11 - Boq
11 - Boq
11 - Boq
1 PACKAGE SUBSTATION
1-1 Supply, install, connect and test IP54 type tested power
package substation consists of 11 KV medium voltage (2+1
SF6 LBS) RMU, an immersed oil type 1500KVA transformer
11/0.38 KV (∆/Y), 50Hz, low tension panel with 2500A ACB,
circuit breakers as indicated in single line diagram including
Raychem insulated bus-bars, earth leakage switches,
hygrostat, heaters, fans and relays, measuring and protective
devices, ventilation fans with filters, metal enclosure,
concrete foundation, terminations of cables/wires with their
respective breakers, and all necessary accessories and
ancillary civil works and material required for complete
installation as specified, shown on drawings and EEA
electrical company regulation.
1-1-1 Ditto as above but for substation SUB-TR (2) with P.F.C unit. No 1
1-1-2 Ditto as above but for substation SUB-TR (3) with P.F.C unit. No 1
1-1-3 Ditto as above but for substation SUB-TR (4) with P.F.C unit. No 1
1-1-4 Ditto as above but for substation SUB-TR (5) with P.F.C unit. No 1
1-1-5 Ditto as above but for substation SUB-TR (6) with P.F.C unit. No 1
1-1-6 Ditto as above but for substation SUB-TR (8) with P.F.C unit. No 1
1-1-7 Ditto as above but for substation SUB-TR (10) with P.F.C unit. No 1
1-1-8 Ditto as above but for substation SUB-TR (11) with P.F.C unit. No 1
1-2 Supply, install, connect and test IP54 type tested power
package substation consists of 11 KV medium voltage (2+1
SF6 LBS) RMU, an immersed oil type 1000KVA transformer
11/0.38 KV (∆/Y), 50Hz, low tension panel with 1600A ACB,
circuit breakers as indicated in single line diagram including
Raychem insulated bus-bars, earth leakage switches,
hygrostat, heaters, fans and relays, measuring and protective
devices, ventilation fans with filters, metal enclosure,
concrete foundation, terminations of cables/wires with their
respective breakers, and all necessary accessories and
ancillary civil works and material required for complete
installation as specified, shown on drawings and EEA
electrical company regulation.
1-2-1 Ditto as above but for substation SUB-TR (1) with P.F.C unit. No 1
1-2-2 Ditto as above but for substation SUB-TR (12) with P.F.C unit. No 1
1-2-3 Ditto as above but for substation SUB-TR (13) with P.F.C unit. No 1
1-2-4 Ditto as above but for substation SUB-TR (14) with P.F.C unit. No 1
1-2-5 Ditto as above but for substation SUB-TR (15) with P.F.C unit. No 1
1-2-6 Ditto as above but for substation SUB-TR (16) with P.F.C unit. No 1
1-2-7 Ditto as above but for substation SUB-TR (17) with P.F.C unit. No 1
1-3 Supply, install, connect and test IP54 type tested power
package substation consists of 11 KV medium voltage (3+1
Page 1
BOQ Rev. no. 1 Issue date: Mar 2021
INFRAGROUP CONSULTANTS BILL OF QUANTITY
Page 2
BOQ Rev. no. 1 Issue date: Mar 2021
INFRAGROUP CONSULTANTS BILL OF QUANTITY
No. 286
7-2 Ditto as above but with double arm. No. 36
7-3 Ditto as above but for ground spike (move through 180)
lighting unit with 12W LED UPLIGHTER, IP-67. No. 128
8 FIBER DISTRIBUTION NETWORKS:
8-1 U.P.V.C PIPES
Supplying , installing, connecting and testing and put into
operation of UPVC pipes/conduits, SCH-40 needed for pulling
L.C Fiber Optic network cables including elbows, connections,
supports, all necessary accessories and ancillary civil works
like excavation & backfilling, concrete, sand required for
complete installation as specified and as indicated in the
drawings, specifications, and according to standards
requirement.
8-1-1 Ditto as above but UPVC pipes/conduits with 50mm
Diameter. Mt. 3200
8-1-2 Ditto as above but UPVC pipes/conduits with 100mm
Diameter. Mt. 5300
8-2 HANDHOLES & MANHOLES FOR LOW CURRENT
NETWORK:
Supplying, installing, connecting and testing and put into
operation pre-cast concrete hand hole & man hole for L.C
fiber optic cables, the item including UPVC pipes/conduit
sleeves, connections, supports, metal cover, drain pipe outlet
ground rod, all necessary accessories and ancillary civil
works like excavation & backfilling, concrete, drilling, rung,
filler/plaster and cleaning the site resulting from these works
and all necessary accessories and ancillary works required to
Page 5
BOQ Rev. no. 1 Issue date: Mar 2021
INFRAGROUP CONSULTANTS BILL OF QUANTITY
Page 6
BOQ Rev. no. 1 Issue date: Mar 2021