CALCULATION OF BUILDING STRUCTURE ANALYSIS

PT. NAMASINDO PLAS – RPET, BANDUNG


Document No. Rev. Contract No. Page No.
1 0

CALCULATION AND ANALYSIS OF BUILDING


PT.NAMASINDO PLAS – RPET, BANDUNG

Picture 1. Modelling picture in SAP2000


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
2 0

TABLE OF CONTENTS
TABULATION OF REVISED
SHEETS……………………………………………………………………………………………………………………3
1. GENERAL DESCRIPTION...................................................................................................................4

1.1 Scope...........................................................................................................................................4

1.2 Code, Standards, and Refferences.................................................................................................4

1.3 Quality of Material.........................................................................................................................5

1.4 Unit Weight of Material...................................................................................................................5

2. LOADING DESIGN.............................................................................................................................5

2.1 Load Type....................................................................................................................................5

2.1.1 Dead Load (DL)......................................................................................................................5

2.1.2 Live Load (LL)........................................................................................................................5

2.1.3 Wind Load (WL).....................................................................................................................5

2.1.4 Seismic Load (QL)..................................................................................................................5

2.2 Load Calculation...........................................................................................................................6

2.2.1 Dead Load.............................................................................................................................6


2.2.2 Super Dead Load................................................................................................................................6

2.2.3 Live Load...............................................................................................................................6


2.2.4 Wind Load.............................................................................................................................6

2.2.5 Seismic Load.........................................................................................................................7

2.3 Load Combination.......................................................................................................................10

3. STRUCTURAL ANALYSIS AND DESIGN...........................................................................................10

3.1 Structural Properties...................................................................................................................10

3.2 Anaysis Result...........................................................................................................................10

3.2.1 Stress Ratio.........................................................................................................................11

3.2.2.Support Reaction Summary...................................................................................................11


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
3 0

TABULATION OF REVISED SHEETS


REVISIONS REVISIONS
SHEET SHEET
A B C 0 1 2 3 4 A B C 0 1 2 3 4
41
2 42
3 43
4 44
5 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
4 0

1. GENERAL DESCRIPTION
1.1 Scope
This document presents design calculation of Building Structure will be perform and calculate by SAP 2000
Structure Spesification:
- Length = 72 m
- width = 24 m
- Height = 10 m
- Upper Structure material = steel Structure
- Sub-Structure material = steel Structure

Picture 2. Modelling Steel Material in SAP2000


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
5 0

1.2 Code, Standards, and Refferences


1 SNI 2847: 2013 Persyaratan Beton Struktural Untuk Bangunan
2 SNI 1726: 2019 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan
Gedung dan non Gedung
3 SNI 1727: 2013 Beban Minimum Untuk Perancangan Bangunan Gedung dan Struktur
Lain
4 PPIUG 1983.
1.3 Quality of Material
No Material Description Value Unit
Fc’ 25 Mpa. Fc’20 Mpa
1 Concrete Kg/cm2
Compressive strength at 28 days 300,250
Deformed reinforcing steel bar
2 Yield strength Kg/cm2
(fy) 4000

3 Plain reinforcing steel bat (fy) Yield strength Kg/cm2


2400
1.4
Unit Weight of Material
No Material Value Unit

1 Steel Structure 7850 kg/m3


2 Structural Concrete 2400 kg/m3
2. LOADING DESIGN
The following loads and forces are considered in the design of steel structurer
2.1 Load Type
2.1.1 Dead Load (DL)
Selfweight of Steel Structure

2.1.2 Super Dead Load (SDL)


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
6 0

2.2.3 Wind Load (WL)


Calculation of wind loads using SNI 1727:2020 using the wind load procedure on buildings:
SPGAU (envelope procedure)
2.2.4 Seismic Load (QL)
The structure is to be designed to resist Seismic Force induced as lateral static equivalent
the lateral seismic force will be calculated base on indonesian code SNI.
2.2 Load Calculation
2.2.1 Dead Load (DL)
Selfweight of Steel Structure

2.2.2 Super Dead Load (SDL)


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
7 0

Gambar. Input Superdead Load


2.2.3 Wind Load

(Sumber : PPURG SKBI-1.3.53.1987

1. Wind Load

Sudur Atap (α) = 10˚


Jarak anatar Rafter =6m
Jarak Anatar Gording = 1.5 m
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
8 0

Beban Angin = 25 kg/m² (Tekanan Tiup Minimum kecuali daerah


5 km dari pinggir pantai ,(Sumber : PPURG SKBI-1.3.53.1987)
Tekanan Angin Tekan = (0.02α- 0.4) x 25 x 1.5
= ((0.02 x10)- 0.4) x 25 x 1.5
= -0.2 X 25 x 1.5
= -7.5 kg/m²
Tekanan Angin Hisap =-0.4 x 25 x 1.5
= -15 kg/m²
Karena angina semuanya bernilai negative atau hisap maka digunakan nilai
terbesar = -15 kg/m²

Gambar. Input Wind Load


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
9 0

2.2.4 Live Load

Gambar. Input Live Load


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
10 0

22.2.5 Seismic Load


Seismic Load is calculated based on SNI 1726-2012 with Static Equivalent Method
Data Seismic :
- Lokasi Bangunan = Bandung
- Kelas Sittus = D (Tanah Sedang)
- Jenis Bangunan = Gudang
- Kategori Resiko = 1 (tabel 3 SNI 1726:2019)
- Faktor Keutamaan = 1 (tabel 4 SNI 1726:2019)
- Ss = 1.1209 (https://rsa.ciptakarya.pu.go.id/2021)
- S1 = 0.4928 (https://rsa.ciptakarya.pu.go.id/2021)
- TL (periode transisi jangka panjang) = 20 detik (https://rsa.ciptakarya.pu.go.id/2021)
- SDS = 0.7859
- SD1 = 0.5937

Table 1 Occupancy Categories

Table 2 Site Geology and Soil Characteristic

Gudang penyimpanan, kategori resiku I


Faktor keutamaan gempa (Ie) 1.0
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
11 0

Table 3 Structural System


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
12 0
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
13 0
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
14 0

Response Spectrum Bandung


Inputting bandung sepctrum response parameters

2.3 Load Combination


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
15 0
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
16 0

2.4 Faktor Reduksi Kekuatan (Ø)


Pada perencanaan beton bertulang sperti pile dan sloof maka factor dari material
ditentukan sebagai factor kuat lebih struktur dimana nilai dari sifat struktur direduksi hal
– hal yang diinginkan tidak terjadi dimana Faktor reduksi kekuatan yang merupakan
suatu bilangan bersifat mereduksi kekuatan bahan dan pada perencanaan gempa dengan
kombinasi ultimate pada Tabel 2.3 dalam SNI 03-2847-2019,.

3. STRUCTURAL ANALYSIS AND DESIGN


3.1 Evaluation Of Structural Performance
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
17 0

Gambar ,Axial Force Diagram

Gambar ,Shear Force Diagram

Gambar,Moment Diagram
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
18 0

3.2 Analysis Result


The structure below are calculated by SAP 2000 (computer program for civil structure) and these
are the result for stress ratio. The structure will meet therequirement if the value of stress ratio <
1. From the results of building analysis using the sap 2000 application there are not records or errors
in the structure with solar panel installation. From the conclusion above this building is safe to
install the solar panels according to the installation plan.

Gambar,Steel Stress Ratio


CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
19 0

3.3 Table Steel Design

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
47 KOLOM WF 400 Column Messages 0.010313
No
48 KOLOM WF 400 Column Messages 0.010163
No
49 KOLOM WF 400 Column Messages 0.013195
No
50 KOLOM WF 400 Column Messages 0.020061
No
51 BLK WF 100 Beam Messages 0.000246
No
52 BLK WF 100 Beam Messages 0.001373
No
53 REGEL DEPAN 400 Beam Messages 0.081198
No
54 REGEL DEPAN 400 Beam Messages 0.080372
No
55 RAFTER WF 200 Brace Messages 0.488417
No
63 RAFTER WF 200 Brace Messages 0.363875
No
71 RAFTER WF 200 Brace Messages 0.364018
No
80 RAFTER WF 200 Brace Messages 0.490926
No
87 RAFTER WF 200 Brace Messages 0.805835
No
95 RAFTER WF 200 Brace Messages 0.695552
No
103 RAFTER WF 200 Brace Messages 0.696116
112 RAFTER WF 200 Brace No 0.809761
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
20 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
203 REGEL DEPAN 400 Beam Messages 0.048812
No
206 RAFTER WF 200 Brace Messages 0.712145
No
207 RAFTER WF 200 Brace Messages 0.780044
No
228 REGEL DEPAN 400 Beam Messages 0.004841
No
231 RAFTER WF 200 Brace Messages 0.707978
No
232 RAFTER WF 200 Brace Messages 0.769704
No
253 REGEL DEPAN 400 Beam Messages 0.001003
No
256 RAFTER WF 200 Brace Messages 0.70817
No
257 RAFTER WF 200 Brace Messages 0.770108
No
278 REGEL DEPAN 400 Beam Messages 0.000672
No
281 RAFTER WF 200 Brace Messages 0.708202
No
282 RAFTER WF 200 Brace Messages 0.769872
No
303 REGEL DEPAN 400 Beam Messages 0.00281
No
306 RAFTER WF 200 Brace Messages 0.710378
No
307 RAFTER WF 200 Brace Messages 0.776292
No
328 REGEL DEPAN 400 Beam Messages 0.020328
No
331 RAFTER WF 200 Brace Messages 0.708874
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
21 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
332 RAFTER WF 200 Brace Messages 0.782165
No
353 REGEL DEPAN 400 Beam Messages 0.030396
No
356 RAFTER WF 200 Brace Messages 0.738914
No
357 RAFTER WF 200 Brace Messages 0.812415
No
378 REGEL DEPAN 400 Beam Messages 0.031143
No
381 RAFTER WF 200 Brace Messages 0.766851
No
382 RAFTER WF 200 Brace Messages 0.789976
No
403 REGEL DEPAN 400 Beam Messages 0.016078
No
406 RAFTER WF 200 Brace Messages 0.760091
No
407 RAFTER WF 200 Brace Messages 0.757666
No
480 KOLOM WF 400 Column Messages 0.013171
No
481 KOLOM WF 400 Column Messages 0.020145
No
482 BLK WF 100 Beam Messages 0.000192
No
483 BLK WF 100 Beam Messages 0.001115
No
484 REGEL DEPAN 400 Beam Messages 0.050006
No
487 RAFTER WF 200 Brace Messages 0.785639
No
488 RAFTER WF 200 Brace Messages 0.712511
509 KOLOM WF 400 Column No 0.013149
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
22 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
510 KOLOM WF 400 Column Messages 0.020134
No
511 BLK WF 100 Beam Messages 0.00021
No
512 BLK WF 100 Beam Messages 0.000907
No
513 REGEL DEPAN 400 Beam Messages 0.003302
No
516 RAFTER WF 200 Brace Messages 0.773713
No
517 RAFTER WF 200 Brace Messages 0.708331
No
538 KOLOM WF 400 Column Messages 0.013147
No
539 KOLOM WF 400 Column Messages 0.020132
No
540 BLK WF 100 Beam Messages 0.000291
No
541 BLK WF 100 Beam Messages 0.00096
No
542 REGEL DEPAN 400 Beam Messages 0.001603
No
545 RAFTER WF 200 Brace Messages 0.773615
No
546 RAFTER WF 200 Brace Messages 0.708491
No
567 KOLOM WF 400 Column Messages 0.013299
No
568 KOLOM WF 400 Column Messages 0.020173
No
569 BLK WF 100 Beam Messages 0.000759
No
570 BLK WF 100 Beam Messages 0.000881
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
23 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
571 REGEL DEPAN 400 Beam Messages 0.001842
No
574 RAFTER WF 200 Brace Messages 0.773309
No
575 RAFTER WF 200 Brace Messages 0.708352
No
596 KOLOM WF 400 Column Messages 0.013203
No
597 KOLOM WF 400 Column Messages 0.020214
No
598 BLK WF 100 Beam Messages 0.002499
No
599 BLK WF 100 Beam Messages 0.000816
No
600 REGEL DEPAN 400 Beam Messages 0.003074
No
603 RAFTER WF 200 Brace Messages 0.772933
No
604 RAFTER WF 200 Brace Messages 0.710943
No
625 KOLOM WF 400 Column Messages 0.015171
No
626 KOLOM WF 400 Column Messages 0.021407
No
627 BLK WF 100 Beam Messages 0.008574
No
628 BLK WF 100 Beam Messages 0.007349
No
629 REGEL DEPAN 400 Beam Messages 0.027817
No
632 RAFTER WF 200 Brace Messages 0.79963
No
633 RAFTER WF 200 Brace Messages 0.70696
654 KOLOM WF 400 Column No 0.129563
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
24 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
655 KOLOM WF 400 Column Messages 0.144715
No
656 BLK WF 100 Beam Messages 0.009273
No
657 BLK WF 100 Beam Messages 0.050469
No
658 REGEL DEPAN 400 Beam Messages 0.050823
No
661 RAFTER WF 200 Brace Messages 0.458199
No
662 RAFTER WF 200 Brace Messages 0.356195
No
681 KOLOM WF 400 Column Messages 0.25755
No
682 KOLOM WF 400 Column Messages 0.267763
No
683 BLK WF 100 Beam Messages 0.009698
No
684 BLK WF 100 Beam Messages 0.053123
No
687 KOLOM WF 400 Column Messages 0.268782
No
688 KOLOM WF 400 Column Messages 0.268378
No
689 BLK WF 100 Beam Messages 0.009148
No
690 BLK WF 100 Beam Messages 0.0038
No
693 KOLOM WF 400 Column Messages 0.275072
No
694 KOLOM WF 400 Column Messages 0.268611
No
695 BLK WF 100 Beam Messages 0.011383
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
25 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
696 BLK WF 100 Beam Messages 0.015762
No
699 KOLOM WF 400 Column Messages 0.130298
No
700 KOLOM WF 400 Column Messages 0.135457
No
701 BLK WF 100 Beam Messages 0.011878
No
702 BLK WF 100 Beam Messages 0.065981
No
703 KOLOM WF 400 Column Messages 0.193864
No
704 KOLOM WF 400 Column Messages 0.140824
No
705 KOLOM WF 400 Column Messages 0.362512
No
706 KOLOM WF 400 Column Messages 0.266329
No
707 KOLOM WF 400 Column Messages 0.375243
No
708 KOLOM WF 400 Column Messages 0.273285
No
709 KOLOM WF 400 Column Messages 0.372042
No
710 KOLOM WF 400 Column Messages 0.271513
No
711 KOLOM WF 400 Column Messages 0.372201
No
712 KOLOM WF 400 Column Messages 0.271595
No
713 KOLOM WF 400 Column Messages 0.372334
No
714 KOLOM WF 400 Column Messages 0.271627
715 KOLOM WF 400 Column No 0.374181
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
26 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
716 KOLOM WF 400 Column Messages 0.272614
No
717 KOLOM WF 400 Column Messages 0.364044
No
718 KOLOM WF 400 Column Messages 0.2681
No
719 KOLOM WF 400 Column Messages 0.235151
No
720 KOLOM WF 400 Column Messages 0.14022
WIND BRACE REGEL See
721 L65 Brace WarnMsg 0.079686
WIND BRACE REGEL See
722 L65 Brace WarnMsg 0.058545
WIND BRACE REGEL See
723 L65 Brace WarnMsg 0.059052
WIND BRACE REGEL See
724 L65 Brace WarnMsg 0.083589
WIND BRACE REGEL See
725 L65 Brace WarnMsg 0.106285
WIND BRACE REGEL See
726 L65 Brace WarnMsg 0.120377
WIND BRACE REGEL See
727 L65 Brace WarnMsg 0.075861
WIND BRACE REGEL See
728 L65 Brace WarnMsg 0.136663
WIND BRACE REGEL See
729 L65 Brace WarnMsg 0.102333
WIND BRACE REGEL See
730 L65 Brace WarnMsg 0.100606
WIND BRACE REGEL See
731 L65 Brace WarnMsg 0.073836
WIND BRACE REGEL See
732 L65 Brace WarnMsg 0.070305
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
27 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
WIND BRACE REGEL See
733 L65 Brace WarnMsg 0.102398
WIND BRACE REGEL See
734 L65 Brace WarnMsg 0.102825
WIND BRACE REGEL See
735 L65 Brace WarnMsg 0.073799
WIND BRACE REGEL See
736 L65 Brace WarnMsg 0.075889
WIND BRACE REGEL See
737 L65 Brace WarnMsg 0.102407
WIND BRACE REGEL See
738 L65 Brace WarnMsg 0.10285
WIND BRACE REGEL See
739 L65 Brace WarnMsg 0.073606
WIND BRACE REGEL See
740 L65 Brace WarnMsg 0.076147
WIND BRACE REGEL See
744 L65 Brace WarnMsg 0.101425
WIND BRACE REGEL See
745 L65 Brace WarnMsg 0.10291
WIND BRACE REGEL See
746 L65 Brace WarnMsg 0.071554
WIND BRACE REGEL See
747 L65 Brace WarnMsg 0.076224
WIND BRACE REGEL See
748 L65 Brace WarnMsg 0.114495
WIND BRACE REGEL See
749 L65 Brace WarnMsg 0.104864
WIND BRACE REGEL See
750 L65 Brace WarnMsg 0.111096
WIND BRACE REGEL See
751 L65 Brace WarnMsg 0.076271
WIND BRACE REGEL See
752 L65 Brace WarnMsg 0.058545
753 WIND BRACE REGEL Brace See 0.08635
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
28 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
L65 WarnMsg
WIND BRACE REGEL See
754 L65 Brace WarnMsg 0.056072
WIND BRACE REGEL See
755 L65 Brace WarnMsg 0.057981
No
756 KOLOM WF 400 Column Messages 0.194965
No
757 KOLOM WF 400 Column Messages 0.140476
No
758 KOLOM WF 400 Column Messages 0.359041
No
759 KOLOM WF 400 Column Messages 0.266358
No
760 KOLOM WF 400 Column Messages 0.372032
No
761 KOLOM WF 400 Column Messages 0.273263
No
762 KOLOM WF 400 Column Messages 0.368795
No
763 KOLOM WF 400 Column Messages 0.271558
No
764 KOLOM WF 400 Column Messages 0.372332
No
765 KOLOM WF 400 Column Messages 0.271593
No
766 KOLOM WF 400 Column Messages 0.372047
No
767 KOLOM WF 400 Column Messages 0.271477
No
768 KOLOM WF 400 Column Messages 0.373457
No
769 KOLOM WF 400 Column Messages 0.272304
No
770 KOLOM WF 400 Column Messages 0.371091
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
29 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
771 KOLOM WF 400 Column Messages 0.27002
No
772 KOLOM WF 400 Column Messages 0.32903
No
773 KOLOM WF 400 Column Messages 0.270221
No
774 KOLOM WF 400 Column Messages 0.280475
No
775 KOLOM WF 400 Column Messages 0.269888
No
776 KOLOM WF 400 Column Messages 0.268837
No
777 KOLOM WF 400 Column Messages 0.267633
No
778 KOLOM WF 400 Column Messages 0.257767
No
779 KOLOM WF 400 Column Messages 0.264397
No
780 REGEL DEPAN 400 Beam Messages 0.0094
No
781 REGEL DEPAN 400 Beam Messages 0.020395
No
782 KOLOM WF 400 Column Messages 0.14295
No
783 KOLOM WF 400 Column Messages 0.13649
No
784 REGEL DEPAN 400 Beam Messages 0.036007
No
785 REGEL DEPAN 400 Beam Messages 0.025396
WIND BRACE REGEL See
786 L65 Brace WarnMsg 0.046968
WIND BRACE REGEL See
787 L65 Brace WarnMsg 0.058693
788 WIND BRACE REGEL Brace See 0.059881
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
30 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
L65 WarnMsg
WIND BRACE REGEL See
789 L65 Brace WarnMsg 0.048925
WIND BRACE REGEL See
790 L65 Brace WarnMsg 0.106932
WIND BRACE REGEL See
791 L65 Brace WarnMsg 0.070262
WIND BRACE REGEL See
792 L65 Brace WarnMsg 0.044868
WIND BRACE REGEL See
793 L65 Brace WarnMsg 0.079596
WIND BRACE REGEL See
794 L65 Brace WarnMsg 0.102917
WIND BRACE REGEL See
795 L65 Brace WarnMsg 0.058658
WIND BRACE REGEL See
796 L65 Brace WarnMsg 0.075518
WIND BRACE REGEL See
797 L65 Brace WarnMsg 0.069263
WIND BRACE REGEL See
799 L65 Brace WarnMsg 0.102915
WIND BRACE REGEL See
800 L65 Brace WarnMsg 0.103075
WIND BRACE REGEL See
801 L65 Brace WarnMsg 0.075632
WIND BRACE REGEL See
802 L65 Brace WarnMsg 0.043442
WIND BRACE REGEL See
803 L65 Brace WarnMsg 0.075582
WIND BRACE REGEL See
804 L65 Brace WarnMsg 0.075119
WIND BRACE REGEL See
805 L65 Brace WarnMsg 0.102429
WIND BRACE REGEL See
806 L65 Brace WarnMsg 0.060287
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
31 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
WIND BRACE REGEL See
807 L65 Brace WarnMsg 0.10183
WIND BRACE REGEL See
808 L65 Brace WarnMsg 0.102719
WIND BRACE REGEL See
809 L65 Brace WarnMsg 0.071264
WIND BRACE REGEL See
810 L65 Brace WarnMsg 0.075007
WIND BRACE REGEL See
811 L65 Brace WarnMsg 0.10795
WIND BRACE REGEL See
812 L65 Brace WarnMsg 0.104909
WIND BRACE REGEL See
813 L65 Brace WarnMsg 0.098053
WIND BRACE REGEL See
814 L65 Brace WarnMsg 0.044776
WIND BRACE REGEL See
815 L65 Brace WarnMsg 0.102186
WIND BRACE REGEL See
816 L65 Brace WarnMsg 0.079766
WIND BRACE REGEL See
817 L65 Brace WarnMsg 0.061542
WIND BRACE REGEL See
818 L65 Brace WarnMsg 0.056961
WIND BRACE REGEL See
819 L65 Brace WarnMsg 0.044007
WIND BRACE REGEL See
820 L65 Brace WarnMsg 0.051285
WIND BRACE REGEL See
821 L65 Brace WarnMsg 0.0855
WIND BRACE REGEL See
822 L65 Brace WarnMsg 0.075782
WIND BRACE REGEL See
823 L65 Brace WarnMsg 0.071732
824 WIND BRACE REGEL Brace See 0.048062
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
32 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
L65 WarnMsg
WIND BRACE REGEL See
825 L65 Brace WarnMsg 0.042688
WIND BRACE REGEL See
826 L65 Brace WarnMsg 0.069209
WIND BRACE REGEL See
827 L65 Brace WarnMsg 0.059852
WIND BRACE REGEL See
828 L65 Brace WarnMsg 0.070666
WIND BRACE REGEL See
829 L65 Brace WarnMsg 0.048303
WIND BRACE REGEL See
830 L65 Brace WarnMsg 0.074513
WIND BRACE REGEL See
831 L65 Brace WarnMsg 0.034742
WIND BRACE REGEL See
832 L65 Brace WarnMsg 0.057649
WIND BRACE REGEL See
833 L65 Brace WarnMsg 0.038432
WIND BRACE REGEL See
834 L65 Brace WarnMsg 0.058475
No
46 RAFTER WF 200 Brace Messages 0.396198
No
65 RAFTER WF 200 Brace Messages 0.42788
No
73 RAFTER WF 200 Brace Messages 0.770146
No
83 RAFTER WF 200 Brace Messages 0.774831
No
92 GE 125.75.3.2 Beam Messages 0.037741
No
93 GE 125.75.3.2 Beam Messages 0.037642
No
94 GE 125.75.3.2 Beam Messages 0.037604
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
33 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
96 GE 125.75.3.2 Beam Messages 0.037592
No
97 GE 125.75.3.2 Beam Messages 0.03759
No
98 GE 125.75.3.2 Beam Messages 0.037596
No
99 GE 125.75.3.2 Beam Messages 0.037603
No
108 GE 125.75.3.2 Beam Messages 0.037609
No
109 GE 125.75.3.2 Beam Messages 0.037925
No
110 GE 125.75.3.2 Beam Messages 0.037729
No
111 GE 125.75.3.2 Beam Messages 0.037636
No
113 GE 125.75.3.2 Beam Messages 0.037603
No
114 GE 125.75.3.2 Beam Messages 0.037594
No
115 GE 125.75.3.2 Beam Messages 0.037593
No
116 GE 125.75.3.2 Beam Messages 0.037608
No
117 RAFTER WF 200 Brace Messages 0.181529
No
120 RAFTER WF 200 Brace Messages 0.350644
No
123 GE 125.75.3.2 Beam Messages 0.037611
No
124 GE 125.75.3.2 Beam Messages 0.037864
No
125 GE 125.75.3.2 Beam Messages 0.037687
127 GE 125.75.3.2 Beam No 0.03762
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
34 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
128 GE 125.75.3.2 Beam Messages 0.037598
No
129 GE 125.75.3.2 Beam Messages 0.037595
No
131 GE 125.75.3.2 Beam Messages 0.037604
No
132 GE 125.75.3.2 Beam Messages 0.037615
No
133 GE 125.75.3.2 Beam Messages 0.037626
No
134 GE 125.75.3.2 Beam Messages 0.038128
No
135 GE 125.75.3.2 Beam Messages 0.037821
No
136 GE 125.75.3.2 Beam Messages 0.037669
No
137 GE 125.75.3.2 Beam Messages 0.037615
No
138 GE 125.75.3.2 Beam Messages 0.0376
No
139 GE 125.75.3.2 Beam Messages 0.0376
No
140 GE 125.75.3.2 Beam Messages 0.037624
No
141 GE 125.75.3.2 Beam Messages 0.037628
No
142 GE 125.75.3.2 Beam Messages 0.037837
No
143 GE 125.75.3.2 Beam Messages 0.037679
No
144 GE 125.75.3.2 Beam Messages 0.037617
No
145 GE 125.75.3.2 Beam Messages 0.037597
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
35 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
146 GE 125.75.3.2 Beam Messages 0.037594
No
147 GE 125.75.3.2 Beam Messages 0.037604
No
148 GE 125.75.3.2 Beam Messages 0.037611
No
149 GE 125.75.3.2 Beam Messages 0.037623
No
150 GE 125.75.3.2 Beam Messages 0.038095
No
151 GE 125.75.3.2 Beam Messages 0.037825
No
152 GE 125.75.3.2 Beam Messages 0.03767
No
153 GE 125.75.3.2 Beam Messages 0.037615
No
154 GE 125.75.3.2 Beam Messages 0.0376
No
155 GE 125.75.3.2 Beam Messages 0.0376
No
156 GE 125.75.3.2 Beam Messages 0.037619
No
157 GE 125.75.3.2 Beam Messages 0.037624
No
158 GE 125.75.3.2 Beam Messages 0.037711
No
159 GE 125.75.3.2 Beam Messages 0.037637
No
160 GE 125.75.3.2 Beam Messages 0.037603
No
161 GE 125.75.3.2 Beam Messages 0.037593
No
162 GE 125.75.3.2 Beam Messages 0.037594
163 GE 125.75.3.2 Beam No 0.037606
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
36 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
164 GE 125.75.3.2 Beam Messages 0.037614
No
165 GE 125.75.3.2 Beam Messages 0.037627
No
166 GE 125.75.3.2 Beam Messages 0.038296
No
167 GE 125.75.3.2 Beam Messages 0.037912
No
168 GE 125.75.3.2 Beam Messages 0.037701
No
169 GE 125.75.3.2 Beam Messages 0.037626
No
170 GE 125.75.3.2 Beam Messages 0.037604
No
171 GE 125.75.3.2 Beam Messages 0.037603
No
172 GE 125.75.3.2 Beam Messages 0.037624
No
173 GE 125.75.3.2 Beam Messages 0.037631
No
174 GE 125.75.3.2 Beam Messages 0.037589
No
175 GE 125.75.3.2 Beam Messages 0.037591
No
176 GE 125.75.3.2 Beam Messages 0.037588
No
177 GE 125.75.3.2 Beam Messages 0.037588
No
178 GE 125.75.3.2 Beam Messages 0.037594
No
179 GE 125.75.3.2 Beam Messages 0.037611
No
180 GE 125.75.3.2 Beam Messages 0.037625
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
37 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
181 GE 125.75.3.2 Beam Messages 0.037639
No
182 GE 125.75.3.2 Beam Messages 0.038686
No
183 GE 125.75.3.2 Beam Messages 0.038066
No
184 GE 125.75.3.2 Beam Messages 0.037755
No
185 GE 125.75.3.2 Beam Messages 0.037645
No
186 GE 125.75.3.2 Beam Messages 0.037613
No
187 GE 125.75.3.2 Beam Messages 0.037608
No
188 GE 125.75.3.2 Beam Messages 0.037639
No
189 GE 125.75.3.2 Beam Messages 0.037647
No
190 GE 125.75.3.2 Beam Messages 0.037628
No
191 GE 125.75.3.2 Beam Messages 0.037593
No
192 GE 125.75.3.2 Beam Messages 0.037586
No
193 GE 125.75.3.2 Beam Messages 0.037586
No
194 GE 125.75.3.2 Beam Messages 0.037594
No
195 GE 125.75.3.2 Beam Messages 0.037613
No
196 GE 125.75.3.2 Beam Messages 0.037628
No
197 GE 125.75.3.2 Beam Messages 0.037643
198 GE 125.75.3.2 Beam No 0.038822
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
38 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
199 GE 125.75.3.2 Beam Messages 0.038123
No
200 GE 125.75.3.2 Beam Messages 0.037775
No
201 GE 125.75.3.2 Beam Messages 0.037652
No
202 GE 125.75.3.2 Beam Messages 0.037616
No
204 GE 125.75.3.2 Beam Messages 0.03761
No
205 GE 125.75.3.2 Beam Messages 0.037644
No
208 GE 125.75.3.2 Beam Messages 0.037653
No
209 GE 125.75.3.2 Beam Messages 0.03762
No
210 GE 125.75.3.2 Beam Messages 0.037591
No
211 GE 125.75.3.2 Beam Messages 0.037586
No
212 GE 125.75.3.2 Beam Messages 0.037586
No
213 GE 125.75.3.2 Beam Messages 0.037594
No
214 GE 125.75.3.2 Beam Messages 0.037612
No
215 GE 125.75.3.2 Beam Messages 0.037626
No
217 GE 125.75.3.2 Beam Messages 0.037641
No
218 GE 125.75.3.2 Beam Messages 0.03877
No
219 GE 125.75.3.2 Beam Messages 0.038106
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
39 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
220 GE 125.75.3.2 Beam Messages 0.037769
No
221 GE 125.75.3.2 Beam Messages 0.03765
No
222 GE 125.75.3.2 Beam Messages 0.037615
No
223 GE 125.75.3.2 Beam Messages 0.03761
No
224 GE 125.75.3.2 Beam Messages 0.037641
No
225 GE 125.75.3.2 Beam Messages 0.03765
No
226 GE 125.75.3.2 Beam Messages 0.037617
No
227 GE 125.75.3.2 Beam Messages 0.037591
No
229 GE 125.75.3.2 Beam Messages 0.037585
No
230 GE 125.75.3.2 Beam Messages 0.037586
No
233 GE 125.75.3.2 Beam Messages 0.037594
No
234 GE 125.75.3.2 Beam Messages 0.037612
No
235 GE 125.75.3.2 Beam Messages 0.037626
No
236 GE 125.75.3.2 Beam Messages 0.037641
No
237 GE 125.75.3.2 Beam Messages 0.038761
No
238 GE 125.75.3.2 Beam Messages 0.0381
No
239 GE 125.75.3.2 Beam Messages 0.037767
240 GE 125.75.3.2 Beam No 0.037649
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
40 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
242 GE 125.75.3.2 Beam Messages 0.037615
No
243 GE 125.75.3.2 Beam Messages 0.037609
No
244 GE 125.75.3.2 Beam Messages 0.037641
No
245 GE 125.75.3.2 Beam Messages 0.03765
No
246 GE 125.75.3.2 Beam Messages 0.037612
No
247 GE 125.75.3.2 Beam Messages 0.037591
No
248 GE 125.75.3.2 Beam Messages 0.037585
No
249 GE 125.75.3.2 Beam Messages 0.037586
No
250 GE 125.75.3.2 Beam Messages 0.037594
No
251 GE 125.75.3.2 Beam Messages 0.037612
No
252 GE 125.75.3.2 Beam Messages 0.037626
No
254 GE 125.75.3.2 Beam Messages 0.037641
No
255 GE 125.75.3.2 Beam Messages 0.038757
No
258 GE 125.75.3.2 Beam Messages 0.038091
No
259 GE 125.75.3.2 Beam Messages 0.037764
No
260 GE 125.75.3.2 Beam Messages 0.037648
No
261 GE 125.75.3.2 Beam Messages 0.037614
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
41 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
262 GE 125.75.3.2 Beam Messages 0.037609
No
263 GE 125.75.3.2 Beam Messages 0.037642
No
264 GE 125.75.3.2 Beam Messages 0.03765
No
265 GE 125.75.3.2 Beam Messages 0.037608
No
267 GE 125.75.3.2 Beam Messages 0.03759
No
268 GE 125.75.3.2 Beam Messages 0.037585
No
269 GE 125.75.3.2 Beam Messages 0.037586
No
270 GE 125.75.3.2 Beam Messages 0.037593
No
271 GE 125.75.3.2 Beam Messages 0.037611
No
272 GE 125.75.3.2 Beam Messages 0.037628
No
273 GE 125.75.3.2 Beam Messages 0.037641
No
274 GE 125.75.3.2 Beam Messages 0.038763
No
275 GE 125.75.3.2 Beam Messages 0.038081
No
276 GE 125.75.3.2 Beam Messages 0.03776
No
277 GE 125.75.3.2 Beam Messages 0.037647
No
279 GE 125.75.3.2 Beam Messages 0.037614
No
280 GE 125.75.3.2 Beam Messages 0.037608
283 GE 125.75.3.2 Beam No 0.037644
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
42 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
284 GE 125.75.3.2 Beam Messages 0.037651
No
285 GE 125.75.3.2 Beam Messages 0.037605
No
286 GE 125.75.3.2 Beam Messages 0.03759
No
287 GE 125.75.3.2 Beam Messages 0.037585
No
288 GE 125.75.3.2 Beam Messages 0.037586
No
289 GE 125.75.3.2 Beam Messages 0.037594
No
290 GE 125.75.3.2 Beam Messages 0.037612
No
292 GE 125.75.3.2 Beam Messages 0.037632
No
293 GE 125.75.3.2 Beam Messages 0.037644
No
294 GE 125.75.3.2 Beam Messages 0.038835
No
295 GE 125.75.3.2 Beam Messages 0.038091
No
296 GE 125.75.3.2 Beam Messages 0.037764
No
297 GE 125.75.3.2 Beam Messages 0.037649
No
298 GE 125.75.3.2 Beam Messages 0.037615
No
299 GE 125.75.3.2 Beam Messages 0.037608
No
300 GE 125.75.3.2 Beam Messages 0.03765
No
301 GE 125.75.3.2 Beam Messages 0.037655
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
43 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
302 GE 125.75.3.2 Beam Messages 0.037596
No
304 GE 125.75.3.2 Beam Messages 0.037587
No
305 GE 125.75.3.2 Beam Messages 0.037585
No
308 GE 125.75.3.2 Beam Messages 0.037585
No
309 GE 125.75.3.2 Beam Messages 0.03759
No
310 GE 125.75.3.2 Beam Messages 0.037601
No
311 GE 125.75.3.2 Beam Messages 0.037615
No
312 GE 125.75.3.2 Beam Messages 0.037622
No
313 GE 125.75.3.2 Beam Messages 0.038379
No
314 GE 125.75.3.2 Beam Messages 0.037901
No
315 GE 125.75.3.2 Beam Messages 0.037697
No
317 GE 125.75.3.2 Beam Messages 0.037625
No
318 GE 125.75.3.2 Beam Messages 0.037603
No
319 GE 125.75.3.2 Beam Messages 0.037599
No
320 GE 125.75.3.2 Beam Messages 0.037626
No
321 GE 125.75.3.2 Beam Messages 0.037629
No
344 GE 125.75.3.2 Beam Messages 0.038396
345 GE 125.75.3.2 Beam No 0.037872
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
44 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
346 GE 125.75.3.2 Beam Messages 0.037682
No
347 GE 125.75.3.2 Beam Messages 0.037619
No
348 GE 125.75.3.2 Beam Messages 0.037601
No
349 GE 125.75.3.2 Beam Messages 0.037603
No
350 GE 125.75.3.2 Beam Messages 0.037614
No
351 GE 125.75.3.2 Beam Messages 0.037625
No
352 GE 125.75.3.2 Beam Messages 0.037589
No
354 GE 125.75.3.2 Beam Messages 0.037587
No
355 GE 125.75.3.2 Beam Messages 0.037586
No
358 GE 125.75.3.2 Beam Messages 0.037586
No
359 GE 125.75.3.2 Beam Messages 0.03759
No
360 GE 125.75.3.2 Beam Messages 0.037596
No
361 GE 125.75.3.2 Beam Messages 0.037618
No
362 GE 125.75.3.2 Beam Messages 0.037619
No
363 GE 125.75.3.2 Beam Messages 0.038833
No
364 GE 125.75.3.2 Beam Messages 0.038032
No
365 GE 125.75.3.2 Beam Messages 0.037737
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
45 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
367 GE 125.75.3.2 Beam Messages 0.037638
No
368 GE 125.75.3.2 Beam Messages 0.03761
No
369 GE 125.75.3.2 Beam Messages 0.037614
No
370 GE 125.75.3.2 Beam Messages 0.03763
No
371 GE 125.75.3.2 Beam Messages 0.037648
No
372 GE 125.75.3.2 Beam Messages 0.0376
No
373 GE 125.75.3.2 Beam Messages 0.037592
No
374 GE 125.75.3.2 Beam Messages 0.037588
No
375 GE 125.75.3.2 Beam Messages 0.037588
No
376 GE 125.75.3.2 Beam Messages 0.037594
No
377 GE 125.75.3.2 Beam Messages 0.037603
No
379 GE 125.75.3.2 Beam Messages 0.037637
No
380 GE 125.75.3.2 Beam Messages 0.037639
No
383 GE 125.75.3.2 Beam Messages 0.038697
No
384 GE 125.75.3.2 Beam Messages 0.037996
No
385 GE 125.75.3.2 Beam Messages 0.037724
No
386 GE 125.75.3.2 Beam Messages 0.037633
387 GE 125.75.3.2 Beam No 0.037608
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
46 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
388 GE 125.75.3.2 Beam Messages 0.037612
No
389 GE 125.75.3.2 Beam Messages 0.037625
No
390 GE 125.75.3.2 Beam Messages 0.037642
No
392 GE 125.75.3.2 Beam Messages 0.03762
No
393 GE 125.75.3.2 Beam Messages 0.037599
No
394 GE 125.75.3.2 Beam Messages 0.03759
No
395 GE 125.75.3.2 Beam Messages 0.037589
No
396 GE 125.75.3.2 Beam Messages 0.037593
No
397 GE 125.75.3.2 Beam Messages 0.037602
No
398 GE 125.75.3.2 Beam Messages 0.037632
No
399 GE 125.75.3.2 Beam Messages 0.037634
No
400 GE 125.75.3.2 Beam Messages 0.038633
No
401 GE 125.75.3.2 Beam Messages 0.037978
No
402 GE 125.75.3.2 Beam Messages 0.037718
No
404 GE 125.75.3.2 Beam Messages 0.037631
No
405 GE 125.75.3.2 Beam Messages 0.037607
No
408 GE 125.75.3.2 Beam Messages 0.037611
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
47 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
409 GE 125.75.3.2 Beam Messages 0.037623
No
410 GE 125.75.3.2 Beam Messages 0.03764
No
411 GE 125.75.3.2 Beam Messages 0.037638
No
412 GE 125.75.3.2 Beam Messages 0.037607
No
413 GE 125.75.3.2 Beam Messages 0.037593
No
414 GE 125.75.3.2 Beam Messages 0.03759
No
415 GE 125.75.3.2 Beam Messages 0.037593
No
417 GE 125.75.3.2 Beam Messages 0.037602
No
418 GE 125.75.3.2 Beam Messages 0.03763
No
419 GE 125.75.3.2 Beam Messages 0.037633
No
420 GE 125.75.3.2 Beam Messages 0.038578
No
421 GE 125.75.3.2 Beam Messages 0.037959
No
422 GE 125.75.3.2 Beam Messages 0.037711
No
423 GE 125.75.3.2 Beam Messages 0.037628
No
424 GE 125.75.3.2 Beam Messages 0.037606
No
425 GE 125.75.3.2 Beam Messages 0.03761
No
426 GE 125.75.3.2 Beam Messages 0.037622
427 GE 125.75.3.2 Beam No 0.037638
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
48 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
428 GE 125.75.3.2 Beam Messages 0.037657
No
429 GE 125.75.3.2 Beam Messages 0.037614
No
430 GE 125.75.3.2 Beam Messages 0.037596
No
431 GE 125.75.3.2 Beam Messages 0.037591
No
432 GE 125.75.3.2 Beam Messages 0.037593
No
433 GE 125.75.3.2 Beam Messages 0.037601
No
434 GE 125.75.3.2 Beam Messages 0.037628
No
435 GE 125.75.3.2 Beam Messages 0.037631
No
436 GE 125.75.3.2 Beam Messages 0.038532
No
437 GE 125.75.3.2 Beam Messages 0.037939
No
438 GE 125.75.3.2 Beam Messages 0.037704
No
439 GE 125.75.3.2 Beam Messages 0.037626
No
440 GE 125.75.3.2 Beam Messages 0.037605
No
441 GE 125.75.3.2 Beam Messages 0.03761
No
442 GE 125.75.3.2 Beam Messages 0.037621
No
443 GE 125.75.3.2 Beam Messages 0.037637
No
444 GE 125.75.3.2 Beam Messages 0.037677
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
49 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
445 GE 125.75.3.2 Beam Messages 0.037621
No
446 GE 125.75.3.2 Beam Messages 0.037598
No
447 GE 125.75.3.2 Beam Messages 0.037591
No
448 GE 125.75.3.2 Beam Messages 0.037594
No
449 GE 125.75.3.2 Beam Messages 0.037601
No
450 GE 125.75.3.2 Beam Messages 0.037628
No
451 GE 125.75.3.2 Beam Messages 0.03763
No
452 GE 125.75.3.2 Beam Messages 0.03852
No
453 GE 125.75.3.2 Beam Messages 0.037925
No
454 GE 125.75.3.2 Beam Messages 0.0377
No
455 GE 125.75.3.2 Beam Messages 0.037625
No
456 GE 125.75.3.2 Beam Messages 0.037604
No
457 GE 125.75.3.2 Beam Messages 0.037609
No
458 GE 125.75.3.2 Beam Messages 0.037622
No
459 GE 125.75.3.2 Beam Messages 0.037637
No
460 GE 125.75.3.2 Beam Messages 0.037701
No
461 GE 125.75.3.2 Beam Messages 0.03763
462 GE 125.75.3.2 Beam No 0.037601
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
50 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
Messages
No
463 GE 125.75.3.2 Beam Messages 0.037592
No
464 GE 125.75.3.2 Beam Messages 0.037594
No
465 GE 125.75.3.2 Beam Messages 0.0376
No
466 GE 125.75.3.2 Beam Messages 0.037629
No
467 GE 125.75.3.2 Beam Messages 0.037631
No
468 GE 125.75.3.2 Beam Messages 0.038154
No
469 GE 125.75.3.2 Beam Messages 0.03779
No
470 GE 125.75.3.2 Beam Messages 0.037654
No
471 GE 125.75.3.2 Beam Messages 0.037609
No
472 GE 125.75.3.2 Beam Messages 0.037596
No
473 GE 125.75.3.2 Beam Messages 0.0376
No
474 GE 125.75.3.2 Beam Messages 0.037608
No
475 GE 125.75.3.2 Beam Messages 0.037617
No
476 GE 125.75.3.2 Beam Messages 0.037674
No
477 GE 125.75.3.2 Beam Messages 0.037619
No
478 GE 125.75.3.2 Beam Messages 0.037597
No
479 GE 125.75.3.2 Beam Messages 0.03759
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT. NAMASINDO PLAS – RPET, BANDUNG
Document No. Rev. Contract No. Page No.
51 0

TABLE: Steel Design 1 - Summary Data - AISC 360-10

DesignTyp
Frame DesignSect e Status Ratio
Text Text Text Text Unitless
No
485 GE 125.75.3.2 Beam Messages 0.03759
No
486 GE 125.75.3.2 Beam Messages 0.037594
No
489 GE 125.75.3.2 Beam Messages 0.037613
No
490 GE 125.75.3.2 Beam Messages 0.037614

You might also like