Berita Acara Volume Monthly Nov 2023 - LPPBJ

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

BERITA ACARA PT.

LAHAT PULAU PINANG BARA JAYA


PERHITUNGAN VOLUME Engineering Department
OVERBURDEN DAN BATUBARA Site Lubuk Betung, Merapi Selatan
Mine Engineer - Deni Pradesta
01 s/d 30 Nov 2023 Mine Survey - Wahyu

Dibuat Oleh : Wahyu


Berikut hasil perhitungan Overburden dan Batubara dari Tanggal 01 - 30 Nov 2023

1 Volume Batubara :
Coal Getting On Pit Seam A 2867.178 BCM 3,727.33 MT
Coal Getting On Pit Seam B 1,480.113 BCM 1,924.15 MT
Density Batubara (Bituminus) 1.3
Total Volume Batubara 4,347.29 BCM 5,651.48 MT

2 Volume Overburden :
Total Volume Monthly LPPBJ 01 - 30 Nov 2023 39,203.84 BCM

Volume Material LPPBJ Volume Batubara


= 43551.131 BCM 4,347.29 BCM
-
Volume Material TNB
= 37,135.67 BCM
= 80,686.80 BCM

3 Striping Ratio (SR) :


Volume Material (Overburden) Volume Batubara
= 76,339.51 BCM 5,651.48 MT
:
= SR ACT 13.51
= SR TAR 4.90

4 Total Cut Volume OB LPPBJ (TARGET) 61,846.39 BCM


Total Cut Volume OB LPPBJ (ACTUAL) 39,203.84 BCM
Actual to Target - 22,642.55 BCM
Persentase Tercapai OB LPPBJ 63.39% BCM
Total Cut Volume OB TNB (TARGET) 89,694.20 BCM
Total Cut Volume OB TNB (ACTUAL) = 37,135.67 BCM
Actual to Target - 52,558.53 BCM
Persentase Tercapai OB 41.40% Persen
Total Cut Volume COAL (TARGET) 30,908.11 MT
Total Cut Volume COAL (ACTUAL) 5,651.48 MT
Persentase Tercapai COAL 18.28% Persen

5 Survey VS Truck Count (OB & CG)


Survey OB LPPBJ (01 Nov - 30 Nov 2023) 39,203.84 BCM
Truck Count OB LPPBJ (01 Nov - 30 Nov 2023) 42,722.23 BCM
Selisih 8%
Survey OB TNB (01 Nov - 30 Nov 2023) 37,135.67 BCM
Total Truck Count OB (01 Nov - 30 Nov 2023) 42,077.30 BCM
Selisih 12% Persen
Survey CG 5,651.48 MT
Truck Count CG 6,257.27 MT
Selisih 10% Persen

6 Fuel Consumption
Solar Issued during the month for OB & Coal LPPBJ 47,615 Liter
Fuel Untuk Kegiatan
Fuel Ratio Liter/BCM Penambangan di PIT 2
1.09
Notes : 1. Fuel Ratio < 0.80 (PIT & ROAD HAUL)

2. Pekerjaan TNB dibagian expose a telah ter cut oleh LPPBJ pada tanggal 19/11/2023 shift 2 sehingga
perhitungan OB yang telah dikerjakan di adjust berdasarkan truckcount LPPBJ sehingga didapatkan volume
385.44 bcm

Truck Count Direkap Oleh : Diukur dan Diolah Oleh : Diverifikasi Oleh:
Admin Produksi Surveyor Mine Plan Engineer Dept head Engineering
PT Lahat Pulau Pinang Bara Jaya PT Lahat Pulau Pinang Bara Jaya PT Lahat Pulau Pinang Bara Jaya PT Lahat Pulau Pinang Bara Jaya

Widya Wahyu Deni Pradesta Iwan S Sihombing

Diketahui Oleh:
Kepala Teknik Tambang
PT Lahat Pulau Pinang Bara Jaya

Joni Suherna
PT. LAHAT PULAU PINANG BARA JAYA
LAMPIRAN 1 Engineering Department
HASIL PERHITUNGAN VOLUME BY SURPAC Site Lubuk Betung, Merapi Selatan
01 s/d 30 Nov 2023
Mine Survey - Wahyu

VOLUME BY SURPAC 6.3.2

OVERBURDEN NOVEMBER 2023 PIT 2 SELATAN LPPBJ

DTM CUT AND FILL VOLUME REPORT

VOLUME BY SURPAC 6.3.2

OVERBURDEN EXPOSE A NOVEMBER 2023 PIT 2 SELATAN TNB

DTM CUT AND FILL VOLUME REPORT


PT. LAHAT PULAU PINANG BARA JAYA
LAMPIRAN 2 Engineering Department
HASIL PERHITUNGAN VOLUME BY SURPAC Site Lubuk Betung, Merapi Selatan
01 s/d 30 November 2023
Mine Survey - Wahyu

VOLUME BY SURPAC 6.3.2

COAL GEATING SEAM A NOVEMBER 2023 PIT 2 SELATAN LPPBJ

DTM CUT AND FILL VOLUME REPORT

VOLUME BY SURPAC 6.3.2

COAL GEATING SEAM B1 NOVEMBER 2023 PIT 2 SELATAN LPPBJ

DTM CUT AND FILL VOLUME REPORT


PT. LAHAT PULAU PINANG BARA JAYA
LAMPIRAN 3 Engineering Department
HASIL PERHITUNGAN VOLUME BY SURPAC Site Lubuk Betung, Merapi Selatan
01 s/d 30 November 2023
Mine Survey - Wahyu

VOLUME BY SURPAC 6.3.2

COAL GEATING SEAM B2 NOVEMBER 2023 PIT 2 SELATAN LPPBJ

DTM CUT AND FILL VOLUME REPORT

VOLUME BY SURPAC 6.3.2

OVERBURDEN NOVEMBER 2023 PIT 2 SELATAN TNB

DTM CUT AND FILL VOLUME REPORT


PT. LAHAT PULAU PINANG BARA JAYA
LAMPIRAN 4 Engineering Department
HASIL SURPAC DAN ACTUAL LAPANGAN LPPBJ Site Lubuk Betung, Merapi Selatan
01 s/d 30 November 2023 Mine Survey - Wahyu