Typical Pump Installation Details: Iranian Petroleum Standards
Typical Pump Installation Details: Iranian Petroleum Standards
Typical Pump Installation Details: Iranian Petroleum Standards
INSTALLATION DETAILS
C
IRANIAN PETROLEUM STANDARDS
B NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION
A DATE DRAWING No. SHT REV.
STRAINER
CHECK VALVE
PRESSURE
GAUGE
COCK
FLEXIBLE
CONNECTION
CONCRETE FOUNDATION
NOTES:
C
IRANIAN PETROLEUM STANDARDS
B NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION
A DATE DRAWING No. SHT REV.
BASE-MOUNTED END
REV. DESCRIPTION DATE
SUCTION PUMP IPS-D-AR-019 2
INSTALLATION DETAIL 4
NOTES:
a)FOR INSTALLATION
NIPPLE
NIPPLE 1/4" (DN8) SHUT-OFF COCK.
GAGE TO BE LEFT SHUT-OFF
EXCEPT WHEN ACTUALLY
CHECKING SYSTEM PRESSURES.
GATE VALVE
C
B
PIPE TO SYSTEM SEE
A
PLANS FOR CONTINUATION REV. DESCRIPTION DATE
SIDE ELEVATION SHOP DRAWINGS FOR PUMP. BE RECORDED & FORWARDED FOR RECORD PURPOSES.