桩基 Universal公司宣传册
桩基 Universal公司宣传册
桩基 Universal公司宣传册
2. PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.N3 /JUMEIRAH LAKE TOWERS, DUBAI
CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m AND 98 NOS. OF 1,200 mm DIAMETER
OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Dec 2008 – Jan 2008
PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.L1 / JUMEIRAH LAKE TOWERS, DUBAI
3. CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 700 mm DIAMETER FOR 189 LM DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -9.925 m DMD. PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m
AND 98 NOS. OF 1,200 mm DIAMETER OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Jan 2008 – March 2008
4. PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.H1 /JUMEIRAH LAKE TOWERS, DUBAI
CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 700 mm DIAMETER FOR 189 LM DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -9.925 m DMD. PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m
AND 98 NOS. OF 1,200 mm DIAMETER OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Jan 2008 – Mar 2008
5. PROJECT NAME 2B+G+M+12+R MULTI-USE BUILDING ON PLOT NO.R1/88 / AL NAKHEEL, RAS AL KHAIMAH
CLIENT M/S BAHRI AND MAZROEI TRADING CO.B.M.T.C.
CONSULTANT ELITE CONSULTING ENGINEERING
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: SECANT PILE WALL OF 800 mm DIAMETER DESIGNED FOR A MAXIMUM EXCAVATION DEPTH
OF -7. 25 m AND DOUBLE U CHANNELS WITH TIE BACK ANCHORS FOR 96.0 LM DESIGNED FOR A
MAXIMUM EXCAVATION DEPTH OF -9.80 m.
CONSTRUCTION PERIOD Feb 2008 – Mar 2008
6. PROJECT NAME CONSTRUCTION OF B+G+1 LUXURY VILLA ON PLOT NO.356-1294 AT UMM SAQUEIM,DUBAI
CLIENT H.H.SHEIKH MAYED BIN RASHID AL MAKTOUM
CONSULTANT ARCHDOME CONSULTING ENGINEERS
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: 48 NOS. H BEAMS AND 44 NOS. OF DOUBLE H BEAMS DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -5.70 m FROM WORKING PLATFORM LEVEL.
CONSTRUCTION PERIOD Aug 2008- Sept 2008
7. PROJECT NAME CONSTRUCTION OF B+G+1 LUXURY VILLA ON PLOT NO.356-1294 AT UMM SAQUEIM,DUBAI
CLIENT H.H.SHEIKH MAYED BIN RASHID AL MAKTOUM
CONSULTANT ARCHDOME CONSULTING ENGINEERS
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK 633 NOS. STONE COLUMNS OF 800 mm DIAMETER APPX. AND LENGTH 12 m
CONSTRUCTION PERIOD Sept. 2008
8. PROJECT NAME COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS-CONTRACT 3B (BRIDGE AND UNDER PASS)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT PARSONS DE LEUW, CATHER OVERSEAS LTD.
MAIN CONTRACTOR GROUP5 CONT. / PINNACLE
TYPE OF WORK WORKING PILES-539 NOS. OF 1,000 mm DIAMETER OF APPX. LENGTH 15.00 m
CONSTRUCTION PERIOD July 2008 – Dec.09
10. PROJECT NAME SCP PALM DEIRA STATION, ENTRANCE E AT PALM DEIRA, DUBAI
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT SYSTRA / PARSONS / WS ATKINS
MAIN CONTRACTOR JT METRO
TYPE OF WORK PILING – 800mm DIAMETER, MAXIMUM LENGTH 36.925 m
CONSTRUCTION PERIOD Sept 2008 – Jan. 2009
11. PROJECT NAME PROPOSED RESIDENTIAL BUILDING ON PLOT NO.600-7936 / NAD AL SHIBBA, DUBAI
CLIENT M/S MIZIN LLC.
CONSULTANT ADNAN SAFFARINI
MAIN CONTRACTOR UNIVERSAL PILING COMPANY LLC.
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 600 mm DIAMETER FOR 88 LM DESIGNED FOR MAXIMUM
EXCAVATION DEPTH OF 7.5 m
CONSTRUCTION PERIOD Jnue 2009- May 2010
PROJECT NAME UNDERGROUND STATION ENTRANCE CANOPIES AT BURJUMAN AND CITY CENTRE STATIONS, DUBAI
CLIENT M/S GOVERNMENT OF DUBAI ROADS AND TRANSPORT AUTHORITY
12. CONSULTANT SYSTRA/PARSONS / WS ATKINS
MAIN CONTRACTOR JT METRO
TYPE OF WORK PILING OF 800 mm DIAMETER, MAXIMUM LENTH OF 27.235 m
CONSTRUCTION PERIOD Dec 2008 - Feb. 2009
13. PROJECT NAME CONTRACT-R777/4A, DUBAI CREEK CROSSINGS – 7TH CROSSING CORRIDOR
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS DE LEUW,CATHER OVERSEAS LTD
MAIN CONTRACTOR M/S WADE ADAMS
TYPE OF WORK SHORING: CONTIGUOUS/ SECANT PILE WALL, 2048 NOS. OF 600 mm and 750 mm DIAMETER (TOTAL LM
APPX. 1.56 Kms.) DESIGNED FOR MAXIMUM EXCAV. DEPTH OF 14.00 m, PILING: BORED CAST-IN-SITU
PILES OF 2.0 m DIAMETER.
CONSTRUCTION PERIOD JAN 2008 – FEB 2012
19. PROJECT NAME CONSTRUCTION TESTING OF COMPLETE PILING FOUNDATION FOR LINK BRIDGE
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT APG ARCHITECTURE & PLANNING GROUP
MAIN CONTRACTOR DHABI CONTRACTING
TYPE OF WORK PILING WORKS: 800 m DIAMETER, MAX. LENGTH 22 m
CONSTRUCTION PERIOD Oct.2009 – Nov. 2009
20. PROJECT NAME CONSTRUCTION OF CIDH FOUNDATIONS FOR THE TRAFFIC SIGNALS
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT PARSONS DE LEUW CATHER OVERSEAS
MAIN CONTRACTOR AL NABOODAH CONSTRUCTION
TYPE OF WORK CIDH PILING WORKS: 1000 m DIAMETER, 33 Nos.
CONSTRUCTION PERIOD SEP 2010 - DEC 2010
21. PROJECT NAME MONOPOLE PILE FOUNDATIONS
CLIENT INTELLIGENT TELECOMMUNICATION SYSTEMS
CONSULTANT M/S ETISALAT
MAIN CONTRACTOR UNIVERSAL PILING COMPANY LLC
TYPE OF WORK PILING WORKS: 1850 mm DIAMETER, MAX. LENGTH 14 m
CONSTRUCTION PERIOD NOV 2009 – JAN 2011
22. PROJECT NAME PROJECT NO.7089 FOR ADVANCE INTEGRATED SYSTEM/ ABU DHABI
CLIENT ADVANCE INTEGRATED SYSTEM
CONSULTANT KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR MACE CONTRACTORS CO LTD.
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD DEC 2009- FEB 2011
23. PROJECT NAME G+M+3FL COMM & RES BUILDING / AL NAIF DUBAI
CLIENT MR. ABDULLA ABDUL AZIZ MOHAMMAD AL ZAROONI & MR. JAFFAR ABDUL AZIZ ABNAA ABDULLA
CONSULTANT ADT ARCHITECTURAL ENGG.CONSULTANCY
MAIN CONTRACTOR KASKI INT’L CONTRACTING LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD JAN. 2010 – FEB. 2010
24. PROJECT NAME GROUT FILLING BETWEEN GAS/ CRUDE OIL PIPE LINE & SLEEVE / UAE
CLIENT AL DANA CONTRACTING
CONSULTANT M/S AL DANA CONTRACTING
MAIN CONTRACTOR AL DANA CONTRACTING
TYPE OF WORK GROUT FILLING WORKS
CONSTRUCTION PERIOD FEB 2010- SEP 2010
25. PROJECT NAME PROPOSED HOT ROLLED STEEL STRUCTURE BLDG. AS FACTORY 7 G+M OFFICE / AL QUOZ
CLIENT TRINITY MECHANICAL SERVICES LLC
CONSULTANT AL JASSIM ENGINEERING CONSULTANTS
MAIN CONTRACTOR DOLPHIN STEEL CONSTRUCTION LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD MAY 2010
28. PROJECT NAME PROPOSED HOSPITAL BUILDING (B+ G+ S+12) FOR EXISTING ZULEKHA HOSPITAL
CLIENT MRS. ZANUBIA IQBAL DAUD & MRS. ZULEKHA IQBAL DAUD JULLU SADIQ VALI
CONSULTANT M/S WINNER CONSULTANTS
MAIN CONTRACTOR MS. ASCON
TYPE OF WORK SHORING & PILING WIORKS
CONSTRUCTION PERIOD JUNE 2010- FEB. 2011
PROJECT NAME JAP014- CO2 DMCC INDUSTRIAL AREA & JUMEIRAH LAKE TOWERS, INFRASTRUCTURE & LAND SCAPING
44. CLIENT M/S NAKHEEL
CONSULTANT WILBER SMITH ASSOCIATES / FAITHFUL AND GOULD
MAIN CONTRACTOR WADE ADAMS CONT. LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD APRIL 2011- MAY 2011
46. PROJECT NAME AL RAS AKHDAR & BAYNOONAH STREET UPGRADING AND TRAFFIC IMPROVEMENT.
CLIENT DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH
TYPE OF WORK SHEET PILE / SECANT PILE
CONSTRUCTION PERIOD JULY 2011- DEC 2012
47. PROJECT NAME IMPROVEMENT OF FIFTH INDUSTRIAL INTERSECTION SHARJAH EMIRATES ROAD SECTION STAGE
IMPROVEMENT OF AL DHAID I/C KING AZEEZE I/C AND UNIVERSITY I/C
CLIENT MINISTRY OF PUBLIC WORKS.
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONT.L.L.C.
TYPE OF WORK PILING WORK
CONSTRUCTION PERIOD JUNE 2011- DEC 2012
48. PROJECT NAME AL AIN ASSET ENHANCEMENT SCHEME – CONSTRUCTION OF SEWERAGE INFRASTRUCTURE.
CLIENT ADSSC
CONSULTANT M/S HYDER CONSULTANT
MAIN CONTRACTOR SIX CONSTRUCT
TYPE OF WORK PILING WORK
CONSTRUCTION PERIOD JULY 2011-JAN 2012
52. PROJECT NAME BACK FILLING AND DEWATERING WORKS ZABEEL COPORATE PARK
CLIENT M/S RASIS TIME DEVELOPERS
CONSULTANT M/S ARCH GROUP CONSULTANTS
MAIN CONTRACTOR M/s UNIVERSALPILING COMPANY LLC
TYPE OF WORKS BACK FILLING AND DEWATERING WORKS
CONSTRUCTION PERIOD Jan-12- IN PROGRESS
53. PROJECT NAME PROPOSED CONSTRUCTION OF G +M WARE HOUSE CUM OFFICE - (S-360)
CLIENT M/S NMC CENTRE STORAGE
CONSULTANT M/S NAGA ARCHITECTS AND DESIGNED PLANNERS
MAIN CONTRACTOR M/S SUVADH CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD Jan-2012- JAN 2012
54. PROJECT NAME ARABIAN CROWN TOWER
CLIENT M/S MIDDLE EAST DEVELOPMENT LLC
CONSULTANT M/S AL BURJ CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JULY 2012- APRIL 2013
55. PROJECT NAME WORK SEQUENCE FOR DN 1800 SDSOUTH LINE TUNNEL-2 (BAYNOONAH STREET)
CLIENT M/S DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JAN 2012- Nov 2012
58. PROJECT NAME RAS AL AKHDAR AND BAYNNONAH STREET UPGRADING & TRAFFIC IMPROVEMENT PACKAGE 2
CLIENT DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR AL NABOODAH CONT. LLC
TYPE OF WORKS SHORING WITH STRUTS
CONSTRUCTION PERIOD MARCH 2012- FEB 2013
69. PROJECT NAME KHALIFA PORT INTERCHANGE PROJECT, CONTRACT NO. DOT/T/HW/155/09
CLIENT M/S DEPARTMENT OF TRANSPORT
CONSULTANT M/S MOTT MCDONALD
MAIN CONTRACTOR L & T CONSTRUCTION INFRASTRUCTURE
TYPE OF WORKS PILING & CIDH WORKS
CONSTRUCTION PERIOD JUN 2012- AUG 2012
76. PROJECT NAME -881 / 3A COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS - CONTRACT 3A
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M]/S PARSONS
MAIN CONTRACTOR TODINI COSTRUZIONI GENERAL S. P.A
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Sep 2012- October 2012
78. PROJECT NAME DEWA CONTRACT NO. CNE/0072/2008, PROPOSED 400 KV OHL
CLIENT M/S DEWA
CONSULTANT SIGMA POWER ENGINEERING CONSULTANTS
MAIN CONTRACTOR GULF JYOTHI INTERNATIONAL LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MARCH 2013- DEC. 2013
81. PROJECT NAME CONSTRUCTION AND EXECUTION OF RAS AL KHAIMAH RING ROAD
CLIENT MS/ FOLLOW UP COMMITTEE FOR INITIATIVES OF H. H PRESIDENT OF UAE
CONSULTANT M/S CORE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL RAHJI CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013- FEB.2013
88. PROJECT NAME CONTRACT R842/3 – IMPROVEMENT OF AL KHAIL ROAD JUNCTIONS (10, 11 AND 13)
CLIENT M/S RTA
MAIN CONTRACTOR ETA STAR DEWATERING L.L.C
TYPE OF WORKS DRILLING WORKS FOR DEWATERING WORKS
CONSTRUCTION PERIOD July 2013- July 2013
91. PROJECT NAME BURJ DUBAI DEVELOPMENT - ROADS & INFRASTRUCTURE WORKS
CLIENT M/S EMAAR
CONSULTANT M/S HALCROW INTERNATIONAL PARTNERSHIP
MAIN CONTRACTOR M/S AL FUTTAIM CARILLION
TYPE OF WORKS CIDH FOUNDATION
CONSTRUCTION PERIOD JULY 2013
92. PROJECT NAME IMPROVEMENT OF 5TH INDUSTRIAL INTERSECTION PHASE (3) - IMPROVEMENT OF 5TH INDUSTRIAL
INTERSECTION SHARJAH RING ROAD I/C AND TIE IN WITH DUBAI
CLIENT M/S MINISTRY OF PUBLIC WORKS
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S SHELL BIRD ELECTROMECHANICAL LLC
TYPE OF WORKS CIDH PILES
CONSTRUCTION PERIOD July 2013- Sept 2013
98. PROJECT NAME CHILLER MODIFICATION AND EXPANSION - RITZ CARLTON HOTEL
CLIENT M/S ABJAR HOTELS INTERNATIONAL
CONSULTANT M/S RICE PERRY ELLIS
MAIN CONTRACTOR AL MADAR MGM CONSTRUCTION L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Jan. 2014
102. PROJECT NAME R - 945 PROTECTION OF METRO VIADUCT AND ELEVATED STRUCTURE
CLIENT M/S RTA
CONSULTANT M/S ATKINS
MAIN CONTRACTOR M/S KHALAF SULTAN TRAFFIC SIGNS
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DEC.2013 – SEP. 2014
109. PROJECT NAME PROPOSED 2B + G + M + 4 STOREY RETAIL MALL AND RESIDENTIAL BUILDING
CLIENT M/S JUMA AL MAJID ABDULLAH
CONSULTANT M/S DAR CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS PACKAGE
CONSTRUCTION PERIOD APR. 2015 – AUG. 2015
110. PROJECT NAME CONTRACT R-981 CONSTRUCTION OF CAMEL RACE TRACK FOOTBRIDGES
CLIENT M/s RTA
CONSULTANT M/s PARSONS
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2014
111. PROJECT NAME ADSSC CONTRACT O-11008 - ASSET ENHANCEMENT SCHEME, STAGE 1 IN ABU DHABI, AREA 2 -
CONSTRUCTION OF DEEP TRUNK SEWER FROM MPS 14 TO MPS 18 INCLUDING INTERCEPTION OF
SEWER AND ABANDONMENT OF EXISTING PUMP STATIONS
CLIENT M/s ABU DHABI SEWERAGE SERVICES COMPANY (ADSSC)
CONSULTANT M/s MONTGOMERY WATSON HARZA(MWH)
MAIN CONTRACTOR M/S MABANI DELMA GEN. CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEB. 2014- AUG 2015
114. PROJECT NAME KR467- ROADS & INFRASTRUCTURE IMPROVEMENT PROJECTS IN UAE (FUJAIRAH INTERNATIONAL
ROADS)
CLIENT M/S THE INITIATIVE OF H. H PRESIDENT OF UAE FOLLOW UP COMMITTEE, MINISTRY OF PUBLIC
WORKS
CONSULTANT IDROESSE INFRASTRUCTURE
MAIN CONTRACTOR M/S KHANSAHEB
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2014
119. PROJECT NAME PROPOSED ADDITION OF FACILITY BLOCK TO THE B+G+1 PRIMARY SCHOOL AT HEIBAH FOURTH
CLIENT MR. DINESH CHANDRA KOTHARI
CONSULTANT M/S AL SARAYA ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S TOWER CONTRACTING
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD MAY 2014 - JUNE 2014
130. PROJECT NAME FEWA CONTRACT NO. E18 / 2012 (2) - 33 / 11 KV SUBSTATION WORKS
CLIENT M/S FEDERAL ELECTRICITY AND WATER AUTHORITY
CONSULTANT M/S ENERGOPROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S ETA
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUL. 2014 – AUG. 2014
137. PROJECT NAME (C99FM) REFURBISHMENT AND MAINTENANCE OF QUAY WALL FURNITURE
CLIENT M/S DP WORLD
CONSULTANT M/S URS INFRASTRUCTURE & ENVIRONMET UK LIMITED
MAIN CONTRACTOR M/S KHANSAHEB ROAD & INFRASTRUCTURE
TYPE OF WORKS PILE TESTING WORK AT JEBEL ALI PORT- CONTAINER TERMINAL 2
CONSTRUCTION PERIOD NOV. 2014
138. PROJECT NAME DESIGNED AND CONSTRUCTION OF STORE AT ZA'ABEEL PALACE FACILITIES
CLIENT M/S ENGINEER'S OFFICE
CONSULTANT M/S ENGINEER'S OFFICE
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENGINEERING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APR. 2015 – MAY 2015
139. PROJECT NAME B + G + M + 1 FLOOR - COMMERCIAL & OFFICE BUILDING
CLIENT H.H. SHEIKH SULTAN SAQER SULTAN AL QASSIMI
CONSULTANT M/S MAZAYA CONSULTING ENGINEERS
MAIN CONTRACTOR INTERMASS ENGINEERING & CONTRACTING LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUN. 2015 – JUNE 2015
144. PROJECT NAME R902-2A IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD STAGE 2 -
PHASE 2A
CLIENT M/S RTA
CONSULTANT M/S CDM SMITH INC.
MAIN CONTRACTOR M/S WADE ADAMS CONT. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAR. 2015 – AUG. 2015
154. PROJECT NAME NAD AL SHEBA ARENA (INDOOR FUTSAL & VOLLEY BALL)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S DAR AL HANDASAH (SHAIR & PARTNERS)
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2015 – JULY 2015
155. PROJECT NAME IMPROVEMENT OF 5TH INDUSTRIAL INTERSECTION SHARJAH SHARJAH RING ROAD I/C AND TIE IN
WITH DUBAI
CLIENT M/S MINISTRY OF PUBLIC WORKS
CONSULTANT M/S PARSONS INTERNATIONAL
MAIN CONTRACTOR M/S AL RAHJI CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAR. 2015 – MAY 2015
156. PROJECT NAME B+G+6+ ROOF FLOORS BUILDING FOR M/S GOVERNMENT OF DUBAI - DUABI REAL STATE
CORPORATE AT AL WARQAA
CLIENT M/S. DUBAI CLUB FOR CAMEL RACES
CONSULTANT TOUCH FREE HAND ENGNEERING CONSULTANCY
MAIN CONTRACTOR M/S AL RABAT BUILDING CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APR.2015 - MAY 2015
157. PROJECT NAME R-983 PEDESTRIAN BRIDGES AT BANIYAS ROAD (BRIDGE NO. 01)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER
MAIN CONTRACTOR M/S WAAGNER BIRO GULF LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2015 – MAY 2015
161. PROJECT NAME PROPOSED FISH FARM FOR M/S PALM MARINA
CLIENT M/S PALM MARINA
CONSULTANT -
MAIN CONTRACTOR M/S KHANSAHEB PROPERTY SERVICES DIVISION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2015
163. PROJECT NAME SOBHA HARTLAND "HARDLAND GARDEN APARTMENTS CLUSTER 1 (4 NOS B+G+8 TOWER) – PHASE 2
CLIENT M/S SOBHA ENGINEERING & CONTRACTING LLC
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, PILING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD NOVEMBER 2017 – FEB. 2018
164. PROJECT NAME SOBHA HARTLAND "HARDLAND GARDEN APARTMENTS CLUSTER 1 (4 NOS B+G+8 TOWER)"
CLIENT M/S SOBHA ENGINEERING & CONTRACTING LLC
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, PILING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD AUG 2015 – MARCH 2017
165. PROJECT NAME DESIGN & BUILD KHENIZI & BARHI 132 / 11 KV SUBSTATIONS
CLIENT M/S PALM JUMEIRAH COMPANY LLC
CONSULTANT M/S MOTT MCDONALD
MAIN CONTRACTOR M/S S.S. LOOTAH CONTRACTING CO.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2015 – JULY 2015
166. PROJECT NAME NAD AL SHEBA ARENA (INDOOR FUTSAL & VOLLEY BALL)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S DAR AL HANDASAH (SHAIR & PARTNERS)
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEP 2015 – NOV 2015
170. PROJECT NAME PROPOSED RESIDENTIAL & COMMERCIAL BUILDING FAHAD 3 2B + G + M + 2 TYP ROOF
CLIENT M/S ABNAA KHALIFA AL FAHAD
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS EXCAVATION & SHORING WORKS
CONSTRUCTION PERIOD -
171. PROJECT NAME R1041 DUBAI PARKS ACCESS FROM SHEIKH ZAYED ROAD PACKAGE 1
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S CHINA STATE CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEP 2015 – MARCH 2016
174. PROJECT NAME FEWA CONTRACT NO. E18/2012 (1) 33/11 KV SUBSTATION WORK
CLIENT M/S FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
CONSULTANT M/S ENERGO PROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S NCC- National Contracting Co.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MARCH 2016 – MAY 2016
177. PROJECT NAME CONSTRUCTION OF R.A.K GOVT. & ADNOC DISTRIBUTION SERVICE STATION
CLIENT M/S ADNOC DISTRIBUTION
CONSULTANT M/S AL GURG CONSULTANT
MAIN CONTRACTOR M/S WADE ADAMS EMIRATES LLC
TYPE OF WORKS PILING & SHORING WORKS
CONSTRUCTION PERIOD AUG 2015 – OCT. 2015
178. PROJECT NAME ADDITIONAL OF STORE AND SERVICES BLOCK IN A EXISTING G+1 VILLA
CLIENT MR. JIM & MRS. ELIZABTH YOON
CONSULTANT M/S ADT ARCHITECT. ENGG. CONSULTANCY
MAIN CONTRACTOR M/S ANDREW BANNISTER DESIGN LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD DEC. 2015 – JANUARY 2016
182. PROJECT NAME BURJ VISTA & ADDRESS (BLVD) PEDESTRIAN BRIDGE
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S KABRI INTERNATIONAL CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOVEMBER 2016 – JANUARY 2017
183. PROJECT NAME R1023 PROPOSED DIRECTIONAL RAMP FROM AL KHAIL ROAD TO FINANCIAL CENTRE ROAD
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S ITAL CONSULTANTS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – AUGUST 2016
185. PROJECT NAME PROPOSED MOHAMMED BIN RASHID AL MAKTOUM CITY DISTRICT ONE
CLIENT M/s MEYDAN SOBHA L.L.C. F.Z
CONSULTANT M/s AE7 CONSULTANTS
MAIN CONTRACTOR M/s MS CONSTRUCTION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – IN PROGRESS
188. PROJECT NAME UPGRADE JUNCTIONS AT AIRPORT ROAD - R1011/1 & R1011/2 PACKAGES AT AIRPORT, DUBAI
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/s LOUIS BERGER SAS COMPANY
MAIN CONTRACTOR M/S HABTOOR LEIGHTON GROUP
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – IN PROGRESS
189 PROJECT NAME UR 881/2A1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROAD AT PHASE 2A1, DUBAI
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/s PARSONS
MAIN CONTRACTOR M/S ACTION
TYPE OF WORKS DRILLING OF BOREHOLES
CONSTRUCTION PERIOD JANUARY 2016 – JANUARY 2016
190 PROJECT NAME PROPOSED FISH FARM – PHASE 2 ON PLOT NO. WWA-206 ATJAFZA, DUBAI
CLIENT M/S PALM MARINA
CONSULTANT M/S YAGHMOUR CONSULTANTS
MAIN CONTRACTOR M/S KHANSAHEB PROPERTY SERVICES DIVISION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – FEBRURAY 2016
191 PROJECT NAME PROPOSED R978/3A - DEVELOPMENT OF CYCLE & JOGGING TRACK AT VARIOUS LOCATION IN DUBAI
CLIENT M/S ROADS & TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S NATIONAL CONTRACTING & TRANSPORT CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2016 – NOVEMBER 2017
192 PROJECT NAME NAS TRACK & FIELD OUTDOOR VIDEO SCREEN AT DUBAI
CLIENT M/S OFFICE OF HIS HIGHNESS THE CROWN PRINCE OF DUBAI
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO,
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2016 - FEBRUARY 2016
193 PROJECT NAME MOTION GATE 7: SHORING WORK ON BUILDING 2-404 PROJECT IN DUBAI, U.A.E. AT DUBAI
CLIENT M/S DUBAI PARKS & RESORT
CONSULTANT M/S GENSLER
MAIN CONTRACTOR M/S LAING O'ROURKE MIDDLE EAST (HOLDINGS) LTD
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MARCH 2016 – MARCH 2016
194 PROJECT NAME R902/4B IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD STAGE – 2 PHASE 4B –
EXTENSION OF ACADEMIC CITY ROAD M/S DUBAI PARKS & RESORT
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S CDM SMITH
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2016 – DECEMBER 2016
195 PROJECT NAME PROPOSED CONTRACT - R1005/1 -IMPROVEMENT OF AL AWIR ROAD & INTERNATIONAL CITY
ACCESSES R1005/1
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER
MAIN CONTRACTOR M/S AFCONS CONSTRUCTION MID-EAST LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JULY 2016 – DECEMBER 2017
196 PROJECT NAME PROPOSED R999/2 - DUBAI WATER CANAL INFRASTRUCTUE PACKAGE-2- PEDESTRIAN BRIDGES-1 & 2
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSON INTERNATIONAL LIMITED
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2016 – JULY 2017
197 PROJECT NAME FEWA CONTRACT NO. E19/2012 (1) 33/11 KV SUBSTATION WORK
CLIENT M/S FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
CONSULTANT 'M/S ENERGO PROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S NCC- NATIONAL CONTRACTING COMPANY
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DECEMBER 2016
198 PROJECT NAME PROPOSED (1B+G+6+R FLOORS) HOTEL AND SERVICE APARTMENTS
CLIENT M/S DEYAAR DEVELOPMENT PJSC
CONSULTANT 'M/S U + A ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS GROUND IMPROVEMENT
CONSTRUCTION PERIOD MAY 2016 – SEPTEMBER 2016
199 PROJECT NAME PJ - 10078 - PROPOSED (B + G + 8) BUILDING FOR H.H.S. MOHAMMAD BIN RASHID LIBRARY
CLIENT M/S DUBAI MUNICIPALITY - GENERAL PROJECTS DEPARTMENT
CONSULTANT M/S ARCHITECTURAL CONSULTING GROUP
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016
200 PROJECT NAME (MRHE-02 GOZ) - CONSTRUCTION & MAINTENANCE OF RESIDENTIAL COMPLEX BUILDING
CLIENT M/S GOVERNMENT OF DUBAI
CONSULTANT 'M/S CONIN INCORPORATED CONSULTANTS
MAIN CONTRACTOR M/S SOBHA ENGINEERING & CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUNE 2016 – APRIL 2017
203 PROJECT NAME R 881/2A2 - 1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS – PHASE 2A2 -
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOVEMBER 2016 – IN PROGRESS
205 PROJECT NAME TERHAB HOTEL & HOTEL APARTMENTS (B + G + 4P + 3 FACILITIES FLOOR + 16 FLOORS + 45FLOORS)
CLIENT M/S MANAZIL GLOBAL PROPERT DEVELOPMENT
CONSULTANT M/S B.D. & S MIDDLE EAST ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL NASIRIYA CONTRACTING
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016 – OCTOBER 2017
206 PROJECT NAME HIRE OF PRESSURE GAUGE, HYDRAULIC JACKS & BEAM
CLIENT M/S GEOHARBOUR MIDDLE EAST CONSTRUCTION LLC
CONSULTANT -
MAIN CONTRACTOR -
TYPE OF WORKS HIRE OF PRESSURE GAUGE, HYDRAULIC JACKS & BEAM
CONSTRUCTION PERIOD OCTOBER 2016
208 PROJECT NAME INSPECTION, TESTING & MODIFICATION OF EXISTING SHORING AND ENABLING SYSTEMS
CLIENT M/S EMIRATES CENTRAL COOLING SYSTEM CORPORATION (EMPOWER)
CONSULTANT M/S ARIF & BINTOAK CONS. ARCH. & ENGR.
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS STRENGTHENING OF SHORING WALL USING ANCHORS, EXCAVATION, DEWATERING, PILING & PILE
TESTING
CONSTRUCTION PERIOD SEPTEMBER 2016 – MAY 2017
229 PROJECT NAME PROPOSED AL SOOR INVESTMENT RESIDENTIAL BUILDING (B+G+10 TYPICAL FLOORS+HC)
CLIENT MR.HAMAD AL OWAIS
CONSULTANT M/S KHATIB & ALAMI CONSULTING ENGINEERS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING & PILING WORKS
CONSTRUCTION PERIOD DECEMBER 2017 – MARCH 2018
233 PROJECT NAME R881/3C2 - COMPREHENSIVE IMPROVEMENT OF THE PARALLEL ROADS - PHASE3C2
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS OVERSEAS LTD.
MAIN CONTRACTOR M/S CHINA STATE CONST.ENGG. CORP.(M.E.) L.L.C
TYPE OF WORKS BRIDGE PILING WORKS
CONSTRUCTION PERIOD JUNE 2017 – IN PROGRESS
234 PROJECT NAME DUBAI MALL BOULEVARD EXPANSION
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S KABRI INTERNATIONAL CO. LLC
TYPE OF WORKS PILING & FABRICATION OF STEEL CAGES
CONSTRUCTION PERIOD MAY 2017 – SEPTEMBER 2017
245 PROJECT NAME PROPOSED DUBAI CREEK HARBOUR, PHASE-1, ISLAND DISTRICT
CLIENT M/S EMAAR
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS BRIDGE PILING WORKS & GANTRY
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS
248 PROJECT NAME R1048/3 IMPROVEMENT OF EXPO 2020 ROADS NETWORK (CONTRACT-3
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S AECOM MIDDLE EAST
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING Co.LLC
TYPE OF WORKS PILING WORKS BRIDGE
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS
249 PROJECT NAME WAFI HOTEL COMPLEX & MALL EXPANSION-PH 08 PROPOSED ACCESS FROM / TO FLY OVER
BRIDGE
CLIENT MR. SHAIKH MANA BIN KHALIFA AND MR. BIN SAEED AL MAKTOUM
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENG. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEB. 2018 – IN PROGRESS
250 PROJECT NAME 1403-EPC FOR REFINARY EXPANSION TANKAGE FACILITIES-PIPELINES FOR ENOC
CLIENT M/S ENOC PROCESSING COMPANY LLC
CONSULTANT M/S TEBODIN MIDDLE EAST LTD
MAIN CONTRACTOR M/S OVERSEAS AST COMPANY LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JAN. 2018 – MARCH 2018
251 PROJECT NAME DOWNTOWN DUBAI DEVELOPMENT VIDA RESIDENCES – DUBAI OPERA
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JAN. 2018 – IN PROGRESS
252 PROJECT NAME DOWNTOWN DUBAI DEVELOPMENT PALACE DUBAI OPERA & PALACE RESIDENCES DUBAI OPERA
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOT STARTED
253 PROJECT NAME PROPOSED OFFICE BUILDING (B+G+7) & PROPOSED PARKING BUILDING (B+G+8)
CLIENT M/S DUBAI COURTS & ATTORNEY GENERAL
CONSULTANT M/S ARAB EXPERTS ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JAN. 2018 – IN PROGRESS
257 PROJECT NAME PROPOSED HASSYAN CLEAN COAL POWER PLANT - PHASE 1 (4 X 600 MW NET)
CLIENT M/S DUBAI ELECTRICITY & WATER AUTHORITY/ ACWA POWER / HARBIN ELECTRIC CORP M/S
CONSULTANT INOVA M/S ENGINEERING CONSULTANTS GROUP
MAIN CONTRACTOR THE SECOND CONSTRUCTION CO. LTD OF CHINA CONSTRUCTION THIRD ENGING. BUREAU
(DUBAI BRANCH)
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD NOT STARTED
258 PROJECT NAME R1005/2 - IMPROVEMENTS OF AL AWIR ROAD & INTERNATIONAL CITY ACCESSES AT AL AWIR &
INTERNATIONAL CITY, DUBAI
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER SAS COMPANYGROUP
MAIN CONTRACTOR M/S CHINA STATE CONST. ENGG. CORP. (M.E.) LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOT STARTED
259 PROJECT NAME PROJECT DS-189 AL KHAWANEEJ SECOND SEWERAGE DRAINAGE SYSTEM
CLIENT M/S DUBAI MUNICIPALITY
CONSULTANT M/S MWH CONSULTANTS
MAIN CONTRACTOR M/S ARABTEC ENGINEERING SERVICES LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD NOT STARTED