004
2 232098.283 402140.373 24.895 24.900 -5 -0.005
3 232101.636 402139.892 24.893 24.900 -7 -0.007
4 232105.758 402139.278 24.889 24.900 -11 -0.011
5 232107.329 402139.037 24.889 24.900 -11 -0.011
6 232110.685 402138.546 24.884 24.900 -16 -0.016
7 232114.801 402137.963 24.875 24.900 -25 -0.025
8 232116.365 402137.722 24.867 24.900 -33 -0.033
9 232119.698 402137.235 24.863 24.900 -37 -0.037
10 232123.881 402136.620 24.887 24.900 -13 -0.013
11 232125.608 402136.371 24.893 24.900 -7 -0.007
12 232086.222 402131.497 24.897 24.900 -3 -0.003
13 232090.492 402131.331 24.883 24.900 -17 -0.017
14 232096.814 402130.407 24.865 24.900 -35 -0.035
15 232100.186 402129.911 24.854 24.900 -46 -0.046
16 232104.313 402129.307 24.849 24.900 -51 -0.051
17 232105.892 402129.081 24.846 24.900 -54 -0.054
18 232109.216 402128.595 24.844 24.900 -56 -0.056
19 232113.360 402127.978 24.840 24.900 -60 -0.06
20 232114.935 402127.748 24.845 24.900 -55 -0.055
21 232118.262 402127.177 24.854 24.900 -46 -0.046
22 232122.404 402126.654 24.871 24.900 -29 -0.029
23 232124.155 402126.398 24.895 24.900 -5 -0.005
The Main Contractor Works PGTL Master (Phase 2)
SURVEY REPORT
Project No: C23004 DATE: 13-06-24 ZONE -1
TYPE OF INSPECTION : Time 7.00AM PROJECT LEVEL 100.000=3.150 Q.N.D
LOCATION: SHEEL PHASE-2 M C B BUILDING NORTH SIDE MEP PIPE LOCATION AND BEAM TOP LEVEL
DESIGN COORDINATE ACTUAL COORDINATE Difference (mm)
Point no. REMARKS
Easting Northing Easting Northing Elevation (QND) Easting Northing Elevation
REMARKS
Surveyor Gulf Contracting company. QA/QC Gulf Contractiong company. Client / Consultant
Signature
Date 6/13/2024