Rate Analysis 2023-24 (Updated)
Rate Analysis 2023-24 (Updated)
Rate Analysis 2023-24 (Updated)
COST
ADD GST
S.NO. PARTICULARS UNIT MATERIALS LABOUR OVERHEAD COST TOTAL
COST COST COST ( INCL
( 18 % ) GST )
Including water ,
Including Including
electricity , Contractor
GST ,Mix , Scaffolding , T
proffit etc. (ADD 15% A B A+B
Wastage etc. & P etc.
+2% )
SQM 646
0.0347 Cum
1.23 CFT
28.82 Bags
1440.92 kg / Cum
3.15
Mass
Density Volume
V M 50
D 1440
D M 50
V 0.034722 1440.009
50.0
PLASTER WORK AS PER CPWD - DAR
COST FOR 10 SQM FOR 12 MM THICKNESS IN MIX ( 1 : 6) Unit Quantity
MATERIAL : FOR 10 SQM
Cement Mortar 1 : 6 ( 1 Cement : 4 Sand ) Cum 0.144
LABOUR :
MASON Day 0.88
BELDAR / COOLIE Day 0.88
BHISTI Day 0.99
Scaffolding & Sundries L.S. 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 SQM
COST FOR 1 SQM
5039 726
550 484
450 396
350 347
16 160
2112
42
2154
323
2477
248
5890 848
550 484
450 396
350 347
16 160
2235
45
2279
342
2621
262
5039 867
550 484
450 396
350 347
16 160
2253
45
2298
345
2643
264
5890 1013
550 484
450 396
350 347
16 160
2400
48
2448
367
2815
281
5039 1129
550 484
450 396
350 347
16 160
2515
50
2565
385
2950
295
5890 1437
550 484
450 396
350 347
16 160
2824
56
2880
432
3312
331
MORTAR RATE ANALYSIS
MIX CEMENT CONSUMPTION
Cum Bags
CEMENT MORTAR 1:1 ( 1 CEMENT : 1 FINE SAND ) 0.7175 20.66
CEMENT MORTAR 1:2 ( 1 CEMENT : 2 FINE SAND ) 0.475 13.68
CEMENT MORTAR 1:3 ( 1 CEMENT : 3 FINE SAND ) 0.357 10.28
CEMENT MORTAR 1:4 ( 1 CEMENT : 4 FINE SAND ) 0.268 7.72
CEMENT MORTAR 1:5 ( 1 CEMENT : 5 FINE SAND ) 0.214 6.16
CEMENT MORTAR 1:6 ( 1 CEMENT : 6 FINE SAND ) 0.178 5.13
Rate Amount
320 6612
2331 2496
123
450 338
450 315
9884
Rate Amount
320 4378
2331 2496
123
450 338
450 315
7649
Rate Amount
320 3290
2331 2496
123
450 338
450 315
6562
Rate Amount
320 2470
4.612 35.60
2331 2499
103 110
123
450 338
450 315
5890
Rate Amount
320 1972
4.612 28.42
2331 2494
103 110
123
450 338
450 315
5380
Rate Amount
320 1640
4.612 23.64
2331 2489
103 110
123
450 338
450 315
5039
Cement Sand
( In Cement Sand
CEMENT PLASTER IN FINE SAND Unit
Qunitals) ( In bags ) ( Cum ) ( Cuft )
A 12 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 5.46 10.92 1.55 54.6
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 3.65 7.31 1.55 54.8
B 15 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 6.54 13.09 1.85 65.4
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 4.30 8.61 1.83 64.6
C 20 MM THICKNESS PLASTER
1 1 : 4 ( 1 Cement : 4 Fine Sand ) 10 Sqm 8.50 16.99 2.41 85.0
2 1 : 6 ( 1 Cement : 6 Fine Sand ) 10 Sqm 5.60 11.19 2.38 83.9
LABOUR :
MASON - 1ST CLASS Day 0.36
BELDAR / COOLIE Day 1.27
BHISTI Day 0.2
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
LABOUR :
MASON - 1ST CLASS Day 0.36
BELDAR / COOLIE Day 1.27
BHISTI Day 0.2
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
LABOUR :
MASON - 1ST CLASS Day 0.47
BELDAR / COOLIE Day 1.8
BHISTI Day 0.2
Scaffolding Sqm 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
LABOUR :
MASON - 1ST CLASS Day 0.47
BELDAR / COOLIE Day 1.8
BHISTI Day 0.2
Scaffolding Sqm 10
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
X 90 MM (W) X 90 MM ( H)
X110 MM (W) X 70 MM ( H)
Rate Amount
4.5 2223
0.276 136
5890 1472
TOTAL -A 3832
465 167
340 432
300 60
TOTAL -B 659
4491
90
4581
687
5268
Rate Amount
4.5 2223
0.276 136
5039 1260
TOTAL -A 3619
465 167
340 432
300 60
TOTAL -B 659
4278
86
4364
655
5018
Rate Amount
4.5 2223
0.276 136
5890 1472
TOTAL -A 3832
465 219
340 612
300 60
16 160
TOTAL -B 1051
4882
98
4980
747
5727
Rate Amount
4.5 2223
0.276 136
5039 1260
TOTAL -A 3619
465 219
340 612
300 60
16 160
TOTAL -B 1051
4670
93
4763
714
5477
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
BRICK SIZE ( 230 MM X 110 MM X 70 MM )
VOLUME OF 1 BRICK 0.001771 Cum
Say 10 mm thick mortar of brick layer as per narms
No. of Brick in 1 Cum 434 Nos.
Voulme of Brick for 1Cum
( Nos. of Bricks x Volume of 1 Brick without mortar) 0.769 Cum
Volume of Mortar 0.231 Cum
Add 25% For Wastage & Frog Filling 0.289 Cum
Add 35% For Dry Mortar 0.390 Cum
Volume of Wet Mortar 0.39 Cum
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.078 Cum
Nos. of Bags 2.249 Bags
Sand 0.312 Cum
11.029 Cft
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.056 Cum
Nos. of Bags 1.606 Bags
Sand 0.335 Cum
11.82 Cft
Amount
2250
138
720
728
3835 77 575 4487
219
612
60
160
1051 21 158 1229
4886
98
4984
748
5731
Amount
2250
138
514
780
3682
219
612
60
160
1051
4732
95
4827
724
5551
FOR 10 SQM
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
BRICK SIZE ( 230 MM X 110 MM X 70 MM )
VOLUME OF 1 BRICK 0.001694 Cum
Say 10 mm thick mortar of brick layer as per narms
No. of Brick in 100 Sqm ( 1 / .23 *.08 ) 540 Nos.
Voulme of Brick for 1 Sqm
( Nos. of Bricks x Volume of 1 Brick without mortar) 0.9148 Cum
Volume of 1 SQM BRICKWORK ( 1 * 1* .11 ) 1.100 Cum
Volume of Mortar 0.1852 Cum
Add 25% For Wastage & Frog Filling 0.232 Cum
Add 25% For Dry Mortar 0.31259 Cum
Volume of Wet Mortar 0.3126 Cum
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Sqm Brickwork
Volume of Mortar 0.063 Cum
Nos. of Bags 1.801 Bags
Sand 0.250 Cum
8.831 Cft
BRICK WORK WITH COMMON CLAY NON MODULAR BRICK IN
CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum Brickwork
Volume of Mortar 0.0447 Cum
Nos. of Bags 1.286 Bags
Sand 0.268 Cum
9.46 Cft
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 10 sqm
COST FOR 1 sqm
PER SITE CALCULATION
Rate Amount
4.5 2430
0.276 149
320 576
66 583
TOTAL -A 3738 373.8076
465 279
340 680
300 210
340 439
16 160
TOTAL -B 1768 176.76
5506
110 11.01135
5616
842 84
6458
646
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
AAC Block SIZE ( 600 MM X 250 MM X 200 MM )
VOLUME OF 1 AAC Block 0.030 Cum
Say 10 mm thick mortar of AAC Block layer as per narms 0.0333
No. of AAC Block in 1 Cum 30.02 Nos.
Voulme of AAC Block for 1Cum
( Nos. of AAC Blocks x Volume of 1 AAC Block without mortar) 0.901 Cum
Volume of Mortar 0.099 Cum
Add 1% For Wastage 0.100 Cum
Add 35% For Dry Mortar 0.135 Cum
Volume of Wet Mortar 0.14 Cum
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar 0.027 Cum
Nos. of Bags 0.780 Bags
Sand 0.108 Cum
3.824 Cft
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar 0.019 Cum
Nos. of Bags 0.557 Bags
Sand 0.116 Cum
4.10 Cft
AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes & sizes in :
Unit Quantity Rate
Cement mortar 1 :6 ( 1 cement : 6 sand )
For 1 Cum
MATERIAL :
Common burnt clay ( non modular ) AAC Block in class designation 7.5 ,
Cum 1 3500
AAC Block size 600mm x 250mm x 200mm
Carriage of AAC Blocks Cum 1 350
Cement Bags 0.557 320
Sand Cft 4.097 66
TOTAL -A
LABOUR :
MASON - 1ST CLASS Day 0.47 465
BELDAR / COOLIE Day 1.8 340
BHISTI Day 0.2 300
Scaffolding Sqm 10 16
TOTAL -B
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
TION
Amount
3500
350
249
252
4352
219
612
60
160
1051
5402
108
5510
827
6337
AR
Amount
3500
350
178
270
4299
219
612
60
160
1051
5349
107
5456
818
6275
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
AAC Block SIZE ( 600 MM X 250 MM X 200 MM )
VOLUME OF 1 AAC Block
Say 10 mm thick mortar of AAC Block layer as per narms
No. of AAC Block in 1 Cum
Voulme of AAC Block for 1Cum
( Nos. of AAC Blocks x Volume of 1 AAC Block without mortar)
Volume of Mortar
Add 1% For Wastage
Add 35% For Dry Mortar
Volume of Wet Mortar
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:4 ( 1 CEMENT : 4 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar
Nos. of Bags
Sand
AAC Block WORK WITH COMMON CLAY NON MODULAR AAC Block
IN CEMENT MORTAT 1:6 ( 1 CEMENT : 6 SAND )
For 1 Cum AAC Blockwork
Volume of Mortar
Nos. of Bags
Sand
LABOUR :
MASON - 1ST CLASS
BELDAR / COOLIE
BHISTI
Scaffolding
TOTAL COST - A
Water & Electricity Charges 2%
TOTAL COST - B
Overhead & Contractor Proffit 15%
COST FOR 1 CUM
AAC Block work with common burnt clay F.P.S. ( Non modular ) AAC
Block size 600mm x 250mm x 200mm of class designation 7.5 in
Superstructure above plinth level upto level V in all shapes & sizes in :
LABOUR :
MASON - 1ST CLASS
BELDAR / COOLIE
BHISTI
Scaffolding
TOTAL COST - A
Water & Electricity Charges 2%
TOTAL COST - B
Overhead & Contractor Proffit 15%
COST FOR 1 CUM
0.030 Cum
0.0333
30.02 Nos.
0.901 Cum
0.002 Cum
0.002 Cum
0.003 Cum
0.002727 Cum
0.001 Cum
0.016 Bags
0.002 Cum
0.077 Cft
0.000 Cum
0.011 Bags
0.002 Cum
0.08 Cft
LABOUR :
For 1 SQM sQM 1
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
LABOUR :
For 1 SQM sQM 1
TOTAL COST - A
Water & Electricity Charges 2% 2%
TOTAL COST - B
Overhead & Contractor Proffit 15% 15%
COST FOR 1 CUM
AS PER SITE CALCULATION
Rate Amount
322.8 323
TOTAL -B 323
858
17
876
876
Rate Amount
80 300
5890 236
TOTAL -A 536
215.2 215
TOTAL -B 215
751
15
766
766
GRADE OF ADMIXTURE
S NO CONC CEMENT SAND 10MM 20MM FLY ASH ADMIXTURE 37S PC100
AS PER MIX AS PER MIX CONSUMPTIO CONSUMPTION IN CONSUMPTION IN AS PER MIX AS PER MIX AS PER MIX
DESIGN IN KG DESIGN IN BAGS N IN CFT CFT CFT DESIGN IN KG DESIGN IN DESIGN IN KG
1 M10 150 3.00 17.14 13.38 15.60 170.00 1.00
M15 150 3.00 17.14 13.38 15.60 170.00 1.00
M20 400 8.00 17.14 13.38 15.60 1.00
2 M25 270 5.40 16.33 9.51 16.80 130.00 3.50
3 M35 376 7.52 13.10 10.97 16.22 105.00 3.50
5 M40 400 8.00 13.91 9.51 16.68 90.00 0.00 3.00
4 M50 450 9.00 13.91 9.51 16.68 90.00 3.00
1 AAC BLOCK (600 X 250 X 2180 CUM 65.4 CUM ( 33.33 Block covered in per 1 Cum 0.6 0.25 0.2 0.0300 cum
200) , then rate of one block is Rs. 65/-)
Volume
2 JOINTING MORTAR 9.03 KG KG So, 17.7 Brick equal of one Block
13
14
15
S.NO. ITEMS UNIT AVERAGE
UP TO SEPT -23
1 0 AAC BLO ₹ 3,064
2 0 AAC BLO ₹ 2,794
3 0 JOINTI ₹ 10
4 0 BRICKS ₹ 4
5 BRICKS - RED - 1ST CLASS Nos. ₹ 6
1 0 8 MM T ₹ 62,306
2 0 10 MM ₹ 61,339
3 0 12 MM ₹ 55,699
4 0 16 MM ₹ 61,755
5 0 20 MM ₹ 58,373
6 0 25 MM ₹ 60,123
1 0 CEMENTT ₹ 297
2 0 CEMENT ₹ 307
1 0 MT ₹ 1,789
2 ₹ - MT ₹ 956
3 0 JAMUN ₹ 39
4 0 DOUBLE ₹ 66
5 0 FILLING ₹ 32
1 0 AGGREG ₹ 1,050
2 0 AGGREG ₹ 632
3 0 GRAVE ₹ 3,150
1 0 PLASTIS ₹ 42
2 0 PLASTIS
1 0 KOTA ST ₹ 33
2 0 KOTA ST ₹ 32
1 0 GWALIO ₹ 115
2 0 GRANITE ₹ 200
3 0 GRANIT ₹ 181
4 0 GRANIT ₹ 119
5 0 SK BLU ₹ 196
6 0 GRANITR ₹ 234
1 0 ITALIAN ₹ 239
2 0 ITALIA ₹ 180
3 0 ITALIA ₹ 189
4 0 BOTTIC ₹ 45
5 0 COREAN ₹ 784
6 0 LIGHT ₹ 321
7 0 DARK B ₹ 296
8 0 GSL BE ₹ 345
9 0 GRAY M ₹ 414
10 0 GREEN ₹ 101
11 0 UDAYPU ₹ 99
1 0 M.S. FL
2 0 MS PLA
3 0 MS ANG
4 0 MS ANG
5 0 MS CHA ₹ 60,963
6 0 MS FLA
7 0 MS SQ T
8 0 MS GIR
9 0 MS TUBE
10 0 MS NUT
11 0 MS TUBE
12 0 MS ANG ₹ 59,000
13 0 MS TUB
14 0 MS PLAT
15 0 MS TUB ₹ 71,741
16 0 STEEL
17 0 MS PLA ₹ 68,560
18 0 MS PLA ₹ 68,560
19 0 MS PLA
20 0 MS TUB
21 0 STEEL
22 0 MS TUB ₹ 71,740
23 0 ROUND ₹ 52,550
24 0 MS TUB ₹ 61,900
25 0 MS PLA ₹ 77,880
26 0 MS PLA ₹ 82,600
27 0 MS FLAT 75 X 5MM
28 0 STEEL TUBE PIPE 80 MM
29 0 MS FLAT ₹ 60,100
30 0 RHS 96 ₹ 72,000
31 0 SHS 15 ₹ 73,750
32 0 RHS 80 ₹ 70,210
33 0 SHS 10 ₹ 72,920
34 0 SHS 10 ₹ 70,560
35 0 SHS 72 ₹ 69,350
36 0 SHS 32 ₹ 69,390
37 0 CHS 27 ₹ 73,230
38 0 RHS 40 ₹ 83,860
39 0 CHS 16 ₹ 73,180
40 0 RHS 30 ₹ 92,867
41 0 RHS 30 ₹ 83,179
42 0 RHS 40 ₹ 83,179
43 0 MS PLA ₹ 71,650
44 0 G.I Plai ₹ 99,250
45 0 MS PLA ₹ 77,290
46 0 SHS 15 ₹ 85,000
47 0 SHS 30 ₹ 93,000
48 0 MS CHA ₹ 84,000
49 0 STEEL ₹ 77,527
50 0 STEEL ₹ 76,313
51 0 STEEL ₹ 76,313
52 0 CHS OD ₹ 83,190
53 0 MS PAL ₹ 82,600
54 0 MS PAL ₹ 79,650
55 0 MS CHA ₹ 60,000
56 0 MS FLA ₹ 61,260
57 0 CHS OD ₹ 73,000
58 0 SHS 32 ₹ 87,998
59 0 SHS 60 ₹ 86,817
60 0 SHS 10 ₹ 87,910
61 0 SHS 20 ₹ 97,942
62 0 MS ANG ₹ 61,596
63 0 MS PLA ₹ 85,510
64 0 MS CHA ₹ 78,527
65 0 MS CHA ₹ 78,527
66 0 MS GIR ₹ 66,906
67 0 MS GIR ₹ 60,339
68 0 MS PLA ₹ 79,275
69 0 MS PLA ₹ 78,116
70 0 MS PLA ₹ 59,671
71 0 SHS 20 ₹ 92,925
72 0 RHS 15 ₹ 87,910
73 0 RHS 20 ₹ 86,730
74 0 SHS 91 ₹ 86,730
75 0 SHS 10 ₹ 86,730
76 0 SHS 15 ₹ 86,730
77 0 RHS 10 ₹ 86,730
78 0 RHS 28 ₹ 87,910
79 0 ISA75* ₹ 60,000
80 0 ISA75* ₹ 60,000
81 0 ISA40* ₹ 60,000
82 0 MS BA ₹ 60,000
83 0 MS FLA ₹ 61,360
84 0 MS FLA ₹ 61,000
85 0 MS PLAT ₹ 85,000
86 0 MS PLA ₹ 85,000
87 0 RHS 10 ₹ 92,630
88 0 RHS 12 ₹ 88,500
89 0 SHS 32 ₹ 86,140
90 0 RHS 80 ₹ 86,140
91 0 RHS 96 ₹ 86,140
92 0 CHS 3 ₹ 90,135
93 0 CHS 25 ₹ 87,910
94 0 CHS 30 ₹ 87,910
95 0 CHS 12 ₹ 87,320
96 0 MS PLA #DIV/0!
97 0 MS ANG ₹ 67,998
98 0 MS PIP ₹ 86,600
99 0 MS PIP ₹ 98,648
100 0 MS PLA ₹ 17,713
101 0 MS CHA ₹ 78,340
102 0 MS PLA ₹ 82,390
103 0 MS PLA ₹ 81,660
104 0 MS PLA ₹ 79,890
105 0 MS PLA ₹ 79,890
106 0 ISMB 6 ₹ 72,800
107 0 ISMB 5 ₹ 72,800
108 0 ISMB 3 ₹ 72,800
109 0 ISMB 1 ₹ 72,800
110 0 ISMC 1 ₹ 72,800
111 0 RHS 24 ₹ 84,960
112 0 RHS 12 ₹ 84,960
113 0 MS PIPE ₹ 108,432
114 0 MS PLA ₹ 82,481
115 0 ISA 50, ₹ 68,450
116 0 GI SHE ₹ 106,530
117 0 RHS 10 ₹ 93,220
118 0 CHS 60 ₹ 103,420
119 0 MS PIPE 65MM
120 0 MS PIPE 125MM
121 0 MS FLA ₹ 68,100
122 0 ISA 50 ₹ 68,460
123 0 0
124 0 0
125 0 0
126 0 0
1 0 DIESEL ₹ 88
2 0 G.I. SH
3 0 GREEN ₹ 34
4 0 AL . PL
5 0 BINDIN
6 0 MS FAS
7 0 MS FAS ₹ 12
8 0 SS CLAM ₹ 272
9 0 TENAX ₹ 709
10 0 AAC BL
11 0 HILTY
12 0 HILTY ₹ 1,617
13 0 HILTY
14 0 HILTY
0 0 HILTY ₹ 11
15 0 HILTY ₹ 53
16 0 EPDM ₹ 708
17 0 EXPANS ₹ 708
18 0 SIKADU ₹ 2,816
19 0 KERB ST ₹ 123
20 0 SAUCER ₹ 122
21 0 SAUCER ₹ 53
22 0 PAVERS ₹ 692
23 0 HANDMA ₹ 206
24 0 ADHESI ₹ 572
25 0 PLY 8' ₹ 59
26 0 Bottom B ₹ 559
27 0 Bottom B ₹ 559
28 0 Epoxy B ₹ 3,400
29 0 CERAMIC ₹ 600
30 0 CI Manh ₹ 9,678
31 0 AKAMI ₹ 1,837
32 0 BIRLA ₹ 983
33 0 SFRG M ₹ 1,238
34 0 CERAMI #DIV/0!
35 0 ₹ 49
36 0 ₹ 51
37 0
38 0 LIGHT ₹ 6,254
39 0 PAVERS ₹ 447
40 0 ADHESI ₹ 867
41 0 ADHESI ₹ 238
42 0 SS PROF ₹ 761
43 0 Regin H ₹ 9,529
44 0 LIGHT ₹ 6,254
45 0 PLAIN W ₹ 210
46 0 TRACTOR TROLLY
47 0 RMC - ₹ 7,198
48 0 RMC-25 ₹ 5,533
49 0 RMC-15 ₹ 5,094
50 0 IVORY T ₹ 306
51 0 Mirror ₹ 1,983
52 0 GROUT ₹ 65
53 0 EPDM ₹ 330
54 0 FLOOR ₹ 171
55 0 MS BEN ₹ 27
56 0 COREAN ₹ 578
57 0 GI DUCT ₹ 663
58 0 GI DUCT ₹ 755
59 0 GI DUCT ₹ 933
60 0 GI DUCT ₹ 1,146
61 0 MS BOL ₹ 12
62 0 HARDNE ₹ 535
63 0 HILTY - ₹ 1,779
64 0 THREAD ₹ 7,376
65 0 M-24 N ₹ 175
66 0 M-10 N ₹ 17
67 0 THREAD ₹ 5,301
68 0 M-20 N ₹ 67
69 0 GI SHE ₹ 1,541
70 0 FRP GR ₹ 11,036
71 0 PVC FLE ₹ 37
72 0 VETRIFI ₹ 650
73 0 VETRIFI ₹ 650
74 0 TILE AD ₹ 21
75 0 MS BALL ₹ 6
Wooden Frame mm mm
L H
Frame Size 1200 2100
Wooden Size 95 70
206.75 2 2.0675 0.095 0.070 0.027
117.5 1 1.175 0.095 0.07 0.008
0.035
Add Wastage 5% 0.0018
0.037
Cum
Cum
Cum
Cum
Cum