1.

PROJECT NAME KHATT HOTEL / RAS AL KHAIMAH


CLIENT M/S SHEIKH SHQR BIN MOHAMMAD AL QASSIMI
CONSULTANT HYDER CONSULTANT
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK 32 NOS. PILES OF DIAMETER 1,000 mm, 18 m LENGTH
CONSTRUCTION PERIOD Dec 2007

2. PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.N3 /JUMEIRAH LAKE TOWERS, DUBAI
CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m AND 98 NOS. OF 1,200 mm DIAMETER
OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Dec 2008 – Jan 2008

PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.L1 / JUMEIRAH LAKE TOWERS, DUBAI
3. CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 700 mm DIAMETER FOR 189 LM DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -9.925 m DMD. PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m
AND 98 NOS. OF 1,200 mm DIAMETER OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Jan 2008 – March 2008

4. PROJECT NAME 4B+G+39+M COMMERCIAL AND OFFICE BUILDING ON PLOT NO.H1 /JUMEIRAH LAKE TOWERS, DUBAI
CLIENT M/S AL FAJER PROPERTIES LLC
CONSULTANT NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 700 mm DIAMETER FOR 189 LM DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -9.925 m DMD. PILING: 28 NOS. OF 800 mm DIAMETER OF LENGTH 25 m TO 31 m
AND 98 NOS. OF 1,200 mm DIAMETER OF LENGTH 24.5 m TO 35 m
CONSTRUCTION PERIOD Jan 2008 – Mar 2008

5. PROJECT NAME 2B+G+M+12+R MULTI-USE BUILDING ON PLOT NO.R1/88 / AL NAKHEEL, RAS AL KHAIMAH
CLIENT M/S BAHRI AND MAZROEI TRADING CO.B.M.T.C.
CONSULTANT ELITE CONSULTING ENGINEERING
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: SECANT PILE WALL OF 800 mm DIAMETER DESIGNED FOR A MAXIMUM EXCAVATION DEPTH
OF -7. 25 m AND DOUBLE U CHANNELS WITH TIE BACK ANCHORS FOR 96.0 LM DESIGNED FOR A
MAXIMUM EXCAVATION DEPTH OF -9.80 m.
CONSTRUCTION PERIOD Feb 2008 – Mar 2008

6. PROJECT NAME CONSTRUCTION OF B+G+1 LUXURY VILLA ON PLOT NO.356-1294 AT UMM SAQUEIM,DUBAI
CLIENT H.H.SHEIKH MAYED BIN RASHID AL MAKTOUM
CONSULTANT ARCHDOME CONSULTING ENGINEERS
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK SHORING: 48 NOS. H BEAMS AND 44 NOS. OF DOUBLE H BEAMS DESIGNED FOR A MAXIMUM
EXCAVATION DEPTH OF -5.70 m FROM WORKING PLATFORM LEVEL.
CONSTRUCTION PERIOD Aug 2008- Sept 2008

7. PROJECT NAME CONSTRUCTION OF B+G+1 LUXURY VILLA ON PLOT NO.356-1294 AT UMM SAQUEIM,DUBAI
CLIENT H.H.SHEIKH MAYED BIN RASHID AL MAKTOUM
CONSULTANT ARCHDOME CONSULTING ENGINEERS
MAIN CONTRACTOR PINNACLE CONSULTANCY
TYPE OF WORK 633 NOS. STONE COLUMNS OF 800 mm DIAMETER APPX. AND LENGTH 12 m
CONSTRUCTION PERIOD Sept. 2008

8. PROJECT NAME COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS-CONTRACT 3B (BRIDGE AND UNDER PASS)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT PARSONS DE LEUW, CATHER OVERSEAS LTD.
MAIN CONTRACTOR GROUP5 CONT. / PINNACLE
TYPE OF WORK WORKING PILES-539 NOS. OF 1,000 mm DIAMETER OF APPX. LENGTH 15.00 m
CONSTRUCTION PERIOD July 2008 – Dec.09

9. PROJECT NAME COMPREHENSIVE IMPROVEMENTS TO AL ETTIHAD ROADS-PH II – CONTRACT R-885


CLIENT M/S ROADS AND TRANSPORT
CONSULTANT CANSULT
MAIN CONTRACTOR NATIONAL WHEEL J&P L.L.C
TYPE OF WORK WORKING PILES-20 NOS. OF 1,000 mm DIAMETER & 78 NOS. OF 1,200 mm DIAMETER OF APPX. LENGTH 26
m., SHORING, CONTIGUOUS PILE WALL, 477 PILES OF 600 mm DIAMETER.
CONSTRUCTION PERIOD Aug. 2008 – Dec. 2009

10. PROJECT NAME SCP PALM DEIRA STATION, ENTRANCE E AT PALM DEIRA, DUBAI
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT SYSTRA / PARSONS / WS ATKINS
MAIN CONTRACTOR JT METRO
TYPE OF WORK PILING – 800mm DIAMETER, MAXIMUM LENGTH 36.925 m
CONSTRUCTION PERIOD Sept 2008 – Jan. 2009
11. PROJECT NAME PROPOSED RESIDENTIAL BUILDING ON PLOT NO.600-7936 / NAD AL SHIBBA, DUBAI
CLIENT M/S MIZIN LLC.
CONSULTANT ADNAN SAFFARINI
MAIN CONTRACTOR UNIVERSAL PILING COMPANY LLC.
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL OF 600 mm DIAMETER FOR 88 LM DESIGNED FOR MAXIMUM
EXCAVATION DEPTH OF 7.5 m
CONSTRUCTION PERIOD Jnue 2009- May 2010

PROJECT NAME UNDERGROUND STATION ENTRANCE CANOPIES AT BURJUMAN AND CITY CENTRE STATIONS, DUBAI
CLIENT M/S GOVERNMENT OF DUBAI ROADS AND TRANSPORT AUTHORITY
12. CONSULTANT SYSTRA/PARSONS / WS ATKINS
MAIN CONTRACTOR JT METRO
TYPE OF WORK PILING OF 800 mm DIAMETER, MAXIMUM LENTH OF 27.235 m
CONSTRUCTION PERIOD Dec 2008 - Feb. 2009

13. PROJECT NAME CONTRACT-R777/4A, DUBAI CREEK CROSSINGS – 7TH CROSSING CORRIDOR
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS DE LEUW,CATHER OVERSEAS LTD
MAIN CONTRACTOR M/S WADE ADAMS
TYPE OF WORK SHORING: CONTIGUOUS/ SECANT PILE WALL, 2048 NOS. OF 600 mm and 750 mm DIAMETER (TOTAL LM
APPX. 1.56 Kms.) DESIGNED FOR MAXIMUM EXCAV. DEPTH OF 14.00 m, PILING: BORED CAST-IN-SITU
PILES OF 2.0 m DIAMETER.
CONSTRUCTION PERIOD JAN 2008 – FEB 2012

14. PROJECT NAME EAST TOWER HOTEL


CLIENT M/S BAY CENTRAL
CONSULTANT ENGINEERING CONSORTIUM CONSULTING ENGINEERING
MAIN CONTRACTOR DUBAI CIVIL ENGINEERING
TYPE OF WORK PILING WORKS: 600,750 & 100mm DIAMETER – MAX. LENGTH 31.60m. TOTAL NO. OF PILES = 316
APPROXIMATELY
CONSTRUCTION PERIOD April 2009 – Jan. 2010

15. PROJECT NAME AL RAS STATION


CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT SYSTRA/PARSONS / WS ATKINS
MAIN CONTRACTOR JT METRO
TYPE OF WORK TESTING WORKS
CONSTRUCTION PERIOD May 2009

16. PROJECT NAME PROPOSED BUS STATION


CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT CAMPBELL REITH HILL IN’L LTD.
MAIN CONTRACTOR DHABI CONTRACTING
TYPE OF WORK SHORING WORKS, SECANT PILE WALL, 420 LM

17. PROJECT NAME DM-001, ENTRANCE POD G 19B AND G20B


CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT WS ATKINS AND PARTNERS OVERSEAS
MAIN CONTRACTOR JT METRO
TYPE OF WORK TESTING WORKS
CONSTRUCTION PERIOD Aug. 2009

18. PROJECT NAME GREEN DIESEL PROJECT


CLIENT M/S TAKREER- ABU DHABI OIL REFINING COMPANY
CONSULTANT M/S TAKREER- ABU DHABI OIL REFINING COMPANY
MAIN CONTRACTOR AL JABER ENERGY SERVICES LLC
TYPE OF WORK SHORING: CONTIGUOUS PILE WALL, CONSTRUCTED UNDER LOW HEAD ROOM CONFDITION -1044 NOS.
OF 500 mm DIAMETER (TOTAL LM APPX. 574.51 m.)
CONSTRUCTION PERIOD MAY 2010- JAN 2011

19. PROJECT NAME CONSTRUCTION TESTING OF COMPLETE PILING FOUNDATION FOR LINK BRIDGE
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT APG ARCHITECTURE & PLANNING GROUP
MAIN CONTRACTOR DHABI CONTRACTING
TYPE OF WORK PILING WORKS: 800 m DIAMETER, MAX. LENGTH 22 m
CONSTRUCTION PERIOD Oct.2009 – Nov. 2009

20. PROJECT NAME CONSTRUCTION OF CIDH FOUNDATIONS FOR THE TRAFFIC SIGNALS
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT PARSONS DE LEUW CATHER OVERSEAS
MAIN CONTRACTOR AL NABOODAH CONSTRUCTION
TYPE OF WORK CIDH PILING WORKS: 1000 m DIAMETER, 33 Nos.
CONSTRUCTION PERIOD SEP 2010 - DEC 2010
21. PROJECT NAME MONOPOLE PILE FOUNDATIONS
CLIENT INTELLIGENT TELECOMMUNICATION SYSTEMS
CONSULTANT M/S ETISALAT
MAIN CONTRACTOR UNIVERSAL PILING COMPANY LLC
TYPE OF WORK PILING WORKS: 1850 mm DIAMETER, MAX. LENGTH 14 m
CONSTRUCTION PERIOD NOV 2009 – JAN 2011

22. PROJECT NAME PROJECT NO.7089 FOR ADVANCE INTEGRATED SYSTEM/ ABU DHABI
CLIENT ADVANCE INTEGRATED SYSTEM
CONSULTANT KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR MACE CONTRACTORS CO LTD.
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD DEC 2009- FEB 2011

23. PROJECT NAME G+M+3FL COMM & RES BUILDING / AL NAIF DUBAI
CLIENT MR. ABDULLA ABDUL AZIZ MOHAMMAD AL ZAROONI & MR. JAFFAR ABDUL AZIZ ABNAA ABDULLA
CONSULTANT ADT ARCHITECTURAL ENGG.CONSULTANCY
MAIN CONTRACTOR KASKI INT’L CONTRACTING LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD JAN. 2010 – FEB. 2010

24. PROJECT NAME GROUT FILLING BETWEEN GAS/ CRUDE OIL PIPE LINE & SLEEVE / UAE
CLIENT AL DANA CONTRACTING
CONSULTANT M/S AL DANA CONTRACTING
MAIN CONTRACTOR AL DANA CONTRACTING
TYPE OF WORK GROUT FILLING WORKS
CONSTRUCTION PERIOD FEB 2010- SEP 2010

25. PROJECT NAME PROPOSED HOT ROLLED STEEL STRUCTURE BLDG. AS FACTORY 7 G+M OFFICE / AL QUOZ
CLIENT TRINITY MECHANICAL SERVICES LLC
CONSULTANT AL JASSIM ENGINEERING CONSULTANTS
MAIN CONTRACTOR DOLPHIN STEEL CONSTRUCTION LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD MAY 2010

26. PROJECT NAME PROPOSED G+ 4 LABOUR ACCOMODATION


CLIENT MOHAMMAD JASSIM BIN KALBAN
CONSULTANT INT’L ENGG. CENTER ENGG. CONSULTANT
MAIN CONTRACTOR DOLPHIN STEEL CONSTRUCTION LLC
TYPE OF WORK SHORIGN WORKS
CONSTRUCTION PERIOD JULY 2010- OCT. 2010

27. PROJECT NAME D06/22D – LA VILLE CONTEMPORAINE


CLIENT DUBAI PROPERTIES
CONSULTANT HALCROW INT’L PARTNERSHIP
MAIN CONTRACTOR AL NABOODAH CONTRACTING LLC
TYPE OF WOR PILING WORKS

28. PROJECT NAME PROPOSED HOSPITAL BUILDING (B+ G+ S+12) FOR EXISTING ZULEKHA HOSPITAL
CLIENT MRS. ZANUBIA IQBAL DAUD & MRS. ZULEKHA IQBAL DAUD JULLU SADIQ VALI
CONSULTANT M/S WINNER CONSULTANTS
MAIN CONTRACTOR MS. ASCON
TYPE OF WORK SHORING & PILING WIORKS
CONSTRUCTION PERIOD JUNE 2010- FEB. 2011

29. PROJECT NAME PROPOSED WAREHOUSE AND OFFICE


CLIENT MR. ALI NAZIR ALI AL FARDEN - SEVILLE PRODUCTS(FACTORY)
CONSULTANT M/S CHAWLA ARCHITECTURAL & CONSULTING ENGINEERING
MAIN CONTRACTOR M/S DOLPHIN
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD MAY 2010- MAY 2010

30. PROJECT NAME TARIF POLICE STATION


CLIENT M/S MINISTRY OF INTERIOR- ABU DHABI POLICE GHQ
CONSULTANT M/S BAINONA CONSULTING ENGINEERING
MAIN CONTRACTOR M/S DISCOVERY CONTRACTING
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD APRIL 2010- JUNE 2010

31. PROJECT NAME AL REEM ISLAND DEVELOPMENT SECTORS 2 & 3 INFRASTRUCTURE


CLIENT M/S TAMOUH INVESTMENT LLC
CONSULTANT M/S HYDER CONSULTS
MAIN CONTRACTOR M/S COMBINED GROUP
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD AUGUST 2010- DEC 2012
PROJECT NAME 132/ 11 KV EMIRATES HILLS SUBSTATION
CLIENT M/S DEWA
32. CONSULTANT M/S ENERGOPROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S WATER & POWER
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD MAY 2010 – MAY 2010

33. PROJECT NAME PROPOSED B+ G+ 1 VILLA


CLIENT MR. MOHAMMED ABDALLA JUMA ALSARI
CONSULTANT M/S DESIGN CENTER
MAIN CONTRACTOR M/S WATER & POWER
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD MAY 2010- AUGUST 2010

PROJECT NAME CITY SEASONS (4B+ G+ M + 14 TYP. + ROO )


CLIENT MR.MUSALLAM SALEEM BIN HAM
CONSULTANT M/S JAMES CUBITTS & PARTNERS
34. MAIN CONTRACTOR M/S DUBAI CIVIL ENGINEERING
TYPE OF WORK SHORING & PILING WORKS
CONSTRUCTION PERIOD JUNE 2010- MARCH 2011

PROJECT NAME PROPOSED FACTORY AND OFFICE SHORING WORKS


CLIENT FOR M/S ESSAR STEEL MIDDLE EAST FZE
CONSULTANT WINNER CONSULTANT
35. MAIN CONTRACTOR M/S DOLPHIN STEEL CONSTRUCTION LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD JULY 2010 – SEP. 2010

PROJECT NAME CONSTRUCTION OF AL NABOODAH SHOW ROOMS & WORKSHOP


CLIENT M/S AL NABOODAH REAL ESTATE INVESTMENT LLC
36. CONSULTANT MAKHAN CONSULTING ENGINEERING
MAIN CONTRACTOR M/S AL NABOODAH / M/S GROUP FIVE
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD NOV. 2010 – DEC. 2010

PROJECT NAME PROPOSED G +4 FLOORS LABOUR ACCOMMODATION


CLIENT M/S DUBAI INVESTMENTS PARK
37. CONSULTANT WINNER CONSULTANTS
MAIN CONTRACTOR SUVADH CONTRACTING LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD NOV. 2010

PROJECT NAME CONSTRUCTION OF SHED NO. C


CLIENT M/S UAE ARMED FORCES GENERAL HEAD QUARTERS
38. CONSULTANT ENGINEERS OFFICE OF THE UAE ARMED FORCES
MAIN CONTRACTOR INTERMASS ENGINEERING AND CONTRACTING CO. LLC
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD DEC. 2010- FEB 2011

PROJECT NAME CONSTRUCTION OF THE OUTER BY PASS EXTENSION TO EMIRTAES ROAD


CLIENT M/S MINISTRY OF PUBLIC WORKS
39. CONSULTANT M/S IDROESSE INFRASTRUCTURE
MAIN CONTRACTOR M/S CHINA STATE CONSTRUCTION ENGINEERING CORPORATION
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD DEC. 2010- APRIL 2011

PROJECT NAME SOLAR THERMAL POWER PLANT SHAMS


CLIENT SHAMS 1
40. CONSULTANT UTE ABENER TEYMA
MAIN CONTRACTOR UNIVERSAL PILING COMPANY
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD NOV. 2010 – AUG. 2011

41. PROJECT NAME NEW MACHINERY AND COMPONENT REPAIR WORKSHOP


CLIENT M/S MAINTENANCE PARTNERS FOR MACHINERY LLC
CONSULTANT ARAB CONSULTANT ARCHITECTS AND ENGINEERS
MAIN CONTRACTOR SIX CONSTRUCT
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD FEB. 2011- APRIL 2011

42. PROJECT NAME FOUNDATION FOR 33 KV TERMINAL TOWERS


CLIENT FEWA RAK
CONSULTANT MOTT MCDONALD
MAIN CONTRACTOR GULF ELECTRICAL CONTRACTING LLC
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD MAY 2011
PROJECT NAME PROPOSED WORKSHOP & OFFICE BUILDING
CLIENT M/S RAMADI KITCHEN INDUSTRIES LLC
43. CONSULTANT M/S M D BHATIA & BROS.
MAIN CONTRACTOR DOLPHIN STEEL CONSTRUCTION LLC.
TYPE OF WORK PILING WORKS
CONSTRUCTION PERIOD APRIL 2011

PROJECT NAME JAP014- CO2 DMCC INDUSTRIAL AREA & JUMEIRAH LAKE TOWERS, INFRASTRUCTURE & LAND SCAPING
44. CLIENT M/S NAKHEEL
CONSULTANT WILBER SMITH ASSOCIATES / FAITHFUL AND GOULD
MAIN CONTRACTOR WADE ADAMS CONT. LLC
TYPE OF WORK SHORING WORKS
CONSTRUCTION PERIOD APRIL 2011- MAY 2011

PROJECT NAME D+ G+ M COMMERCIAL BUILDING


45. CLIENT MAJAN CENTRE
CONSULTANT AL HAWRAA ENGINEERING CONSULTANT
MAIN CONTRACTOR M/S BUMI
TYPE OF WORK REMOVAL OF H BEAM
CONSTRUCTION PERIOD May 2011- MAY 2011

46. PROJECT NAME AL RAS AKHDAR & BAYNOONAH STREET UPGRADING AND TRAFFIC IMPROVEMENT.
CLIENT DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH
TYPE OF WORK SHEET PILE / SECANT PILE
CONSTRUCTION PERIOD JULY 2011- DEC 2012

47. PROJECT NAME IMPROVEMENT OF FIFTH INDUSTRIAL INTERSECTION SHARJAH EMIRATES ROAD SECTION STAGE
IMPROVEMENT OF AL DHAID I/C KING AZEEZE I/C AND UNIVERSITY I/C
CLIENT MINISTRY OF PUBLIC WORKS.
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONT.L.L.C.
TYPE OF WORK PILING WORK
CONSTRUCTION PERIOD JUNE 2011- DEC 2012

48. PROJECT NAME AL AIN ASSET ENHANCEMENT SCHEME – CONSTRUCTION OF SEWERAGE INFRASTRUCTURE.
CLIENT ADSSC
CONSULTANT M/S HYDER CONSULTANT
MAIN CONTRACTOR SIX CONSTRUCT
TYPE OF WORK PILING WORK
CONSTRUCTION PERIOD JULY 2011-JAN 2012

49. PROJECT NAME CONSTRUCTION OF CIDH WORKS FOR TRAFFIC SIGNALS.


CLIENT M/S ROAD TRANSPORT AUTHORITY
CONSULTANT PARSONS DE LEUW, CATHER OVERSEAS LTD.
MAIN CONTRACTOR AL NABOODAH CONT. L.L.C.
TYPE OF WORKS CIDH WORKS
CONSTRUCTION PERIOD JULY 2011- JAN 2013

50. PROJECT NAME MONOPOLE PILE FOUNDATIONS AT DUBAI


CLIENT M/S ETISALAT
MAIN CONTRACTOR SIGN WORKS
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Sep-2011- Nov.2011

51. PROJECT NAME MONOPOLE PILE FOUNDATIONS AT RAS AL KHAIMAH


CLIENT SIGN WORKS
MAIN CONTRACTOR SIGN WORKS
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOV 2011- DEC 2011

52. PROJECT NAME BACK FILLING AND DEWATERING WORKS ZABEEL COPORATE PARK
CLIENT M/S RASIS TIME DEVELOPERS
CONSULTANT M/S ARCH GROUP CONSULTANTS
MAIN CONTRACTOR M/s UNIVERSALPILING COMPANY LLC
TYPE OF WORKS BACK FILLING AND DEWATERING WORKS
CONSTRUCTION PERIOD Jan-12- IN PROGRESS

53. PROJECT NAME PROPOSED CONSTRUCTION OF G +M WARE HOUSE CUM OFFICE - (S-360)
CLIENT M/S NMC CENTRE STORAGE
CONSULTANT M/S NAGA ARCHITECTS AND DESIGNED PLANNERS
MAIN CONTRACTOR M/S SUVADH CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD Jan-2012- JAN 2012
54. PROJECT NAME ARABIAN CROWN TOWER
CLIENT M/S MIDDLE EAST DEVELOPMENT LLC
CONSULTANT M/S AL BURJ CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JULY 2012- APRIL 2013

55. PROJECT NAME WORK SEQUENCE FOR DN 1800 SDSOUTH LINE TUNNEL-2 (BAYNOONAH STREET)
CLIENT M/S DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JAN 2012- Nov 2012

56. PROJECT NAME FALCON EYE PROJECT NO. 7089


CLIENT M/S ADVANCED INTEGRATED SYSTEMS
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JAN 2012- Nov 2012

57. PROJECT NAME CONSTRUCTION OF PRECAST BOUNDARY WALL


CLIENT H.H SHEIKHA BINT SAEED AL MAKTOUM
CONSULTANT M/S KHATIB & ALAMI
MAIN CONTRACTOR M/S EMIRATES PRECAST CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD -

58. PROJECT NAME RAS AL AKHDAR AND BAYNNONAH STREET UPGRADING & TRAFFIC IMPROVEMENT PACKAGE 2
CLIENT DEPARTMENT OF TRANSPORT
CONSULTANT M/S PARSONS
MAIN CONTRACTOR AL NABOODAH CONT. LLC
TYPE OF WORKS SHORING WITH STRUTS
CONSTRUCTION PERIOD MARCH 2012- FEB 2013

59. PROJECT NAME PROPOSED VTS TOWER FOR KONGSBERG


CLIENT JAGGARD GIBBSONS SOLUTIONS
MAIN CONTRACTOR JAGGARD GIBBSONS SOLUTIONS
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD -

60. PROJECT NAME PROPOSED B + G + 1 FLOOR BUILDING


CLIENT MR. AHMED AL TAMIMI
CONSULTANT HI CORNER CONSULTANCY
MAIN CONTRACTOR DUBAI CIVIL ENGINEERING
TYPE OF WORKS SHORING WORKS / H BEAMS WORKS
CONSTRUCTION PERIOD MARCH 2012- APRIL 2012

61. PROJECT NAME R842/4-IMPROVEMENT OF AL KHAIL ROAD


CLIENT M/S RTA
CONSULTANT M/S PARSONS
MAIN CONTRACTOR WADE ADAMS
TYPE OF WORKS CIDH FOUNDATION
CONSTRUCTION PERIOD MARCH 2012

62. PROJECT NAME MONO POLE PILE FOUNDATION


CLIENT M/S DAKTRONICS
CONSULTANT -
MAIN CONTRACTOR SIGN WORKS
TYPE OF WORKS PILINGWORKS: 1 NO. OF DIA 1.85 m; LENGTH APPROX. 8.0m
CONSTRUCTION PERIOD APRIL 2012

63. PROJECT NAME R916 WO 36 TRAFFIC SIGNAL WORK


CLIENT M/S RTA
CONSULTANT M/S PARSONS
MAIN CONTRACTOR AL WASIT ROADS CONTRACTING
TYPE OF WORKS CIDH FOUNDATION
CONSTRUCTION PERIOD APRIL 2012

64. PROJECT NAME PROPOSED COMMERCIAL BUILDING (B + G + 1)


CLIENT M/S J.F.K HOLDING COMPANY LIMITED
CONSULTANT M/S EMSQUARE ENGG CONSULTANTS
MAIN CONTRACTOR SUVADH CONTRACTING L.L.C
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2012- JUNE 2012
PROJECT NAME IMPROVEMENT OF 5TH INDUSTRIAL INTERSECTION SHARJAHSHARJAH RING ROAD I/C AND TIE IN
65. WITH DUBAI
CLIENT M/S MINISTRY OF PUBLIC WORKS
CONSULTANT M/S PARSONS INTERNATIONAL
MAIN CONTRACTOR M/S AL RAHJI CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2012-FEB.2014

66. PROJECT NAME 2B+G+3+HC- COMMERCIAL & RESIDENTIAL BUILDING


CLIENT MR. MOHAMMED ZAINAL BAQER MOHEBI
CONSULTANT M/S NEB (NATIONAL BUREAU ENGINEERING)
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JUNE 2012- JAN 2013

67. PROJECT NAME PRIVATE VILLA (B+G+1)


CLIENT MR. MOHAMMED ZAINAL BAQER MOHEBI
CONSULTANT M/S NEB (NATIONAL BUREAU ENGINEERING)
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JUNE 2012- FEB 2013

68. PROJECT NAME C56 JA ADDITIONAL BERTH AT CONTAINER TERMINAL 2


M/S DP WORLD
CLIENT HALCROW INTERNATIONAL PARTNERSHIP LLC
CONSULTANT M/S ARCHIRODON
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2012- MARCH 2013

69. PROJECT NAME KHALIFA PORT INTERCHANGE PROJECT, CONTRACT NO. DOT/T/HW/155/09
CLIENT M/S DEPARTMENT OF TRANSPORT
CONSULTANT M/S MOTT MCDONALD
MAIN CONTRACTOR L & T CONSTRUCTION INFRASTRUCTURE
TYPE OF WORKS PILING & CIDH WORKS
CONSTRUCTION PERIOD JUN 2012- AUG 2012

70. PROJECT NAME 2B + G + M + 5 STOREY COMMERCIAL & RESIDENTIAL BUILDNG


CLIENT MR. JUMA AL MAJID ABDULLA
CONSULTANT M/S DAR CONSULTING ARCHITECTS & ENGINEERS
MAIN CONTRACTOR BELHASA ENGINEERING & CONTRACTING CO (LLC)
TYPE OF WORKS PILING & SHORING WORKS
CONSTRUCTION PERIOD AUGUST 2012- FEB 2013

71. PROJECT NAME FEWA CONTRACT- 4EW/2010, R. O DESALINATION PLANT


CLIENT M/S FEDERAL ELECTRICITY AND WATER AUTHORITY
CONSULTANT M/S ILF CONSULTING ENGINEERS
MAIN CONTRACTOR W & P DEWATERING & PILING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEP 2012- SEP 2012

72. PROJECT NAME 30 m TELECOM MONOPOLE


CLIENT M/S EMIRATES INTEGARATED TELECOMMUNICATIONS COMPANY
CONSULTANT M/S EKSAN ENGINEERING CONSULTANCY
MAIN CONTRACTOR HAYAT COMMUNICATIONS (MEA) FZCO
TYPE OF WORKS PILING WORK
CONSTRUCTION PERIOD NOV 2012-M DEC 2012

73. PROJECT NAME R-900- ITS EXPANSION


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR WAAGNER BIRO GULF LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Nov 2012- Dec-2012

74. ROJECT NAME R955, BICYCLE TRACK GATE


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S TURATH ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S KHANSAHEB
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Nov.2012- Dec.2012
PROJECT NAME R 881 / 4 - COMPREHENSIVE IMPROVEMENT OF PARALLEL ROADS
75. CLIENT (CONTRACT 4)
CONSULTANT GOVERNMENT OF DUBAI ROADS AND TRANSPORT AUTHORITY
MAIN CONTRACTOR AL NABOODAH CONTRACTING GROUP L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Nov-2012 – March 2014

76. PROJECT NAME -881 / 3A COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS - CONTRACT 3A
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M]/S PARSONS
MAIN CONTRACTOR TODINI COSTRUZIONI GENERAL S. P.A
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Sep 2012- October 2012

77. PROJECT NAME PROPOSED BUILDING (G + 6)


CLIENT MR. SAID BIN ABDULLAH BIN SALEM AL KHAROUSI
CONSULTANT M/S.WINNER ENGG CONSULTANT`
MAIN CONTRACTOR AL FARIS AL MALAKI
TYPE OF WORKS PLOT NO. 28, MULK 673 IN AL GOWAIR, SHARJAH
CONSTRUCTION PERIOD Dec 2012- MARCH 2013

78. PROJECT NAME DEWA CONTRACT NO. CNE/0072/2008, PROPOSED 400 KV OHL
CLIENT M/S DEWA
CONSULTANT SIGMA POWER ENGINEERING CONSULTANTS
MAIN CONTRACTOR GULF JYOTHI INTERNATIONAL LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MARCH 2013- DEC. 2013

79. PROJECT NAME G + 6 RESIDENTIAL BUILDING


CLIENT MR. JASIM SULAIMAN ABDULLA AL QADHI
CONSULTANT C.V TEC CONSULTING ENGINEERS
MAIN CONTRACTOR ROSE CITY CONTRACTING
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MARCH 2013

80. PROJECT NAME UNIPOLE PROJECT AT JADAF AND AL KHAWANEEJ


CLIENT M/S CAPITAL LLC
CONSULTANT AL HAWRAA ENGINEERING CONSULTANT
MAIN CONTRACTOR AMBITION ADVERTISING
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APRIL 2013 - JULY 2013

81. PROJECT NAME CONSTRUCTION AND EXECUTION OF RAS AL KHAIMAH RING ROAD
CLIENT MS/ FOLLOW UP COMMITTEE FOR INITIATIVES OF H. H PRESIDENT OF UAE
CONSULTANT M/S CORE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL RAHJI CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013- FEB.2013

82. PROJECT NAME TRA / ROD/ 914/1-PEDESTRAIN FOOT BRIDGES


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S ASCON ROADS CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013 – SEPT.2013

83. PROJECT NAME CONSTRUCTION OF PEDESTRIAN BRIDGE


CLIENT M/S DUBAI MULTI COMMODITIES CENTRE (DMCC)
CONSULTANT M/S HALCROW ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013- MAY 2013

84. PROJECT NAME TRA / ROD/ 914/1-PEDESTRAIN FOOT BRIDGES


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S ASCON ROADS CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013- MAY 2013

85. PROJECT NAME DUBAI FRAME ZA'BEEL PARK


CLIENT M/S DUBAI MUNICIPALITY
CONSULTANT HYDER CONSULTING (ME)
MAIN CONTRACTOR BIN LADEN CONTRACTING COMPANY
TYPE OF WORKS PILING AND TESTING WORKS
CONSTRUCTION PERIOD MAY 2013- JULY 2013
86. PROJECT NAME PROPOSED RESIDENTIAL VILLA
CLIENT MR. AHMAD ISMAIL AQIL ABDUL RAHIM JANAHI
CONSULTANT ARIF & BINTOAK
MAIN CONTRACTOR DUBAI CIVIL ENGINEERING
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2013- JAN. 2014

87. PROJECT NAME FOUNDATION FOR SIGNBORADS


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT -
MAIN CONTRACTOR M/S PIXCOM TECHNOLOGIES LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2013 – JULY 2013

88. PROJECT NAME CONTRACT R842/3 – IMPROVEMENT OF AL KHAIL ROAD JUNCTIONS (10, 11 AND 13)
CLIENT M/S RTA
MAIN CONTRACTOR ETA STAR DEWATERING L.L.C
TYPE OF WORKS DRILLING WORKS FOR DEWATERING WORKS
CONSTRUCTION PERIOD July 2013- July 2013

89. PROJECT NAME MECHANICAL PUMP ROOM


CLIENT M/S MEYDAN GROUP LLC
MAIN CONTRACTOR M/S SOBHA CONTRATING
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD July 2013- Sept. 2013

90. PROJECT NAME 50m SS TOWER


CLIENT M/S MITAS TELECOM
MAIN CONTRACTOR HAYAT COMMUNICATIONS (MEA) FZCO
TYPE OF WORKS PILING WORKS (DESIGN ONLY)
CONSTRUCTION PERIOD July 2013- Sept. 2013

91. PROJECT NAME BURJ DUBAI DEVELOPMENT - ROADS & INFRASTRUCTURE WORKS
CLIENT M/S EMAAR
CONSULTANT M/S HALCROW INTERNATIONAL PARTNERSHIP
MAIN CONTRACTOR M/S AL FUTTAIM CARILLION
TYPE OF WORKS CIDH FOUNDATION
CONSTRUCTION PERIOD JULY 2013

92. PROJECT NAME IMPROVEMENT OF 5TH INDUSTRIAL INTERSECTION PHASE (3) - IMPROVEMENT OF 5TH INDUSTRIAL
INTERSECTION SHARJAH RING ROAD I/C AND TIE IN WITH DUBAI
CLIENT M/S MINISTRY OF PUBLIC WORKS
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S SHELL BIRD ELECTROMECHANICAL LLC
TYPE OF WORKS CIDH PILES
CONSTRUCTION PERIOD July 2013- Sept 2013

93. PROJECT NAME TRA / ROD / 914 / 1 - PEDESTRIAN FOOT BRIDGES


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S ASCON ROADS CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD October 2013

94. PROJECT NAME B + G + 8 + GYM RESIDENTIAL BUILDING


CLIENT MR HUSSAIN MOHAMMED HABEEB ALREDHA
CONSULTANT M/S KHAWAJAH ENGINEERING CONSULTANCY
MAIN CONTRACTOR AL KAITOOB BUILDING CONTRACTING L.L.C
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD Sep 2013- Nov. 2013

95. PROJECT NAME PROPOSED G + M SHOPS


CLIENT MR SAIF DARWISH JUMA SAEED
CONSULTANT M/S PARADISE HOME ENGINEERING CONSULTANCY
MAIN CONTRACTOR M/S HIGH STAR CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD October 2014 – November 2014
96. PROJECT NAME PROPOSED B + G + 1 VILLA
CLIENT MS. RITU MEHTA / MR. PRADEEP KUMAR MEHTA
CONSULTANT M/S FREELINE ENGINEERING CONSULTANTS
MAIN CONTRACTOR AL FARIS AL MALAKI BLDG.CONT. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD Dec. 2013

97. PROJECT NAME PROPOSED B + G + 1 VILLA


CLIENT MS. JYOTI SAJJAN SINGH LODHA / MR. SAJJAN SINGH LODHA
CONSULTANT M/S FREELINE ENGINEERING CONSULTANTS
MAIN CONTRACTOR AL FARIS AL MALAKI BLDG.CONT. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD Jan. 2014

98. PROJECT NAME CHILLER MODIFICATION AND EXPANSION - RITZ CARLTON HOTEL
CLIENT M/S ABJAR HOTELS INTERNATIONAL
CONSULTANT M/S RICE PERRY ELLIS
MAIN CONTRACTOR AL MADAR MGM CONSTRUCTION L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD Jan. 2014

99. PROJECT NAME TRADE CENTRE FOOT BRIDGE


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S. PARSONS DE LEUW, CATHER OVERSEAS LTD
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPT. 2013

100. PROJECT NAME FOUNDATION FOR SIGNBOARD


CLIENT M/S EMIRATES NEON GROUP (ENG)
CONSULTANT M/S AL HADARA ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S EMIRATES NEON GROUP (ENG)
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD OCT. 2013

101. PROJECT NAME RA / ROD / 914 / 1 - PEDESTRIAN FOOT BRIDGES


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S ASCON ROADS CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD OCT. 2013 – FEB. 2014

102. PROJECT NAME R - 945 PROTECTION OF METRO VIADUCT AND ELEVATED STRUCTURE
CLIENT M/S RTA
CONSULTANT M/S ATKINS
MAIN CONTRACTOR M/S KHALAF SULTAN TRAFFIC SIGNS
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DEC.2013 – SEP. 2014

103. PROJECT NAME BORE HOLES FOR DEWATERING WELLS


MAIN CONTRACTOR M/S WATER & POWER ENGINEERING COMPANY LLC
TYPE OF WORKS DRILLING WORKS
CONSTRUCTION PERIOD DEC. 2013 – JAN. 2014

104. PROJECT NAME PM/S GOVERNMENT OF DUBAI REAL ESTATE CORPORATION


CLIENT PROPOSED SIGNBOARD AT WESTIN
CONSULTANT M/S AL HAWRAA ENGINEERING CONSULTANT
MAIN CONTRACTOR M/S AMBITION ADVERTISING
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DEC.2013

105. PROJECT NAME R881 - 2A COMPREHENSIVE IMPROVEMENT OF PARALLEL ROADS


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S EMIRATES ROAD CONTRACTING
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEB. 2014- SEP. 2014

106. PROJECT NAME RESIDENTIAL (B + G ONLY)


CLIENT MR ABDULLA FAREED ABDULLA SALEH AL GURG
CONSULTANT M/S ARCHDOME CONSULTING ENGINEERS
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENGINEERING L.L.C
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2014-JUNE 2014
107. PROJECT NAME PROPOSED B + G + M +1 + ROOF DECK COMMERCIAL & OFFICE BUILDING
CLIENT DR. MARYAM OBAID BIN MANSOOR
CONSULTANT AMEY ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S LUXURIOUS CONTRACTING
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD -

108. PROJECT NAME R1027-RESIDENTIAL / COMMERCIAL BUILDING (B+G+M+2F+HC)


CLIENT M/S AL WASL
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS PACKAGE
CONSTRUCTION PERIOD NOV. 2014 – APR. 2015

109. PROJECT NAME PROPOSED 2B + G + M + 4 STOREY RETAIL MALL AND RESIDENTIAL BUILDING
CLIENT M/S JUMA AL MAJID ABDULLAH
CONSULTANT M/S DAR CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS PACKAGE
CONSTRUCTION PERIOD APR. 2015 – AUG. 2015

110. PROJECT NAME CONTRACT R-981 CONSTRUCTION OF CAMEL RACE TRACK FOOTBRIDGES
CLIENT M/s RTA
CONSULTANT M/s PARSONS
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2014

111. PROJECT NAME ADSSC CONTRACT O-11008 - ASSET ENHANCEMENT SCHEME, STAGE 1 IN ABU DHABI, AREA 2 -
CONSTRUCTION OF DEEP TRUNK SEWER FROM MPS 14 TO MPS 18 INCLUDING INTERCEPTION OF
SEWER AND ABANDONMENT OF EXISTING PUMP STATIONS
CLIENT M/s ABU DHABI SEWERAGE SERVICES COMPANY (ADSSC)
CONSULTANT M/s MONTGOMERY WATSON HARZA(MWH)
MAIN CONTRACTOR M/S MABANI DELMA GEN. CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEB. 2014- AUG 2015

113. PROJECT NAME PROPOSED EMIRATES GOLF COURSE - 1 NO. UNIPOLE


CLIENT M/S GOVERNEMENT OF DUBAI- REAL ESTATE DEPARTMENT
CONSULTANT AL HARAA ENGG CONSULTANTS
MAIN CONTRACTOR M/S AMBITION ADVERTISING
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEB 2014

114. PROJECT NAME KR467- ROADS & INFRASTRUCTURE IMPROVEMENT PROJECTS IN UAE (FUJAIRAH INTERNATIONAL
ROADS)
CLIENT M/S THE INITIATIVE OF H. H PRESIDENT OF UAE FOLLOW UP COMMITTEE, MINISTRY OF PUBLIC
WORKS
CONSULTANT IDROESSE INFRASTRUCTURE
MAIN CONTRACTOR M/S KHANSAHEB
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2014

115. PROJECT NAME PROPOSED 2B+G +11 FLOOR RESIDENTIAL BUILDING


CLIENT M/S NILONA HOLDING FZ-LLC
CONSULTANT M/S DUBAI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD MAY. 2014 – SEP. 2014

116. PROJECT NAME BRIDGE AT LEAF ENTRANCE


CLIENT M/S BUNYA
CONSULTANT M/S HYDER CONSULTANTS
MAIN CONTRACTOR M/S COMBINED GROUP CONTRACTING CO. ( K.S.C.C)
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2014 – DEC. 2014

117. PROJECT NAME THE POINTE (CONTRACT NO.: N-006-6-40)


CLIENT M/S NAKHEEL
CONSULTANT M/S DAR AL HANDASAH (SHAIR AND PARTNERS)
MAIN CONTRACTOR M/S GULF TECHNICAL CONSTRUCTION COMPANY (GTCC)
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAY 2014 – IN PROGRESS
118. PROJECT NAME PROPOSED 3B+G+5 FLOORS HOSPITAL EXTENSION BUILDING
CLIENT M/S ZULEKHA HOSPITAL
CONSULTANT M/S DUBAI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING LLC
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD NOV. 2014 – MAR. 2015

119. PROJECT NAME PROPOSED ADDITION OF FACILITY BLOCK TO THE B+G+1 PRIMARY SCHOOL AT HEIBAH FOURTH
CLIENT MR. DINESH CHANDRA KOTHARI
CONSULTANT M/S AL SARAYA ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S TOWER CONTRACTING
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD MAY 2014 - JUNE 2014

120. PROJECT NAME PROPOSED B+G+1 VILLA


CLIENT MRS. MUNA AMENALLA KAMALION
CONSULTANT M/S AL MOSTAQBAL ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S NAJMAT AL FAWARES GENERAL CONT. LLC.
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD APRIL 2014- MAY 2014

121. PROJECT NAME PROPOSED G+M WAREHOUSE


CLIENT M/S SERVOTECH INTERNATIONAL
CONSULTANT M/S PARADISE HOME ENGINEERING CONSULTANCY
MAIN CONTRACTOR -
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD SEP. 2014 – FEB. 2015

122. PROJECT NAME PROPOSED SIGNBOARD


CLIENT M/S AL BOOM TOURISM VILLAGE
CONSULTANT M/S AL RAFDEEN ENGINEERING CONSULTANT
MAIN CONTRACTOR M/S SOLID BASE OUTDOOR LLC.-
TYPE OF WORKS PILING
CONSTRUCTION PERIOD MAY 2014

123. PROJECT NAME 44m HEIGHT BUCKET ELEVATOR


CLIENT M/S AL KHALEEJ SUGAR COMPANY
CONSULTANT -
MAIN CONTRACTOR M/S AL KHALEEJ SUGAR COMPANY
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD JUNE 2014

124. PROJECT NAME CAR PARKING BUILDING (G+M+4+R)


CLIENT M/S AL TAYER MOTORS
CONSULTANT -
MAIN CONTRACTOR M/S FUJAIRAH NATIONAL CONTRACTING
TYPE OF WORKS PILING
CONSTRUCTION PERIOD JUNE 2014

125. PROJECT NAME PROPOSED B+G+1 SHOWROOM AND OFFICES BUILDING


CLIENT M/S DUBAI FUND FINANCIAL ADDRESSES
CONSULTANT M/S ABDUL RAHIM ARCHITECTURAL CONSULTANTS
MAIN CONTRACTOR M/S RANICON CONTRACTING
TYPE OF WORKS SHORING
CONSTRUCTION PERIOD JUN. 2015 – IN PROGRESS

126. PROJECT NAME BELHASA RESIDENTIAL BUILDING (2B+G+9 TYP+R)


CLIENT M/S SAIF AHMAD SAIF BELHASA
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVRSAL PILING LLC
TYPE OF WORKS SHORING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD FEB. 2015 – AUG. 2015

127. PROJECT NAME SOBHA INTERNATIONAL SCHOOL


CLIENT M/S SOBHA ENGINEERING & CONTRACTING LLC
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S SOBHA ENGINEERING & CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUL. 2014 – AUG. 2014
128. PROJECT NAME PROPOSED RESIDENTIAL BUILDING (2 B+ G + 8 TYP. + H.C.)
CLIENT M/S AVON DEVELOPERS & INVESTMENTS
MAIN CONTRACTOR M/S McFADDEN INTERNATIONAL CONSTRUCTION GROUP LLC
TYPE OF WORKS IMPROVEMENTS FOR EXISTING SHORING WORKS (ANCHORING WORKS)
CONSTRUCTION PERIOD -

129. PROJECT NAME MONT ROSE (REF 138 – 140)


CLIENT M/S DEYAAR DEVELOPMENT PJSC
CONSULTANT M/S GLEEDS INTERNATIONAL MANAGEMENT & CONSTRUCTION CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JUL. 2014 – AUG. 2015

130. PROJECT NAME FEWA CONTRACT NO. E18 / 2012 (2) - 33 / 11 KV SUBSTATION WORKS
CLIENT M/S FEDERAL ELECTRICITY AND WATER AUTHORITY
CONSULTANT M/S ENERGOPROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S ETA
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUL. 2014 – AUG. 2014

131. PROJECT NAME PROPOSED B + G + 1 MASJID & SERVICES


CLIENT M/S JAFARIA ENDOWMENT BOARD AWQAF MASJID JAMA
CONSULTANT M/S ABDUL RAHIM ARCHITECTURAL CONSULTANTS
MAIN CONTRACTOR M/S NAJMAT AL FAWARES CONT.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEP. 2014 – NOV. 2014

132. PROJECT NAME PROPOSED B + G + 8 + R RESIDENTIAL BUILDING


CLIENT M/S MIZIN L.L.C (GRACE PROPERTY DEVELOPER LTD)
CONSULTANT M/S AL AJMI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING COMPANY LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEB. 2015 – APR. 2015

133. PROJECT NAME ACCESS TO BLUEWATERS ISLAND


CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS INTERNATIONAL
MAIN CONTRACTOR M/S HABTOOR LEIGHTON GROUP
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD OCT. 2014 – MARCH 2016

134. PROJECT NAME B + G + 4 RESIDENTIAL BUILDING


CLIENT M/S SOBHA WATERFRONT LIMITED
CONSULTANT M/S AL WASL AL JADEED CONSULTANTS
MAIN CONTRACTOR M/S SOBHA CONTRACTING LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD OCT. 2014 – FEB. 2015

135. PROJECT NAME PROPOSED RESIDENTIAL BUILDING (B + G + 2P + 20 FLOORS + GYM + ROOF)


CLIENT M/S PAN GLOBAL DEVELOPMENT LLC
CONSULTANT M/S CHAWLA ARCHITECTURAL & CONSULTING ENGINEERING
MAIN CONTRACTOR M/S GAMMON & BILLIMORIA CONTRACTING LLC
TYPE OF WORKS SHORING & PILING WORKS
CONSTRUCTION PERIOD OCTOBER 2017 – IN PROGRESS

136. PROJECT NAME THE ROYAL ATLANTIS - EARLY WORKS PACKAGE


CLIENT M/S KERZNER INTERNATIONAL DEVELOPMENT
CONSULTANT M/S AECOM CONSULTANT
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC.
TYPE OF WORKS EARLY WORKS PACKAGE
CONSTRUCTION PERIOD OCT. 2014 – APR. 2015

137. PROJECT NAME (C99FM) REFURBISHMENT AND MAINTENANCE OF QUAY WALL FURNITURE
CLIENT M/S DP WORLD
CONSULTANT M/S URS INFRASTRUCTURE & ENVIRONMET UK LIMITED
MAIN CONTRACTOR M/S KHANSAHEB ROAD & INFRASTRUCTURE
TYPE OF WORKS PILE TESTING WORK AT JEBEL ALI PORT- CONTAINER TERMINAL 2
CONSTRUCTION PERIOD NOV. 2014

138. PROJECT NAME DESIGNED AND CONSTRUCTION OF STORE AT ZA'ABEEL PALACE FACILITIES
CLIENT M/S ENGINEER'S OFFICE
CONSULTANT M/S ENGINEER'S OFFICE
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENGINEERING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APR. 2015 – MAY 2015
139. PROJECT NAME B + G + M + 1 FLOOR - COMMERCIAL & OFFICE BUILDING
CLIENT H.H. SHEIKH SULTAN SAQER SULTAN AL QASSIMI
CONSULTANT M/S MAZAYA CONSULTING ENGINEERS
MAIN CONTRACTOR INTERMASS ENGINEERING & CONTRACTING LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUN. 2015 – JUNE 2015

140. PROJECT NAME G + M + 2 STOREY RESIDENTIAL / COMMERCIAL BUILDING


CLIENT MRS. ZAINAB MAHMOOD ALI & FATIMA, AYESHA ZUBAIDA, AMEENA & MAHMOOD ABNAA GHULOOM
ABDUL MALIK MOHD. ALI
CONSULTANT M/S. CHAWLA ARCHITECTS
MAIN CONTRACTOR H & M BUILDING CONT. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JAN. 2015 – FEB. 2015

141. PROJECT NAME DRILLING OF 2 NOS BOREHOLES FOR PILING WORKS


CLIENT N/A
CONSULTANT N/A
MAIN CONTRACTOR M/S NATIONAL PILING COPMANY LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JAN. 2015

142. PROJECT NAME 2B + G + 8 + HEALTH CLUB, RESIDENTIAL BUILDING


CLIENT MR. JAMNO PERUMAL KALWANI
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S ROSE CITY CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD AUG. 2015 - DEC. 2015

143. PROJECT NAME B + G + 8 + HEALTH CLUB, RESIDENTIAL BUILDING


CLIENT M/S WORLD GATE INVESTMENT LTD.
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S ROSE CITY CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUN. 2015 – SEPT. 2015

144. PROJECT NAME R902-2A IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD STAGE 2 -
PHASE 2A
CLIENT M/S RTA
CONSULTANT M/S CDM SMITH INC.
MAIN CONTRACTOR M/S WADE ADAMS CONT. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAR. 2015 – AUG. 2015

145. PROJECT NAME 2B + G + 2 COMMERCIAL DEVELOPMENTS (LIFESTYLE CENTER)


CLIENT M/S KHANSAHEB INVESTMENTS LLC
CONSULTANT M/S JRHP
MAIN CONTRACTOR M/S KHANSAHEB INVESTMENTS LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUN. 2015 – SEPT. 2015

146. PROJECT NAME R709 /3B - REMAINING WORKS ON INTERCHANGE 8


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S AECOM
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEB. 2015 – JUN. 2015

147. PROJECT NAME PROPOSED B + G + 05 TYP BUILDING


CLIENT MR. BAKER ABU SEEDO & MR. AMRE ABU SEEDO
CONSULTANT M/S ENGR ADNAN SAFFARINI OFFICE
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD APR. 2015 – AUG. 2015

148. PROJECT NAME PROPOSED G+M+4 COMMERCIAL AND RESIDENTIAL BUILDING


CLIENT M/S EASA SALEH AL GURG LLC
CONSULTANT M/S FACE
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENGINEERING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APR. 2015 – MAY 2015

149. PROJECT NAME BICYLE & JOGGING TRACKS


CLIENT M/S MEYDAN SOBHA LLC – FZ
CONSULTANT M/S AE7 MORSE ARCHITECTURE & ENGINEERING CONSULTANCIES
MAIN CONTRACTOR M/S WADE ADAMS CONT. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2015 – OCT. 2015
150. PROJECT NAME LEGOLAND PACKAGE 3
CLIENT M/S MERAAS DEVELOPMENT
CONSULTANT M/S KLING CONSULTANT
MAIN CONTRACTOR M/S BESIX ORASCOM
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JULY 2015 – AUG. 2015

151. PROJECT NAME R 881/2A1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUN. 2015 – OCT. 2016

152. PROJECT NAME PROPOSED SIGNBOARD


CLIENT -
CONSULTANT -
MAIN CONTRACTOR M/S KHALAF SULTANT TRAFFIC SIGNS CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEB. 2015 – MAR. 2015

153. PROJECT NAME DEEP WELL BORING & INSTALLATION WORK


CLIENT -
CONSULTANT -
MAIN CONTRACTOR ETA STAR DEWATERING L.L.C
TYPE OF WORKS ALSAADA STREET, ZABEEL, DUBAI
CONSTRUCTION PERIOD FEB. 2015

154. PROJECT NAME NAD AL SHEBA ARENA (INDOOR FUTSAL & VOLLEY BALL)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S DAR AL HANDASAH (SHAIR & PARTNERS)
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2015 – JULY 2015

155. PROJECT NAME IMPROVEMENT OF 5TH INDUSTRIAL INTERSECTION SHARJAH SHARJAH RING ROAD I/C AND TIE IN
WITH DUBAI
CLIENT M/S MINISTRY OF PUBLIC WORKS
CONSULTANT M/S PARSONS INTERNATIONAL
MAIN CONTRACTOR M/S AL RAHJI CONSTRUCTION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MAR. 2015 – MAY 2015

156. PROJECT NAME B+G+6+ ROOF FLOORS BUILDING FOR M/S GOVERNMENT OF DUBAI - DUABI REAL STATE
CORPORATE AT AL WARQAA
CLIENT M/S. DUBAI CLUB FOR CAMEL RACES
CONSULTANT TOUCH FREE HAND ENGNEERING CONSULTANCY
MAIN CONTRACTOR M/S AL RABAT BUILDING CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APR.2015 - MAY 2015

157. PROJECT NAME R-983 PEDESTRIAN BRIDGES AT BANIYAS ROAD (BRIDGE NO. 01)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER
MAIN CONTRACTOR M/S WAAGNER BIRO GULF LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD APR. 2015 – MAY 2015

158. PROJECT NAME 2B + G + M + 1 FLOOR SHOWROOMS & OFFICE BUILDING


CLIENT M/S JUMA AL MAJID ABDULLAH
CONSULTANT M/S DAR CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD NOV 2015 – DEC. 2015

159. PROJECT NAME 2B + G + 9 TYP + ROOF RESIDENTIAL BUILDING


CLIENT MR. SAEER HOHD. AMIN AHMAD HOHD FALAKHAZ
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD AUG 2015 – NOV 2015
160. PROJECT NAME B + G + 6 FLOORS
CLIENT MR. BAKER SADDIQ OMAR ABUSIDO
CONSULTANT M/S NEXT ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING & EXCAVATION WORKS
CONSTRUCTION PERIOD SEP 2015 – NOV. 2015

161. PROJECT NAME PROPOSED FISH FARM FOR M/S PALM MARINA
CLIENT M/S PALM MARINA
CONSULTANT -
MAIN CONTRACTOR M/S KHANSAHEB PROPERTY SERVICES DIVISION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2015

162. PROJECT NAME AL QIYADAH MIXED USED DEVELOPMENT


CLIENT M/S MOHAMMED JUMA AL NABOODAH & SAEED JUMA SAEED AL NABOODAH
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING & PARTIAL EXCAVATION
CONSTRUCTION PERIOD AUG 2015 – APRIL 2016

163. PROJECT NAME SOBHA HARTLAND "HARDLAND GARDEN APARTMENTS CLUSTER 1 (4 NOS B+G+8 TOWER) – PHASE 2
CLIENT M/S SOBHA ENGINEERING & CONTRACTING LLC
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, PILING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD NOVEMBER 2017 – FEB. 2018

164. PROJECT NAME SOBHA HARTLAND "HARDLAND GARDEN APARTMENTS CLUSTER 1 (4 NOS B+G+8 TOWER)"
CLIENT M/S SOBHA ENGINEERING & CONTRACTING LLC
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING, PILING, EXCAVATION & DEWATERING WORKS
CONSTRUCTION PERIOD AUG 2015 – MARCH 2017

165. PROJECT NAME DESIGN & BUILD KHENIZI & BARHI 132 / 11 KV SUBSTATIONS
CLIENT M/S PALM JUMEIRAH COMPANY LLC
CONSULTANT M/S MOTT MCDONALD
MAIN CONTRACTOR M/S S.S. LOOTAH CONTRACTING CO.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2015 – JULY 2015

166. PROJECT NAME NAD AL SHEBA ARENA (INDOOR FUTSAL & VOLLEY BALL)
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S DAR AL HANDASAH (SHAIR & PARTNERS)
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEP 2015 – NOV 2015

167. PROJECT NAME PROPOSED PRIVATE VILLA (B+G+2)


CLIENT MR. AHMAD HAMAD AHMAD BINSAND ALSUWAIDI
CONSULTANT M/S RIMAL ENGINEERNG CONSULTANT
MAIN CONTRACTOR M/S FUJAIRAH NATIONAL CONSTRUCTION CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEP 2015 – OCT 2015

168. PROJECT NAME PROPOSED B + G + 4 FLOORS MULTI USE BUILDING


CLIENT M/S DUBAI SILICON OA SIS AUTHORITY
CONSULTANT M/S DAR
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS EXCAVATION , DEWATERING WORKS
CONSTRUCTION PERIOD AUG 2015 – DEC. 2015

169. PROJECT NAME DPDP-6009/CW-MC-03 - INFRASTRUCTURE WORKS FOR PHASE 1


CLIENT M/S DUBAI PARKS
CONSULTANT M/S HALCROW A CH2M HILL COMPANY
MAIN CONTRACTOR M/S KIER DUBAI LLC
TYPE OF WORKS CIDH FOUNDATION
CONSTRUCTION PERIOD OCT 2015 – DEC. 2015

170. PROJECT NAME PROPOSED RESIDENTIAL & COMMERCIAL BUILDING FAHAD 3 2B + G + M + 2 TYP ROOF
CLIENT M/S ABNAA KHALIFA AL FAHAD
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS EXCAVATION & SHORING WORKS
CONSTRUCTION PERIOD -
171. PROJECT NAME R1041 DUBAI PARKS ACCESS FROM SHEIKH ZAYED ROAD PACKAGE 1
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S CHINA STATE CONSTRUCTION
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEP 2015 – MARCH 2016

172. PROJECT NAME HIRE OF DRILLING RIG FOR H BEAMS INSTALLATION


CLIENT M/S W&P
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS EXCAVATION & SHORING WORKS
CONSTRUCTION PERIOD JULY 2015 – AUG 2015

173. PROJECT NAME MOTION GATEPACKAGE 7 ON BUILDING 2-404


CLIENT DUBAI PARKS
CONSULTANT M/S GENSLER
MAIN CONTRACTOR M/S LAING O'ROURKE MIDDLE EAST (HOLDINGS) LTD
TYPE OF WORKS PILING WORK
CONSTRUCTION PERIOD AUG 2015 – SEP 2015

174. PROJECT NAME FEWA CONTRACT NO. E18/2012 (1) 33/11 KV SUBSTATION WORK
CLIENT M/S FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
CONSULTANT M/S ENERGO PROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S NCC- National Contracting Co.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MARCH 2016 – MAY 2016

175. PROJECT NAME PROPOSED SKATE PARK SHADE BUILDING


CLIENT M/S CONVIC CREATE COMMUNITY
CONSULTANT M/S AUSTRALIAN CONSULTANT
MAIN CONTRACTOR M/S BELHASA PROJECTS LLC.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD AUG 2015 – OCT. 2015

176. PROJECT NAME R1064 – STAFF ACCOMMODATION BUILDING


CLIENT M/S. WASL LLC ON
CONSULTANT M/S AL TURATH ENGG. CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS EXCAVATION WORKS
CONSTRUCTION PERIOD NOV 2015 – FEBRUARY 2016

177. PROJECT NAME CONSTRUCTION OF R.A.K GOVT. & ADNOC DISTRIBUTION SERVICE STATION
CLIENT M/S ADNOC DISTRIBUTION
CONSULTANT M/S AL GURG CONSULTANT
MAIN CONTRACTOR M/S WADE ADAMS EMIRATES LLC
TYPE OF WORKS PILING & SHORING WORKS
CONSTRUCTION PERIOD AUG 2015 – OCT. 2015

178. PROJECT NAME ADDITIONAL OF STORE AND SERVICES BLOCK IN A EXISTING G+1 VILLA
CLIENT MR. JIM & MRS. ELIZABTH YOON
CONSULTANT M/S ADT ARCHITECT. ENGG. CONSULTANCY
MAIN CONTRACTOR M/S ANDREW BANNISTER DESIGN LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD DEC. 2015 – JANUARY 2016

179. PROJECT NAME PROPOSED (B + G + 1) VILLA


CLIENT MR. ABDOULAZIZ ALI MOHEBBI
CONSULTANT M/S ABDUL RAHIM ARCHITECT CONSULTANTS
MAIN CONTRACTOR M/S GOVER CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD OCT 2015

180. PROJECT NAME CONSTRUCTION OF (B+G+6+RF) RESIDENTIAL BUILDING


CLIENT MR. EZZ AZMI WATSON
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S ROSE CITY CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD -
181. PROJECT NAME 3B + G + M + 4P + 30 STOREY HOTEL & RESIDENTIAL APPARTMENT BUILDING
CLIENT MR. M. SAAD MOHAMMED AL JUBARRAH AL ROMAIHI
CONSULTANT M/S JOUZY / AXIANTA
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PLOT NO. 345-409 AT BURJ KHALIFA, DUBAI, UAE
CONSTRUCTION PERIOD FEBRUARY 2016 – MAY 2017

182. PROJECT NAME BURJ VISTA & ADDRESS (BLVD) PEDESTRIAN BRIDGE
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S KABRI INTERNATIONAL CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOVEMBER 2016 – JANUARY 2017

183. PROJECT NAME R1023 PROPOSED DIRECTIONAL RAMP FROM AL KHAIL ROAD TO FINANCIAL CENTRE ROAD
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S ITAL CONSULTANTS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – AUGUST 2016

184. PROJECT NAME MEERAS OUTLET VILLAGE


CLIENT M/S MEERAS DEVELOPMENT
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S LAING O’ROURKE
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – JANUARY 2016

185. PROJECT NAME PROPOSED MOHAMMED BIN RASHID AL MAKTOUM CITY DISTRICT ONE
CLIENT M/s MEYDAN SOBHA L.L.C. F.Z
CONSULTANT M/s AE7 CONSULTANTS
MAIN CONTRACTOR M/s MS CONSTRUCTION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – IN PROGRESS

186. PROJECT NAME PROPOSED (G+M+4) STOREY PHASE -2 OFFICE BUILDING


CLIENT M/s GOVERNMENT OF DUBAI -AIRPORT FREEZONE
CONSULTANT M/s LACASA ARCHITECTS & ENG.CONSULTANTS
MAIN CONTRACTOR M/s MS BELHASA ENGG. & CONT. CO.LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2016 – MARCH 2016

187. PROJECT NAME AL KHAWANEEJ HEIGHTS – 40 VILLAS PROJECT


CLIENT M/s H.E. MR. MOHAMMED JUMA SAEED AL NABOODAH
CONSULTANT M/s ADS ARCHITECTURAL CONSULTANTS
MAIN CONTRACTOR M/s AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD DEC. 2015 - DEC. 2015

188. PROJECT NAME UPGRADE JUNCTIONS AT AIRPORT ROAD - R1011/1 & R1011/2 PACKAGES AT AIRPORT, DUBAI
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/s LOUIS BERGER SAS COMPANY
MAIN CONTRACTOR M/S HABTOOR LEIGHTON GROUP
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – IN PROGRESS

189 PROJECT NAME UR 881/2A1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROAD AT PHASE 2A1, DUBAI
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/s PARSONS
MAIN CONTRACTOR M/S ACTION
TYPE OF WORKS DRILLING OF BOREHOLES
CONSTRUCTION PERIOD JANUARY 2016 – JANUARY 2016

190 PROJECT NAME PROPOSED FISH FARM – PHASE 2 ON PLOT NO. WWA-206 ATJAFZA, DUBAI
CLIENT M/S PALM MARINA
CONSULTANT M/S YAGHMOUR CONSULTANTS
MAIN CONTRACTOR M/S KHANSAHEB PROPERTY SERVICES DIVISION
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2016 – FEBRURAY 2016

191 PROJECT NAME PROPOSED R978/3A - DEVELOPMENT OF CYCLE & JOGGING TRACK AT VARIOUS LOCATION IN DUBAI
CLIENT M/S ROADS & TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S NATIONAL CONTRACTING & TRANSPORT CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2016 – NOVEMBER 2017
192 PROJECT NAME NAS TRACK & FIELD OUTDOOR VIDEO SCREEN AT DUBAI
CLIENT M/S OFFICE OF HIS HIGHNESS THE CROWN PRINCE OF DUBAI
CONSULTANT M/S GOLDEN SQUARE ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO,
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2016 - FEBRUARY 2016

193 PROJECT NAME MOTION GATE 7: SHORING WORK ON BUILDING 2-404 PROJECT IN DUBAI, U.A.E. AT DUBAI
CLIENT M/S DUBAI PARKS & RESORT
CONSULTANT M/S GENSLER
MAIN CONTRACTOR M/S LAING O'ROURKE MIDDLE EAST (HOLDINGS) LTD
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MARCH 2016 – MARCH 2016

194 PROJECT NAME R902/4B IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD STAGE – 2 PHASE 4B –
EXTENSION OF ACADEMIC CITY ROAD M/S DUBAI PARKS & RESORT
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S CDM SMITH
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2016 – DECEMBER 2016

195 PROJECT NAME PROPOSED CONTRACT - R1005/1 -IMPROVEMENT OF AL AWIR ROAD & INTERNATIONAL CITY
ACCESSES R1005/1
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER
MAIN CONTRACTOR M/S AFCONS CONSTRUCTION MID-EAST LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JULY 2016 – DECEMBER 2017

196 PROJECT NAME PROPOSED R999/2 - DUBAI WATER CANAL INFRASTRUCTUE PACKAGE-2- PEDESTRIAN BRIDGES-1 & 2
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSON INTERNATIONAL LIMITED
MAIN CONTRACTOR M/S WAAGNER BIRO GULF L.L.C
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JUNE 2016 – JULY 2017

197 PROJECT NAME FEWA CONTRACT NO. E19/2012 (1) 33/11 KV SUBSTATION WORK
CLIENT M/S FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
CONSULTANT 'M/S ENERGO PROJEKT ENTEL CO. LTD
MAIN CONTRACTOR M/S NCC- NATIONAL CONTRACTING COMPANY
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DECEMBER 2016

198 PROJECT NAME PROPOSED (1B+G+6+R FLOORS) HOTEL AND SERVICE APARTMENTS
CLIENT M/S DEYAAR DEVELOPMENT PJSC
CONSULTANT 'M/S U + A ARCHITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS GROUND IMPROVEMENT
CONSTRUCTION PERIOD MAY 2016 – SEPTEMBER 2016

199 PROJECT NAME PJ - 10078 - PROPOSED (B + G + 8) BUILDING FOR H.H.S. MOHAMMAD BIN RASHID LIBRARY
CLIENT M/S DUBAI MUNICIPALITY - GENERAL PROJECTS DEPARTMENT
CONSULTANT M/S ARCHITECTURAL CONSULTING GROUP
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016

200 PROJECT NAME (MRHE-02 GOZ) - CONSTRUCTION & MAINTENANCE OF RESIDENTIAL COMPLEX BUILDING
CLIENT M/S GOVERNMENT OF DUBAI
CONSULTANT 'M/S CONIN INCORPORATED CONSULTANTS
MAIN CONTRACTOR M/S SOBHA ENGINEERING & CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUNE 2016 – APRIL 2017

201 PROJECT NAME ALOFT HOTEL NEAR DIERA CITY CENTRE


CLIENT M/S MAJID AL FUTTAIM
CONSULTANT M/S ROBERT BIRD GROUP LTD.
MAIN CONTRACTOR M/S LAING O’ ROURKE
TYPE OF WORKS PILING WORKS / SHORING WORKS / MONITORING OF SHORING WALL
CONSTRUCTION PERIOD JUNE 2016 – MARCH 2017
202 PROJECT NAME R 881/2A1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JUNE 2016 – JUNE 2016

203 PROJECT NAME R 881/2A2 - 1 COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROADS – PHASE 2A2 -
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOVEMBER 2016 – IN PROGRESS

204 PROJECT NAME R 978/4A DEVELOPMENT OF CYCLE AND JOGGING TRACK


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD AUGUST 2016 – SEPTEMBER 2016

205 PROJECT NAME TERHAB HOTEL & HOTEL APARTMENTS (B + G + 4P + 3 FACILITIES FLOOR + 16 FLOORS + 45FLOORS)
CLIENT M/S MANAZIL GLOBAL PROPERT DEVELOPMENT
CONSULTANT M/S B.D. & S MIDDLE EAST ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL NASIRIYA CONTRACTING
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016 – OCTOBER 2017

206 PROJECT NAME HIRE OF PRESSURE GAUGE, HYDRAULIC JACKS & BEAM
CLIENT M/S GEOHARBOUR MIDDLE EAST CONSTRUCTION LLC
CONSULTANT -
MAIN CONTRACTOR -
TYPE OF WORKS HIRE OF PRESSURE GAUGE, HYDRAULIC JACKS & BEAM
CONSTRUCTION PERIOD OCTOBER 2016

207 PROJECT NAME BELGRAVIA - 2 (G+P+4) RESIDENTIAL BUILDING


CLIENT M/S DUBAI PORT AUTHORITY
CONSULTANT 'M/S AL WASL AL JADEED CONSULTANTS
MAIN CONTRACTOR M/S. SOBHA ENGINEERING AND CONTRACTING LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016

208 PROJECT NAME INSPECTION, TESTING & MODIFICATION OF EXISTING SHORING AND ENABLING SYSTEMS
CLIENT M/S EMIRATES CENTRAL COOLING SYSTEM CORPORATION (EMPOWER)
CONSULTANT M/S ARIF & BINTOAK CONS. ARCH. & ENGR.
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS STRENGTHENING OF SHORING WALL USING ANCHORS, EXCAVATION, DEWATERING, PILING & PILE
TESTING
CONSTRUCTION PERIOD SEPTEMBER 2016 – MAY 2017

209 PROJECT NAME PROPOSED EMPOWER HEADQUARTERS


CLIENT 'M/S EMIRATES CENTRAL COOLING SYSTEM CORPORATION (EMPOWER)
CONSULTANT M/S P&T ARCHITECTS AND ENGINEERS LTD
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS STRENGTHENING OF SHORING WALL USING ANCHORS, EXCAVATION, DEWATERING, PILING, PILE
TESTING & CONCRETE COLUMNS
CONSTRUCTION PERIOD NOT STARTED

210 PROJECT NAME BLUEWATER ISLAND DISTRICT COOLING ISLAND PROJECT


CLIENT 'M/S EMIRATES CENTRAL COOLING SYSTEM CORPORATION (EMPOWER)
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S OVERSEAS AST COMPANY LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEBRUARY 2017 – MARCH 2017

211 PROJECT NAME COMMERCIAL AND RESIDENTIAL BUILDING


CLIENT M/S RHINE INVESTMENT LTD
CONSULTANT M/S NATIONAL ENGINEERING BUREAU
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD OCTOBER 2016 – IN PROGRESS

212 PROJECT NAME FOUNTAIN VIEW LINK BRIDGE AT VARIOUS LOCATIONS


CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S DEWAN ARCHITECTS
MAIN CONTRACTOR M/S KABRI INTERNATIONAL CONTRACTING CO. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016 – JANUARY 2017
213 PROJECT NAME FEWA CONTRACT NO. E18/2012 - 33/11 KV SUSTATION WORKS
CLIENT M/S FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
CONSULTANT M/S ENERGOPROJEKT ENTEL CO. LTD.
MAIN CONTRACTOR M/S NATIONAL CONTRACTING COMPANY LTD.
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD SEPTEMBER 2016

214 PROJECT NAME R0500 - (B+G+3) RESIDENTIAL DEVELOPMENT BUILDING


CLIENT M/S WASL LLC
CONSULTANT M/S AL BURJ CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION, LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JANUARY 2017 – MAY 2017

215 PROJECT NAME PROPOSED MIRAGE BLUEWATER ISLAND WIDE INFRASTRUCTURE


CLIENT M/S MERAAS DEVELOPMENT
CONSULTANT M/S WSP & M/S PARSONS BRINCKERHOFF
MAIN CONTRACTOR M/S KIER DUBAI LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD MARCH 2017 – APRIL 2017

216 PROJECT NAME IMPROVEMENT OF AL SHINDAGHA CORRIDOR (SANA JUNCTION)


CLIENT M/S ROADS & TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD FEBRUARY 2017 – JANUARY 2018

217 PROJECT NAME PROPOSED RESIDENTIAL VILLA (B + G + 2F + R)


CLIENT M/S AL REEM REAL ESTATE DEVELOPMENT
CONSULTANT M/S. DYNAMIC ENGG. CONSULTANTS
MAIN CONTRACTOR M/S INTERMASS ENGG. & CONTRACTING CO LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JANUARY 2017 – APRIL 2017

218 PROJECT NAME THE ONE JBR RESIDENTIAL TOWER


CLIENT M/S DUBAI PROPERTIES
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S. NATIONAL PILING
TYPE OF WORKS DRILLING WORKS
CONSTRUCTION PERIOD FEBRUARY 2017

219 PROJECT NAME PROPOSED 3B+G+7+ROOF MEDICAL BUILDINGS


CLIENT M/S EMIRATES HEALTHCARE DEVELOPMENT CORPORATION – DXB
CONSULTANT M/S ADNAN SAFFARINI
MAIN CONTRACTOR GROUND FORCE FOUNDATION LLC
TYPE OF WORKS SHORING & ANCHORING WORKS
CONSTRUCTION PERIOD DECEMBER 2016 – FEBRUARY 2017

220 PROJECT NAME PURPLE DRAGON


CLIENT M/S PURPLE DRAGON ENTERTAINMENT CLUB
CONSULTANT M/S R.QITECTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS APPROVAL ASSISTANCE
CONSTRUCTION PERIOD DECEMBER 2016 – DECEMBER 2016

221 PROJECT NAME PROPOSED SHOPPING MALL BUILDING (2B+G+2)


CLIENT M/S LULU HYPERMARKET LLC
CONSULTANT M/S ADNAN SAFFARINI
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JANUARY 2017 – JANUARY 2018

222 PROJECT NAME DS-198/1 UPGRADING OF SUBSIDIARY SEWAGE PUMPING STATION G1 TO G7


CLIENT M/S DUBAI MUNICIPALITY AT DUBAI
CONSULTANT M/S ITAL CONSULTANT
MAIN CONTRACTOR M/S MABANI DELMA GENERAL CONTRACTING CO. L.L.C.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD DECEMBER 2016 – IN PROGRESS
223 PROJECT NAME PROPOSED G+ 1 + ROOF PARKING BUILDING
CLIENT M/S AL WASL SPORTS CLUB
CONSULTANT M/S AL ASRI ENGINEERING CONSULTANT
MAIN CONTRACTOR M/S INTERMASS ENGINEERING & CONTRACTING
TYPE OF WORKS PILING, SHORING & TESTING OF EXISTING SHORING SYSTEM
CONSTRUCTION PERIOD JANUARY 2017 – OCTOBER 2017

224 PROJECT NAME PROPOSED MULTI-PURPOSE BUILDING (2B + G + 6 TYP + R)


CLIENT MR. NASSER MOHAMMED MOHAMMED LOOTAH
CONSULTANT '+971 ARCHITECTS
MAIN CONTRACTOR M/S BELHASA ENGINEERING & CONTRACTING CO. LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD APRIL 2017 – AUGUST 2017

225 PROJECT NAME PALM DEIRA ACCESS BRIDGE (TEMPORARY ACCESS)


CLIENT M/s ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS OVERSEAS LTD.
MAIN CONTRACTOR M/S BELHASA SIX CONSTRUCT LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEBRUARY 2017 – NOVEMBER 2017

226 PROJECT NAME PROPOSED BOREHOLES DRILLINGS


CLIENT M/s KHALID BALOOCH TRANSPORT
CONSULTANT -
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS DRILLING OF BOREHOLES - 600 mm DIA; 15.0 M Length
CONSTRUCTION PERIOD FEBRUARY 2017 – FEBRUARY 2017

227 PROJECT NAME PROPOSED B + G + 1 STOREY VILLA


CLIENT MR. ZEYAD HASSAN AL MOOSA AND RASHID HASSAN MUSTAFA AL MOOSA
CONSULTANT M/S AGATE ENGINEERING CONSULTANTS
MAIN CONTRACTOR -
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD NOT STARTED

228 PROJECT NAME PROPOSED RESIDENTIAL VILLA (B+G+1)


CLIENT M/S ELLINGTON PROPERTIES DEVELOPMENT LLC
CONSULTANT M/S NAGA ARCHITECTS ENGINEERS DESIGNERS PLANNERS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD MAY 2017 – FEB.2018

229 PROJECT NAME PROPOSED AL SOOR INVESTMENT RESIDENTIAL BUILDING (B+G+10 TYPICAL FLOORS+HC)
CLIENT MR.HAMAD AL OWAIS
CONSULTANT M/S KHATIB & ALAMI CONSULTING ENGINEERS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING & PILING WORKS
CONSTRUCTION PERIOD DECEMBER 2017 – MARCH 2018

230 PROJECT NAME PROPOSED (B + 2P + 12 FLOORS) RESIDENTIAL TWIN TOWERS


CLIENT M/S SOBHA
CONSULTANT M/S DUBAI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JULY 2017 – SEPTEMBER 2017

231 PROJECT NAME PROPOSED RESIDENTIAL BUILDING (B + G + 1 + 4 STOREY)


CLIENT M/S JARVIS INVESTMENT LTD
CONSULTANT M/S LACASA
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD MAY 2017 – JANUARY 2018

232 PROJECT NAME PROPOSED (B + G + 4P + H.C. + 29 T.F.) SHARJAH CITY


CLIENT M/S SHARJAH CITY FOR HUMANITARIAN SERVICES
CONSULTANT M/S KHATIB & ALAMI (CONSOLIDATED ENGG. CO.)
MAIN CONTRACTOR M/S AL HAMAD CONTRACTING CO. LLC.
TYPE OF WORKS SHORING & PILING WORKS
CONSTRUCTION PERIOD JUNE 2017 – IN PROGRESS

233 PROJECT NAME R881/3C2 - COMPREHENSIVE IMPROVEMENT OF THE PARALLEL ROADS - PHASE3C2
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS OVERSEAS LTD.
MAIN CONTRACTOR M/S CHINA STATE CONST.ENGG. CORP.(M.E.) L.L.C
TYPE OF WORKS BRIDGE PILING WORKS
CONSTRUCTION PERIOD JUNE 2017 – IN PROGRESS
234 PROJECT NAME DUBAI MALL BOULEVARD EXPANSION
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S KABRI INTERNATIONAL CO. LLC
TYPE OF WORKS PILING & FABRICATION OF STEEL CAGES
CONSTRUCTION PERIOD MAY 2017 – SEPTEMBER 2017

235 PROJECT NAME ROUTE 2020 METRO RAIL PROJECT


CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S CWJV "ACCIONA-GULERMAK
TYPE OF WORKS SHORING AND PILING WORKS
CONSTRUCTION PERIOD JUNE 2017 – DECEMBER 2017

236 PROJECT NAME RESIDENTIAL BUILDING (G+4P+14F+ROOF)


CLIENT M/S SOBHA WATERFRONT LTD
CONSULTANT M/S FEDERAL ENGINEERING CONSULTANCY
MAIN CONTRACTOR M/S ELLINGTONGROUP
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD DECEMBER 2017 – JANUARY 2018

237 PROJECT NAME RESIDENTIAL BUILDING (G+4P+16F+ROOF)


CLIENT M/S SOBHA WATERFRONT LTD
CONSULTANT M/S FEDERAL ENGINEERING CONSULTANCY
MAIN CONTRACTOR M/S ELLINGTONGROUP
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOVEMBER 2017 – JANUARY 2018

238 PROJECT NAME DUBAI MALL BOULEVARD EXPANSION


CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S WSP
MAIN CONTRACTOR M/S AL SHAFAR GENERAL CONTRACTING
TYPE OF WORKS PILING & SHORING WORKS
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS

239 PROJECT NAME PROPOSED 2B+G+19 FLOORS RESIDENTIAL BUILDING


CLIENT M/S SHARJAH CEMENT AND INDUSTRIAL DEVELOPMENT COMPANY
CONSULTANT M/S DUBAI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD DECEMBER 2017 – IN PROGRESS

240 PROJECT NAME PROPOSED [G+5P+14+HC] FLOORS DELUXE HOTEL APARTMENTS


CLIENT M/S AL BANNAI INVESTMENTS LLC
CONSULTANT M/S ME ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S AL ASHRAM CONTG. LLC
TYPE OF WORKS PILING & SHORING WORKS
CONSTRUCTION PERIOD OCTOBER 2017 – DECEMBER 2017

241 PROJECT NAME BLUE WATER ISLAND MOSQUE PROJECT


CLIENT M/S MERAAS DEVELOPMENT
CONSULTANT M/S BREWER SMITH BREWER GULF / STRUCTURAL CONSULTANT: BG&E
MAIN CONTRACTOR M/S AL SAHEL CONTRACTING COMPANY LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD AUGUST 2017

242 PROJECT NAME P157: FLYDUBAI NEW HEADQUARTERS BUILDING


CLIENT M/S FLYDUBAI
CONSULTANT M/S PMK CONSULT & M/S DEWAN ARCHITECTS +ENGINEERS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD OCTOBER 2017 – JANUARY 2018

243 PROJECT NAME PROPOSED RESIDENTIAL VILLA (B + G + 2F + R)


CLIENT M/S AL REEM REAL ESTATE DEVELOPMENT
CONSULTANT M/S DYNAMIC ENGG. CONSULTANTS
MAIN CONTRACTOR M/S INTERMASS ENGG. & CONTRACTING CO LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD NOT STARTED

244 PROJECT NAME MIRDIFF CINEMA EXPANSION


CLIENT M/S MAJID AL FUTTAIM
CONSULTANT M/S MOTT MacDONALD
MAIN CONTRACTOR M/S AL NABOODAH
TYPE OF WORKS PILING WORKS LOW HEADROOM
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS

245 PROJECT NAME PROPOSED DUBAI CREEK HARBOUR, PHASE-1, ISLAND DISTRICT
CLIENT M/S EMAAR
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S WADE ADAMS CONTRACTING LLC
TYPE OF WORKS BRIDGE PILING WORKS & GANTRY
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS

246 PROJECT NAME PROJECT AT DUBAI, MBR-DUBAI HILLS ESTATE, U.A.E.


CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S W & P DEWATERING & PILING CO. LLC
TYPE OF WORKS BOREHOLES FOR DEWATERING WELLS
CONSTRUCTION PERIOD AUGUST 2017

247 PROJECT NAME ARJAN - CONSTRUCTION OF B+G+10 RESIDENTIAL / COMMERCIAL BUILDING


CLIENT M/S CORPORATE R.E.D & GENERAL TRADING LIMITED
CONSULTANT M/S PNC ARCHITECTS
MAIN CONTRACTOR M/S SOBHA ENGINEERING & CONTRACTING.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD OCTOBER 2017

248 PROJECT NAME R1048/3 IMPROVEMENT OF EXPO 2020 ROADS NETWORK (CONTRACT-3
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S AECOM MIDDLE EAST
MAIN CONTRACTOR M/S AL NABOODAH CONTRACTING Co.LLC
TYPE OF WORKS PILING WORKS BRIDGE
CONSTRUCTION PERIOD NOVEMBER 2017 – IN PROGRESS

249 PROJECT NAME WAFI HOTEL COMPLEX & MALL EXPANSION-PH 08 PROPOSED ACCESS FROM / TO FLY OVER
BRIDGE
CLIENT MR. SHAIKH MANA BIN KHALIFA AND MR. BIN SAEED AL MAKTOUM
CONSULTANT M/S PARSONS
MAIN CONTRACTOR M/S KHANSAHEB CIVIL ENG. LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD FEB. 2018 – IN PROGRESS

250 PROJECT NAME 1403-EPC FOR REFINARY EXPANSION TANKAGE FACILITIES-PIPELINES FOR ENOC
CLIENT M/S ENOC PROCESSING COMPANY LLC
CONSULTANT M/S TEBODIN MIDDLE EAST LTD
MAIN CONTRACTOR M/S OVERSEAS AST COMPANY LLC.
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD JAN. 2018 – MARCH 2018

251 PROJECT NAME DOWNTOWN DUBAI DEVELOPMENT VIDA RESIDENCES – DUBAI OPERA
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD JAN. 2018 – IN PROGRESS

252 PROJECT NAME DOWNTOWN DUBAI DEVELOPMENT PALACE DUBAI OPERA & PALACE RESIDENCES DUBAI OPERA
CLIENT M/S EMAAR PROPERTIES PJSC
CONSULTANT M/S KEO INTERNATIONAL CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOT STARTED

253 PROJECT NAME PROPOSED OFFICE BUILDING (B+G+7) & PROPOSED PARKING BUILDING (B+G+8)
CLIENT M/S DUBAI COURTS & ATTORNEY GENERAL
CONSULTANT M/S ARAB EXPERTS ENGINEERING CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD JAN. 2018 – IN PROGRESS

254 PROJECT NAME PROPOSED (B + G + 1 + GYM + SERVICE BLOCK VILLA


CLIENT MR. YUSUFFALI MUSALIAM VEETTIL ABDUL KADER
CONSULTANT M/S INOVA DESIGN LLC
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD NOT STARTED
255 PROJECT NAME R1029/1 DEVELOPMENT OF LATIFA BIN HAMDAN STREET CONT-1
CLIENT M/S ROAD AND TRANSPORT AUTHORITY
CONSULTANT M/S CDM SMITH INC.
MAIN CONTRACTOR M/S NATIONAL CONTRACTING & TRANSPORT CO. LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD NOT STARTED

256 PROJECT NAME PROPOSED (G + 2P + 12 FLOORS) RESIDENTIAL TWIN TOWERS


CLIENT MR. JOSEPH THOMAS
CONSULTANT M/S DUBAI CONSULTANTS
MAIN CONTRACTOR M/S UNIVERSAL PILING FOUNDATION LLC
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD FEB. 2018 - IN PROGRESS

257 PROJECT NAME PROPOSED HASSYAN CLEAN COAL POWER PLANT - PHASE 1 (4 X 600 MW NET)
CLIENT M/S DUBAI ELECTRICITY & WATER AUTHORITY/ ACWA POWER / HARBIN ELECTRIC CORP M/S
CONSULTANT INOVA M/S ENGINEERING CONSULTANTS GROUP
MAIN CONTRACTOR THE SECOND CONSTRUCTION CO. LTD OF CHINA CONSTRUCTION THIRD ENGING. BUREAU
(DUBAI BRANCH)
TYPE OF WORKS ENABLING WORKS
CONSTRUCTION PERIOD NOT STARTED

258 PROJECT NAME R1005/2 - IMPROVEMENTS OF AL AWIR ROAD & INTERNATIONAL CITY ACCESSES AT AL AWIR &
INTERNATIONAL CITY, DUBAI
CLIENT M/S ROADS AND TRANSPORT AUTHORITY
CONSULTANT M/S LOUIS BERGER SAS COMPANYGROUP
MAIN CONTRACTOR M/S CHINA STATE CONST. ENGG. CORP. (M.E.) LLC
TYPE OF WORKS PILING WORKS
CONSTRUCTION PERIOD NOT STARTED

259 PROJECT NAME PROJECT DS-189 AL KHAWANEEJ SECOND SEWERAGE DRAINAGE SYSTEM
CLIENT M/S DUBAI MUNICIPALITY
CONSULTANT M/S MWH CONSULTANTS
MAIN CONTRACTOR M/S ARABTEC ENGINEERING SERVICES LLC
TYPE OF WORKS SHORING WORKS
CONSTRUCTION PERIOD NOT STARTED