TAIFA FIRE STATION & PUMP SHEDS Rev 01

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL NOTES

GENERAL
FIRE FIGHTING STATION
A B C D E A B C D E 1 This drawing is protected under the copyright act
and cannot be used or reproduced in part or in
24,200 whole without the authors consent
24,200
6,000 6,000 6,000 6,000 2 Read only figured dimensions.
6,000 6,000 6,000 6,000
200 11,800 200 11,800 200 3 All construcon work is to comply with the latest
200 11,800 200 11,800 200
K.B.S. standard code of prac ce, local authority
1 1 By- Laws, and fire regulaons.
200

200

200

200
4 P.v. denotespermanent venl laon and must be
FOAM GENERATOR ROOM provided above all openings where indicated or
6,000

6,000
shown

6,000
5,800

6,000
(epoxy power-floated f.f)
5 All walls to be reinforced with hoop iron alterna ng
courses
11,800

11,800
2 2 6 Water meters to be 300mm above ground level.

200
F

7 D.p.c. denotes damp proof course and to be of


bituminous felt placed under every wall and must be
atleast 150mm above ground level
6,000

6,000

6,000

6,000
MARSHALL OFFICE
19,200

19,200
LADIES WC GENTS WC

19,200

18,800

19,200
(Ceramic les ff) (Ceramic les (Ceramic les 8 All r.c. works to structural engineers details
ff) ff) ROOF TERRACE
9 Provide atleast one row of precast concrete
600x600x50mm paving slabs around the building
3 3

12,800
unless otherwise shown.
200

200
10 Contractors must verify all figured dimensions and
level on site before commencement of works and
any descripancy must be reported to the architect
PUMP ROOM
7,000
6,800

6,800
7,000

7,000

7,000
for clarificaon.
(epoxy power-floated f.f)
11 All levels shown are finished levels unless otherwise
stated
200

200
4 4 12 All surface beds to be cast on well compacted and
well consolidated filling

200

200
200 23,800 200
200 23,800 200
6,000 6,000 6,000 6,000
13 Depth of foundaon to be decided on site and
24,200 6,000 6,000 6,000 6,000
trenches to be minimum 600mm below reduced
GROUND FLOOR PLAN 24,200
ground level.
ROOF TERRACE PLAN
14 All pipes and services passing under road works to
be encased in 150mm thick concrete surround and
atleast 450mm below reduced ground level.

PUMP SHEDS

Rev. No. Date Revision

A B C D E F G H I J K L M N O P Q R S
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300 4,700 300
1
300

Project;

PROPOSED 45,000 METRIC TONS LPG


STORAGE TERMINAL FOR TAIFA GAS SEZ
INVESTMENTS
8,300
8,000
7,700

6,000

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000 2,000 3,000

Client:
TAIFA GAS INVESTMENT
2
SEZ LIMITED.
300

5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
90,300 P.O. BOX 40462 - 00232,
NAIROBI, KENYA.

Consultant:

Title:

FIRE-FIGHTING STATION & PUMP SHEDS

Scale: Drawn: Project. No.:


1:100 O.W.N

Date: Approved: Drg. No.


24/01/2024 A.M.N SC-01