(Package 1 Ipc 3
(Package 1 Ipc 3
(Package 1 Ipc 3
BILL NO DESCRIPTION Original BOQ Previous IPC This IPC Upto Date
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Supply, installation, testing, disinfection and
commissioning of the following items of work (unless
specifically stated otherwise) including all jointing
material, wastages,labour, tools, accessories and
other incidentals, etc. required for completion of each
item as per specification, drwaings and / or as
directed by the Enginner/ Project manager.
(Provisional Quantites have been taken,to be
executed after approval of the Engineer)
CIVIL WORKS
1 Breaking of Existing Road Pavement Stucture 100Cft 45.00 5,000.00 225,000.00 4,089.13 204,456.53 - 4,089.13 204,456.53
Dismentling reinforced cement concrete
2 100Cft 1.00 8,000.00 8,000.00 - - - -
Dismentling reinforced cement concrete separating
3 reinforcemnt from concrete cleaning and 100Cft 5.00 8,000.00 40,000.00 - - - -
straightening the same
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
7 Earth for slush or daldal including dewatering 1000Cft 9.60 55,000.00 528,000.00 - - - -
Add for additional lift of every three ft. or part
8 thereof in excavation for pipelines & storage - -
tanks trenches and pits.
Lift from 5 ft to 8ft 1,000 Cft 8.00 35,000.00 280,000.00 4,889.18 171,121.45 - 4,889.18 171,121.45
Lift from 8 ft to 11ft 1,000 Cft 8.00 45,000.00 360,000.00 1,704.04 76,681.78 - 1,704.04 76,681.78
Lift from 11 ft to 14ft 1,000 Cft 4.00 55,000.00 220,000.00 - - -
Providing, laying and compacting (90% modified
AASHTO) sewer pipe bedding. The bedding material
shall be well grade granular fill with fine particles not
9 more than 15%. The granular fill aggregate shall be 100 Cft 9.00 12,000.00 108,000.00 - - - -
1" to 1-1/2" size complete in all respect as per
drawings, specification and direction by the
Engineer.
Supplying and filling sand over pipe line under road
10 100 Cft 15.00 12,000.00 180,000.00 - - - -
structure.
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
11 compacting. Finishing curing complete in all 100 Cft 1.00 90,000.00 90,000.00 - - - -
respect as shown on the drawing. Minimum
cylindrical strength 3000 Psi.
CHAMBERS - -
Providing and laying plain cement concrete including
all kind of form work. Hgoisting, placing
12 compacting. Finishing curing complete in all 100 Cft 1.00 90,000.00 90,000.00 - - - -
respect as shown on the drawing. Minimum
cylindrical strength 1500 Psi.
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Providing and laying reinforced cement concrete
having 3000 psi cylindrical strength including all kind
13 of form work. Hoisting, placing, compacting, 100 Cft 6.00 90,000.00 540,000.00 - - - -
Finishing, curing complete in all respect as shown on
the drawing.
Fabrication of mild steel reinforcement for cement
concrete including cutting, bending, laying in
14 position, making joints and fastenings including 100 Kg 27.00 35,000.00 945,000.00 - - - -
cost of binding wire (also include removal of rust).
Using tor bars (Grade-60).
Providing "expansion joint" in concrete work of 9"
wide corrugated PVC waterstoper (with bulb),
15 conforming to ASTM D2240 and D638 Type IV, Rft 74.67 1,900.00 141,873.00 - - - -
including soldering cost of material and labour etc.
complete.
iv Granular Subbsae 100 Cft 23.00 8,000.00 184,000.00 11,403.01 912,241.11 - 11,403.01 912,241.11
v Aggregate Base Course 100 Cft 30.00 10,000.00 300,000.00 - - -
vi Asphaltic Base Course Plant mix (Class B) 100 Cft 6.00 90,000.00 540,000.00 - - - -
vii Cut - Back Asphlt for Bituminous Prime Coat 100 Sft 30.00 900.00 27,000.00 - - - -
viii Cut - Back Asphlt for Bituminous Tack Coat 100 Sft 30.00 900.00 27,000.00 - - - -
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF
KARACHI (LOT#1)
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
ix Asphaltic Concrete for Wearing Course (Class "A") 100 Cft 6.00 90,000.00 540,000.00 - - - -
Refilling the excavated stuff in trenches 6" thick layer
20 i/c watering rammaning to full compaction etc. 1,000 Cft 26.00 35,000.00 910,000.00 2,223.57 77,825.06 - - 2,223.57 77,825.06
complete.
Transportation of Earth all types when the total
distance, including the lead covered in the item of - -
work, Is more than 1000 ft. (300m)
a) upto 1/4 mile (400m) 1,000 Cft 7.00 9,000.00 63,000.00 - - - -
b) for every 330 ft (100m) additional lead or part
therefore, beyond 1/4 mile (400m) upto one mile 1,000 Cft 7.00 5,000.00 35,000.00 - - - -
21
(1.6 Km).
c) for every 1/4 mile (400) additional lead or part
therefore, beyond one mile (1.6 Km) up to 5 mile 1,000 Cft 7.00 5,000.00 35,000.00 - - - -
(8Km).
d) for every 1/2 mile (800m) additional lead or part
therefore, beyond 5 miles (8 Km) for lead 35Km 1,000 Cft 7.00 5,000.00 35,000.00 - - - -
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
ii 16" i/d Each 1.00 300,000.00 300,000.00 - - - -
iii 18" i/d Each 2.00 350,000.00 700,000.00 - - - -
Providing, and fixing, double orifice Air Valve 3"
internal dia BSS quality and weight including the
25 cost of jointing material with all fittings and Each 5.00 200,000.00 1,000,000.00 - - - -
accessories Complete in all respect as approved by
the Engineer.
Providing, fixing, jointing and testing of M.S flanges
including Rubber gasket Complete in all respect as
26 - -
per drawings, specifications and as directed by
Engineer.
i 6" i/d Each 4.00 15,000.00 60,000.00 - - - -
ii 16" i/d Each 2.00 20,000.00 40,000.00 - - - -
iii 18" i/d Each 4.00 30,000.00 120,000.00 - - - -
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
Providing, laying, jointing testing, disinfecting and
commissioning the High Density Polyethylene Pipe
fittings and specials such as bend, Tee, Taper core,
stab end etc. (HDPE) (PE - 100), PN-10 (SDR 17)
29 - - - -
conforming to relevant ASTM standard and ISO
4427, DIN8074/75 complete in all respects (including
injection moulded fittings) as approved by the
Engineer.
Bends - -
i 180mm Each 1.00 25,000.00 25,000.00 - - - -
Tees - -
Reducing Tee - -
i 180mm Each 1.00 25,000.00 25,000.00 - - - -
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
iv 710mm Each 3.00 50,000.00 150,000.00 - - - -
v 1000mm Each 3.00 60,000.00 180,000.00 - - - -
Stub Ends - -
ii 18" i/d Each 3.00 60,000.00 180,000.00 2.00 120,000.00 - 2.00 120,000.00
iii 24" i/d Each 2.00 80,000.00 160,000.00 1.00 80,000.00 - 1.00 80,000.00
Original BOQ Previous IPC This IPC (IPC 02) Upto Date IPC
Sr. # Description Rate Amount (PKR) Amount
Unit Quantity Qunatity Amount (PKR) Qunatity Amount Qunatity
(PKR) (PKR)
iii 8" i/d Each 1.00 50,000.00 50,000.00 - - - -
ii 18" i/d Each 3.00 50,000.00 150,000.00 4.00 200,000.00 - 4.00 200,000.00
iii 24" i/d Each 2.00 45,000.00 90,000.00 6.00 270,000.00 - 6.00 270,000.00
iv 33" i/d Each 10.00 80,000.00 800,000.00 4.00 320,000.00 - 4.00 320,000.00
Repair of leaking joint on PRCC pipe of following
diameters. It includes the cost of sealing with gunny
34 begs, spun yarn, lead wool, rapid hardning cement - -
etc. Complete in all respect.
ii 18" i/d Each 1.00 40,000.00 40,000.00 6.00 240,000.00 - - 6.00 240,000.00
iii 24" i/d Each 1.00 50,000.00 50,000.00 7.00 350,000.00 - - 7.00 350,000.00
iv 33" i/d Each 2.00 60,000.00 120,000.00 18.00 1,080,000.00 - - 18.00 1,080,000.00
CIVIL WORKS
Additional Works Assigned at
1 Breaking of Existing Road Pavement Stucture 100Cft 1,346.00 2,500.00 3,365,000.00 #REF! 2,500.00 #REF! #REF! 2,500.00 #REF! Different Location as per Instructions
of Consultant/Client)
Dismentling reinforced cement concrete
2 100Cft 20.00 8,000.00 160,000.00 20.00 8,000.00 160,000.00 - 8,000.00 -
Dismentling reinforced cement concrete separating
3 reinforcemnt from concrete cleaning and straightening 100Cft 144.00 3,000.00 432,000.00 144.00 3,000.00 432,000.00 - 3,000.00 -
the same
7 Earth for slush or daldal including dewatering 1000Cft 281.40 20,000.00 5,628,000.00 281.40 20,000.00 5,628,000.00 - 20,000.00 -
Refilling the excavated stuff in trenches 6" thick layer Additional Works Assigned at
20 i/c watering rammaning to full compaction etc. 1,000 Cft 751.00 8,000.00 6,008,000.00 811.05 8,000.00 6,488,376.00 60.05 8,000.00 480,376.00 Different Location as per Instructions
complete. of Consultant/Client)
Transportation of Earth all types when the total
distance, including the lead covered in the item of
work, Is more than 1000 ft. (300m)
a) upto 1/4 mile (400m) 1,000 Cft 188.00 6,000.00 1,128,000.00 188.00 6,000.00 1,128,000.00 - 6,000.00 -
b) for every 330 ft (100m) additional lead or part
therefore, beyond 1/4 mile (400m) upto one mile (1.6 1,000 Cft 188.00 2,000.00 376,000.00 188.00 2,000.00 376,000.00 - 2,000.00 -
21 Km).
c) for every 1/4 mile (400) additional lead or part
therefore, beyond one mile (1.6 Km) up to 5 mile 1,000 Cft 188.00 2,000.00 376,000.00 188.00 2,000.00 376,000.00 - 2,000.00 -
(8Km).
i 6" i/d Each 2.00 10,000.00 20,000.00 2.00 10,000.00 20,000.00 - 10,000.00 -
ii 8" i/d Each 2.00 15,000.00 30,000.00 2.00 15,000.00 30,000.00 - 15,000.00 -
iii 10" i/d Each 2.00 20,000.00 40,000.00 2.00 20,000.00 40,000.00 - 20,000.00 -
iv 12" i/d Each 2.00 30,000.00 60,000.00 2.00 30,000.00 60,000.00 - 30,000.00 -
v 16" i/d Each 2.00 40,000.00 80,000.00 2.00 40,000.00 80,000.00 - 40,000.00 -
vi 18" i/d Each 4.00 40,000.00 160,000.00 4.00 40,000.00 160,000.00 - 40,000.00 -
vii 33" i/d Each 2.00 50,000.00 100,000.00 2.00 50,000.00 100,000.00 - 50,000.00 -
vii 48" i/d Each 4.00 100,000.00 400,000.00 4.00 100,000.00 400,000.00 - 100,000.00 -
vii 66" i/d Each 2.00 150,000.00 300,000.00 2.00 150,000.00 300,000.00 - 150,000.00 -
Providing, laying, cutting, butt fusion jointing, testing,
commissioning & disinfecting the High Density
Polyethylene Pipe (HDPE) PE - 100, PN-8 (SDR 21)
28 conforming to ISO 4427 or DN8074/8075 or
equivalent to the satisfaction of Engineer. The pipe
shall be from reputable manufacturer approved by the
Engineer.
i 180mm Rft. 198.00 1,600.00 316,800.00 198.00 1,600.00 316,800.00 - 1,600.00 -
ii 225mm Rft. 198.00 1,800.00 356,400.00 198.00 1,800.00 356,400.00 - 1,800.00 -
iii 280mm Rft. 165.00 2,000.00 330,000.00 165.00 2,000.00 330,000.00 - 2,000.00 -
Additional Works at Banaras Chowk
03 Nos HDPE Pipelines (Total
Length = 1800Rft)
iv 355mm Rft. 6,600.00 3,000.00 19,800,000.00 8,480.00 3,000.00 25,440,000.00 1,880.00 3,000.00 5,640,000.00
Additional Works at 5000 Road Near
KDA Office Surjani Town (Total
Length = 80Rft)
v 450mm Rft. 220.00 6,000.00 1,320,000.00 220.00 6,000.00 1,320,000.00 - 6,000.00 -
vi 500mm Rft. 275.00 7,000.00 1,925,000.00 275.00 7,000.00 1,925,000.00 - 7,000.00 -
vii 1000mm Rft. 33.00 30,000.00 990,000.00 33.00 30,000.00 990,000.00 - 30,000.00 -
viii 1400mm Rft. 3,069.00 50,000.00 153,450,000.00 3,069.00 50,000.00 153,450,000.00 - 50,000.00 -
ix 1600mm Rft. 550.00 65,000.00 35,750,000.00 550.00 65,000.00 35,750,000.00 - 65,000.00 -
Providing, laying, cutting, jointing, testing,
commissioning & disinfecting the uPVC Dia 225mm
28a (SDR 80) conforming to the satisfaction of Engineer.
The pipe shall be from reputable manufacturer
approved by the Engineer.
i) 225mm Rft. - - - 20.00 2,500.00 50,000.00 20.00 2,500.00 50,000.00
Providing, laying, jointing testing, disinfecting and
commissioning the High Density Polyethylene Pipe
fittings and specials such as bend, Tee, Taper core,
stab end etc. (HDPE) (PE - 100), PN-10 (SDR 17)
29
conforming to relevant ASTM standard and ISO 4427,
DIN8074/75 complete in all respects (including
injection moulded fittings) as approved by the
Engineer.
Bends
i 180mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
ii 225mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iii 280mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
iv 355mm Each 14.00 20,000.00 280,000.00 14.00 20,000.00 280,000.00 - 20,000.00 -
v 450mm Each 1.00 35,000.00 35,000.00 1.00 35,000.00 35,000.00 - 35,000.00 -
i 500mm Each 1.00 35,000.00 35,000.00 1.00 35,000.00 35,000.00 - 35,000.00 -
ii 1000mm Each 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 - 100,000.00 -
iii 1400mm Each 7.00 125,000.00 875,000.00 7.00 125,000.00 875,000.00 - 125,000.00 -
iv 1600mm Each 2.00 210,000.00 420,000.00 2.00 210,000.00 420,000.00 - 210,000.00 -
Tees
i 180mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
ii 225mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iii 280mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
iv 355mm Each 14.00 30,000.00 420,000.00 14.00 30,000.00 420,000.00 - 30,000.00 -
v 450mm Each 1.00 33,000.00 33,000.00 1.00 33,000.00 33,000.00 - 33,000.00 -
vi 500mm Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
vii 1000mm Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
viii 1400mm Each 7.00 100,000.00 700,000.00 7.00 100,000.00 700,000.00 - 100,000.00 -
ix 1600mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
Reducers
i 180mm Each 1.00 5,000.00 5,000.00 1.00 5,000.00 5,000.00 - 5,000.00 -
ii 225mm Each 1.00 10,000.00 10,000.00 1.00 10,000.00 10,000.00 - 10,000.00 -
iii 280mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
iv 355mm Each 14.00 18,000.00 252,000.00 14.00 18,000.00 252,000.00 - 18,000.00 -
v 450mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
vi 500mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
vii 1000mm Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
viii 1400mm Each 7.00 80,000.00 560,000.00 7.00 80,000.00 560,000.00 - 80,000.00 -
ix 1600mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
Reducing Tee
i 180mm Each 1.00 10,000.00 10,000.00 1.00 10,000.00 10,000.00 - 10,000.00 -
ii 225mm Each 1.00 15,000.00 15,000.00 1.00 15,000.00 15,000.00 - 15,000.00 -
iii 280mm Each 1.00 20,000.00 20,000.00 1.00 20,000.00 20,000.00 - 20,000.00 -
iv 355mm Each 27.00 15,000.00 405,000.00 27.00 15,000.00 405,000.00 - 15,000.00 -
v 450mm Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
vi 500mm Each 2.00 30,000.00 60,000.00 2.00 30,000.00 60,000.00 - 30,000.00 -
vii 1000mm Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
viii 1400mm Each 13.00 80,000.00 1,040,000.00 13.00 80,000.00 1,040,000.00 - 80,000.00 -
ix 1600mm Each 3.00 100,000.00 300,000.00 3.00 100,000.00 300,000.00 - 100,000.00 -
Stub Ends
i 180mm Each 2.00 40,000.00 80,000.00 2.00 40,000.00 80,000.00 - 40,000.00 -
Additonal Work at 5000 Road
II 225mm Each 2.00 50,000.00 100,000.00 4.00 50,000.00 200,000.00 2.00 50,000.00 100,000.00
nearKDA Office
III 280mm Each 2.00 80,000.00 160,000.00 2.00 80,000.00 160,000.00 - 80,000.00 -
IV 355mm Each 15.00 30,000.00 450,000.00 15.00 30,000.00 450,000.00 - 30,000.00 -
V 450mm Each 2.00 60,000.00 120,000.00 2.00 60,000.00 120,000.00 - 60,000.00 -
VI 500mm Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
VII 1000mm Each 2.00 100,000.00 200,000.00 2.00 100,000.00 200,000.00 - 100,000.00 -
VII 1400mm Each 10.00 250,000.00 2,500,000.00 10.00 250,000.00 2,500,000.00 - 250,000.00 -
IX 1600mm Each 3.00 250,000.00 750,000.00 3.00 250,000.00 750,000.00 - 250,000.00 -
Providing & fixing MS Split collar on PRCC pipe, 18"
wide fabricated with 1/8" thick M.S plate 1-1/4" wide
1/8" thick ring at center 1/2" thick M.S squre bar on
30
both ends. It includes the cost of 4 nos-1/2" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.
i 6" i/d Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
ii 8" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iii 10" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
iv 12" i/d Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
Providing & fixing MS Split collar on PRCC pipe, 18"
wide fabricated with 3/8" thick M.S plate 1-1/4" wide
3/8" thick ring at center 3/4" thick M.S square bar on
31
both ends. It includes the cost of 4 nos-3/4" thick
flanges, nuts & bolts rubber packing, labour and the
sealing material.
i 16" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
ii 18" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iii 33" i/d Each 1.00 60,000.00 60,000.00 1.00 60,000.00 60,000.00 - 60,000.00 -
iv 48" i/d Each 5.00 80,000.00 400,000.00 5.00 80,000.00 400,000.00 - 80,000.00 -
iv 66" i/d Each 1.00 200,000.00 200,000.00 1.00 200,000.00 200,000.00 - 200,000.00 -
i 6" i/d Each 1.00 25,000.00 25,000.00 1.00 25,000.00 25,000.00 - 25,000.00 -
ii 8" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
iii 10" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
iv 12" i/d Each 5.00 40,000.00 200,000.00 5.00 40,000.00 200,000.00 - 40,000.00 -
Providing & fixing M.S Split stepped collar on PRCC
pipe, 18" wide on PRCC pipe, 18" wide fabricated
with 3/8" thick M.S plate, 3/4" thick M.S squre bars on
33
both ends. It includes the cost of 4 nos- 3/4" thick M.S
flanges, nut & bolts rubber packing, labour and the
sealing material.
i 16" i/d Each 1.00 70,000.00 70,000.00 1.00 70,000.00 70,000.00 - 70,000.00 -
ii 18" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
iii 33" i/d Each 1.00 100,000.00 100,000.00 1.00 100,000.00 100,000.00 - 100,000.00 -
iv 48" i/d Each 5.00 100,000.00 500,000.00 5.00 100,000.00 500,000.00 - 100,000.00 -
v 66" i/d Each 1.00 300,000.00 300,000.00 1.00 300,000.00 300,000.00 - 300,000.00 -
Repair of leaking joint on PRCC pipe of following
diameters. It includes the cost of sealing with gunny
34
begs, spun yarn, lead wool, rapid hardning cement etc.
Complete in all respect.
i 6" i/d Each 1.00 30,000.00 30,000.00 1.00 30,000.00 30,000.00 - 30,000.00 -
ii 8" i/d Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
iii 10" i/d Each 1.00 40,000.00 40,000.00 1.00 40,000.00 40,000.00 - 40,000.00 -
iv 12" i/d Each 1.00 50,000.00 50,000.00 1.00 50,000.00 50,000.00 - 50,000.00 -
v 16" i/d Each 1.00 60,000.00 60,000.00 1.00 60,000.00 60,000.00 - 60,000.00 -
vi 18" i/d Each 1.00 80,000.00 80,000.00 1.00 80,000.00 80,000.00 - 80,000.00 -
vii 33" i/d Each 1.00 200,000.00 200,000.00 38.00 200,000.00 7,600,000.00 37.00 200,000.00 7,400,000.00
viii 48" i/d Each 1.00 200,000.00 200,000.00 11.00 200,000.00 2,200,000.00 10.00 200,000.00 2,000,000.00
ix 66" i/d Each 1.00 350,000.00 350,000.00 1.00 350,000.00 350,000.00 - 350,000.00 -
Repair of leaking joint on M.S pipes Including the cost
of cutting the damaged portion of pipe and replace it
35 Sft 50.00 30,000.00 1,500,000.00 50.00 30,000.00 1,500,000.00 - 30,000.00 -
with 3/8" thick M.S sheets, welding etc. Complete in
all respect.
MS Jointing Clamps Dia 225mm Length 12 inches
35a Each - - - 12.00 22,000.00 264,000.00 12.00 22,000.00 264,000.00
conforming to standard practices
Providing and Fixing of MS Jointing Clamps Dia
35b 225mm Length 4 inches conforming to standard Each - - - 2.00 5,200.00 10,400.00 2.00 5,200.00 10,400.00
practices
Providing & fixing Rubber Packing under M.S Collars
Additional Works Assigned at
for making it water tight complete in all respects, as
36 KG 415.83 1,800.00 748,494.00 665.83 1,800.00 1,198,494.00 250.00 1,800.00 450,000.00 Different Location as per Instructions
per Drawings, specifications and as directed by the
of Consultant/Client)
Engineer.
TOTAL AMOUNT BILL #01 390,117,074.00 #REF! #REF!
-
PACKAGE#1 REPAIR & REPLACEMENT OF DAMAGED SECTIONS OF WATER LINES & SEWERS ON PEOPLES BUS SERVICE ROUTES IN DEFFERENT DISTRICTS OF KARACHI
(LOT#1)
BILL # 02: REPAIR OF SEWER LINES
Original BOQ Previous IPC This IPC (IPC 01) Upto Date IPC
Sr. # Description
Unit Quantity Rate (PKR) Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR) Qunatity Amount (PKR)
Replacement of Sewer Line b/w Manholes
i 5 ft. to 8 ft.(1.5 to 2.4 m) depth 12.52 1000Cft. 25000 313,000.00 113,805.00 2,845,125.00 - - 113,805.00 2,845,125.00
ii 8ft. to 11 ft.(2.4 to 3.9 m) depth 7.51 1000Cft. 30000 225,300.00 112,534.30 3,376,029.00 - - 112,534.30 3,376,029.00
iii 11 ft. to 14 ft.(3.9 to 5.5 m) depth 6.66 1000Cft. 35000 233,100.00 75,948.70 2,658,204.50 - - 75,948.70 2,658,204.50
iv 14 ft. to 17 ft.(5.5 to 6.4 m) depth 2.8 1000Cft. 45000 126,000.00 726.70 32,701.50 - - 726.70 32,701.50
Providing, and fixing / driving the shuttering timbering
for trench support during excavation and laying of
9 - - -
sewers, complete in all respect as per drawings,
specification and direction by the Engineer.
i) for depth upto 10ft 27 100Sft 8000 216,000.00 - - -
ii) for depth above 10ft 3 100Sft 9500 28,500.00 2,240.00 212,800.00 - - 2,240.00 212,800.00
MANHOLES - - -
iii) 11 ft. to 14 ft. (3.9 to 5.5 m) depth 6.66 1004 Cft. 35000 233,100.00 - - -
iv) 14 ft. to 17 ft. (5.5 to 6.4 m) depth 2.8 1005 Cft. 40000 112,000.00 - - -
Providing and laying plain cement concrete including all
kind of form work, hoisting, placing compacting,
25 finishing, curing complete in all respect as shown on - - -
the drawing
Minimum cylindrical strength 1500 psi (Lean) 2.89 100Cft 30000 86,700.00 254.00 76,200.24 - - 254.00 76,200.24
Minimum cylindrical strength 3000 psi (Benching) 8.03 100Cft 50000 401,500.00 393.37 196,683.17 - - 393.37 196,683.17
Providing and laying cement concrete having 4000 psi
cylindrical strength including all kind of form work/ mould,
hoisting, placing, compacting, finishing and curing
26 0.91 100Cft 90000 81,900.00 839.93 755,933.39 - 839.93 755,933.39
complete in all respect as shown on the drawing.
(Manholes and RCC pipe casing concrete for repairing of
crown)
Providing and fixing 36" dia 8" thick R.C.C. manhole cover
30 including all reinforcement complete in all respect per 58 Each 9000 522,000.00 - - -
drawing, specifications and as directed by the Engineer.
15 ft Deep RCC
Manholes at shah rahe
1 qaideen to Ghazali road 15 1 18.00
to alama iqbal to hali
road
2 Bahadur abad chowk 5 1 5.00
Shah rah e Qaideen
3 block -2 13 1 13.00
4 Sindhi mulim society 1 1 1.00
Grand Total for Sewer Lines 37.00
15 ft Deep RCC
Manholes at shah rahe
1 qaideen to Ghazali road 13 8 104.00
to alama iqbal to hali
road
24 0+1900 100 8 -
B EXTRA BOX -
24 0+1900 100 8 -
B EXTRA BOX
71 EXTRA BOX AT 0+36 11 8.00 0.167 14.70
Shahrah e Quaideen to
1 ghazali road to alama 0+00 to 0+6445 6445 6 0.5 19,335.00
iqbal road to