MS - External Works
MS - External Works
MS - External Works
INDEX
1.0. Purpose
2.0. Scope
3.0. References
4.0. Responsibilities
5.0. Definitions
6.0. Resources
7.0. Sequence
7.1. General
9.0. Attachments
1.0 Purpose:
The purpose of this document is to lay down the systematic procedures for the various activities
required in the External Civil Works carried out in the project . Also to ensure that all works are carried
out in accordance with the approved shop drawings & contract specification.
2.0 Scope:
This method statement covers external civil works required for the projects. It generally encompasses
the following:
➢ Fencing
➢ Kerbstone Laying
➢ Timber Laying
Soft landscape works includes of plantation works, excavation, sweet soil filling, storage, planting, etc as
per project specification, drawing approval & contract documents.
3.0 References:
Standard Specification
Particular Specification
Standard Drawings
Particular Drawing
Bill of Quantities
4.0 Responsibilities:
1. Overall responsible & full authority of all activities at the project site.
2. The provision of details of various activities and obtain set out/check as needed.
1. Ensure all the project key requirements are identified & fulfilled in method statement.
2. Revise the method statement whenever essential during the entire duration of project.
1. Ensure Risk involved in the activity is assessment & relevant control measures are put in place.
2. Ensure & monitor the adequate safety requirements are fulfilled during all stages of work.
4.6 Surveyor:
2. Ensures that adequate temporary control points are available to the vicinity of work site.
3. Re issue to all recipients & withdraw of “superseded documents” when revision takes place.
5.0 Definitions:
Client : ALDAR
6.0 Resources
6.1 Manpower:
Workforce:
1. Mason
2. Helper
3. Landscape Labour
4. Gardener
General Supervision:
5. Site Foreman
6. QA/QC Engineer
7. Safety in charge
8. Site Engineer
9. Surveyor
2. Backhoe Loader
3. Water tanker
5. Shovel
6. Steel Hammers
7. Masonry Tools
9. Plate compactor
6.3 Materials:
1. PPortable Water
7.1 General:
1. Relevant personal protective equipment should be provided and utilized by the workforce.
2. Appropriate Safety guidelines must be adhered during all stages of construction activity.
1.
1.
2.
1.
1. Prior to any concrete testing client / consultant shall be notified about the testing location, Date,
time & type of testing.
3. Work Inspection Requests (WIR) shall be raised to the Client/Consultant for the following stages
of work as per ITP.
4. Relevant test report shall be maintained & copy shall be forwarded to the client / consultant.
9.0 Attachments:
1. ITP