LARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00
EHS RISK ASSESSMENT

Name of the Project : WDFC, Phase-II, EMP-16 Business Unit: RB U


Activity considered : Shuttering / form work for foundation Date: 07-01-2017

Hazard / Environment Aspect

Probability
Risk / Residual

Severity
Rating

Rating
Sl. Additional Control
Activity Source / Existing Control Measures Impact Risk / Action By
No Possible People Measures
Situation / Level Impact
Outcome at risk
Act

Material Worke Site


r/ 1.maintaining good Engineer
handling Improper Slip –trip and
1. helper housekeeping 1 4 L L
(loading / Access fall
2. proper material stacking
unloading)

Worker Site Engg


1.All sharp edges must be
s /
Sharp checked
Wear & tear 1 3 L Safety engg.
edges / 2 PPe’s like gloves and safety L
helpers boots must be used.

1. Manual handling must be


Worker reduced.
WRULD’s
Manual s 2. Weight must be lifted closer
/ 1 3 L L Site engg.
handling / to the body.
Back pain 3.Training must be imparted to /
helpers
workmen Safety engg
Worker Site
Transportat s 1.Not exceeding the Loading engineer
Uneven Toppling of
2. ion of limit 1 3 L L /
ramp/road vehicle /
material 2.Adequate supervision P&M
helpers Engineer
1.Collision with Site
object engineer
1.Competentcy and Fitness of /
2. Collision with 1.Separate walkway for
the driver Traffic
Rash man pedestrian and vehicle
2. Driving within the speed Engineer
driving 3. Rash driving Worker movement
limit /
/ s/ 2 3 H 2.Bank’s men or helper L
4.Fall of TM in 3. PUC certificate and NOC of SHE
over Helpers while reversing
the pit the vehicle Engineer
speeding 3.Use of Reverse horn
5. Soil Collapse 4. Driver having valid driving
while reversing
license

1. Manual handling must be


Worker reduced.
Making of WRULD’s
Manual s 2. Weight must be lifted closer
3 shuttering / 1 3 L L Site engg.
handling / to the body.
board Back pain /
helpers 3.Training must be imparted to
workmen Safety engg
1.Contact with 1. Using job specific PPE’s like
sharp edges gloves, safety shoes, helmets, Site engg.
2.Electric shock Worker nose masks.
Using 1. Using RCCB/ ELCB for /
s 2. Regular inspection of Power/
Power 3.inhalation of power tools. P&M
hand tools. 2 3 M L
/ hand dust / 2. Training for workers for
3. Avoiding using wires which /
tools 3.exposure to helpers using power tools
have cut. Safety engg
noise and 4. providing good illumination
vibration
Use of Worker 1. Using job specific PPE’s like
bonding s nose mask, hand gloves, safety
Exposure to Site engg.
and shoes. 2 3 L L
chemicals / /
shuttering 2.Good ventilation
oils helpers Safety engg
1.Fall of Worker 1. Training to workmen
Installation Fixing of material s 2. Load must be lifted Site engg
4 of formwork CT prop closer to the body 1 3 L L
2.Material /
board jacks 3. Ct must be fixed using
handling helpers tripod stands
Lifting and 1.Loose material must not be Site engg
1. Fall of Worker 1 3 L L
Fixing and left on the edge of the
alignment material S formwork
of boards 2.Material / 2.Load must be lifted closer to
handling the body
helpers
material

___________________
PM / CM / Section In-charge EHSO