Eaton’s Energy Automation Solutions

(EAS) Business
1990 5th Street, Suite 220 Lévis,
Quebec, Canada G6W 5M6

8.03: Schedule of Guaranteed Technical Particulars for Substation Automation System

SI Description Unit NESCO's Requirement Bidder's


Guaranteed
Value
GENERAL
1 Name of the To be mentioned Eaton
Manufacturer/Developer
2 Country of origin and EU/USA/UK/OECD OECD- Canada
manufacture Countries
3 Standards To be Mentioned ISO 9001
4 Communication protocol at all IEC61850 & IEC-104 Comply
levels Fully complying with the
standard
5 Detailed Requirements: Visual T&D (VTD) Software is
included. Industrial PC
hardware is not part of Eaton
scope

6 Number of years of proven 5Yrs. Operational HMI License to be


field experience ofOffered run on the RTU Gateway.
system. (Note: Proof of
experience should be VT&D used for configuration
and SLD version 4 was released
furnished. The components in Dec 2013.
used inthe offered system and
those with field experience VT&D version 5 was released in
should be the same) May 2020.

7 Design Life ≥ 20 Years Software Yes,


Also function of associated
Hardware and operating
system.

8 Features 1. Operation Through HMI 1.Yes


2. SLD With status 2.Yes
3. Measurement Trend 3.Yes
4. Event Data 4. Yes
5. Fault Data 5. Yes. Can be obtained
6. Historical Data via SMP Logs at
7. User Access Level Substation level. And from
8. SAS Simulator Alarm and events data of
9. SAIDI/SAIFI VTD
10. Report Generation 6. Yes. Historical data
11. Alarm Window from VTD Software.
7. Yes
8. Yes. VTD Software has
simulation mode feature
for commissioning
purposes. Customization
of simulation for each
substation is not part of
our scope.

Contractor Name: JV of ERA & UCCL


Contract No.: 27.29.0000.107.07.001.23-145
Eaton’s Energy Automation Solutions
(EAS) Business
1990 5th Street, Suite 220 Lévis,
Quebec, Canada G6W 5M6

9. Input provisions will be


provided for calculations
at substation level.

10. Yes. VTD Report


generation feature
11. Yes

9 System supervision & To be mentioned Control Hierarchy can


monitoring as per spec be implemented.

10 Automatic sequence control as To be mentioned Automation Sequence


per spec control can be implemented via
the Automation functions And or
soft PLC.

11 Quality Assurance ISO 9001 or equivalent Yes.

Signature :

Name : Vincent Alec Ongleo


Address : 29 Floor, BPI-Philam Life Building, 6811 Ayala Avenue,
Makati City, 1209 Philippines
Title : Sales Manager
Date : January 18, 2024

Contractor Name: JV of ERA & UCCL


Contract No.: 27.29.0000.107.07.001.23-145