Commercial Offer For Hvac System
Commercial Offer For Hvac System
Commercial Offer For Hvac System
19/Q107
Subject: Commercial Offer For Installation of Chilled Water Piping Scope Of Works
.................................................................................................................................................................................................................................
Dear Sir,
We thank you for inviting us to quote for the above subject & are Very pleased to
submit our competitive offer for the Installation of chilled water piping works as detailed
below.
Scope of Work
1. The scope of work consists of the Installation of Chilled water pipes, AHU, FCU,
valve package, Floor Tapping And pressure Test. Scope of works are as per the
details given in the approved Drawings.
NOTES / CONDITIONS:
1. M/s. Gulf Industrial and Marine Service Co. will not hold responsibility for
any delay in completion / commissioning due to obstruction by existing
contractors at project area.
2. Any Civil Constructions/ Modification ( Coring , Chipping ) Pipe shifting Etc, Will
not Belongs to M/s. Gulf Industrial and Marine Service Co. Scope of Works.
3. M/s Gulf Industrial and Marine Service Co . personnel’s to come with their
standard safety equipment’s such as Safety Helmet, Safety Glass, Gloves, Safety
Shoes, Safety Jacket and Normal Coverall to meet PPE Requirements.
5. If gate passes for the workers required, M/s Radiant arrange for the same and
bear the fees, if any.
llkkk
6. Electrical Power Supply (Temporary ) ,Test Water, Scaffolding & Necessary
Facilities at the Site Should be Provided By Mep Contractor M/s Radiant.
7. All The approved materials & consumable items Should be Supplied by MEP
Contractor M/s Radiant according to the requirement .
8. Chilled water Pipe’s chemical cleaning and flushing Will not be Belongs to M/s.
Gulf Industrial and Marine Service Co. Scope of Works
Mobilization: To be discussed.
Terms Of Payment :
For Every Work Progress Ivoices Payment Should be Within 30 Days From the
Submission Of Invoice..
If Works Are Required During off Hours ( outside 8 Hours Working Day ) Particularly
During night Time , We Shall Provide Our Manpower With Requirement Of Main
Contractor .
Validity :
Our Proposed offer is valid for a period of 15 days from the date of offer.
We trust you will find our offer quite competitive and look forward to the pleasure of
receiving your valued order at an early data which will receive our best attenation .
With Regards
For. Gulf Industrial & Marine Services Co.
Mohammed
Procurement Engineer
llkkk
Annexure – 1
SI.
Description Qty Unit Rate
No
Installation of CHW Pipe, including fittings, necessary
A supports and Pressure test.
llkkk
Installation of AHU and FCU unit.
D
FCU -01 1 pic 350.00
1
FCU -02 1 pic 400.00
2
FCU -03 1 pic 750.00
3
FCU -04 1 pic 800.00
4
FCU -05 1 pic 850.00
5
AHU 01 1 pic 1,850.00
6
AHU 02 1 pic 2,000.00
7
With Regards
For. Gulf Industrial & Marine Services Co.
Mohammed
Procurement Engineer
llkkk