RATE CALCULATION FOR CIVIL FINISHING ITEMS 9/1/2023

COST
ADD GST
S.NO. PARTICULARS UNIT MATERIALS LABOUR OVERHEAD COST TOTAL
COST COST COST ( INCL
( 18 % ) GST )
Including water ,
Including Including
electricity , Contractor
GST ,Mix , Scaffolding , T
proffit etc. (ADD 15% A B A+B
Wastage etc. & P etc.
+2% )

1 BRICK MASONRY WORK


Non Modular - 230mm x 110mmx 70mm
a 230 mm thickness
Non Modular - 230mm x 110mmx 70mm
Mix ( 1 : 4 ) Cement : Sand Cum 3630 1050 796 5476 986 6462
Mix ( 1 : 6 ) Cement : Sand Cum 3500 1050 774 5324 958 6282
b 115 mm thickness
Mix ( 1 : 4 ) Cement : Sand Sqm 375 180 94 649 117 766
2 AAC BLOCK MASONRY WORK - (MIX CEMENT : SAND )
Size : 600mm x 250mm x 200mm
a 200 mm thickness
Size : 600mm x 250mm x 200mm
Mix ( 1 : 4 ) Cement : Sand Cum 4350 1050 918 6318 1137 7455
Mix ( 1 : 6 ) Cement : Sand Cum 4300 1050 910 6260 1127 7387
b 150 mm thickness
Size : 600mm x 250mm x 150mm
Mix ( 1 : 4 ) Cement : Sand Sqm 400 176 98 674 121 795
3 AAC BLOCK MASONRY WORK - (MIX JOINT MORTAR)
a 200 mm thickness
Size : 600mm x 250mm x 200mm
With Joint Mortar Cum 4000 1050 859 5909 1064 6973
b 150 mm thickness
Size : 600mm x 250mm x 150mm
With Joint Mortar Sqm 450 176 106 732 132 864
4 PLASTER ( MIX CEMENT & SAND )
Mix ( 1 : 4 ) Cement : Sand
6 mm thk - Internal Sqm 40 166 35 241 43 284
12 mm thk - Internal Sqm 65 166 39 270 49 319
15 mm thk - Internal / External Sqm 85 190 47 322 58 380
20 mm thk - External Sqm 113 241 60 414 58 472
Mix ( 1 : 6 ) Cement : Sand
12 mm thk - Internal Sqm 55 165 37 257 46 303
15 mm thk - Internal / External Sqm 69 191 44 304 55 359
20 mm thk - External Sqm 86 191 47 324 58 382
5 GYPSUM PLASTER
13 mm thk -Internal Sqm 86 160 42 288 52 340
Gypsum Punning - 3 to 6mm Sqm 26 55 14 95 17 112
6 RMC ( READY MIX CONCRETE)
M10 ( 1 Cement : 3 Sand : 6 Aggregate ) Cum 3235 1500 805 5540 997 6537
M15 ( 1 Cement : 2 Sand : 4 Aggregate ) Cum 3500 1500 850 5850 1053 6903
M20 ( 1 Cement : 1.5 Sand : 3 Aggregate ) Cum 3800 1500 901 6201 1116 7317
M25 ( 1 Cement : 1 Sand : 2 Aggregate ) Cum 4300 1500 986 6786 1221 8007
M35 - Design Mix Cum 4736 1500 1060 7296 1313 8609
M50 - Design Mix Cum 5716 1500 1227 8443 1520 9963
M60 - Design Mix Cum 6037 1500 1281 8818 1587 10405
7 STONE FLOORING
a Italian Marble Flooring Avg. Rate 273 /- Per Sft Sqft 320 120 75 515 93 608
b Granite Flooring Avg. Rate 160 /- Per Sft Sqft 175 42 37 254 46 300
c Kota Flooring Avg. Rate 33 /- Per Sft Sqft 48 45 16 109 20 129
8 TILE FLOORING
a Tile Flooring (600 x 1200 ) Avg. Rate 68 /- Per Sft Sqft 85 35 20 140 25 165
b Tile Flooring (600 x 600 ) Avg. Rate 50 /- Per Sft Sqft 63 30 16 109 20 129
c Tile Flooring (300 x 300 ) Avg. Rate 30 /- Per Sft Sqft 35 30 11 76 14 90
9 FALSE CEILING
a POP False Ceiling - Plain Sqft 65 20 15 100 18 118
b POP False Ceiling - Cove Design Sqft 65 30 17 112 20 132
c Grid Ceiling - 600mm x 600mm - USG Borel Make Sqft 70 15 15 100 18 118
c Grid Ceiling - 600mm x 600mm - Cascade Make Sqft 45 15 11 71 13 84
PLASTER WORK
THICKNESS
12 MM THK
15 MM THK
20 MM THK

BRICK WORK ( 230 MM )


Substructure
Superstructure

BRICK WORK ( 115 MM )


Superstructure

AAC BLOCK WORK ( 600 MM X 250MM X 200MM )


Superstructure ( With Cement & Sand Mix )
Superstructure ( With Joint Mortar )

Note : Calcution done in Aug -2020


ONE BAG OF CEMENT
ONE BAG OF CEMENT
1 CUM OF CEMENT
Density of Loose Cement
Specific Gravity of Cement
UNIT MIX 1 : 4 MIX 1 : 6
SQM 262 248
SQM 281 264
SQM 331 295

CUM 5268 5018


CUM 5727 5477

SQM 646

CUM 6337 6275


CUM 5908

0.0347 Cum
1.23 CFT
28.82 Bags
1440.92 kg / Cum
3.15
Mass
Density Volume

Mass D*V 1440 0.034722

V M 50
D 1440
D M 50

V 0.034722 1440.009
50.0
PLASTER WORK AS PER CPWD - DAR
COST FOR 10 SQM FOR 12 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity
MATERIAL : FOR 10 SQM
Cement Mortar 1 : 6 ( 1 Cement : 4 Sand ) Cum 0.144
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM

PLASTER WORK AS PER CPWD - DAR


COST FOR 10 SQM FOR 12 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity
MATERIAL :
Cement Mortar 1 : 4 ( 1 Cement : 4 Sand ) Cum 0.144
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM

PLASTER WORK AS PER CPWD - DAR


COST FOR 10 SQM FOR 15 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity
MATERIAL :
Cement Mortar 1 : 6 ( 1 Cement : 6 Sand ) Cum 0.172
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM

PLASTER WORK AS PER CPWD - DAR


COST FOR 10 SQM FOR 15 MM THICKNESS IN MIX ( 1 : 4) Unit Quantity
MATERIAL :
Cement Mortar 1 : 4 ( 1 Cement : 4 Sand ) Cum 0.172
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM

PLASTER WORK AS PER CPWD - DAR


COST FOR 10 SQM FOR 20 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity
MATERIAL :
Cement Mortar 1 : 6 ( 1 Cement : 6 Sand ) Cum 0.224
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM

PLASTER WORK AS PER CPWD - DAR


COST FOR 10 SQM FOR 20 MM THICKNESS IN MIX ( 1 : 4) Unit Quantity
MATERIAL :
Cement Mortar 1 : 4 ( 1 Cement : 4 Sand ) Cum 0.244
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM
AS PER CPWD - DAR
Rate Amount

5039 726

550 484
450 396
350 347
16 160
2112
42
2154
323
2477
248

AS PER CPWD - DAR


Rate Amount

5890 848

550 484
450 396
350 347
16 160
2235
45
2279
342
2621
262

AS PER CPWD - DAR


Rate Amount

5039 867

550 484
450 396
350 347
16 160
2253
45
2298
345
2643
264

AS PER CPWD - DAR


Rate Amount

5890 1013

550 484
450 396
350 347
16 160
2400
48
2448
367
2815
281

AS PER CPWD - DAR


Rate Amount

5039 1129

550 484
450 396
350 347
16 160
2515
50
2565
385
2950
295

AS PER CPWD - DAR


Rate Amount

5890 1437

550 484
450 396
350 347
16 160
2824
56
2880
432
3312
331
MORTAR RATE ANALYSIS
MIX CEMENT CONSUMPTION
Cum Bags
CEMENT MORTAR 1:1 ( 1 CEMENT : 1 FINE SAND ) 0.7175 20.66
CEMENT MORTAR 1:2 ( 1 CEMENT : 2 FINE SAND ) 0.475 13.68
CEMENT MORTAR 1:3 ( 1 CEMENT : 3 FINE SAND ) 0.357 10.28
CEMENT MORTAR 1:4 ( 1 CEMENT : 4 FINE SAND ) 0.268 7.72
CEMENT MORTAR 1:5 ( 1 CEMENT : 5 FINE SAND ) 0.214 6.16
CEMENT MORTAR 1:6 ( 1 CEMENT : 6 FINE SAND ) 0.178 5.13

Cost For 1 Cum


CEMENT MORTAR 1:1 ( 1 CEMENT : 1 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.7175 cum *28.8 =20.664 Bag ) Bag 20.66
Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A

Cost For 1 Cum


CEMENT MORTAR 1:2 ( 1 CEMENT : 3 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.475 cum *28.8 =13.68 Bag ) Bag 13.68
Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A

Cost For 1 Cum


CEMENT MORTAR 1:3 ( 1 CEMENT : 3 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.357 cum *28.8 =10.282 Bag ) Bag 10.28
Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A
Cost For 1 Cum
CEMENT MORTAR 1:4 ( 1 CEMENT : 4 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.268 cum *28.8 =7.718 Bag ) Bag 7.72
Carriege of Cement Bag 7.72
Fine Sand Cum 1.07
Carriege of Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A

Cost For 1 Cum


CEMENT MORTAR 1:5 ( 1 CEMENT : 5 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.214 cum *28.8 =6.16 Bag ) Bag 6.16
Carriege of Cement Bag 6.16
Fine Sand Cum 1.07
Carriege of Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A

Cost For 1 Cum


CEMENT MORTAR 1:6 ( 1 CEMENT : 6 FINE SAND ) Unit Quantity
Material :
Cement OPC 43 Grade ( 0.178 cum *28.8 =5.13 Bag ) Bag 5.13
Carriege of Cement Bag 5.13
Fine Sand Cum 1.07
Carriege of Fine Sand Cum 1.07
Mixer / Misc . Chrges 3%
Labour Charges :
Beldar Day 0.75
Bhisti Day 0.70
TOTAL COST - A
Sand Sand RATE
Cum Cuft INR / CUM
0.72 25.34 9,884
0.95 33.55 7,649
1.07 37.82 6,562
1.07 37.86 5,890
1.07 37.79 5,380
1.07 37.72 5,039

Rate Amount

320 6612
2331 2496
123

450 338
450 315
9884

Rate Amount

320 4378
2331 2496
123

450 338
450 315
7649

Rate Amount

320 3290
2331 2496
123

450 338
450 315
6562
Rate Amount

320 2470
4.612 35.60
2331 2499
103 110
123

450 338
450 315
5890

Rate Amount

320 1972
4.612 28.42
2331 2494
103 110
123

450 338
450 315
5380

Rate Amount

320 1640
4.612 23.64
2331 2489
103 110
123

450 338
450 315
5039
Cement Sand
( In Cement Sand
CEMENT PLASTER IN FINE SAND Unit
Qunitals) ( In bags ) ( Cum ) ( Cuft )
A 12 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 5.46 10.92 1.55 54.6
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 3.65 7.31 1.55 54.8

B 15 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 6.54 13.09 1.85 65.4
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 4.30 8.61 1.83 64.6

C 20 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 8.50 16.99 2.41 85.0
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 5.60 11.19 2.38 83.9

For 100 Sqm For 100 Sqm For 100 Sqm


Mix ( 1:4) Mix ( 1:6) Mix ( 1:4) Mix ( 1:6) Mix ( 1:4) Mix ( 1:6)
Total of Ratio 5 7 Total of Ratio 5 7 Total of Ratio 5 7
Cement 1 1 Cement 1 1 Cement 1 1
Sand 4 6 Sand 4 6 Sand 4 6
Thickness (mm) 12 12 Thickness (mm) 15 15 Thickness (mm) 20 20
Area ( Sqm ) 100 100 Area ( Sqm ) 100 100 Area ( Sqm ) 100 100
Area ( Cum ) 1.2 1.2 Area ( Cum ) 1.5 1.5 Area ( Cum ) 2 2
Add Dry Volume 58% 48% Add Dry Volume 52% 40% Add Dry Volume 48% 36%
Total Volume 1.90 1.78 Total Volume 2.27 2.09 Total Volume 2.95 2.72
Cosumption Cosumption Cosumption
Cement ( Cum ) 0.3792 0.254 Cement ( Cum ) 0.45 0.30 Cement ( Cum ) 0.59 0.39
Cement ( Bags ) 10.92 7.31 Cement ( Bags ) 13.09 8.61 Cement ( Bags ) 16.99 11.19
Cement ( Quintel ) 5.46 3.65 Cement ( Quintel ) 6.54 4.30 Cement ( Quintel ) 8.50 5.60
Sand ( Cum ) 1.52 1.52 Sand ( Cum ) 1.82 1.79 Sand ( Cum ) 2.36 2.33

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 12 MM THICKNESS IN MIX ( 1 : 4) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 1.02 307 313
Fine Sand Cft 5.10 66 337
TOTAL - A 651 65
LABOUR :
Labour Charges SQM 10 150 1500
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 1660 166
TOTAL COST - A 2311
Water & Electricity Charges 2% 2% 46 5
TOTAL COST - B 2357
Overhead & Contractor Proffit 15% 15% 354 35
COST FOR 10 SQM 2710
COST FOR 1 SQM 271 271

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 12 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 0.67 320 214
Fine Sand Cft 5.03 66 332
TOTAL - A 546
LABOUR :
Labour Charges SQM 10 150 1500
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 1660
TOTAL COST - A 2206
Water & Electricity Charges 2% 2% 44
TOTAL COST - B 2250
Overhead & Contractor Proffit 15% 15% 338
COST FOR 10 SQM 2588
COST FOR 1 SQM 259

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 15 MM THICKNESS IN MIX ( 1 : 4) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 1.30 320 416
Fine Sand Cft 6.50 66 429
TOTAL - A 845
LABOUR :
Labour Charges SQM 10 175 1750
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 1910
TOTAL COST - A 2755
Water & Electricity Charges 2% 2% 55
TOTAL COST - B 2810
Overhead & Contractor Proffit 15% 15% 422
COST FOR 10 SQM 3232
COST FOR 1 SQM 323

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 15 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 0.84 320 269
Fine Sand Cft 6.30 66 416
TOTAL - A 685
LABOUR :
Labour Charges SQM 10 175 1750
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 1910
TOTAL COST - A 2595
Water & Electricity Charges 2% 2% 52
TOTAL COST - B 2646
Overhead & Contractor Proffit 15% 15% 397
COST FOR 10 SQM 3043
COST FOR 1 SQM 304

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 20 MM THICKNESS IN MIX ( 1 : 4) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 1.74 320 557
Fine Sand Cft 8.70 66 574
TOTAL - A 1131
LABOUR :
Labour Charges SQM 10 225 2250
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 2410
TOTAL COST - A 3541
Water & Electricity Charges 2% 2% 71
TOTAL COST - B 3612
Overhead & Contractor Proffit 15% 15% 542
COST FOR 10 SQM 4154
COST FOR 1 SQM 415

PLASTER WORK AS PER SITE


COST FOR 10 SQM FOR 20 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity Rate Amount
MATERIAL :
OPC Cement Bag 1.19 225 268
Fine Sand Cft 8.92 66 589
TOTAL - A 857
LABOUR :
Labour Charges SQM 10 175 1750
Scaffolding & Sundries L.S. 10 16 160
TOTAL - B 1910
TOTAL COST - A 2767
Water & Electricity Charges 2% 2% 55
TOTAL COST - B 2822
Overhead & Contractor Proffit 15% 15% 423
COST FOR 10 SQM 3245
COST FOR 1 SQM 325
STANDARD SIZE OF BRICKS AS PER IS CODE 1077 -1992

MODULAR BRICK 190 MM ( L ) X 90 MM (W) X 90 MM ( H)


NON MODULAR BRICK 230 MM ( L ) X110 MM (W) X 70 MM ( H)

BRICK WORK AS PER CPWD - DAR


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
foundation & plinth in : Unit Quantity
Cement mortar 1: 4 ( 1 cement : 4 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 494
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 494
Cement Mortar 1 : 4 ( 1 Cement : 4 Sand ) Cum 0.25

LABOUR :
MASON - 1ST CLASS Day 0.36
BELDAR / COOLIE Day 1.27
BHISTI Day 0.2

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

BRICK WORK AS PER CPWD - DAR


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
foundation & plinth in : Unit Quantity
Cement mortar 1: 6 ( 1 cement : 6 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 494
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 494
Cement Mortar 1 : 6 ( 1 Cement : 6 Sand ) Cum 0.25

LABOUR :
MASON - 1ST CLASS Day 0.36
BELDAR / COOLIE Day 1.27
BHISTI Day 0.2

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

BRICK WORK AS PER CPWD - DAR


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes &
sizes in :
Unit Quantity
Cement mortar 1 :4 ( 1 cement : 4 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 494
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 494
Cement Mortar 1 : 4 ( 1 Cement : 4 Sand ) Cum 0.25

LABOUR :
MASON - 1ST CLASS Day 0.47
BELDAR / COOLIE Day 1.8
BHISTI Day 0.2
Scaffolding Sqm 10

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

BRICK WORK AS PER CPWD - DAR


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes &
sizes in :
Unit Quantity
Cement mortar 1 :6 ( 1 cement : 6 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 494
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 494
Cement Mortar 1 : 6 ( 1 Cement : 6 Sand ) Cum 0.25

LABOUR :
MASON - 1ST CLASS Day 0.47
BELDAR / COOLIE Day 1.8
BHISTI Day 0.2
Scaffolding Sqm 10

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
X 90 MM (W) X 90 MM ( H)
X110 MM (W) X 70 MM ( H)

PER CPWD - DAR

Rate Amount

4.5 2223

0.276 136
5890 1472
TOTAL -A 3832

465 167
340 432
300 60
TOTAL -B 659
4491
90
4581
687
5268

PER CPWD - DAR

Rate Amount

4.5 2223

0.276 136
5039 1260
TOTAL -A 3619

465 167
340 432
300 60
TOTAL -B 659
4278
86
4364
655
5018

PER CPWD - DAR

Rate Amount

4.5 2223

0.276 136
5890 1472
TOTAL -A 3832

465 219
340 612
300 60
16 160
TOTAL -B 1051
4882
98
4980
747
5727

PER CPWD - DAR

Rate Amount

4.5 2223
0.276 136
5039 1260
TOTAL -A 3619

465 219
340 612
300 60
16 160
TOTAL -B 1051
4670
93
4763
714
5477
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
BRICK SIZE ( 230 MM X 110 MM X 70 MM )
VOLUME OF 1 BRICK 0.001771 Cum
Say 10 mm thick mortar of brick layer as per narms
No. of Brick in 1 Cum 434 Nos.
Voulme of Brick for 1Cum
( Nos. of Bricks x Volume of 1 Brick without mortar) 0.769 Cum
Volume of Mortar 0.231 Cum
Add 25% For Wastage & Frog Filling 0.289 Cum
Add 35% For Dry Mortar 0.390 Cum
Volume of Wet Mortar 0.39 Cum
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.078 Cum
Nos. of Bags 2.249 Bags
Sand 0.312 Cum
11.029 Cft
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.056 Cum
Nos. of Bags 1.606 Bags
Sand 0.335 Cum
11.82 Cft

BRICK WORK AS PER SITE CALCULATION


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
foundation & plinth in : Unit Quantity Rate
Cement mortar 1: 4 ( 1 cement : 4 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 500 4.5
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 500 0.276
Cement Bags 2.249 320
Sand Cft 11.029 66
TOTAL -A
LABOUR :
MASON - 1ST CLASS Day 0.47 465
BELDAR / COOLIE Day 1.8 340
BHISTI Day 0.2 300
Scaffolding Sqm 10 16
TOTAL -B
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

BRICK WORK AS PER CPWD - DAR


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes &
sizes in :
Unit Quantity Rate
Cement mortar 1 :6 ( 1 cement : 6 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 500 4.5
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 500 0.276
Cement Bags 1.606 320
Sand Cft 11.817 66
TOTAL -A
LABOUR :
MASON - 1ST CLASS Day 0.47 465
BELDAR / COOLIE Day 1.8 340
BHISTI Day 0.2 300
Scaffolding Sqm 10 16
TOTAL -B
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
TION

Amount

2250

138
720
728
3835 77 575 4487

219
612
60
160
1051 21 158 1229
4886
98
4984
748
5731

Amount

2250

138
514
780
3682

219
612
60
160
1051
4732
95
4827
724
5551
FOR 10 SQM
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
BRICK SIZE ( 230 MM X 110 MM X 70 MM )
VOLUME OF 1 BRICK 0.001694 Cum
Say 10 mm thick mortar of brick layer as per narms
No. of Brick in 100 Sqm ( 1 / .23 *.08 ) 540 Nos.
Voulme of Brick for 1 Sqm
( Nos. of Bricks x Volume of 1 Brick without mortar) 0.9148 Cum
Volume of 1 SQM BRICKWORK ( 1 * 1* .11 ) 1.100 Cum
Volume of Mortar 0.1852 Cum
Add 25% For Wastage & Frog Filling 0.232 Cum
Add 25% For Dry Mortar 0.31259 Cum
Volume of Wet Mortar 0.3126 Cum
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Sqm Brickwork
Volume of Mortar 0.063 Cum
Nos. of Bags 1.801 Bags
Sand 0.250 Cum
8.831 Cft
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.0447 Cum
Nos. of Bags 1.286 Bags
Sand 0.268 Cum
9.46 Cft

BRICK WORK AS PER SITE CALCULATION


Brick work with common burnt clay F.P.S. ( Non modular ) brick
size 230mm x 110mm x 70mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes &
sizes in :
Unit Quantity
Cement mortar 1: 4 ( 1 cement : 4 sand )
For 10 Sqm
MATERIAL :
Common burnt clay ( non modular ) brick in class designation 7.5 ,
Nos. 540
brick size 230 mm x 110 mm x 70 mm
Carriage of bricks Nos. 540
Cement Bags 1.801
Sand Cft 8.831
LABOUR :
MASON - 1ST CLASS Day 0.6
BELDAR / COOLIE Day 2
BHISTI Day 0.7
BELDAR / COOLIE - FOR LIFT MATERIALS Day 1.29
Scaffolding Sqm 10

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 sqm
COST FOR 1 sqm
PER SITE CALCULATION

Rate Amount

4.5 2430

0.276 149
320 576
66 583
TOTAL -A 3738 373.8076

465 279
340 680
300 210
340 439
16 160
TOTAL -B 1768 176.76
5506
110 11.01135
5616
842 84
6458
646
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
AAC Block SIZE ( 600 MM X 250 MM X 200 MM )
VOLUME OF 1 AAC Block 0.030 Cum
Say 10 mm thick mortar of AAC Block layer as per narms 0.0333
No. of AAC Block in 1 Cum 30.02 Nos.
Voulme of AAC Block for 1Cum
( Nos. of AAC Blocks x Volume of 1 AAC Block without mortar) 0.901 Cum
Volume of Mortar 0.099 Cum
Add 1% For Wastage 0.100 Cum
Add 35% For Dry Mortar 0.135 Cum
Volume of Wet Mortar 0.14 Cum
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar 0.027 Cum
Nos. of Bags 0.780 Bags
Sand 0.108 Cum
3.824 Cft
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar 0.019 Cum
Nos. of Bags 0.557 Bags
Sand 0.116 Cum
4.10 Cft

AAC Block WORK AS PER SITE CALCULATION


AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
foundation & plinth in : Unit Quantity Rate
Cement mortar 1: 4 ( 1 cement : 4 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) AAC Block in class designation 7.5 ,
Cum 1 3500
AAC Block size 600mm x 250mm x 200mm
Carriage of AAC Blocks Cum 1 350
Cement Bags 0.780 320
Sand Cft 3.824 66
TOTAL -A
LABOUR :
MASON - 1ST CLASS Day 0.47 465
BELDAR / COOLIE Day 1.8 340
BHISTI Day 0.2 300
Scaffolding Sqm 10 16
TOTAL -B
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

AAC Block WORK AS PER CPWD - DAR

AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes & sizes in :
Unit Quantity Rate
Cement mortar 1 :6 ( 1 cement : 6 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) AAC Block in class designation 7.5 ,
Cum 1 3500
AAC Block size 600mm x 250mm x 200mm
Carriage of AAC Blocks Cum 1 350
Cement Bags 0.557 320
Sand Cft 4.097 66
TOTAL -A
LABOUR :
MASON - 1ST CLASS Day 0.47 465
BELDAR / COOLIE Day 1.8 340
BHISTI Day 0.2 300
Scaffolding Sqm 10 16
TOTAL -B
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
TION

Amount

3500

350
249
252
4352

219
612
60
160
1051
5402
108
5510
827
6337

AR

Amount

3500

350
178
270
4299

219
612
60
160
1051
5349
107
5456
818
6275
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
AAC Block SIZE ( 600 MM X 250 MM X 200 MM )
VOLUME OF 1 AAC Block
Say 10 mm thick mortar of AAC Block layer as per narms
No. of AAC Block in 1 Cum
Voulme of AAC Block for 1Cum
( Nos. of AAC Blocks x Volume of 1 AAC Block without mortar)
Volume of Mortar
Add 1% For Wastage
Add 35% For Dry Mortar
Volume of Wet Mortar
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar
Nos. of Bags
Sand

AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar
Nos. of Bags
Sand

AAC Block WORK


AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
foundation & plinth in :
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) AAC Block in class designation 7.5 ,
AAC Block size 600mm x 250mm x 200mm
Carriage of AAC Blocks
Cement
Sand
Joint mortar

LABOUR :
MASON - 1ST CLASS
BELDAR / COOLIE
BHISTI
Scaffolding

TOTAL COST - A
Water & Electricity Charges 2%
TOTAL COST - B
Overhead & Contractor Proffit 15%
COST FOR 1 CUM

AAC Block WORK

AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes & sizes in :

Cement mortar 1 :6 ( 1 cement : 6 sand )


For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) AAC Block in class designation 7.5 ,
AAC Block size 600mm x 250mm x 200mm
Carriage of AAC Blocks
Cement
Sand
Joint mortar

LABOUR :
MASON - 1ST CLASS
BELDAR / COOLIE
BHISTI
Scaffolding

TOTAL COST - A
Water & Electricity Charges 2%
TOTAL COST - B
Overhead & Contractor Proffit 15%
COST FOR 1 CUM
0.030 Cum
0.0333
30.02 Nos.

0.901 Cum
0.002 Cum
0.002 Cum
0.003 Cum
0.002727 Cum

0.001 Cum
0.016 Bags
0.002 Cum
0.077 Cft

0.000 Cum
0.011 Bags
0.002 Cum
0.08 Cft

AS PER SITE CALCULATION

Unit Quantity Rate Amount

Cum 1 3500 3500


0.0300
Cum 1 276 276
Bags 0.016 320 5
Cft 0.077 66 5
kg 20 10 200
TOTAL -A 3986
Day 0.47 465 219
Day 1.8 340 612
Day 0.2 300 60
Sqm 10 16 160
TOTAL -B 1051
5037
2% 101
5137
15% 771
5908

AS PER CPWD - DAR

Unit Quantity Rate Amount

Cum 1 2200 2200

Cum 1 276 276


Bags 0.011 320 4
Cft 0.083 66 5
kg 20 10 200
TOTAL -A 2685

Day 0.47 465 219


Day 1.8 340 612
Day 0.2 300 60
Sqm 10 16 160
TOTAL -B 1051
3736
2% 75
3810
15% 572
4382
FIXING OF TILES ON TOILETS AS PER SITE CALCULAT
LAYING & FIXING OF WALL & FLOOR TILES IN SIZE ( 400 X 800 ) AT
TOILET AREA Unit Quantity
For 1 SQM
MATERIAL :
TILES Sqm 1
MORTAR ( Mix 1 Cement : 4 Coarse sand ) FOR 40MM THK Cum 0.040

LABOUR :
For 1 SQM sQM 1

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM

FIXING OF TILES ON TOILETS AS PER SITE CALCULAT


LAYING & FIXING OF WALL & FLOOR TILES IN SIZE ( 300 X300 ) AT
TOILET AREA Unit Quantity
For 1 SQM
MATERIAL :
TILES Sqm 1
MORTAR ( Mix 1 Cement : 4 Coarse sand ) FOR 40MM THK Cum 0.040

LABOUR :
For 1 SQM sQM 1

TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
AS PER SITE CALCULATION

Rate Amount

322.8 300 0.0300


5890 236
TOTAL -A 536

322.8 323
TOTAL -B 323
858
17
876

876

AS PER SITE CALCULATION

Rate Amount

80 300
5890 236
TOTAL -A 536

215.2 215
TOTAL -B 215
751
15
766

766
GRADE OF ADMIXTURE
S NO CONC CEMENT SAND 10MM 20MM FLY ASH ADMIXTURE 37S PC100
AS PER MIX AS PER MIX CONSUMPTIO CONSUMPTION IN CONSUMPTION IN AS PER MIX AS PER MIX AS PER MIX
DESIGN IN KG DESIGN IN BAGS N IN CFT CFT CFT DESIGN IN KG DESIGN IN DESIGN IN KG
1 M10 150 3.00 17.14 13.38 15.60 170.00 1.00
M15 150 3.00 17.14 13.38 15.60 170.00 1.00
M20 400 8.00 17.14 13.38 15.60 1.00
2 M25 270 5.40 16.33 9.51 16.80 130.00 3.50
3 M35 376 7.52 13.10 10.97 16.22 105.00 3.50
5 M40 400 8.00 13.91 9.51 16.68 90.00 0.00 3.00
4 M50 450 9.00 13.91 9.51 16.68 90.00 3.00

GRADE OF MATERIAL ADMIXTURE


S NO CONC AMOUNT CEMENT SAND 10MM 20MM F ASH ADMIXTURE 37S PC100
1 M10 3272 885 720 649 768 208.25 42.48 0
M15 3272 885 720 649 768 208.25 42.48 0
M20 4539 2360 720 649 768 0.00 42.48 0
2 M25 3875 1593 686 462 827 159.25 148.68 0
3 M35 4377 2218 550 533 798 128.63 148.68 0
5 M40 4744 2360 584 462 821 110.25 0.00 407
4 M50 5039 2655 584 462 821 110.25 0.00 407

LABOUR COST 1500


GRADE OF MATERIAL
S NO CONC AMOUNT
1 M10 4772
M15 4772
M20 6039
2 M25 5375
3 M35 5877
5 M40 6244
4 M50 6539
FLY ASH %

113% 5.839 17.14 28.98

48% 2.934737 26.31


28% 27.20
23% 26.19
20% 26.19
FY - 2019 -2020 2023 2023
S.NO. PARTICULARS RATE RATE UNIT RATE RATE UNIT REMARK
1 CEMENT PPC 295 BAGS 59000 MT
2 CEMENT OPC 43G 320 BAGS 64000 MT
3 FLY ASH 1225 MT 1.225 KG
4 JAMUNA SAND 42 CFT CFT
5 DOUBLE WASH SAND 66.15 CFT CFT
6 AGGREGATE 10 MM 1182 MT 48.53 CFT Bulk density 1450 kg /cum 1713.9 48.53 1713.9 1182
7 AGGREGATE 20 MM 1182 MT 49.20 CFT Bulk density 1470 kg /cum
8 PLASTISIZER 375 I 42.48 KG KG
9 PLASTISIZER Pe -100 135.7 KG KG
31 BRICKS - FLY ASH 4.2 Nos. 2100 CUM Volume 0.22 0.11 0.07 0.001694 cum

1 AAC BLOCK (600 X 250 X 2180 CUM 65.4 CUM ( 33.33 Block covered in per 1 Cum 0.6 0.25 0.2 0.0300 cum
200) , then rate of one block is Rs. 65/-)
Volume
2 JOINTING MORTAR 9.03 KG KG So, 17.7 Brick equal of one Block
13
14
15
S.NO. ITEMS UNIT AVERAGE
UP TO SEPT -23
1 0 AAC BLO ₹ 3,064
2 0 AAC BLO ₹ 2,794
3 0 JOINTI ₹ 10
4 0 BRICKS ₹ 4
5 BRICKS - RED - 1ST CLASS Nos. ₹ 6

1 0 8 MM T ₹ 62,306
2 0 10 MM ₹ 61,339
3 0 12 MM ₹ 55,699
4 0 16 MM ₹ 61,755
5 0 20 MM ₹ 58,373
6 0 25 MM ₹ 60,123

1 0 CEMENTT ₹ 297
2 0 CEMENT ₹ 307

1 0 MT ₹ 1,789
2 ₹ - MT ₹ 956
3 0 JAMUN ₹ 39
4 0 DOUBLE ₹ 66
5 0 FILLING ₹ 32

1 0 AGGREG ₹ 1,050
2 0 AGGREG ₹ 632
3 0 GRAVE ₹ 3,150

1 0 PLASTIS ₹ 42
2 0 PLASTIS

1 0 KOTA ST ₹ 33
2 0 KOTA ST ₹ 32

1 0 GWALIO ₹ 115
2 0 GRANITE ₹ 200
3 0 GRANIT ₹ 181
4 0 GRANIT ₹ 119
5 0 SK BLU ₹ 196

6 0 GRANITR ₹ 234

1 0 ITALIAN ₹ 239
2 0 ITALIA ₹ 180
3 0 ITALIA ₹ 189
4 0 BOTTIC ₹ 45
5 0 COREAN ₹ 784
6 0 LIGHT ₹ 321
7 0 DARK B ₹ 296
8 0 GSL BE ₹ 345
9 0 GRAY M ₹ 414
10 0 GREEN ₹ 101
11 0 UDAYPU ₹ 99

1 0 M.S. FL
2 0 MS PLA
3 0 MS ANG
4 0 MS ANG
5 0 MS CHA ₹ 60,963
6 0 MS FLA
7 0 MS SQ T
8 0 MS GIR
9 0 MS TUBE
10 0 MS NUT
11 0 MS TUBE
12 0 MS ANG ₹ 59,000
13 0 MS TUB
14 0 MS PLAT
15 0 MS TUB ₹ 71,741
16 0 STEEL
17 0 MS PLA ₹ 68,560
18 0 MS PLA ₹ 68,560
19 0 MS PLA
20 0 MS TUB
21 0 STEEL
22 0 MS TUB ₹ 71,740
23 0 ROUND ₹ 52,550
24 0 MS TUB ₹ 61,900
25 0 MS PLA ₹ 77,880
26 0 MS PLA ₹ 82,600
27 0 MS FLAT 75 X 5MM
28 0 STEEL TUBE PIPE 80 MM
29 0 MS FLAT ₹ 60,100
30 0 RHS 96 ₹ 72,000
31 0 SHS 15 ₹ 73,750
32 0 RHS 80 ₹ 70,210
33 0 SHS 10 ₹ 72,920
34 0 SHS 10 ₹ 70,560
35 0 SHS 72 ₹ 69,350
36 0 SHS 32 ₹ 69,390
37 0 CHS 27 ₹ 73,230
38 0 RHS 40 ₹ 83,860
39 0 CHS 16 ₹ 73,180
40 0 RHS 30 ₹ 92,867
41 0 RHS 30 ₹ 83,179
42 0 RHS 40 ₹ 83,179
43 0 MS PLA ₹ 71,650
44 0 G.I Plai ₹ 99,250
45 0 MS PLA ₹ 77,290
46 0 SHS 15 ₹ 85,000
47 0 SHS 30 ₹ 93,000
48 0 MS CHA ₹ 84,000
49 0 STEEL ₹ 77,527
50 0 STEEL ₹ 76,313
51 0 STEEL ₹ 76,313
52 0 CHS OD ₹ 83,190
53 0 MS PAL ₹ 82,600
54 0 MS PAL ₹ 79,650
55 0 MS CHA ₹ 60,000
56 0 MS FLA ₹ 61,260
57 0 CHS OD ₹ 73,000
58 0 SHS 32 ₹ 87,998
59 0 SHS 60 ₹ 86,817
60 0 SHS 10 ₹ 87,910
61 0 SHS 20 ₹ 97,942
62 0 MS ANG ₹ 61,596
63 0 MS PLA ₹ 85,510
64 0 MS CHA ₹ 78,527
65 0 MS CHA ₹ 78,527
66 0 MS GIR ₹ 66,906
67 0 MS GIR ₹ 60,339
68 0 MS PLA ₹ 79,275
69 0 MS PLA ₹ 78,116
70 0 MS PLA ₹ 59,671
71 0 SHS 20 ₹ 92,925
72 0 RHS 15 ₹ 87,910
73 0 RHS 20 ₹ 86,730
74 0 SHS 91 ₹ 86,730
75 0 SHS 10 ₹ 86,730
76 0 SHS 15 ₹ 86,730
77 0 RHS 10 ₹ 86,730
78 0 RHS 28 ₹ 87,910
79 0 ISA75* ₹ 60,000
80 0 ISA75* ₹ 60,000
81 0 ISA40* ₹ 60,000
82 0 MS BA ₹ 60,000
83 0 MS FLA ₹ 61,360
84 0 MS FLA ₹ 61,000
85 0 MS PLAT ₹ 85,000
86 0 MS PLA ₹ 85,000
87 0 RHS 10 ₹ 92,630
88 0 RHS 12 ₹ 88,500
89 0 SHS 32 ₹ 86,140
90 0 RHS 80 ₹ 86,140
91 0 RHS 96 ₹ 86,140
92 0 CHS 3 ₹ 90,135
93 0 CHS 25 ₹ 87,910
94 0 CHS 30 ₹ 87,910
95 0 CHS 12 ₹ 87,320
96 0 MS PLA #DIV/0!
97 0 MS ANG ₹ 67,998
98 0 MS PIP ₹ 86,600
99 0 MS PIP ₹ 98,648
100 0 MS PLA ₹ 17,713
101 0 MS CHA ₹ 78,340
102 0 MS PLA ₹ 82,390
103 0 MS PLA ₹ 81,660
104 0 MS PLA ₹ 79,890
105 0 MS PLA ₹ 79,890
106 0 ISMB 6 ₹ 72,800
107 0 ISMB 5 ₹ 72,800
108 0 ISMB 3 ₹ 72,800
109 0 ISMB 1 ₹ 72,800
110 0 ISMC 1 ₹ 72,800
111 0 RHS 24 ₹ 84,960
112 0 RHS 12 ₹ 84,960
113 0 MS PIPE ₹ 108,432
114 0 MS PLA ₹ 82,481
115 0 ISA 50, ₹ 68,450
116 0 GI SHE ₹ 106,530
117 0 RHS 10 ₹ 93,220
118 0 CHS 60 ₹ 103,420
119 0 MS PIPE 65MM
120 0 MS PIPE 125MM
121 0 MS FLA ₹ 68,100
122 0 ISA 50 ₹ 68,460
123 0 0
124 0 0
125 0 0
126 0 0

1 0 DIESEL ₹ 88
2 0 G.I. SH
3 0 GREEN ₹ 34
4 0 AL . PL
5 0 BINDIN
6 0 MS FAS
7 0 MS FAS ₹ 12
8 0 SS CLAM ₹ 272
9 0 TENAX ₹ 709
10 0 AAC BL
11 0 HILTY
12 0 HILTY ₹ 1,617
13 0 HILTY
14 0 HILTY
0 0 HILTY ₹ 11
15 0 HILTY ₹ 53
16 0 EPDM ₹ 708
17 0 EXPANS ₹ 708
18 0 SIKADU ₹ 2,816
19 0 KERB ST ₹ 123
20 0 SAUCER ₹ 122
21 0 SAUCER ₹ 53
22 0 PAVERS ₹ 692
23 0 HANDMA ₹ 206
24 0 ADHESI ₹ 572
25 0 PLY 8' ₹ 59
26 0 Bottom B ₹ 559
27 0 Bottom B ₹ 559
28 0 Epoxy B ₹ 3,400
29 0 CERAMIC ₹ 600
30 0 CI Manh ₹ 9,678
31 0 AKAMI ₹ 1,837
32 0 BIRLA ₹ 983
33 0 SFRG M ₹ 1,238
34 0 CERAMI #DIV/0!
35 0 ₹ 49
36 0 ₹ 51
37 0
38 0 LIGHT ₹ 6,254
39 0 PAVERS ₹ 447
40 0 ADHESI ₹ 867
41 0 ADHESI ₹ 238
42 0 SS PROF ₹ 761
43 0 Regin H ₹ 9,529
44 0 LIGHT ₹ 6,254
45 0 PLAIN W ₹ 210
46 0 TRACTOR TROLLY
47 0 RMC - ₹ 7,198
48 0 RMC-25 ₹ 5,533
49 0 RMC-15 ₹ 5,094
50 0 IVORY T ₹ 306
51 0 Mirror ₹ 1,983
52 0 GROUT ₹ 65
53 0 EPDM ₹ 330
54 0 FLOOR ₹ 171
55 0 MS BEN ₹ 27
56 0 COREAN ₹ 578
57 0 GI DUCT ₹ 663
58 0 GI DUCT ₹ 755
59 0 GI DUCT ₹ 933
60 0 GI DUCT ₹ 1,146
61 0 MS BOL ₹ 12
62 0 HARDNE ₹ 535
63 0 HILTY - ₹ 1,779
64 0 THREAD ₹ 7,376
65 0 M-24 N ₹ 175
66 0 M-10 N ₹ 17
67 0 THREAD ₹ 5,301
68 0 M-20 N ₹ 67
69 0 GI SHE ₹ 1,541
70 0 FRP GR ₹ 11,036
71 0 PVC FLE ₹ 37
72 0 VETRIFI ₹ 650
73 0 VETRIFI ₹ 650
74 0 TILE AD ₹ 21
75 0 MS BALL ₹ 6
Wooden Frame mm mm
L H
Frame Size 1200 2100
Wooden Size 95 70
206.75 2 2.0675 0.095 0.070 0.027
117.5 1 1.175 0.095 0.07 0.008
0.035
Add Wastage 5% 0.0018
0.037
Cum
Cum
Cum
Cum
Cum