Manjeet Kumar.
Manjeet Kumar.
Manjeet Kumar.
Report Submitted By
MANJEET KUMAR-200570106009
In partial fulfillment for the award of the degree of
Bachelor of Engineering
In
Civil Engineering
1
Marwadi Education
Foundation Faculty of Engineering
DEPARTMENT OF CIVIL ENGINEERING
2023-24
CERTIFICATE
Date
This is to certify that the Internship at S.S Constructions /Industry has been
satisfactorily completed by Name Manjeet Kumar (200570106009) under my
guidance in the fulfillment of the course Summer Internship (3180601)work
during the academic year 2024- 2025.
2
Acknowledgement
I wish to express our sincere gratitude to my Supervisor Mr. ER Ramesh kushwaha continuously
guiding me at the constructions site and answering all my doubts with patience .I would also like to
thank my Internal Guide Prof. Hussain Rangwala.
For helping us through our internship by giving us the necessary suggestions and advices along with
their valuable co-ordination in completing this internship.
We also thank our parents, friends and all the members of the family for the precious support and
encouragement which they had provided incompletion of our work.In addition to that, we would also
like to mention the company personals who gave us the permission to use and experience the valuable
resources required for the internship.
Thus, In conclusion to the above said, we once again thank the staff members of S.S Constructions or
their valuable support in completion of the internship.
Thank You
3
Contents
Acknowledgement……………………………………………………………………………4
Chapter1:Introduction… ....................................................................................................... 7
Introduction of company……………………………………………………………………………………... 7
Aim and objective of the internship:…………………………………………………………………………. 7
Site Overview:………………………………………………………………………………………………... .8
Chapter2:Roleand Responsibilities…………………………………………………………..9
General…………………………………………………………………………………………………………. 9
Daily Task sand Activities……………………………………………………………………………………... 9
Leveling work………………………………………………………………………………………………….. 10
Pcc……………………………………………………………………………………………………………..11
Reinforcement…………………………………………………………………………………………………12
Bss for column………………………………………………………………………………………………...15
Casting work……………………………………..............................................................................................16
Settle yard……………………………………………………………………………………………………..18
Soil and filling…………………………………………………………………………………………………19
Curing………………………………………………………………………………………………………….20
Chapter3:Skill Learning…………..……………………………………………………….21
Chapter4:Overall Experience…………………………………………………………….. 23
Chapter5:Annexures………………………………………………………………...…………………..24
Annexures-1……………………………………………………………………………………..24
Annexures-2……………………………………………………………………………………....25
Annexures-3………………………………………………………………………………………26
Annexures-4 ……………………………………………………………………………………27
Annextures-5………………………………………………………………………………………28
4
LIST OF FIGURES
FIG.11(a),(b) Curing……………………………………………………………………………………20
5
Chapter1:Introduction
1.1Introduction of company
Location:301 Avadh Complex , D-5 near Sal Baba Mandir , Laxmi nagar ,Delhi-110092.
S.S construction provide services like supply of building construction materials,Trading of any
materials and civil contractors .
S.S constructions is majorly running constructions of all types of buildings projects and one of them
Project is seltool of medical research and technology(SMRT) Kanpur.Uttar Pradesh.
An internship is a purposeful activity of the student set in a work environment in order to obtain
The aim of internship is providing direction to the activities,help to focus on result,and to assess
An ability to use the techniques ,skills and modern engineering tool necessary for enginnering
practice.
6
1.3 Site Overview:
School of medical Research and Technology (SMRT) is institutional building and has
G+6 currently footing and column work is going. Many activity were working in this
project like shuttering work , fotting and column casting ,Reinforcement work ,soil filing
etc.
Figure-1(a)
Figure-1(b)
7
Chapter2: Roles and Responsibilities
2.1 General
• Check proper ratio for M40 grade during the casting of footing and column.
• Leveling.
• Management of labours.
8
2.3 Leveling work
Leveling done for the PCC according to drawing leveling also done for the column marking,and footing marking.
All the leveling done by dumpy level.
9
2.4 Portland Pozzoland Cement
The Pcc layer improve the bonding between the soil layer and Rcc.
In Pcc first layer stone and white sand are use and proper compaction is done.
After first layer , for Pcc M-15 concrete mix are use.
Figure-3(b) - compaction
10
2.5 Formwork
Formwork is the process of giving support and stability to concrete before it becomes solid.
For all types of formwork aluminum plate are using.
11
2.6 Reinforcement details
13
BSS for Column.
Column no Length (l) Width Spacing Dia of bars No of bars Cutting Rings
length
Ac-73 550 550 100 32 16 7813 37
Ac-8 650 650 100 25 20 7435 43
Cc-40 500 1100 100 32 28 5058 86
Ac-69 550 550 100 32 16 7813 37
Ac-65 550 550 100 32 16 7813 37
Ac-66 550 550 100 32 16 6615 74
Ac-67 550 550 100 32 16 7815 74
Ac-68 550 550 100 32 16 7813 74
Ac-74 650 650 100 25 20 7525 37
14
2.7 Casting work
Casting of footing
• Concrete mix use for all the footing is M-40.
• All the concrete work is done by use of mixer machine.
• The height of placing concrete is 1.5m.
• Needle vibrator are use for compaction of concrete.
15
Casting of column
• Concrete mix use for all the column is M-40.
• All the concrete works is done by use of mixer machine.
• The height of placing concrete is 1.5m.
• Needle vibrator are use for compaction of concrete.
16
2.8 steel yard.
• Loading and unloading of bars from the tailor truck.
• Verification of cutting and bonding of bars according to drawing.
• In steel yard all types of bars are stored 80,100,120,160,200,250,320 etc ,and also cutting and banding is done
14 steel yard.
17
2.9 Soil & Filling.
18
2.10 Curing
19
Chapter 3: Skills Learned
• ABOUT THE SKILLS:
Skill is a term that encompasses the knowledge, competencies and abilities to perform operational
tasks. Skills are developed through life and work experiences and they can also be learned through
study.
1. Communication
2. Data Collection
3. Site Inspection
4. Problem Solving
5. Construction Activities
1.Communication:
• Gained communication skills by preparing an everyday report on the tasks performed.
• Involved in the construction stage of the project, site meetings and communication with clients
2.Data Collection:
• Provided technical assistance to senior engineers with data collection and analysis.
3.Site Inspection:
• Provided on-site inspection services including column, beam and slab, reinforcing steel, and
Concrete testing.
Checked project progress by site inspection and prepared daily report indicating material and
Labour required for work.
20
4.Problem Solving:
• Implementation of a plan
• Generated Intervention
• Implementation of BBS
5.Construction Activities:
21
CHAPTER4: OVERALL EXPERIENCE
• Technical Experince:
• Learnt many technical skills ,techniques during internship project at construction site.
• Experienced actual site work is different from book knowledge and different methods are used
on construction site.
• Concrete grade used one site M15, M40 grade and got the knowledge about other grades of concrete.
• Book knowledge and leaned skill was very helpful during the technical experience on site.
• Personal Experince :
• At the site mason and workers was very nice and gave me the detailed knowledge of work and
gave me best tips regarding work and management.
• Learned about how to manage and interact with many workers doing different type of work
on Site.
• Know about what is the responsibilities of engineer and how to manage whole construction
site and deal with problems on site during work.
22
CONCLUSION
Overall summer internship is a really good program .It helps to enhance and develop my skills , abilities,
and knowledge. It was a good experience and memories as not only I have gained experience, but also
new friends and knowledge. The treatment by company was just, equitable and professional. I’ve learned
from different units and peoples. I am grateful and thankful to my guide, Mr. ER Hardik patel and Prof
Hussain Rangwala .They help me to handle some of my weakness and provided guidance to me whenever I
am in need. I think the summer internship of 14 days was enough to gain the experience and knowledge on
site. This summer internship helps us to identify our strength, abilities, weakness and more.
23
ANNEXURES
ANNEXURE-1
24
ANNEXURE-2
Main Entrance
25
ANNEXURE-3
Academic View
26
ANNEXURE-4
Typical plan showing shuttering arrangement for column
27
ANNEXURE-5
28
29