PT Trakindo Utama COMPONENT CONDITION REPORT

Reported By : Sidik N Reported Date : 25 June 2024


Equipment No : Engine 3 Cust WO No :

SIMS Information
DEALER STORENO EQUIPMENT CUSTOMER
CODE J211 31 NUMBER ENGINE 3 NAME PT APEXINDO
TECHNICIAN EQUIPMENT
DATE 25 June IDENTIFICATION 22536 LOCATION Maera
CATERPILLAR CATERPILLAR INSTRUCTION
MODEL 3516 SERIAL No 73Z00535
ALIGNMENT GENERATOR
HOURS 42461 KILOMETERS ENGINE #3
PART  IF PART NAME QTY DESC,* GROUPNO  IF GROUP NAME IF MADE  IF DESCRIPTIVE COMMENTS
NUMBER NON CODE CONTAINING NON PRODUCT DURABILITY
RESPONSIBLE CAT PART CAT INOPERABLE ISSUE
 49 4450  EPG  GENERATOR
DESCRIPTION CODES * A – Structural C – Leaks E – System Malfunction G – General Repair K - Serviceability X – Operator
(Refer SIMS Guidelines : B – Surface D – Factory Assembly F – Factory Shipping H – Adjustment N - Abuse Complaint
SEBD0850)

Component Information
Component Description : PCR Schedule Hrs : CompTargethrs
Comp Serial No / ID : Comp Hours : Current hrs failed
Comp Arr / Gp No : Life Remaining : Remain of target life
MachineHrs Install : Comp New Price :
MachineHrs Removed : Cost To Repair :
Date Comp Installed : Cost/Hr Remaining :
Date Comp Failed :

Failure Outline :

Part Name: Alignment


Photo / Drawing
Part No.:
Failure Mode:
Comments :
Perform generator alignment with cold alignment method and find parallel or bore alignment results and angular or face
alignment results. Tool was installed with following procedure below.

1 of 3 Form No :PSDV.SVOP.FRM.032.R01
PT Trakindo Utama COMPONENT CONDITION REPORT

Part Name: Alignment Specification Photo / Drawing


Part No.:
Failure Mode:
Comments :
Listed below the specification generator alignment for double bearing. Specification that applies to actual engine is rear
driven generator spec sheet. New or realigned unit specification applies when generator is being installed. Used unit
specification applies when generator set has operated within the operating temperature and generator alignment is checked
once engine stops and cools down below the operating temperature. Bore specification “A to C TIR” must be within range
(0.015±0.002” for new or realigned unit and 0.015”±0.010” for used unit).

2 of 3 Form No :PSDV.SVOP.FRM.032.R01
PT Trakindo Utama COMPONENT CONDITION REPORT

Part Name: Alignment GEN#3 Photo / Drawing


Part No.:
Failure Mode:
Comments :
Alignment results for GENSET#3
Model 3516 Serial number 73Z00535

Figure. Overall Engine Condition

Alignment results
Actual Ind A B C D TIR A to C TIR B to D
Realign face 0 + 0.006” + 0.008” + 0.003” + 0.008” + 0.003”

Realign bore 0 + 0.011” + 0.015” + 0.008” + 0.015” + 0.003”

Position A Position B Position C Position D

3 of 3 Form No :PSDV.SVOP.FRM.032.R01