E House Refernces
E House Refernces
E House Refernces
1) 33KV/11KV EHOUSE
CLIENT & LOCATION BSES YAMUNA POWER Ltd, New Delhi
OUTER DIMENSIONS 14.4m x 6.2m = 89.28 sq.m
YEAR 2016-17
2) 33KV/11KV EHOUSE
CLIENT & LOCATION KSEB Ltd – Bhalangad, Kerala
OUTER DIMENSIONS 8m x 4.8m = 38.4 sq.m
YEAR 2018-19
3) 33KV/11KV EHOUSE
CLIENT & LOCATION KSEB Ltd – Palakkad, Kerala
OUTER DIMENSIONS 8m x 4.8m = 38.4 sq.m
YEAR 2018-19
4) 33KV/415V EHOUSE
CLIENT & LOCATION Vedanta – Cairn Energy, Barmer, Rajasthan
OUTER DIMENSIONS 14m x 5m = 70 sq.m
YEAR 2019-20
5) 6.6KV/415V EHOUSE
CLIENT & LOCATION Hindustan Zinc Ltd, Agucha, Rajasthan
OUTER DIMENSIONS 16.5m x 4.3m = 70.95 sq.m
YEAR 2019-20
SCOPE :
SURVEY, DESIGN, ENGINEERING, SUPPLY, CIVIL WORKS, ERECTION, TESTING, &
COMMISSIONING OF 33/11KV GIS GRID SUB STATION ON TURNKEY BASIS AT C BLOCK
KRISHNA NAGAR, DELHI (INDIA)
Main content
1) 33KV GIS – 2xIncomers from Grid, 2x25MVA Trafo Feeders, Buscoupler+riser
2) 11kV AIS -2xI/C, Buscopler+Riser etc, 12xOG feeder, 2xCapacitor feeders
3) Fixed value 11kV Capacitor banks with air core reactors and outdoor housing
4) Transformer Monitoring units (Eberle Regda)
5) 415V ACDB with clients external supply as source,
6) 220V DC Battery and Charger
7) Scada Panel with UPS supply
8) Fire alarm & Detection and Suppression systems, CCTV & Access control
9) Redundant HVAC system
10) BOP including 33&11kV Cable Laying, terminations and testing, Client supply Transformer Installation
and testing , Earthing Grid, Lightning protection, Complete outdoor Area Lighting, all Civil activities
and also the new Gates, etc.
SCOPE :
SURVEY, DESIGN, ENGINEERING, SUPPLY, ERECTION, TESTING, & COMMISSIONING OF 33/11KV
GIS SUB STATION FOR KSEB AT BHALANGAD, THRISSUR, KERALA.
Main content
1) 33KV RMU – 2xIncomers from Grid, 2x10MVA Trafo Feeders, Buscoupler
2) 11kV GIS -2xI/C, Buscopler+Riser etc, 4OG feeder, 2xPT
3) 415V ACDB with clients external supply as source,
4) 110V DC Battery and Charger
5) Fire alarm & Detection systems & CCTV.
6) Redundant AC system (n+1 concept)
Highlights
1) Manufactured in two parts and coupled at site
2) Full GI material for walls and roof with special painting to suit GI Surface
SCOPE :
SURVEY, DESIGN, ENGINEERING, SUPPLY, ERECTION, TESTING, & COMMISSIONING OF 33/11KV
GIS SUB STATION FOR KSEB AT OLAVAKKODE , PALAKKAD, KERALA.
(Content is identical to the previous one)
Main content
1) 33KV RMU – 2xIncomers from Grid, 2x10MVA Trafo Feeders, Buscoupler
2) 11kV GIS -2xI/C, Buscopler+Riser etc, 4OG feeder, 2xPT
3) 415V ACDB with clients external supply as source,
4) 110V DC Battery and Charger
5) Fire alarm & Detection systems & CCTV.
6) Redundant AC system (n+1 concept)
Highlights
1) Manufactured in two parts and coupled at site
2) Full GI material for walls and roof with special painting to suit GI Surface
SCOPE :
DESIGN, ENGINEERING, SUPPLY, Supervision of Erection, Supervision of Commissioning
33KV/415V Ehouse at Barmer Oilfield, Rajasthan
Main content
1) 33KV GIS (Nxplus-C)
2) 415V Intelligent PMCC, connected via Busduct to Client Transformer
3) Lighting system Transformer and panel
4) Redundant Ducted HVAC System,
5) Fire Alarm System
6) Access control System
7) Also present are ABB Drive panels - Supplied ,Installed and Commissioned by Baker Hughes
Highlights
1) Manufactured in two parts and coupled at site
2) Full GI material for walls and roof with special painting to suit GI Surface
3) 2hour Fire rated Construction
Main content
1) 6.6KV AIS (NxAIR)
2) 415V ACDB
3) 415V ACDB with clients external supply as source,
4) Lighting & Aux power system Transformer for above panel
5) 24V DC Battery and Charger
6) Fire alarm & Detection systems
7) Redundant AC system (n+1 concept)
Highlights
1) Manufactured in three parts and coupled at site
2) Full GI material for walls and roof with special painting to suit GI Surface
3) Very difficult location for Transportation - Hence all equipment wer e installed at site
Challenges
• Difficult area due to open mining construction having depth of >250m in remotely located site.
• Large underground mining area requiring fresh air ventilation via multiple fans (10 nos of 200kW)
• The challenge was to arrange reliable power supply setup to feed these fans as there is no possibility of opting for
regular civil based substation construction at such site
• Installation of E-house midway at around 140m depth at stepped terrace with difficult approach roads
Solution Benefits
• Complete containerized E-house solution with 15 nos. • Highly reliable solution with one time cost and portability.
6.6kV NXAIR panels Battery/Charger, PLC panel
(client) , 415/230V dry type aux trafo , Air con. Etc • E-house reduces construction work in a harsh environment.
• 6.6kV Motor feeder panels within E-house feed 200kW • Housing and technology optimized for onsite conditions
fans which are pumping fresh air into U/g mining area
Site Pic
Site Pic