A terminal board is fitted in the lower part of the operator for the connection of the motor, of any
limit switch
REF 1 REF 2
REF2 is Over current adjustment for the SLOW speed.
The Potentiometers REF1 & REF2 are factory base
set and should NOT be adjusted by the installer until
the installation dimensions are re checked and setup
cycle is completed.
Control Board Adjustments and Indicators Explained
.
L6 L7 L8 L9
L6
L6
L7
L8
L9
.
Beam Loop P.B 1 P.B 2 Light
Beam The GREEN LED is OFF in standby while gates are closed. It will be
ON during the closing cycle to indicate that the safety beam circuit is operatio
-nal. The factory link connecting BEAM and GND must be retained if a safety
beam is not used.
LOOP The GREEN LED will pulse on once when receiving contact indicating
that the signal was received.
P.B 1 The GREEN LED will pulse on once when receiving contact indicating
that the signal was received.
P.B 2 The GREEN LED will pulse on once when receiving contact indicating
that the double was received.
Light This GREEN LED will be ON during the opening operation of the gate(s).It will
stay ON while the gate(s) are open, and it will switch OFF within 10 seconds after the
gate(s) are closed.
ENGLISH
ON DIP
S9
12 3 45
S9
Automatic door closing selection
Auto Close select:
ON
OFF
1 1
Auto Close Time select:
5 Sec 30 Sec 90 Sec 180 Sec
ON
2 3 2 3 2 3 2 3
Second Motor Delay
Second Motor Delay (for double gates only)
DELAY ON DELAY OFF
ENGLISH
4 4
2 Sec 5 Sec
ON
5 5
Connecting The Gate Motor(s)
Connect the gate motor(s) to the motor output connector(s) located in the bottom left corner
of the control board as illustrated below.
M1 M2
RED RED
BLACK BLACK
Motor output for the Master (Leading) gate in a Double gate installation.
AT-
DC 1 DC 2 SOLAR+ -
BAT- BAT+
BLACK RED
ENGLISH
-
+ Connecting the polarity incorrectly
! will damage the control board and
VOID your warranty.
BATTE
RY 1
-
+
BATTE
RY 2
Connecting The Power Input
Please follow the instructions below carefully as this will be the Primary source of power
for the Control Board. Ensure that there are no loose strands before inserting the wire into the
connector to avoid shorting the Primary power source.
DO NOT Connect more than one
Solar Panel
+ -
DC 1 DC 2 SOLAR+ -
BAT- BAT+ BAT- BAT+
Internal AC Transformer
wered the
inate.
DC 1 DC 2 SOLAR+ -
BAT- BAT+
ENGLISH
Auto setup (Programming)
Before beginning this step you must first ensure that all your motor wiring connections are
connected correctly, there are no loose wire strands and all connection points are joined and
insulated correctly.
If you are using a limit switched motor ensure that the limit switches have been set correctly.
If this control panel was purchased in kit form you should not need to adjust the Force dials
as this would have been factory preset according to your motor type.
The purpose of the programming cycle is so that the gate control panel can learn its opening
and closing limits and learn its slowdown. If the control panel is not programmed it may run
inconsistently and may not reach its stopping points and/or slow down incorrectly.
1. Your gates should be in the closed position before beginning the programming cycle.
If they are not use the manual override to bring them to the closed position then release
the override.
2. Press and HOLD the f the FORCE dials on the top of the control panel.
3.When you hear the buzzer sound release the PROG Button.
4. Now press the button on your remote which activates your gates.
5. The control panel will now OPEN the Master/Leading gate (M1).
6. The control panel will now OPEN the Slave/Trailing gate (M2).
7. The control panel will now CLOSE the Slave/Trailing gate (M2).
8. The control panel will now CLOSE the Master/Leading gate (M1).
9. The buzzer will now sound indicating a successful programming.
P.B.1
P.B.2
GND
GND
M1 M2
GND
GND
PB2
PB1
Both gates
Single Push Button
Dual Push
with Isolation
Key Switch
Button Switch
Master gate
only
The PE sensors are a safety device used to prevent the gates closing on an object or obstacle that
breaks the beam between the transmitter and the receiver.
P.B.1
LOOP
P.B.2
GND
GND
GND
GND
12V GND
PE Beam
GND
+12V
GND
Receiver
Transmitter
_
- + +
NO
GND
NC
Connecting a Courtesy Lamp
Light
LAMP
BEAM
P.B.1
LOOP
P.B.2
GND
GND
GND
GND
- +
ANT GND
If this control panel was purchased in a kit the Remotes have already been programed for there primary
purpose only (gate opening).
1. Press the LEARN CH button for the channel group you wish to
program.
2. Cycle to the desired channel by pressing the LEARN CH button.
(The control panel indicates which channel you are on flashing the
channel
3. Press the desired button on the remote you wish to use for the
channel. Repeat the above process for any additional remote
Deleting
Troubleshooting
Problems Solution
* The control panel is NOT * Try reprogramming the
responding to a remote control remote to the control panel.
* The gate(s) are open but will * Check the LED on the remote control
not close * Check the Power input from the batteries
* Check that the PE Sensor is aligned if in use
* The output voltage for * Check the accessories fuse
the accessories is not working and replace if necessary
* The gate(s) not reaching the end * Turn the FORCE 1 trimmer
of opening/closing distance fractionally clockwise
* The gate(s) are opening instead * Check the polarity of motor (s) wires.
of closing and closing instead of opening
* Check your remote
* The gates do not respond at all
* Reprogram the remote