ESR App C SFT Rev C-Jan 2002
ESR App C SFT Rev C-Jan 2002
ESR App C SFT Rev C-Jan 2002
To:.......................................................................(SAEP/AEP)*
The following Electrical Equipment has been made safe in accordance with the AFPC Electrical Safety Rules for
the testing detailed in this Sanction forTest to proceed:
.................................................................................................................................................................................
.................................................................................................................................................................................
TESTING TO BE CARRIED
OUT:..........................................................................................................................
.................................................................................................................................................................................
POINTS AT WHICH THE ELECTRICAL EQUIPMENT HAS BEEN ISOLATED AND CAUTION
NOTICES ATTACHED:.......................................…..............................................................................................
...............................................................................................................................................................................
……DANGER NOTICES ATTACHED
AT:.................................................................................................................
...............................................................................................................................................................................
……CIRCUIT MAIN EARTH APPLIED
AT:...............................................................................................................
.................................................................................................................................................................................
(These may be removed and replaced under this Sanction for Test)
DATE:..........................................................................TIME:.................................................................................
NAME :........................................................................SIGNATURE.....................................................................
(IN BLOCK LETTERS) (SAEP)
2. RECEIPT
I have checked the precautions taken and accept responsibility for carrying out the testing on the Electrical
Equipment detailed on this Sanction for Test and for taking precautions to prevent Danger.
DATE:..........................................................................TIME:.................................................................................
NAME :........................................................................SIGNATURE.....................................................................
(IN BLOCK LETTERS) (SAEP/AEP)*
4. CANCELLATION
All Earths specified in Part 1 have been removed. This Sanction for Test is cancelled.
DATE:..........................................................................TIME:.................................................................................
* Delete whatever is not applicable REV C:- Jan 2001 MESC 93-55-81-035-9
White Copy- Permit Holder, Pink Copy – Senior Authorised Electrical Person , Blue Copy- Retained by Permit Co-ordinator
SANCTION FOR TEST
NAME :........................................................................SIGNATURE.....................................................................
(IN BLOCK LETTERS) (SAEP)
5. CROSS REFERENCES:....................................../................................................/............................................
* Delete whatever is not applicable REV C:- Jan 2001 MESC 93-55-81-035-9
White Copy- Permit Holder, Pink Copy – Senior Authorised Electrical Person , Blue Copy- Retained by Permit Co-ordinator