9. POWER BLOCKS: -
i) The detailed procedure for obtaining power blocks has been given in G.R 17.4 & S.R there to ACTM Vol-II, Part-I Para
20603 to 20613 and Indian Railways which must be rigidly followed except in case of emergency.
ii) The sequence of switching operations for granting and cancelling the Power Block, for a particular section are included in
Annexure IV. - These shall be strictly followed by all staff. For staff to work, a section is made dead by changing the
position of Isolator from its normal position. The protection of dead section is achieved by placing a Yellow Ferrules
/Banner type reminder collars on the Signal buttons/Electric Slides with the caution ‘DANGER’ – MEN WORKING’ on
the relevant Signal buttons/Electric Slides/slots. Adequate number of such Ferrules /Banner type reminder collars is
provided at each station.
NOTE: -
In case of Power Block on Automatic Signaled Lines/Sections, the signals will be at danger due to earthing of OHE to rail for
providing safety to staff. The Station Master shall issue necessary authority as per G.R. 9.12& their SRsand any other Caution
Order for Diesel Trains when these are permitted to move over the section under Power Block, to pass the automatic signals at
‘ON’.
NOTE: - FOR THE PURPOSE OF THIS RULEA DEAD ELECTRIC EINGINE DESPATCHED AS VECHICLES SHALL
NOT BE CONSIDERED AS AN ELECTRIC LOCOMOTIVE.
15. ELECTRIC LOCOMOTIVES: -
Provisions included in A. C. Traction Manual must be complied with in case of double heading or banking by
electric locomotives and precautions indicated therein must be complied with when dispatching electric
locomotives as vehicles or hauling a damaged electric locomotive (ACTM Volume III Para – 30636 & 30637).
20. FIRE:
Regarding fire on or adjacent to any electrical equipment, please refer GR 6.10 (2) and SR 6.10 (1a) to (1c) and
ACTMVol. -I, General, Chapter –VI.
22. Nothing in these rules shall amend or supersede any General orSubsidiary rules or instructions included in A. C.
Traction Manual. These working rules shall be read as supplement to the aforesaid rule books.
23. Any amendment to these working rules will be notified by a correction slip to the Station Working Rules. All corrections to the
Station Working Rulesshall, on receipt, be immediately carried out in the recipient’s copies. The correction slip will be serially
numbered and it will be the responsibility of each of the staff to whom working rules copies are supplied, to call for the
missing correction slips. It will be the responsibility ofeach supervisory staff to bring the contents of the correction slips to the
notice of all staff concerned and obtain their acknowledgements.
26. The inspecting staff of Operating, Signal &Tele-communication,ElectricalTraction, as well as, Engineering Departments, shall
make regular checks at all points to which these Special Working Rules are supplied& applicable to ensure that the rules are
correct up-to-date and the staff concerned are fully conversant with the rules and abide by them.
DONT(s):
1. DO NOT lift or raise your tools towards traction wires (Keep the tools in their respective position immediate after use).
2. DO NOT load coal on the engine tender to a height more than 4 meters above rail level.
3. DO NOT take electric locomotive with raised pantograph to any unwired line. Power Block working limit or near the
section insulators as the end of section under Power Block.
4. DO NOT climb into the engine tender for ANY PURPOSE while under traction wires, unless power is cut off and ‘Permit
to Work’ obtained. (For watering, use the water column from the ground with the special device provided for this purpose
and opens the tank cover by special device provided.)
5. DO NOT allow long articles like firing rods, shovel or any other thing to protrude above the engine while on electrified
tracks.
6. DO NOT place a steam loco motive with chimney directly opposite a traction mast or under any insulator or under a
bridge.
7. DO NOT direct any water jet or spray towards the traction wires. (Jets or water, if necessary, may be used horizontally
outside the safety zone of 2 meters (7 feet).
8. DO NOT put the drivers vacuum brake handle in quick release position when traction is running.
Note: -
1. These TWRs shall be read along with and as an Appendix “G” to the Station Working Rules.
2. The enclosed Electric Traction Working Rule diagram No- TSWR/SRPR-APG/SBNR is based on sectioning diagram no
TRD/BKN/SRPR/01 R-A and SIP NO.5992.
3. On a written request memo from TPC, the Section Controller will arrange for a Power or Power-cum-Traffic block at a suitable time &
time interval as per the traffic margin available. He will then grant the block after the passage of a train or a group of trains, for which he
will exchange his T N (train notice) number with the Private Numbers of both the SMs of the stations on either end of the section or sector
in which Power Block is being granted, intimating them of the section & timings of the Power Block.
4. Both the SMs will note down in Red Ink the Power Block particulars in their respective Train Signal Registers.
5. The Section Controller will then return the Power Block memo to TPC, confirming in writing the Power Block sanction details & Timings.
6. The sequence of switching operations will then be done or got done by the TPC as given in the following tables.
7. The TPC will then issue PTW (Permit to Work) to the authorized electric traction staff at site, under exchange of private numbers and
written entries in the Message books maintained with the TPC and with the authorized traction personnel at site.
8. The cancellation of the power block will be in the reverse order. The sequence of operations for cancellation is again given in the tables.
9. Wherever reception or dispatch of trains is not permitted due to power block affecting the block section, the station masters on either sides
shall make an entry to that effect inRed ink in the Train Signal Register and exchange private numbers. “Power Block Caps” shall be
placed on the concerned signal buttons on SM Panels at the respective stations.
10. Before opening any Interrupter or Isolator which bridges an insulated overlap or a section insulator, it should be ensured that there is no
electric rolling stock with its pantograph raised, under or likely to come under the insulated overlap or the section insulator.
11. Points leading to unwired tracks shall not under any circumstances be used for the movement of electric locomotive with its pantograph
raised.
12. For any unusual movement of Electric Locomotives/EMUS or for Shunt moves by block forward or block back, the Station Master on duty
must refer to Electric Traction Working Rules diagram and his Station Working Rules and consult TPC and ensure that there is no chance
of energizing a section where power block has been granted.
2. SUB 1. Line clear shall not be granted to 1. All X-over Open BM Close BM
SECTOR- KYNT for any DN Electric points shall be 1956 at KYNT 1959 at
Train/Loco. kept set in TSS SBNR/SSP
KYNT TSS to 2. DN Electric train/Loco shall not be NORMAL
SBNR/SSP permitted to proceed towards RMSR. Open BM Close BM
position 1959 at 1956 at
3. Line clear shall not be granted to
2. Power block
RMSR for any UP Electric Loco/Train. SBNR/SSP KYNT/TSS
caps shall be
4. UP Electric train/Loco shall not be
permitted to proceed towards KYNT. placed on the
5. All UP & DN Reception and Departure relevant
Signals for any Electric Train/Loco shall button of
be kept in DANGER. SM’s control
Panel.
5 Elementary 1. Line clear shall not be granted to 1. All X-over Open BM Open BM During Power
KYNT for any DN Electric points shall be 1956 at KYNT 1956 at KYNT Block OHE from
Section-
Train/Loco. kept set in TSS TSS SM 1933 to Loc
195602 2. DN Electric train/Loco shall not be NORMAL 78/07 also remain
SM 1932 to permitted to proceed towards RMSR. Open SM 1932 Close SM
position and 1933 at 1932 and SM dead
SM 1933 3. Line clear shall not be granted to
2. Power block SBNR 1933 at SBNR
RMSR for any UP Electric Loco/Train.
caps shall be During power block
4. UP Electric train/Loco shall not be
permitted to proceed towards KYNT. placed on the Close BM Close BM OHE of E/S X 1927
relevant button 1956 at KYNT 1956 at KYNT and 1936 also
5. All UP & DN Reception and Departure
of SM’s TSS TSS remain dead.
Signals for any Electric Train/Loco shall
be kept in DANGER. control Panel.
7 Elementary 1. No movement on either direction of any All X-over 1. Open the SS 1. Close SS 1927
Section- Electric Train/Loco shall be permitted points shall be 1927 at SBNR at SBNR
X- 1927 on line no.03 kept set in
2. Reception & Departure signal of line no. NORMAL
03 shall be kept at DANGER. position
3. Relevant shunt signal shall be kept at
ON position
8 Elementary 1. No movement permitted of any All X-over 2. Open the SS 2. Close SS 1928
Section- Electric Train/Loco from & points shall be 1928 at SBNR at SBNR
X- 1928 towards Goods line. kept set in
2. Relevant shunt signal shall be kept at NORMAL
ON position position
NOTE: –
1. For any unusual movement of Electric Loco/Train/vehicle the Station Master on duty must refer to the Traction Station
Working Rules Diagram of the station.
2. Points leading towards unwired track shall not be used under any circumstances for the movement of Electric Loco with
raised pantograph.
3. When the power block is being given in the Sri vijaynaga station, the station master working at the Ramsinghpur and
kalyankot will be informed to under private number exchange.
4. Power Block caps must be placed on the relevant point/signal/route button of control cum Indication Panel for the line
under Power Block.