Unit Cost
Item Particulars Quantities Units Total Amount
Materials Labor
A GENERAL REQUIREMENTS
1 Building permit and Licenses 1.00 lot - - -
2 Occupancy Permit 1.00 lot - - -
3 Bonds and Insurances (Performance Bonds) 1.00000 lot - - -
4 Mobilization / Demobilization 1.00 lot - - -
4 Project Supervision 1.00 lot - -
Project in Charge 12.00 mos - -
Timekeeper/Warehouseman 12.00 mos -
5 Temporary Facilities (Baracks ) 12.00 lot - - -
Service Baraks to Site 12.00 mos
6 Relocation survey 1.00 lot - - -
7 Security / Watch man 12.00 month - - -
8 Temporary Lighting and power consumption 12.00 month - - owner supplied
9 Temporary Water line and consumption 12.00 month - - owner supplied
10 Soil poisoning 1.00 lot - - -
11 Miscellaneous, Contingencies and Overhead 1.00 lot -
12 Safety net / enclosure 82.00 l.m. - - -
SUB-TOTAL -
8 PAINTING WORKS
8.1 Exterior wall 513.00 sq.m. 350.00 179,550.00
8.2 Interior - semi gloss(walls) flta latex(flat latex) 1,415.00 sq.m. 350.00 495,250.00
SUB-TOTAL 674,800.00
13 ELECTRICAL ROUGHING-INS
electrical roughing-ins 1.00 lot 350,000.00 - 350,000.00
SUB-TOTAL 350,000.00
13.2 Plumbing works roughing ins and waterproofing 1.00 lot 250,000.00 - 250,000.00
SUB-TOTAL 250,000.00