Reinforced cement concrete demolished in suspended
1 floors, reinforcement removed and debris cleared m³ 0.2 21,924.00 4,384.80 within the site
Excavation in trenches for walls, column pits and
foundation in sort/loose soil up to a depth 1.5m and 2 depositing excavated material to distance within the m³ 1.5 1,086.00 1,629.00 site as directed.(Earth work support and back filling to be paid separately where necessary).
Filling under floors with gravel or other approved
quality material supplying, filling, spreading, leveling, 3 watering and compaction in 150mm layers as per m³ 4.5 4,538.00 20,421.00 Engineer's instruction, measured on compacted volume(material not available at site)
100mm thick nominal hollow block work in cement and
5 sand mortar 1:5 with 400x100x200mm blocks (cavities m² 108 2,742.00 296,136.00 unfilled)
Mixing & Placing in Position Cement concrete grade
6 C20/25 in column shaft using mixer,vibrator and curing- m³ 2.25 42,044.00 94,599.00 up to first floor level
Mixing and Placing in Position Lintel, cement concrete
grade C16/20, 112x150mm with 2 nos. 12 mm dia. high 7 Lm. 21 3,042.00 63,882.00 yield strength bars including necessary form work-up to first floor level
112x150mm stiffener columns in 1:2:4(20mm) cement
8 concrete including reinforced with 2 nos of 10mm dia. Lm. 8.5 1,884.00 16,014.00 high yield steel bars , including necessary form work
12mm laminated plywood shuttering for column shaft
9 m² 18 4,504.00 81,072.00 including dismantling-up to first floor level
High yield strength reinforcing in columns, beams, slabs
10 and lintels up to second floor level bent to shape laid in Kg 85 661.00 56,185.00 position and tied with G.I. Wire as directed Plain round steel reinforcements shape into stirrups 11 and laid in position and tied with GI wires as directed- Kg 18 658.00 11,844.00 up to first floor level Cement plaster with 1:5 mix, 15mm thick finished 12 smooth with skim coat in internal walls-up to first floor m² 3 1,622.00 4,866.00 level Cement plastering with 1:5 mix , 15mm thick finished 13 semi rough in external reveals (not exceeding 100mm Lm. 155 291.00 45,105.00 wide ) walls Rendering cement 12mm, in 1:5 cement and sand on 14 existing concrete, floating coat using Colour cement, m² 98 1,584.00 155,232.00 finished smooth
Skirting 25x100mm in 1:5, projected or flush with walls
15 Lm. 17 698.00 11,866.00 and including forming groove finished with red cement
Asbestos corrugated sheet fixed on existing roof with
16 m² 39 3,248.00 126,672.00 necessary bolt and nuts
Fabricating and fixing door, 95mm x 70mm (nominal)
frame in class 1 or above timber and 19 to 22 mm )think class 1 or above battened with grooved and tongued joints sash with 3 nos of 5" x 3" sized brass(MELWA) 17 butt hinges and necessary screws as per engineer's m² 5 37,697.00 188,485.00 instruction. Rate shall be included cleaning and preparation of surface and application primer for under coat and two coats of enamel paint (Door lock barrel bolt paid separately )
Prepare surface and apply one coats of floor paint, red,