Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Class 10-07 Park Document

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Class 10-07

Park Document

What is a Park Document?


Park Documentation is used for Dual Verification.

What is a Dual Verification?


Dual Verifications are being used by the Companies for the End-Users.

The companies are located somewhere like in USA. There is a Manufacturing Unit located in USA. So
operating cost in USA is very high. Now a days all Manufacturing Units are being shifted to Asian
Countries like India, China and so on in order to reduce the Operating Cost.
Parked Document is not a Complete Document and it will not update the Reports.

Dual Verification
(Maker & Checker)

User A: He is going to enter all the details and Park this Invoice.

Once the Document is parked, system is going to generate a Document Number.

This Document Number is going to Sent to User B.

User B: is going to do a cross verified by B about the details entered by User A whether they are all
Correct. If the User B found correct whatever the details entered by User A is correct then the
Invoice is Posted by User B.

The same Document Number is updated after saving the document by the User B.

If any mistake is noted by User B then that either will be sent back to the User A or B itself can rectify
the errors and post the Document.

This is how the errors are rectified.

One Person is going to Park the Document


The other Person is going to Post the document.

We will see how to Park a Document

Go to FB50
FB50 - Enter G/L Account Document

DC on FB50 - Enter G/L Account Document

Enter all the required fields

Click on (Now the User is going to Park this document (instead of Posting))
After parking the Document, screen appears

Document Number 100008 was generated.

In order to post the Document, you need to use the T. Code FV50

FV50 - Post/Delete: Single Screen Transaction

Click on FV50 - Post/Delete: Single Screen Transaction


After clicking on FV50 - Post/Delete: Single Screen Transaction, screen appears

Go to Main Menu  Document  Select a Park Document

Click on Select Park Document

Enter Company Code, Parked Document Number and Fiscal Year


After entering Company Code, Parked Document Number and Fiscal Year, screen appears

Click on

Click on Park Document

Enter Reference Number & Document Header Text

You can observe the Document Number is generated. We assume the User A missed Reference
Number & Document Header Text
After entering Reference Number & Document Header Text, screen appears

Click on (All the details are found to be Correct after entering Reference Number & Docu Number)

Go to Main Menu  Document  Click on Select Park Document

Click on Park Document


After clicking on Park Document, screen appears

Click on

Click on
Park one Document by using FB50

Click on

Deletion a Park Document


(FV50/FBV0)
FBV0 - Post/Delete
DC on FBV0 - Post/Delete

Enter Fiscal Year  2023

Go to Main Mneu  Document  Click on Post/Delete

Click on Post / Delete


After clicking on Post / Delete, screen appears

Go to Main Menu  Document  Click on

Press Enter key Delete Parked Document

Click on
After clicking on , screen appears

The Parked Document was Deleted

What is the difference between Hold Document & Park Document?


Hold Document Park Document
1. Doc NO given Manually Doc No generated Automatically
2. Same User is Posting the Doc Another User is Posting the Doc

Both the Documents are incomplete so not going to hit the GL Accounts until they are posted

After clicking on , screen appears

Click on
Click on
Click on

Click on
Click on
Click on
Click on
Click on
Click on
After clicking on ¸screen appears
After clicking on ¸screen appears
Click on
Click on
Click on
Click on
Click on
Click on
Click on
DC on
Click on
Click on
Click on
Click on

You might also like