Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Cut and Fill

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

E

80
33
48
Notes:

h 1. DO NOT SCALE FROM THIS DRAWING.


22
.2-
s1 -20
h
ree 1.2 18
h
2. All dimensions are in millimetres Unless Noted
dt -
an es h 1.2
ion tre - 18 es
ge
t at
on
an
d
s 1.2
an
dt
re Otherwise (u.n.o.)
Ve ati ree n
ge
t dt tio
Ve an ta
ge
153.63 eta
ti on Ve 3. Drawing is to be read in conjunction with all relevant
g

.48
P/R 1.2h Ve
153.67 architect's drawings. Any inconsistencies should be

149
E
as
s 153.66 .45

40
02 149

1 4 9 . 46
Gr 9

14 9 7
ST 149.4 reported to PRP immediately.

32

.4
.3 6
153

149
le 153.51

48
.38
153.64 153.49 Sty P/R 1.2h 0
Grass track 153.52 .2h 149.5
s 1

153.55
153 153.30 as P/R 21 4. All levels and dimensions are to be checked on site
153.63 .34 Gr 153.24 9.
14

halt
1 153.3 153.26
before any work commences.

ck
3.3 153.18

So 9.20
1 5
9.0

ra
15 153.30

Asp
as
s .64 Grass tra 153.28 P/R 1.2h 14 s GG.40

il t
3 ck 153.27 153.14 as
Gr

14
15 153.05 149.03 Si Gr 14
9

s
152.95

9.6
0

153.41
4

s
E
3. 3 ng 152.74 152.48 9.3

Gra
P/R 1.2h

60
8 0 153.16 P/R 1.2h 152.21 149.18
3.0 15 3.3 pli gs yle
151.24 149.44 gs 14

14
153.25
.29 ng 151.72 149.79 lin 149.15
N Sa 7

33
15 3 15 li lin St 151.46 P/R 1.2h 150.38 150.29 p 9.0
15 1 153.14 153.11 Sap Sa
p 151.80 151.20 150.93 150.63 Sa

48
3.1 ng 151.61 P/R 1.2h 14 11
41m
.35 3.3
1
15 ng as
s pli 152.0
3 tra ck ng 149.18 4h

.56
Grass pli

P/W 1.2h
pli 151.4 9.
E

.54
153 Gr Sa UK

149.09
15 07 Drawing Reference Note:

149 1
7 Sa 14
0.1
ce on 6 Sa 149.22
3.1 ng
0m 19

.5
ST

.42
149
fen etati ng 151.79 05

149
151.59 pli 9.

0
151.82
153.10 Grass tra 152.93 pli
15 1

149
.05 ng g ST
6m Sa

149.2
s
0.3
ck 03 lin
80m
3 W
P/ veg ST Sa 0 152.03
151.4
pli p as 14 10
h
7 151.34 g Gr
15
.33 152.2 Sa
y to 152.94 lin Sa 149.26
e 0 g s p
0 SB
22m 150.42
urv ue . .16 This drawing is based on drawings provided by others:
t s in t d 15
3.2
Sa
plin 152.86 152.77 -0 Sa
0 149.81
149.49
Grass track 9
56m
14
0.7
no 3 0 151.34
ld is po 152.3 152.2
76 m 00m
gs

oad
152.79 150.60 5 lin
u 150.10 TC
-0.8
152.70 150.97 149.3
0.1
151.19
00m
3 4
0.9
Co st th 152.51 ng p
73m
3.1 pli
149.53 9.4 Sa
W ph
a lt 15 pa Grass track
-0.7
152.32
2m Sa Grass track
0.8 m 6
149.79
14
9.2
8 1. Topographical Survey: by Survey Solutions.

h
P/W 1.2h
152.69 9.8
4.097 7
As

1.2
152.52 14
8 3 151.17 150.61 150.11 14

asp x R
150.96
S -0.0
150.44 9

d
3.0 s 3
m
23m
9.2
50.
ng
008

roa
15 3.0
11
pli g

P/R
g lin g 14
15 lin pli
n
Drawing reference No: 33132NGLS-01
26m -1. 12m 0.6
Sa p
84m
h ap Sa

halt
4 7 Sa ng 8
.2- 9.4

40m sse
S sh pli
3. 2
ree
s1 15
3.2
2
-0.8 00m -0.4 21m pli
ng 1.2 Bu Sa
15m 4
14

-1.2

.38
16m
9.3 SV
0.3 2. Site Plan: by HTC Architects. ; Drawing reference No:
t
2.60h
15 s ng
09m
d ing pli Sa

.70
an 3 14

ph,
Cre
3.1 ng pl

149
6 3 Sa s
07m -0.8
pli m ng
ion 3.1 15 2.9 Sa ng
0.9 pling pli
70m
5h

.4 1
00

149
1
3.1 tat 15 15 Sa pli Sa UK UK 3273-P408-C-Proposed Site Plan (with yard parking)
-1.1
SV
-0.1
ge g Sa
15m
15
1.5

h
s
93m

149
n

151.90
86m
Ve as ss pli ing .32 SV

.2-7
Gr Gr
a 9 Sa pl Sa 9
-1.0
2.1
32m
14
84m 0.5 Sa

.66
15
83m 1.1 Rev: C

s1
-0.7

149
-015.25.53
5
15m
2
1.9
78m 1.1 60m

.61
3 9.5

tree
ng 1 ss 15 9.7 14
-1.3
2.9 a 14
pli Gr
02m 0.1 1.8

149
3h
16m
1 15
Sa 3.1 Please ensure that you are working to the latest revisions -

nd
UK

.47
.23
-0.9
4h

7h
m 15
80m 0.8 m 1
963

na
3
UK
489 50.4
15 4

149
.74

r 0.
2
.96 9.4
-0.2
4
-0. m

149.4
1
5.408 m
9.4 any discrepancy should be reported to PRP immediately.

atio
1
1. m 14
113
15 15
128

rrie
.18 3.1
8 as
s 1 14
13m -1. 16m 01.541
3 Gr 2 0

get
m

E
15 15 5 ng 0.7 2. 9.6

Ba
2.7 pli
70

40
15
-0.5
7 14
06m -0.7

Ve
15 Sa m 0.9
1.0 .20 7h

5
ng m

33
9 0
057
li -

3.3
1.2
670
5 ap 2 .9 15 0 1.2
3.2 2.2 51 15
-1.2

48
15
67m -0. 07m
S s
28m
1
1.

15
15 9 15 ree
2.9 dt External Works:
9m -0.9 m 0.7 0.7

.49
15
459 6m an 0

0
.82 9.5

151.98
.28
n

149.5

149
69m
tio
-0.
s
6m 36UmK 5
14
3
3.2 -0 3. 1
3
Gr
as 04 1 h eta

.76
.31
8

4
.20
-1.2
15 15 ST g
0.6
16m 1.9
e

3.3
-8h 2
0 7m 15
V 1. Prior to any works being carried out within or

149
15
1.2 3
-0.8

15
94m 5m 0.9
2
9m
s g

H
ree 3. 2 1 9 lin
3. 2
.14 immediately adjacent to the public highway, a scheme
p
2.9
.50

1.2
6
-1.0
dt 15 Sa
m 0.4
50m
od 86m
15
968
15
an ng -0 15 1 .65

.62

. 75
s

P/ R
09m
on pli
-0. 14mSapling g .6
as 9
56m 1.9 14
i
tat Sa n0
6 Gr for the safe control of traffic and pedestrians is to be

149
0.8 7

149
o ge
-0.6 -056.6

149 74
0.6
61m 1.1
i
36m
4 l 15
33m
Ve 2.8 3 ap 5 15

149 .76
2.3 1.1

.
elw

149
S
-1.2
15 15 agreed with the Highway Authority and implemented
7m 15
0.1 91m 1.7
5 s
57m
as

.44

.67
3.2 . 5h
15 5h 9 15
2 Gr
53m153 -0.8
6
m UK
0.7 0.3
3

ck
40m
.2

149
UK 9.7
z w 297

149 60
tr a
6 14

15
-0.9

.69
4
93m
3.0
-0. 1.3
.5
88m 04m 2. Anyeitu
islitshownonh
tsidrawnigarenidciaviteonyl. It is

.
a o

.63
51

149
3.3
15
l

3.0

Soil
1 5
90m -1.0 1.2 .83
24m 0.4 2.0
6
00m
0
1

149
H ga
3.2 0 0.2

15
15 4

152.50
2 1.0 15
-0.3 the Contractor's responsibility to trace and indicate the
15
-0.7
01 15 m 2.3 .5h
13m 1.0
0
157 53m
7 6 15 s .6
ST 3 2.7 15 n1 1.1 as 49

67
3. 2 Gr 1

n -0.0
io 1
15
-1. 98 m 15 tat
17m
15
1.5 6m 9.5

.
precise location and nature of all services.

149
ge 14

Bu
3
m -0.8 98m
Ve
680 ete BH 0.7 84m 1.1
15
-0. 20m -0.4 1.1
r
3m 13m

86
nc 1
3.
9 4 9.7
2.7 2.1 1 Co 0
3. The Developer/Contractor shall be responsible for
28
-1.2

.
9.7
09m 0.3
14
1.8

149
15 8 15
4m 14

.85
.76
2.3
-0.8 .84 ling
3
4m 15
55m 1.2
89m liaison with the Statutory Undertakers and other cable

149
6

149
.05 15 0 Sap 9.8
5
6h .80 49
.8
45m -0.1 1.3 49
85m 151.2

E
.2-
-1 14m
9 14 1 1

20
s1
-0.9
6
13m service companies for the provision of all required

.85
2.8
6m 0.5 47m
.65
2.0 ree

33
ng .85
.61
15 t

.83
pli 0 9 .78
-0.4

48
15

149
P/W 1.2h
ss nd 14
56m 1m 1.0 8
7 9
59m
Sa na
3.1 2
-0 3 Gr
a 14
services, diversion.

149
1.5

0
2.6

0
7

.57
15 tio
-1.1
3
32m 0.1

151.5
152.0
15 15
95m
1.1
1.6 87m
eta
5
3.2 0.8

149
h .07 7 15 eg

14
-11 15 5.8
31m
1.0 15
47m 0.7 0.2
2 V
2.-70
56m
1.2 15

9.
8 15 2
3.1 0.5

87
-0.8 -0.2 4. Special care is to be taken when excavating in the
s
68m 1.2
15 5
55m
ree

halt
20m
1 15

5
dt 3 1

150.50

.71
ss

.8

.80
1.0 0.3
05m -1.1 30m 0.4 FFL: 151.900
9h an a
Gr
87m 1.9

49

Asp
15 15
vicinity of existing tress, it is not intended that any tree

149
149
UK ion

ss
.00
-0.2

1
-0.7
tat
15

34m 28m 0.8


0
88m

Gr a
ge .94 9.6 8

1
3.
9.8

151.86
1

15
-1.1
Ve 14
-0.0
19
5
31m
15 roots should be severed or damaged and specialist
81m pli
n g
15
0.9
1.4 3m 14
m -0.9 0 0m 0.6 .52
3.1
2

-0. 555 ng
s
13m
2.28
-105.2 +/- 500mm subject to Sa

1.1
17m 1 advice should be sought when major roots present a

150.00
72m
15 2
Sa
pli 2.9
63 m
-1.2
15
25m m 0.3
8
53
.2
779
s
1.4
5 1.2
4
3 0m 1.7 problem.
-0.0 K 9h
1 as
72m -0. 26m earthworks0.8 design.
Gr 15
92m
15 5
2.7
7 9.9 .86
GG 9.80
-0.9 -0.1
14 9
23m
7
15
2m 1.2 14
U
9.9
9m

.99
.92
.66
.60
0 14 14 5. The formation of all surfaces shall be trimmed, rolled

.93
.97
15 4
38m -1.1 m 1.2 3 .8
2 1.1 m

149
3.
504
50

149
15 0 988
15

.76
08 9h 1

149
.96
15 1
-0.2
5
62m -0.
3.1 g
UK
89m 0. 3m and treated with a glyphosphate based weedkiller in
EL

4 n 2
pli

149
3.1 15 .03 0.6

149
-1.1
Sa
.60

152.03
15

15
15 9h
680 m
52
0.0
1
2.9 1
8m .68
371 64m
9.

UK 3.2
9 0 15 6 accordance with the manufacturers instructions prior to
-01.592.9
2.9
94m
0

4 0
gm 0.7 1.0
24m
15
0.6
4

0.
lin9
15 15 7
p7
15 0.9 15
20
N
-0.6 .27 3.1
2
397
m -0S.a2 78m
15
1.2 67m laying the sub-base
-1. 153.02
11 m 0.4 1.8
15 4
24 94m

149 2
19 8h 53 15 2.9

.91
3.

.8
1 15
17m -0.7
UK
44m 0.8
04
.89

149
6
1m 06

0
4 52 1.4
2. 9 0 8 5
.38 9.7
9
ST 6. All in situ concrete shall be Designated Concrete GEN3

30
. -0.0
1 2.4
27m
15 1.3
15
- 1 2.9
7
15 2m 1 2m 14

3
15
.64 .93

48
-1.0
2
75m
15
57m
.95
1

3.1
0 ng
63m 6h produced in accordance with BS 8500-2006.
9
15 pli 1 .0- 14
-0.2 323.m10 -0.4 1.0

.87
51m
s1
98m
Sa

F
ree
-1.215 0.3

149
88m
0
1.6
s t
90m 0.1
as

.12
nd
Gr 9
7. In all instances sulphate resisting cement is to be used.

.03
h
2.6 4h na 15
96m -0.8
12 m 0.7 65m

150
162
15 UK tio

.04
15 UK

150
ta
-0.6 59m
2. ge

.11
-0. 1.2
0
3.0
57m .05
02m

150
97 5h Ve
15 -1 8 0
-1.2 8. HaBflaetredandSpalyedkerbsa fcesha ble125mm

150
2h .93 15
30m 0.5
2.8

151.87
1.2 .13
38m 1.9
9
K1 s 15 1.1 15
1 15
0
0.7
4

-0.6
U e 15
91m 0.9
tre
76m
15
84m
s
2

g
din 2h nd 2.7
6
1.3
0
aboveh techannellveB
.lunlosedkerbsha ble0-6mm
-0.9

H
uil O K1 na
82m 15
0.1 15
01m 1.4 58m

1.2
b tio
RL

U
ick ld -0.9
ta
Br
39m m 0.7 0.9 aboveweanrigcourseo fpredesaritncrossnigand25mm
h
ge
4m
5
-4
36

P/R
16

60
Ve 1.2 1.5 8
Ho -0.1 2h .15
.0
-0.3
3 15
1.

11m
m
2.1
48m
51
61m
es
36

ph
tre 15 1
pli
n g
1 9 .50 o
fvrehciuala
rccess.
-1.3
,a
rn 0.5
84m 0.4 .13

.90
m 1.7
nd 0

.00
1 Sa 15 15
45
15 sp 2 MH 150
UK na 1.3
ha
s -0.7

149
85m
2.
32m 0.8

150
tio
62m
90 lt 15 CL 4
r La eta 3 0.0
-0.5 -0.0
oa
00m 9. The minimum depth of concrete below all kerbs shall be
g 9.9
1.3
15

.99
08m
e
V m
850
d 14
ne
-1.1
9
9m

149
2. 8
8 15
2.7
ng li ng
.49 0.6 ras
s
ng
020
m 1. 150mm. Kerbs shall be laid on a 10-40mm bed of Class

150 5
84m
EL

ap

.14
73m
15 pli pli
1. 53m
5
-0

.2
Sa S G
Sa 0.1
15

150
-0.9
0 15
42m 0.3
4 1.3
1m 1.5 1 cement mortar unless laid with the foundation in one
9

1.5 .84
.0

6
15
-0.9 .80 .73
h 15 0

150.1
74m
4

12
48m
1 15
2.9 UK 0 operation.

.23
2
-0.1
15
07m
1.0
37m 1.2
2
51m
15 7 15

150
2.7
-1.2
h
76m 0.5 1.7
3

E
94m
15 15 2.6 2

80
15 UK 15 0.2
m -0.6
4
0.8
15 10. Adequate bond must be made between foundation and
65m
.8

32
396 41m
2.
8 r 52 5 FH
be 1.2

48
1
-0. 62m 0.1

0
9
-8h
38m 1.4 m

.07
.95
im 15

152.5
984
.2 yt n
haunch if laid in more than one operation. Preferred
-1.1
s1 rve tatio
31m 0.6

149
150
82m 0.
e 2 0
tre su
ly vege 2 6 0.5 0.1
-0.3
1.4 0.6 15
00m ful
1.0 15
20m
d
an to e to 7 15 15
3 8m method of bonding to be by means of steel U-bars
-0.9
ion 2.8
h eta
t a ble g du
Un ildin
15
71m 0.4 820
m 1.6 0.0
5
reinforcement, any other method to be approved by
-0.8

.10
15 g
2.8
3
UK
Ve bu 7m 0. 2m 15
.04 .31

150
15
94m
6
83m m 0.2

151.92
-0 .97 1 73 15 PRP.
-1.2 40m 0.5
6
33m 1.7
15 1.0 0
15 15

.37
-7h
-0.5
2.

.26
30m 76m 0.9 10m

1
83 .3

.27

150.3
s1

150
11. Mortar joints between kerbs not to be provided unless
-0.2
4

150
4
N 3 8h 2.9 2.9
42m
1
0.2 03m 1.5 ree

150
00 2.8 UK 15 15 2.0 dt
-1.2
11 s
68m
15
0.7
15 ras an
19
208.7m8 specified. Gaps between kerbs to be 1 to 2mm.
9 on

P/W 1.2h
1.5 G ti
60m -0.1 68m 1.115 eta
15 9 3
1.2 1.0
16m Ve
g
-0.7
15 15
26m 0.4 52m 1.6
0
2.4 5
12. The sub-grade shall be prepared to falls to ensure that
-0.7
15 0.1
0.7
4 .58
2.7
65m 04m

.05
0 15

.14
15 8h h 15
UK -16
01m
4h
0.0 m 1.3 m construction thickness' remain uniform, Following

150
532 173

150
151.88
.2 UK .41

E
-1.4
s1 7
51m 0. 62m
0.3

80
15 tre
e 15
1
15 0.

33
-0.5 trimming of the sub-grade it shall be protected against
5
48m 0.8
2. 2.9
55m
nd
75
9m

48
na

alt
15
-0.0 .38
7
tio 2.8
17m 0.2 25m
6

Asph
eta 15 4 0.7 1 the ingress of water, failure to do so will seriously
1.2

s
-1.1 152.64
eg 15
6519.3m 0.5 40m

Gras
.16
V 7 4 15
2.9 n g
21m 0.21
15 3 pli
1.0 weaken the sub-grade.

E
64m

150
.5
25m
8

60
52 Sa 0.1
-1.0
1 .33
69m 0.3 3m 1.4

32
.57 1 s 15
6h .07 15 as
.58
2

48
-0.8
K1 15 2
.93 Gr
70m 82m
ss 15
U Gr
a 4h 0 0
0.4
3 13. All soft spots shall be excavated and replaced with

.50
15
39m
UK
0.1

.38
92m 1.1 15

150
-2.1

150
2
m 0.3 .29 compacted sub-base material

.42
82m

.46
2.7
502
4 51 4
15 2.6 1.9
0 1 0.2

150
-0. 0.7

15

150
82m
151.50
15
09m LEGEND:
15 8 15

2.
2.4 2.3
5
76m 0.1

65
15 m .68
1.2
9
319
15 1.2

.18
.12
0
-1.0
15 15
6h
31m 0. 42m

150
150
h
16 K 1
UK
11m 0.0 8m 0.9
U
9 Indicative Site Boundary
16
h -0.7 05m 8 0.1 69m .81 9
-0.9
1.4 .49 0.4
94m 0.4
0
17m
UK 15 15 0 15

.34
.46 15
0
33m s 1.2-11
h
15
2
0.0 28m151.2
6
1.0

150
2.5 Relative level difference between existing
6 6

.49
. .35 m 0.2

.57
15 2.1
1 20m

.52
95

6
0
- tre 2 15 2.0 ±1.500

150.4
e 15

150
2
-0.4
s 6

150
0.7
15 1 as .1
m 0.3
63m

150
1.7 and proposed levels

15
51
075
nd 15 Gr 1 15

2.
na
74m 0. 58m 0.9

55
0
tio 2.0
ta .33
-1.6 1m 0.2
15
ge m 0
MH 150
.53 0.3
59
Ve 2
3
1.8 6 6

.15

E
2 2.4 1.4
-0.1
15
m CL

1
15 15
13m 0.8

60
233
15 15

150.2
h

150
11

33
UK
-0. 61m 0.1 21m

48
50

-0.9
4 0
0.4
1.
7m
3
63m
2.2 2.1 15 0.9 Earthworks Assessment Notes:
.01
15 15 0
1.2 15
32m
6
T1
0
15
2.0
-0 62m 15
0.8
-0.8 m 0.1
0E

40m
S

15 52.4
-4h 40 1. All earthworks volumes presented on this drawing are based on
24

2.
8
-0.7

.46
1.2 m 0.6 0.5

59
1
06
3

5
0
es 3 15

4
5
3
48

2.0

150.6
150

150.6
2.3
50m 0.0

150.5
re

150.5
0N 15 st dt 15
07m a level for level comparison between proposed formation ground

15 2.4
pa n

9
08 n 7
-1.8
na 1.3
23m 0.3
4

2. 6
erb atio 7

15
15m
1 0.7
19 1 1.5 15

56
y k get tio .0
eta 15 15 level and a reduced existing ground level to accommodate a site
-0.2
52
0.7
e
75m
rv ve eg 1
su to

0
V 5
.09 GG 0.23
to ue
8m 0.0

1.0
1.7
54m wide top soil removal of 350mm.

.50
8 le d 2 15
2.3 ab oint
.1122 15 2 15

15
7
40m 0.4 0.5
2.3 n 3

150
15
5m
.9 6
15 2.2
6 U is p
-115 2. 2 50 15 0.3
15 15
th
71m -0.1pling 15
1.2
93 m 1
0 .64 15
2. No bulking or compaction factors have been included in the
-0.4
2.
24
580
m 0.1 77m 6 7h

1
4h Sa

3
0.4 .2-

150.2
.2-
-0. m 0.5

150.3
15 s1 calculations.
044
152.42
1 3
152.30
es 2.1 ree

H
41amnd t -0. 54m
re t 6
15

1.2
d 0.6
an
-g1et.a2tion m 0.3
15
08m
ion
355

P/R
15
tat 3. Earthworks cut/fill specification by others.

2
8
2.

150.6
-0. 6m .70
0.6 ge
3

150.6
20 2.2

Ro
0 Ve
Ve 15 7 15
m 0.0

ad
672 62m

0
7 1
1.5

3
4
m

150.5
1.1

150.6
150.7
-1. 15
07m 0.4

ar
1 15

kin
2.2
6m -0.2
4
88m
15

gs
2.1
.28

0E
15
O 78m 0.1
-0 23m

4
ld

33
-0.6 m 0.5
3
64 0.4
60

48
H .11 7 15
-0.0
m 2 m .5
58m
1
796
ph
as or Proposed Finished Ground Levels (FGL) are based on shown
15 1.9 1 1 50
, 0 15 0.9
ph ns -0. 15
2.2
PO 8 4m 15
0.3 79m
-0.4 0.1 on drawing no. 63996-110. This earthworks assessment is
E

al
55m

9
La
20

tr 8

8
150.2
oa 2 ng 0.7
9m 0.0

150.3
pli 7
32

58m
d 2.2 1.4 15
ne 15 g3s
Sa 9 for information only and not to be used for construction.
48

15 15
-1.6
1.5
62m 0.4
2. 0 n
07 2.2 pli 15
-0.2
15 Sa 3

4
07 m 0.7

150.7
152.20

9
6 h

1
0
2.1 12 1.6
6 9 15

150.7
0.4

150.7
0.2

150.8
.2-
22m m
15 15 s
as 15
457
152.31 s1 5
1.7 Gr
-0.9
15
61m
ree
2.2
3 15 dt 15
1.7
1
0.
7m -0.0
an ng
152
.35
2.
01 ion 1 Sa
pli 1.8
5 15
62 m Earthworks Arisings Summary
-02.6
tat 15
63m 0.3

150.56
ge 15
Ve
-0.5
8 0
1.7
36m
.2
2 15 5 7 0.5
1.6 15
P/
W
691m.86
15 15
1.4
6 0.0 11m Construction Type Arisings (m3)
-0.9 15
1. 1.2
m 0.4
15
271
2h 7 15
1.
95 h 1.9 2
15
12 1.5
-0. 58m
0
3500m3

5
Topsoil

150.44
UK 15 15 0.8

150.3
m 0.2
15
65m
15
478
3 1. 4
2.
2.1
81 1.8

150.77
-1. m 0.0
17 15 h 15 9h
15
73
15

150.83
12

150.74
5
.2-
2. 1. 7
Attenuation Tanks 480m3

150.8
-0.0
9
5.2 UK m 0.5 1
54m
3 92
60
N 15 0
86 15 tre
es

-0.2
10 8
01m 0.3
EL 1.0 d
19 15 an

E
-0.5
n
91m

20
ta tio

3
ge
21m 0.0

83
10m
5 Ve
8 1.2

4
-0.5
1.4
0m 0.3
15 15
1.8 15
0 Earthworks Arisings Notes:

P/R 1.2H
-0.3
7
66m
2 3
8.7
9 15
9h 0.5 0.6
2. 15 15
.2- m 0.2
5 09
277
1 15
EL s1 0.8
1
2. e 1. An average of 350mm depth of topsoil has been assumed
2 3
1.9
5
1.8
6
nd
tre
-1. 18m 1.1
4 15

80m10h -0.1
15 na

150.77
m

150.88
150.80
15 15
9
across the existing site.

150.85
249

150.50
.7 tio 9
54 1.3 .83
1.8 0.0 UK
2
74m
eta
0.
1 0
EL 15
g 15 15
Ve

150.53
-0.7

150.44
6
82m 0.7
15 h
15 0 15 s 2. An average construction depth of 450mm has been
83m 0.1
2. K1 ing
1m
15 05 1. l
80 U ap
6S
-0.2
2.
20
.32
2m 0.0 0 .94 assumed to be non-frost susceptible construction,
34m
15
-0
din
g MH 152
.32
.68
9m
m 0.2 0.6
5 3. Approximately 480m3 of excavation required for the

150.92
150.86
-0 11

150.81
9 15
8.7

150.92
uil CL 9h
-0.0
b 5
77m attenuation tanks has been accounted in the net result
ick E L1 15U
K
Br 9
1.8
4 15 1.8
7 8m 0.1 15
0.5
0.6
7

-1.3
15 1. 3 15
49m
15 72 9h
1.
96 UK 4. Arisings from drainage runs and foundation works not
96m 0.1
15

150.58
150.49
2. 4
0.8
-0.1
09
88m accounted for.

Asphalt
.74 9h 15
61 UK 3
-0.1
9h 0.9
83m
1 1

Grass
1.0

150.58
RL .2- 15

E
s1 15
m 0.2
h

00
-10
344
9h e
tre

33
UK 1.2
-0. 44m
nd

48
h s
10 ree na
0.0
dt tio

150.97
150.90
UK

150.85
150.94
n s ta
15 na as ge
36m
h io Gr Ve
1.
80 10 tat
-1.0
ge
99m
15 UK Ve 6
0.8
.74
95m 0.1
1. 3 5
15 85 51 15 0.9 15 0.9
15
1.
99
1 1.
66 -0.0 10
h
34m
15
1.0
2
0.7
2 Earthworks Volume Summary
-0.0
15 15
1 UK 1 .04 .54 5h
8.8 7. 2
76m
15 0
15 15 .2- 0.9
s1 15 2D Plan

150.64
150.55
EL
8 -0.2 07m151.00 1 dt
ree
Cut Net
2.8
-0.0 0.9 an
Fill (m3)

150.64
40
N 16 15 n Surface Model Area
10 RL
59m eta
tio
(m3) (m3)

150.95
19 9 g
(m2)
-0.1
0.8 Ve 0

150.99
h 5
15 10 15 0.6 1.0

151.01
15 15

se
15 1.76 UK

150.90
1. h ce tion
10
84m
88 n 0
fe ta 1.0 Attenuation Tanks 464.5 480
u 1.6
8 UK
-0.1 -11h
/R ege
yP ov
15

Ho
15 8
h 0.9 rve ue t
08m
15 10 15 u
ts td 5 as
s
1. UK .2 7 7 .70 no oin 0.9 Gr
-0.1
g 0.8 15
din s1 0.7 50 uld is p

ns
uil 15 69 ree
9 15 15 1
O 0.9 Co st th 6
Br
ic kb W .69
1
1.
59 n dt 15 0 pa 3 15
0.7 Existing ground 10,000 3,735 3640
na
e 15 0.7 0.9

150.69
150.62
m
e)
0 io 15
216
1.1 tat 15 level vs Formation
u

0E
16 15 h
10 ge
-0.
1 Ve
o RL 0

8
15 .68 UK 0.9

32
Y t 1. 15 0.9
3

48
n
80
h 15
GG 0.63 Totals 4,215 3,640 575 Cut
26m
10

Ce
15 UK 15
-0.1
0
1. 0.9

150.93
151.06
51 15

151.02

151.04
69mh
.63
MH 151
R MH 0
15 CL 1.5
3
-0.U1K 10
(A 15 1. 15
2.0 1.
60
15
89m
74 15
CL

Cressex Road
15 1.5
-0.1 Height Bands
15
1. 6
44
1.
64 0.8
5 Cut Volume Fill Volume
-3h 15

40mph, asphalt road


h .2 7
10 s1 1.0
MH 151
.47 UK ree 8 15 Fill 2.7m - 3m -- --
11
h dt 0.9
CL an 15 Fill 2.4m - 2.7m -- --

150.78
UK

151.13
ion

151.02

150.68
53m
t
eta
15 g Fill 2.1m - 2.4m -- --
0.0 Ve

151.08
15 1.4 11
h

151.16 151.12
1. 9 .2-
15
1.5
5 36
10
h s1 Fill 1.8m - 2.1m -- 20.83m³
ree

Grass
15
1.
51 15 UK P/
W 82 m an
d t
Fill 1.5m - 1.8m -- 128.11m³
-0.1
1.
65 1. t ion
2h
Ve
g eta Fill 1.2m - 1.5m -- 266.21m³

151.08
09 h

151.06
11 Fill 0.9m - 1.2m 433.17m³
ST
UK 1.0
1 --
15
0h Fill 0.6m - 0.9m -- 640.08m³
0E

15
K1 0.9
0
P01 15/03/2024 Issued for information NH / MAS
26

U 1.
46 15 Fill 0.3m - 0.6m -- 908.90m³

150.83
15
3

150.76
48

1.

Asphalt
15 27
10
20
N 1.
42
Fill 0m - 0.3m -- 1241.81m³ Rev Date Description By / Chk
19 15 10
h
91 m Cut 0m - 0.3m 1377.18m³ --
-0.0
1. UK
55
h 2
10 1.1 Cut 0.3m - 0.6m 999.82m³ --

151.09
UK

151.11
15

151.21
Cut 0.6m - 0.9m 725.14m³ --

15
6h 1
15 1.1

1.
UK

26
1. 15
15
1.
40
6h .2 -3h Cut 0.9m - 1.2m 427.98m³ --
54
UK s1
15 0h dt
ree Cut 1.2m - 1.5m 145.67m³ --
an

PRP:
1. 1
32 UK ati
on Cut 1.5m - 1.8m 39.17m³ --

150.90
7
63m

150.80
ge
t 1.1 5
Ve 15 0.9 Cut 1.8m - 2.1m 16.10m³ --
-0.0
s 15
as
15 O Gr
Cut 2.1m - 2.4m 3.65m³ --
60 ld
1.
29 3
15 m H 1.1
1. ph
,a o
15 0 Cut 2.4m - 2.7m 0.47m³ --

3
47 1.2 consulting engineers & surveyors

1.1
5
sp rn
6 15
1.1 1.1
15 Cut 2.7m - 3m -- --

15
15 .17
lt s
ha GG5

9
1 .21

1.2
ro La 1 .0 15 15 1
ad 15 1.0 15

15
ne 9
0 Total Cut: 3735.17m³ Catherine House Telephone: 01604 889 870 Leicester
1.2
15 C
MH 15 6 .2 1 Total Fill: 3639.11m³ Harborough Road northampton@prp.uk.com Northampton
E

15 1.0 L 15 1.2 51
40

1. 1.1 15 1
8 Brixworth NN6 9BX www.prp.uk.com London
32

28 6 9
15 1.1 32
48

1. 15 1.

150.82
150.94
40 151
.22 15

18
15 .18 2
1.0
1.0 51 engineering excellence | creating advantage

1.
7 151.1 1 15

15
151 8
.07 151.15 RS .28
15 151
1. 6 151.0 151.16 .15
23 1.0 3 151.22 5 1
15
1.
15
3
151.03 1 Client:
38 GG 1.0 151.09

Road markings
15
15
1.2
3 4
Tungsten Properties
15 1.1
15 4
1.3
3 7 1.1
6
1.1 1.1 15

150.98
150.87
151 15 15 RS
.20
15
1.3
2 2
1.0 Architect:
00
N 151.2 15
10 0
19 151
.32
151.20 HTC Architects
151.3 151.22
4 151.21
151.36
151.34 151 Project:
E

.35 .2
20

1 0
15 15
32

RS 1.3
5 15
48

8
T0
Old Horns Lane,

150.89
151.03
S 1.2
1 .29 2 FH

15
15 4
1.2 0 SV

1.
15 .3 Si
.28

15
51
High Wycombe

6
1 1 RS

1
15

.2
6

6
1.3
5 1.0
15

151.29
15

15
7

1.
1.3

151.04
150.93
29
15
EP

151.39

.28
7

Grass
1.4

151
KO Title:
15

3
1.4

151.05
4
1.4

150.94
Preliminary Cut and Fill

15
h 15
-3

151.25
1.2

0
ay

151.3
ti on 8 St

6
eta 1.3

151.2
eg 15

3
151.4
V

Asphalt

151.21
151.46
151.29
4
151.3

151.07
Status:

150.96
2
1.2
15

INFORMATION

E
20
33
48
N Engineer: NH Date: MAR 2024
80
09
19
Drawn: NH Scales @ A 0: 1
2
4
3

Checked: MAS 1:200


Project No: 63996 Drg No: 115 Rev: P01
© copyright all rights reserved PRP.UK Ltd

You might also like