2005 ) AS ADDITIVE TO CONCRETE MIX.
CONCRETE SIDEWALK 3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED IN THE DESIGN OF 0.50
PAVED ROADS
IF THE FUNCTION IS TO THE FACILITATE THE CHANNELING OF SURFACE

0.36
WATER RUN-OFF
CURB INLET CONCRETE GUTTER
THUS PREVENTING THE EROSION OF SHOULDERS AND SLOPE.
0.15

0.15
4. MINIMUM CURB INLET INTERVAL ("D")10.0METERS IN FLOODED AREAS.
5. MINIMUM CURB INLET INTERVAL ("D")20.0METERS IN OTHER AREAS

0.10 0.10 TYPICAL LAYOUT OF CONCRETE CURB AND GUTTER WITH CURB INLET
0.30 SCALE: 1:100 MTS.

REAR ELEVATION OF GUTTER CONCRETE CURB

CONCRETE GUTTER CONCRETE CURB


0.67 CONCRETE GUTTER
0.17 0.50 0.50

2.20
S =1 : 24
0.21
CONCRETE CURB
0.50 SLOPE 0.8 %

0.36

0.21
0.15

2.80
0.36
0.23
0.21

0.36
0.15

0.10 0.30 0.10 ITEM 200 - AGGREGATE SUB BASE


COURSE t = 0.20 m. CONCRETE CURB AND GUTTER
ITEM 311(a) - PORTLAND CEMENT
CONCRETE PAVEMENT t = 0.23 m.
ESTIMATE OF QUANTITIES PER LINEAR METER
ISOMETRIC
REAR ELEVATION

0.60
ITEM UNIT QUANTITY SCALE: 1:10 MTS.
SCALE: 1:10 MTS.
CLASS 'A" CONCRETE cu.m. 0.09
CONCRETE CURB & GUTTER DETAIL "C"
SCALE: 1:10 MTS.
(FOR FUTURE)

100MMØ PVC DRAIN OR WEEPHOLES WITH FILTER CLOTH TIED


AT THE INNER END OF THE WEEPHOLES AND 120MM MEDIUM
GRAVEL AND 120MM FINE GRAVEL SPACED AT 2.0M. ON
CENTER HORIZONTAL AND 1.0 M. VERTICAL STAGGERED
B=0.65 H

TYPICAL SECTION DETAIL OF STONE MASONRY (BRACED WALL)

NATURAL GRADE LINE CL


30.00
15.00 15.00
1.40 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.35 1.50 0.67 2.00 1.40
BIKE LANE SIDEWALK SHOULDER OUTER LANE ISLAND OUTER LANE SHOULDER SIDEWALK BIKE LANE
3.35 0.50 0.50 3.35
0.50 INNER LANE INNER LANE 0.50
SEE DETAIL ON MEDIAN ISLAND
1.13 SEE DETAIL ON SOLAR STREET LIGHT (FOR FUTURE) TO BE CUT
TO BE CUT (FOR FUTURE)
1.13
PLANTING
TO BE CUT
STRIP 1.20 PLANTING
STRIP
SEE DETAIL ON CONCRETE
CURB AND GUTTER
2.80

2.80
SEE DETAIL "B"
0.50

SLOPE 2.0 % SLOPE 2.0 % SLOPE 2.0 %


SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
SLOPE 2.0 % SLOPE 0.8 %
SLOPE 0.8 %
1.50

0.50
SEE DETAIL "A"
B=0.65 H B=0.65 H
0.40

ITEM 105 - SUB-GRADE ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE


ITEM 105 - SUB-GRADE 1.80 PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
PREPARATION PREPARATION
ITEM 311(1)g1 - PORTLAND CEMENT CONCRETE ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
PAVEMENT, t= 0.33 m. (CARRIAGEWAY)
(FOR FUTURE) SIDE WALK, t=0.10 M. ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M. SIDE WALK, t=0.10 M. (FOR FUTURE)
PCCP BIKELANE, t=0.10 M. PCCP BIKELANE, t=0.10 M. (FOR FUTURE)
(FOR FUTURE) TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/ STONE MASONRY, ON EXCAVATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT CONCRETE CURB AND GUTTER DETAIL
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP
ON EXCAVATION PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 7
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
CONCRETE MEDIAN (ISLAND)

0.05
VARIES

0.20
0.15
ON FILL ON FILL

0.80

1.20
CL OF ISLAND
CL OF ISLAND
1.20

0.15
0.20 0.80 0.20

0.20
0.05
ITEM 104 - EMBANKMENT
PLAN EMBANKMENT COMMON SOIL W/
80 % COMPACTION

VARIES
15 0.03
0.03 15
0.30

0.30

0.30
CARRIAGEWAY

0.58
0.58

0.58
SLOPE 1.5 % SLOPE 1.5 %
0.28

0.28

0.28
CONCRETE MEDIAN (ISLAND)
ITEM 311(1) g1 - PORTLAND CEMENT
CONCRETE PAVEMENT
0.22 0.22 t = 0.33 m.(CARRIAGEWAY)

0.20
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.
ITEM 311(1)g1 - PORTLAND CEMENT
CONCRETE PAVEMENT
t = 0.33 m.(CARRIAGEWAY)
ELEVATION
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.
ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m.

ITEM 104 - EMBANKMENT


SECTION DETAIL OF MEDIAN ISLAND
SECTION "R" SCALE: 1:10 MTS.
(FOR FUTURE)

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF MEDIAN ISLAND
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 8
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
30.00
15.00 CL 15.00
1.40 1.13 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.35 1.50 0.67 2.00 1.13 1.40
BIKE LANE PLANTING SIDEWALK ISLAND INNER LANE OUTER LANE SHOULDER SIDEWALK PLANTING BIKE LANE
STRIP STRIP
SEE DETAIL "A"
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
SLOPE 2.0 % SLOPE 2.0 % SLOPE 0.8 %
SLOPE 0.8 %

Ht = VARIES

Ht = VARIES
S =1 : 24
S =1 : 24
H

H
SECTION "K"

MIN.

MIN.
0.60

0.60
B = 0.65 H SEE DETAIL "A" B = 0.65 H

SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %


SLOPE 2.0 % SLOPE 2.0 %

SECTION "M" ON CROSSING AND U-TURN SLOT

M K E

1.40
BIKE LANE

2.00 1.13
PLANTING STRIP

SIDEWALK

0.67
100

1.50
ITEM 311(1) g1 - PORTLAND CEMENT
SHOULDER CONCRETE PAVEMENT
t = 0.33 m.(CARRIAGEWAY)

3.35
T R A V E L L E D W A Y CL 30 - 50 PENETRATION ASPHALT
SEAL OR COLD APPLIED LIQUID
RUBBER BASE SEALING COMPOUND
150

0.60 16 mm Ø TIE BARS @ 600 O.C


I 0.30 0.30

3850
T R A V E L L E D W A Y
SLOPE 1.5 % SLOPE 1.5 %
500 .00 METERS 500 .00 METERS
10.00 10.00 10.00 10.00 10.00 10.00

0.20 0.28
1.20
MEDIAN ISLAND MEDIAN ISLAND
20.00 20.00 20.00
0.60

0.60

0.60

3850
T R A V E L L E D W A Y CONSTRUCTION JOINT
150

ITEM 200 - AGGREGATE

3.35
T R A V E L L E D W A Y SUB BASE COURSE t = 0.20 m.
L
ITEM 105 - SUB-GRADE
PREPARATION

1.50
SHOULDER
100

0.67
DETAIL "C" CONSTRUCTION/ LONGITUDINAL JOINT
BRGY. ROAD CROSSING

DRIVEWAY/WALK WAY

SIDEWALK
1.13 2.00

SCALE 1:15 MTS.

PLANTING STRIP
1.40

BIKE LANE

PLAN ON ISLAND MEDIAN ON U-TURN SLOT


W/ DRIVEWAY AND ROAD CROSSING BRGY. ROAD

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT DETAIL "C" CONSTRUCTION/ LONGITUDINAL JOINT
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PLAN ON ISLAND MEDIAN ON U-TURN SLOT
W/ DRIVEWAY AND ROAD CROSSING BRGY. ROAD PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 9
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
0.22
2.00

0.04 0.18 SIDEWALK, t=0.10 m.


R=30mm TOP OF PAVEMENT RAMP (NON-SKID PLAIN CEMENT FLOOR FINISH
e W/ GROOVES LINES)

0.08
0.03
SLOPE 1.5 %
CONCRETE CURB

0.36
0.22
ITEM 311(1) a.3 - PORTLAND CEMENT
CONCRETE PAVEMENT
t = 0.28 m.(CARRIAGEWAY)

CONCRETE DROP CURB


CONCRETE DROP CURB
h

SCALE: 1:20 MTS.

0.04 ISOMETRIC OF CURB CUT - OUT


0.15 0.03 NOT TO SCALE 1.20

f
TOP OF PAVEMENT
16mm 1
6mm 1
6m m

0.17
16mm 1
SLOPE 1.5 % 6mm 1
6mm 16
mm

0.45
S = 12

2.00
LENGTH :1

0.28
MARK 6mm
(M) NON-S
KID PLA
IN CE
W/ GRO MENT FLOO

6mm
a a 0.22 m. OVES R FINIS
LINES H
b 0.15 m. 0.22
c 0.03 m. ITEM 311(1) a.3 - PORTLAND CEMENT
CONCRETE PAVEMENT
d 0.17 m. t = 0.28 m.(CARRIAGEWAY)

e 0.04 m.
1.20
f 0.28 m. CONCRETE CURB SPOT. DET. (GROOVES LINE)
h 0.45 m. SCALE: 1:20 MTS. NOT TO SCALE
PLAN OF CURB CUT -OUT DETAIL "J"
ISOMETRIC WIEW SCALE 1:20MTS.

NOT TO SCALE

SIDEWALK, t=0.10 m. 1.40 1.30


0.18
RAMP (NON-SKID PLAIN CEMENT FLOOR FINISH 1.12 0.15 0.03
W/ GROOVES LINES)
SIDEWALK
CONCRETE CURB
1.3 0.50
CONCRETE DROP CURB SLOPE 2.0 %
1.120 0.18
SIDEWALK

20.0 MTS RROW


0.58 SLOPE 1.5 %

0.07
S =1 : 24

0.28
S = 12
:1

0.20
0.28

ITEM 311(1) a.3 - PORTLAND CEMENT


CONCRETE PAVEMENT
0.20

t = 0.28 m.(CARRIAGEWAY)

ITEM 200 - AGGREGATE SUB


CONCRETE GUTTER BASE COURSE, t = 0.20 m.
PCCP SIDEWALK, t=0.10 M.
ITEM 311(1) a.3 - PORTLAND CEMENT
CONCRETE PAVEMENT STONE MASONRY ITEM 200 - AGGREGATE SUB
BASE COURSE, t = 0.20 m. ITEM 104 - EMBANKMENT
t = 0.28 m.(CARRIAGEWAY) (FROM ROADWAY EXCAVATION)
SECTION "L" OF CURB CUT - OUT ITEM 200 - AGGREGATE SUB SELECTED BORROW MIXED SAND & GRAVEL RIVER MIXED

NOT TO SCALE BASE COURSE, t = 0.20 m. SECTION "E"

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF CONCRETE CURB
DETAILED ENGINEERING DESIGN PLAN FOR SPOT. DET. (GROOVES LINE)
ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SECTION "L" OF CURB CUT - OUT PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 10
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD, ISOMETRIC OF CURB CUT - OUT
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
50 mm Ø G.I. PIPE

0.60
12 mm SQUARE BAR SPACE
@ 200 mm. O.C.
0.20 0.20 0.20

0.30
0.50

0.60
0.05 50 mm Ø G.I. PIPE

TOP OF SIDE WALK

0.30

0.05
STONE MASONRY

50 mm Ø G.I. PIPE
FACED OF CURB

SECTION "M" ON RAILINGS


SCALE: 1: 40 MTS
DETAIL "R" ON RAILING
SCALE: 1: 40 MTS

50 mm Ø G.I. PIPE
5.00 5.00 5.00 5.00
2.50 TOP OF SIDE WALK
0.05 0.05 12 mm SQUARE BAR SPACED @ 200 mm. O.C. FACED OF CURB
0.60
0.30

50 mm Ø G.I. PIPE

0.15
RAMP SEE DETAIL "R"
M
ELEVATION
SCALE: 1:80 MTS

1.10

CL
CARRIAGEWAY CARRIAGEWAY

3.35
3.0 6.0 3.0
0.15

6.70
3.2mm x 150mm BROKEN WHITE
REFLECTORIZED CENTERLINE

3.50
CARRIAGEWAY CARRIAGEWAY

10mm SOLID WHITE EDGE LINE


0.10

1.50
CONCRETE SHOULDER SEE DETAIL OF RAMP CONCRETE SHOULDER

0.67
CONCRETE CURB & GUTTER RAMP CONCRETE CURB & GUTTER

1.20

2.0
CONCRETE SIDEWALK CONCRETE SIDEWALK

0.75
1.00

1.13
PLANTING STRIP

1.40
J
BIKE LANE

STONE MASONRY

PIPE RAILINGS PLAN PIPE RAILINGS


SCALE: 1:80 MTS

TYPICAL PLAN DETAIL OF PEDESTRIAN CROSSING WITH RAILINGS


SCALE: 1:70 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT TYPICAL PLAN DETAIL OF PEDESTRIAN CROSSING WITH RAILINGS
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 11
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
0.25 CONCRETE COLLAR

0.25

0.15
100 PIPE DIA.0.15
W CONCRETE COLLAR
FLO

0.15
RCPC
H SLOPE 0.5 %
LENGT RCPC RCPC

PIPE DIA.
FLOW
FOUNDATION FILL,
t=0.15
RCPC
DIA.

FOUNDATION FILL, t=0.15

0.10
DETAIL "X"
CONCRETE COLLAR
SCALE: 1:60 MTS
ISOMETRIC
NOT TO SCALE

DETAIL "Y"

CL
30.00
15.00 15.00
1.40 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.36 1.50 0.67 2.00 1.40
BIKE LANE SIDEWALK SHOULDER OUTER LANE ISLAND OUTER LANE SHOULDER SIDEWALK BIKE LANE
3.35 0.50 0.50 3.35
INNER LANE INNER LANE

SEE DETAIL ON MEDIAN ISLAND


0.50 (FOR FUTURE)
30.0 MTS RROW

30.0 MTS RROW


SEE DETAIL ON G.I. PIPE RAILING SEE DETAIL ON
G.I. PIPE RAILING
SEE DETAIL ON CONCRETE 0.50 (FOR FUTURE)
SEE DETAIL ON

1.13
CONC.MANHOLE CURB AND GUTTER 1.13
PLANTING (FOR FUTURE) SEE DETAIL "B" (FOR FUTURE) PLANTING
SLOPE 2.0 % STRIP STRIP SLOPE 2.0 %
SLOPE 2.0 % SLOPE 2.0 %
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
SLOPE 2.0 % SLOPE 2.0 % SLOPE 0.8 %
SLOPE 0.8 %
0.30

0.30
min.

min.
Ht = VARIES

Ht = VARIES
S =1 : 24

S =1 : 24
D

D
SEE DETAIL "A"
H

H
D

D
IN
OUT
MIN.

MIN.
0.60

0.30

0.30

0.60
SEE DETAIL "Y"
B = 0.65 H ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE X B = 0.65 H
(FOR FUTURE) SIDE WALK, t=0.10 M.
PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
SIDE WALK, t=0.10 M. (FOR FUTURE) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE (FOR FUTURE) PCCP BIKELANE, t=0.10 M.
ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
PCCP BIKELANE, t=0.10 M. (FOR FUTURE) PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
SEE DETAIL ON ITEM 104 - EMBANKMENT (FROM ROADWAY ITEM 200 - AGGREGATE SUB BASE COURSE,
STONE MASONRY EXCAVATION) SELECTED BORROW MIXED SAND ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
ITEM 200 - AGGREGATE SUB BASE COURSE, t=0.20M.
& GRAVEL RIVER MIXED ITEM 104 - EMBANKMENT (FROM ROADWAY
t=0.20M.
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE EXCAVATION) SELECTED BORROW MIXED SAND
PAVEMENT, t= 0.28 m. (SHOULDER) & GRAVEL RIVER MIXED
(FOR FUTURE) ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (SHOULDER)
TYPICAL ROADWAY SECTION ON CROSS DRAINAGE, RC PIPE CULVERT W/ (FOR FUTURE)

USING STONE MASONRY HEADWALL AT INLET AND OUTLET, AND MANHOLE , JUNCTION BOX
0 1 2 4
SCALE: 1:75 MTS
SCALE 1:2 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT TYPICAL ROADWAY SECTION CONSTRUCTION OF PCCP ON
DETAILED ENGINEERING DESIGN PLAN FOR CROSS DRAINAGE RC PIPE CULVERT AND SECTIONS ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 12
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II

You might also like