حفر 1
حفر 1
حفر 1
Drilling Process
lecturer:Ahmed Alsubaih
Email:aaa2r6@mst.edu
Lecture overview
1
E&P IN THE PETROLEUM BUSINESS SYSTEM
Petrochemicals
Transportation
Exploration Development Production and trading Refining
Distribution Retailing
3
For oil and gas reservoirs to exist, all six ingredients
must be present
Geological traps
13
4
Petroleum field life cycle
Exploration Development Production Abandonment
Review existing Land owner permits Operate oil field Abandon field and
geological/ geophysical reinstate property
data Complete Monitor reservoir
development plan performance
Shoot seismic
Facilities and well Develop prod.
Drill exploratory wells design maintenance and
improvement plans
Log and core well and Set performance
sample fluids targets Evaluate ongoing
economic viability of
Well test Final facilities well/field
engineering design
Evaluate data Review scope for
Drill production wells additional investment
Shoot seismic
5
Here is a Drilling Example
6
7
8
9
10
Drilling Rig types
1. Land rigs
11
2. Jackup rigs
12
3. Platform rigs
13
3. Platform rigs
4. Submersible rigs
14
5. Drilling Barge
6. Semi-Submersible rigs
www.offshore.no
15
Transportation of a semi-sub
7. Drill ships
16
Drilling process
Making hole
17
Drill string
18
Drill Pipe
Drill collar
19
Drill bit
• Is used to excavate
the rock at the
bottom of the well
• The weight on the
bit is created by the
weight of drill
collars.
Making Making
a a
Connection Trip
20
Making a mouse hole connection
Moving Kelly
to Single in
Mousehole Single
Added.
Stabbing Ready to
the Pipe Drill
21
Making a trip
Why
trip?
Use
Elevators
Put Kelly in
for
Rathole
tripping
Tripping
one stand
at a time
60-90 ft
22