Polygon RA 7 - Hoisting Endorse

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

INVENTORY OF WORK ACTIVITIES FORM

ACTIVITY-BASED RISK ASSESSMENT


Site: PM: Ricky Yap
INVENTORY OF WORK ACTIVITIES
Company: Polygon Construction & Interior Pte Ltd
No. Process/Location Work Activities
7 Hoisting / Lifting Materials 7.1 Hoisting of materials

7.2 Work carried out at the hoisting platform

Risk Matrix to determine Risk Level


LIKELIHOOD LIKELIHOOD Risk Level Action
SEVERITY
Remote (1) Occasional (2) Frequent (3)
Major (3) 3 6 9 6 -9 = HIGH Additional risk control must be implemented to bring it down to the next level
SEVERITY Moderate (2) 2 4 6 3 – 4 = Medium Additional risk control may be required if it is practical
Minor (1) 1 2 3 1 – 2 = Low Additional risk control may not be necessary

Page 1 of 3
INVENTORY OF WORK ACTIVITIES FORM
ACTIVITY-BASED RISK ASSESSMENT FORM
Company: Polygon Construction & Interior Pte Ltd
Process/ Location: Hoisting / Lifting Materials Conducted by: Project Manager
Approved by: Ricky Yap / Director (Names, designations)
(Name, designation) 15/08/09 (Date) 15/07/09
(Date)
Endorsed by: Ahmad Rushdy Chia (MOM Approved
25 June 2008 25 Dec 2009
Dated 25 March 2007 Risk Consultant) Last Review Date: Next Review Date:

1. Hazard Identification 2. Risk Evaluation 3. Risk Control


1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Possible Action Officer,
Accident / Ill Existing Risk Control Like
No. Work Activity Hazard Severity Risk Level Additional Risk Control Designation
Health & Persons- (if any) lihood
at-Risk (Follow-up date)
7.1 Hoisting of materials Hit by Falling 1. Serious 1. Trained rigger man 2 2 M Implement SWP Project
materials injury or 2. Trained signalman for lifting Manager /
death to equipment and Site
workers operation Supervisor /
and Safety
property Supervisor
lost
Overloading 1. Serious 1. LM certificate given and lifting 3 1 M Implement SWP Project
of materials injury or team present (supervise by for lifting Manager /
leading to death to lifting supervisor) equipment and Lifting
crane workers 2. Lifting supervisor to present operation Supervisor /
collapse and during hoisting operation Safety
property 3. Crane operator shall ensure no Supervisor
lost overloading of crane at any one
time
7.2 Work carried out at the Workers falling Serious injury or 1. Personal protective equipment 2 2 M 1. Substitute safety Safety
hoisting platform off hoisting death to workers (safety belt, helmet) belt with safety Supervisor
platform 2. Barricading harness attach to
independent
lifeline
Falling of Serious injury or 1. Personal protective equipment 2 2 M Barricade off area Project
materials death to workers (safety belt, helmet) below platform Manager

Page 2 of 3
INVENTORY OF WORK ACTIVITIES FORM
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. 3a. 3b.
Possible Action Officer,
Accident / Ill Existing Risk Control Like
No. Work Activity Hazard Severity Risk Level Additional Risk Control Designation
Health & Persons- (if any) lihood
at-Risk (Follow-up date)
2. Barricading

Page 3 of 3