Cut & Fill Using Mean Area Method
Cut & Fill Using Mean Area Method
Cut & Fill Using Mean Area Method
700.13
753.98
833.63
952.37
967.87
975.19
958.66
194.59
1,308.79
1,311.59
1,306.21
1,295.00
1,305.85
1,321.33
1,333.18
1,335.07
1,280.40
1,263.72
1,281.56
1,252.27
1,263.37
1,322.17
1,293.83
1,288.12
1,300.54
1,284.31
1,306.21
1,307.82
1,305.52
1,030.87
766.79
776.65
781.02
783.73
773.14
765.51
768.82
768.63
784.92
790.01
839.56
930.15
918.37
912.16
806.64
640.90
671.93
752.92
775.01
753.64
113.95
866.32
742.48
772.91
8,637.49 44,252.82
Filling Cutting
(m3) (m3)
860.29
883.97
804.48
840.82
858.02
716.38
702.15
783.43
823.71
904.89
887.15
771.58
781.60
790.90
783.88
830.28
927.79
861.50
626.98
715.10
855.47
780.24
765.25
777.23
788.54
811.68
729.17
614.91
614.91
719.75
798.26
1,062.17
1,472.86
1,209.62
845.38
935.05
884.94
583.68
458.40
677.40
858.90
816.20
793.13
531.49
546.73
881.25
917.89
882.00
869.26
890.53
854.09
833.16
849.43
876.82
870.36
44,811.05 0.00
Filling Cutting
(m3) (m3)
833.92
809.28
780.36
785.06
836.86
795.86
763.30
795.57
5,927.31
5,946.83
812.76
795.59
819.01
800.64
842.73
860.77
811.96
797.25
812.05
833.48
835.17
804.43
745.75
766.08
837.64
928.13
946.89
935.09
876.59
757.09
729.55
767.35
810.30
784.03
758.63
790.92
839.98
879.21
892.49
950.85
928.42
831.83
881.75
896.22
825.42
777.66
735.16
796.14
811.65
748.69
761.64
827.32
857.49
906.97
832.28
55,515.44
Filling Cutting
(m3) (m3)
587.52
520.41
1,090.82
1,192.80
768.57
769.57
760.94
762.26
773.56
784.88
796.56
812.30
828.77
845.29
861.88
839.65
800.24
771.94
736.17
750.11
827.32
970.54
951.58
834.49
906.75
900.02
850.46
855.51
839.22
869.72
924.47
835.16
755.86
811.30
864.44
944.12
942.07
1,077.48
1,136.01
1,046.59
1,078.69
936.93
835.04
895.25
869.52
811.65
835.00
849.41
769.57
755.82
809.97
809.97
747.96
738.29
836.56
46,776.99 0.00
Filling Cutting
(m3) (m3)
968.39
941.55
811.40
854.68
1,052.63
995.20
831.15
785.97
755.08
799.25
872.79
1,078.66
1,257.07
1,046.17
797.56
788.88
787.88
790.21
805.62
836.20
861.54
886.71
888.07
862.23
937.20
981.93
961.66
901.09
811.96
834.24
866.62
831.63
878.30
911.94
823.85
853.87
856.54
1,243.01
1,374.60
990.20
936.40
917.58
912.40
888.67
885.22
940.53
899.59
831.49
774.72
705.70
807.55
921.63
878.24
830.50
779.30
49,323.07
Filling Cutting
(m3) (m3)
739.45
786.60
863.94
932.87
913.53
910.05
982.09
904.51
816.66
848.47
846.46
864.59
975.44
990.25
922.02
848.21
795.89
754.77
751.44
807.67
837.86
809.40
813.79
818.46
819.81
876.19
878.56
843.62
813.33
830.22
863.91
847.35
749.41
727.97
737.73
750.10
845.76
822.41
816.97
858.50
851.37
863.91
921.51
956.43
931.92
843.59
767.91
776.89
753.42
732.85
683.47
689.09
795.75
839.88
833.82
45,858.07 0.00
Filling Cutting
(m3) (m3)
853.15
883.97
857.23
833.14
843.60
852.73
886.78
947.88
941.71
863.07
901.01
905.05
866.42
921.98
962.00
967.87
915.57
938.50
853.03
586.07
477.31
632.80
821.93
891.19
916.79
861.55
831.20
900.89
897.16
855.77
828.87
805.26
801.92
823.50
937.07
942.49
878.87
897.96
913.37
915.08
874.56
858.52
832.02
790.88
849.67
916.81
934.67
942.25
918.92
861.64
799.00
761.60
692.64
642.56
716.85
802.30
836.18
856.80
877.51
855.21
817.67
864.88
1,038.86
1,107.78
54,861.48
Filling Cutting
(m3) (m3)
821.76
702.69
730.15
783.88
805.28
810.63
774.30
735.83
727.58
725.93
717.72
729.24
756.98
771.89
766.91
771.91
749.15
665.48
704.55
781.89
637.27
638.60
802.00
803.33
776.88
774.22
782.89
804.60
825.41
845.97
832.52
752.70
732.01
889.27
1,095.76
1,092.97
1,286.37
1,648.04
1,741.73
1,665.88
1,419.63
1,899.98
2,255.12
1,728.94
1,812.12
2,066.98
1,946.83
1,726.96
1,414.30
1,303.12
1,351.04
1,195.31
1,070.43
1,096.87
56,749.77
Filling Cutting
(m3) (m3)
1,135.06
1,074.17
873.39
834.65
798.53
689.38
667.80
591.59
720.24
880.90
775.82
788.29
799.84
1,009.17
1,057.99
1,022.91
1,218.97
965.98
763.51
789.77
739.11
702.10
654.53
632.57
623.56
689.15
787.98
822.03
894.36
1,000.00
989.97
871.92
856.79
1,212.90
1,649.02
1,657.87
1,369.05
1,041.20
824.67
743.83
714.76
583.58
508.47
595.51
711.36
778.92
858.86
1,031.58
1,043.03
875.29
698.66
598.70
511.30
524.65
672.35
46,927.61
Filling Cutting
(m3) (m3)
748.02
771.95
751.88
782.16
816.50
797.94
860.36
831.66
867.50
998.88
1,020.15
906.42
868.54
970.02
916.16
889.43
948.46
952.61
915.58
848.41
837.89
832.19
789.25
789.92
787.27
734.92
699.37
719.77
766.96
797.91
820.03
846.66
876.16
905.85
956.89
969.64
979.07
974.93
915.47
890.44
903.11
929.86
918.56
934.13
939.26
910.28
919.19
925.03
876.41
787.38
779.32
788.26
760.61
749.35
761.30
47,235.27
Filling Cutting
(m3) (m3)
779.88
775.55
794.62
836.88
819.15
791.55
797.56
820.42
880.69
924.01
905.89
864.27
839.89
852.78
858.51
919.48
973.45
972.75
1,006.86
632.15
633.55
1,028.22
1,027.87
1,010.35
992.89
968.22
940.19
909.29
895.57
885.02
847.36
813.99
792.89
780.54
775.22
773.22
758.31
707.38
742.01
792.60
770.56
778.55
799.92
821.71
813.34
811.32
863.37
891.81
931.11
872.25
835.69
984.12
944.42
885.72
954.69
47,079.63
Filling Cutting
(m3) (m3)
994.02
967.49
940.27
1,024.66
1,146.25
1,168.70
1,137.21
986.92
886.43
982.55
1,060.83
1,086.53
1,024.20
945.14
932.31
971.34
923.74
868.33
891.15
948.31
960.66
880.49
927.75
1,086.88
1,075.32
1,017.02
1,026.12
1,014.55
793.43
656.86
640.42
578.04
634.88
709.49
764.92
817.92
822.58
839.95
858.01
804.26
833.31
872.73
875.12
873.76
865.60
858.82
883.71
908.22
825.09
677.09
681.06
769.93
810.68
862.29
873.44
49,266.80
Filling Cutting
(m3) (m3)
829.52
788.56
778.21
741.60
730.97
820.76
897.99
856.81
842.79
872.76
892.96
896.01
831.91
776.27
701.97
696.68
737.13
741.76
707.13
698.55
785.83
860.92
847.47
916.63
1,047.63
1,035.03
945.65
844.53
822.11
867.34
875.47
853.08
892.08
915.83
930.37
926.62
957.70
994.78
925.13
843.21
754.47
670.31
610.12
598.60
701.20
875.36
1,004.01
1,026.22
978.63
938.52
884.73
848.33
866.35
904.13
870.58
46,459.31
Filling Cutting
(m3) (m3)
902.35
922.97
892.22
930.21
944.32
937.09
920.91
959.05
983.17
948.48
976.36
1,018.05
1,000.59
968.91
958.14
975.50
929.54
844.68
883.38
953.30
866.87
906.67
958.48
870.02
895.34
903.49
971.16
1,003.37
928.15
946.85
989.75
1,101.40
1,120.32
899.30
762.93
758.62
760.94
730.71
723.41
742.42
689.45
724.96
809.62
866.54
930.56
940.18
904.89
841.69
858.42
869.84
816.01
805.93
894.95
998.15
1,022.61
49,663.23
Filling Cutting
(m3) (m3)
977.48
988.39
957.98
902.20
946.74
960.92
971.66
933.83
979.07
1,011.36
915.93
951.12
918.02
911.36
959.13
935.10
1,015.51
1,043.75
1,026.47
929.92
882.24
910.35
765.51
774.39
862.04
857.26
859.28
854.50
849.80
831.48
803.45
766.25
814.17
853.40
870.06
826.18
772.24
788.88
785.55
782.21
788.54
838.81
842.15
771.62
754.98
785.27
902.65
1,015.98
1,069.23
1,119.31
1,155.57
1,364.68
1,517.85
1,273.82
1,053.93
50,999.58
Filling Cutting
(m3) (m3)
1,040.17
1,005.56
865.82
811.26
865.60
1,053.51
1,109.51
947.19
879.33
789.54
694.66
636.78
621.64
651.68
738.85
1,047.12
1,702.09
2,557.52
3,327.41
3,661.55
3,623.37
3,269.47
2,632.48
2,042.45
1,565.44
1,176.25
936.93
915.69
1,101.09
1,290.75
1,330.16
1,310.46
1,247.03
1,324.40
1,422.92
1,354.08
1,326.79
1,318.26
1,276.17
1,092.73
870.87
828.84
844.62
849.37
930.99
922.53
924.27
952.85
892.51
794.70
709.52
729.93
764.28
792.57
807.60
69,179.17
Filling Cutting
(m3) (m3)
825.76
771.15
712.82
807.66
913.77
844.90
778.63
796.57
769.93
749.68
722.38
687.63
666.17
657.41
648.69
688.90
765.32
753.15
767.55
825.40
845.31
880.27
948.70
983.15
1,066.15
1,088.46
1,061.20
1,080.18
1,053.21
1,104.90
1,040.46
1,049.12
1,121.34
1,042.71
1,025.07
929.29
873.68
1,037.63
1,156.97
1,166.35
1,175.74
1,177.90
1,147.69
1,085.55
954.62
860.52
850.71
766.50
735.01
830.78
863.28
848.33
843.95
799.02
782.24
49,429.45
Filling Cutting
(m3) (m3)
748.96
768.10
828.09
821.70
825.40
822.37
812.97
798.57
774.91
790.98
913.58
1,157.37
1,616.96
1,962.42
1,946.05
1,933.64
1,701.58
1,227.82
969.58
883.37
844.96
785.81
777.07
735.60
693.35
851.90
862.80
778.94
826.80
987.14
1,067.31
963.23
912.67
836.10
789.63
917.87
949.99
753.20
619.71
545.93
367.39
164.66
59.28
88.40
305.23
572.63
762.00
902.26
1,212.56
1,686.82
1,949.36
1,997.87
1,984.62
1,992.50
1,971.48
54,821.49
Filling Cutting
(m3) (m3)
1,933.51
1,718.25
1,315.23
1,020.56
828.93
826.52
599.74
528.87
691.27
612.66
634.55
685.76
731.23
785.37
835.85
814.44
826.64
855.47
898.69
974.46
1,002.32
1,202.99
1,221.97
1,197.26
1,351.39
1,651.60
1,207.81
208.51
353.84
745.14
552.67
16.74
341.72
1,130.99
1,594.74
1,306.01
1,055.71
877.98
845.69
556.19
356.12
365.46
249.71
164.27
209.20
327.84
573.10
752.70
946.61
1,109.71
1,225.51
1,331.28
1,272.57
1,173.26
1,140.44
46,085.42 1,651.65
Filling Cutting
(m3) (m3)
1,122.51
1,044.18
823.23
564.14
446.79
454.81
435.32
391.93
414.79
488.71
582.97
652.93
633.08
558.73
509.64
516.23
593.23
704.98
696.92
725.29
679.79
626.04
821.02
866.06
930.24
842.37
703.69
857.75
813.55
744.35
801.58
704.87
660.08
772.55
1,035.45
971.12
630.53
504.44
501.91
585.31
662.24
911.78
1,066.49
956.85
886.01
882.94
808.60
744.41
858.92
970.28
949.25
880.37
839.21
771.04
662.17
40,263.70 0.00
Filling Cutting
(m3) (m3)
612.98
590.35
577.28
650.87
705.28
691.86
701.34
749.86
770.94
670.83
455.32
300.31
336.85
384.99
451.52
866.32
1,053.77
912.34
1,083.37
1,162.29
1,110.80
1,160.25
1,273.21
1,169.71
956.79
1,203.66
1,248.56
977.85
880.43
999.47
1,303.36
1,349.93
1,293.19
1,326.42
1,432.55
1,451.18
1,299.68
1,435.61
1,294.99
880.53
601.36
264.53
108.14
161.07
128.84
-78.29
177.29
513.09
652.72
996.70
1,309.38
1,429.61
1,330.14
1,236.45
1,280.72
47,888.58 0.00
Filling Cutting
(m3) (m3)
1,287.30
1,307.46
1,382.11
1,051.78
660.59
494.93
241.32
305.35
553.21
578.93
636.57
801.36
893.86
943.81
1,005.84
998.54
995.03
847.19
819.30
917.02
991.25
879.60
620.12
667.79
703.80
586.61
533.79
594.92
767.72
933.37
966.11
960.58
1,017.45
1,132.04
1,166.00
1,135.43
1,034.90
893.87
827.42
825.74
861.28
848.85
807.60
811.63
797.27
802.98
746.14
796.16
909.97
818.27
747.69
751.33
678.48
538.05
503.82
492.12
45,871.64 0.00
1,053,704.25
92,379.96
1,146,084.21 45,904.47
FEDERAL MINISTRY OF POWER, WORKS & HOUSING (WORK SECTION)
REHABILITATION AND DUALIZATION OF ABA-IKOT EKPENE ROAD IN ABIA AND AKWA IBOM STATES,
CONTRACT NO.6569
AUGMENTATION BILL OF ENGINEERING MEASUREMENT AND EVALUATION
CERTIFIED
INITIAL ESTIMATED BALANCE TO CERTIFIED UP TO BALANCE TO TOTAL
Item No. Description UNIT UPTO ORIGINAL NEW INITIAL BEME
BEME TOTAL COMPLETE CERT.2 COMPLETE RECOMMENDED
CERT.2
2.11 Ditto as in item 2.10 but for mud buildings m3 rate only rate only - 4,500.00 18,000.00 - - -
- -
Measurement (m3)
FOR: CGGC GLOBAL PROJECTS NIG. LTD FOR: Federal Ministry of Works & Housin
Name:................................................... Name:...................................................
Sign:...................................................... Sign:......................................................
Date:..................................................... Date:.....................................................
ABIA AND AKWA IBOM STATES
MAY, 2024
ement (m3)
Total
Volume
Quantity
(m3)
(m3)
45,904.47
45,904.47
135,306.00
(89,401.53)
...............................................
...............................................
THE FEDERAL REPUBLIC OF NIGERIA
FEDERAL MINISTRY OF WORK
MEASURMENT SHEET
BILL NO. 2
ITEM NO. 2.03
DESCRIPTION :Excavate unsuitable material as directed by the Engineer and dispose to spoil.
TOTAL 0
IA
spose to spoil.
VOL.
m3
3840
2296
2688
1950
4472
9840
4556
1600
1400
3360
4160
4472
9840
4556
59,030.00
THE FEDERAL REPUBLIC OF NIGERIA
FEDERAL MINISTRY OF WORK
MEASURMENT SHEET
BILL NO. 2
ITEM NO. 2.05
DESCRIPTION :Excavate in any material in cuttings except rock and haul to spoil as directed.
TOTAL
OF NIGERIA
F WORK
PERCENT VOL.
AGE
% m3
40% 25,339.78
25,339.78
REHABILITATION AND DUALIZATION OF ABA-IKOT EKPENE ROAD IN ABIA AND AKWA IBOM STATES
Measurement (m3)
FOR: CGGC GLOBAL PROJECTS NIG. LTD FOR: Federal Ministry of Works & Housing
Name:................................................... Name:...................................................
Sign:...................................................... Sign:......................................................
Date:..................................................... Date:.....................................................
KWA IBOM STATES
2024
Total
Quantity
(m3)
1,146,084.21
1,146,084.21
127,154.00
1,018,930.21
.............................
.............................
.............................
REHABILITATION AND DUALIZATION OF ABA-IKOT EKPENE ROAD IN ABIA AND AKWA IBO
Calculations
Revised Qty from CH 19+800 to CH 34+050 = 19 + 800 20 + 200 400
Qty from CH 19+800 to CH 34+050
Length = 23 + 025 20 + 200 175
Width =
Revised QTY = L X W X D = 24 + 375 24 + 725 350
Name:................................................... Name:...........................
Sign:...................................................... Sign:..............................
Date:..................................................... Date:.............................
N ABIA AND AKWA IBOM STATES
MAY, 2024
Measurement (m3)
Width Depth/ Total
L&R Thickness Quantity
(m) (m) (m3)
54,096.65
27,300.00
26,796.65
Name:...................................................
Sign:......................................................
Date:.....................................................