Detail of Stool MKD As: St1: Notes
Detail of Stool MKD As: St1: Notes
Detail of Stool MKD As: St1: Notes
H H
G G
TOP PLAN
F F
B A
E E
D D
NOTES:
FOR SEE
C
C
PROOF CHECKER :
CONSTRUCTION DESIGN
B B
KEY PLAN
C7-E 7.599Km
CH: 489.467Km
C7-Start
50
CONTRACTOR
nd
CH:
REVISION QUALITY ASSURANCE
499+400
499+300
499+500
499+200
497+000
497+100
497+200
499+600
RAMP
496+900
497+300
497+400
SUB MAINTENANCE DEPOT
AHMEDA
496+800
499+100
&
496+700
497+500
496+600
DSS
503+300
503+400
496+500
497+800
& SER
497+900
503+500
503+200
497+600
497+700
498+000
496+400
499+000
499+700
BAD
498+100
496+300
route
Cable
503+600
496+200
Underground
503+100
STATION
498+200
Metering
room
ESS
498+300
496+100
498+900
498+400
503+700
496+000
503+000
499+800
495+900
495+800
498+500
498+800
495+700
498+600
498+700
503+800
502+900
495+600
495+500
499+900
495+400
503+900
502+800
495+300
495+200
495+100
495+000
504+000
502+700
500+000
494+900
500+200
494+800
494+700
504+100
502+600
494+600
504+100
494+500
494+400
502+500
500+100
494+300
494+100
494+200
494+000
502+400
504+200
493+900
493+800
493+700
502+300
493+600
504+300
507+600
493+500
493+400
RAMP
493+300
500+300
502+200
504+400
493+200
493+100
507+500
489+400
493+000
502+100
489+500
492+900
504+500
489+600
489+700
492+800
500+400
492+700
489+800
502+000
507+400
489+900
492+600
504+600
490+000
490+100
492+500
490+200
492+400
500+500
501+900
490+300
492+300
507+300
490+400
492+200
490+500
504+700
492+100
501+800
500+600
490+600
492+000
491+000
490+700
490+800
491+100
491+900
507+200
490+900
491+200
491+800
500+700
504+800
491+300
491+400
491+500
491+600
491+700
SSP
501+700
504+900
507+100
500+800
501+600
500+900
505+000
501+500
507+000
505+100
501+000
501+400
506+900
501+100
501+300
505+200
501+200
505+300
506+800
CROSSING
SABARMATI STATION
LEVEL
245.20M
CH:
505+652
SBH-505-10
SBH-505-11
505+702
506+700
505+752
SBH-505-12
505+400
505+796
SBH-505-13
506+600
505+839
505+889
506+027
SBH-505-14
SBH-505-15
SBH-505-17
SBH-506-01
505+939
505+983
SBH-505-16
505+500
506+500
506+400
506+300
505+600
506+200
506+100
505+700
505+800
505+900
506+000
The responsibility of control, check and verification of CHECKED BY REVIEWED BY APPROVED BY
accuracy, correctness, completeness, integration, IRCON INTERNATIONAL DINESHCHANDRA R. AGRAWAL
LIMITED INFRACON PVT. LTD OWNER PROJECT TITLE:
interfacing with other disciplines and full compliance of
PROJECT: NATIONAL HIGH SPEED RAIL
D 22-07-2024 REVISED AS PER PMC OBSERVATION contract provisions in respect of design analysis and MUMBAI-AHMEDABAD HIGH SPEED RAIL PROJECT
drawings rests with the contractor. Package No. MAHSR – C7 CORPORATION LTD.
Package No. MAHSR-C7 (Km.489.467-Km.507.599)
Lump Sum Price Basis for Double Line High Speed 2nd FLOOR , ASIA BHAWAN , ROAD
NO-205 SEC-09, DWARKA, New
C 26-06-2024 REVISED AS PER PMC OBSERVATION DRAWN BY Delhi-110077 DWG TITLE: SHEET NO.
Railway involving Ahmedabad Station, Sabarmati DETAIL OF STOOL - ST1
NHSRCL SUBMITTAL NUMBER:
A Station, Viaduct & Bridges, Crossing Bridges 02 A
B 29-05-2024 REVISED AS PER PMC OBSERVATION DESIGNED BY (excluding fabrication and transportation of steel truss S-TD-NHS-IRDC-C7-ALL-TWO-TW1-004097
LAUNCHING SCHEME FOR GAD-2357
(100m SPAN) OF 04
girders) and Associated works between MAHSR Km. REV.
A
R1 02-01-2024
24-06-24 SUBMISSION
REVISED FORCOMMENTS
AS PER APPROVAL CHECKED BY 489.467 and MAHSR Km. 507.599 in the State of DWG No. DRAIPL/C7/GAD-2357/TAD/ 04 D
Gujarat for the Project for Construction of SCALE SIZE
REV. DATE DESCRIPTION DRAN DSGN CHKD APPD APPROVED BY Mumbai-Ahmedabad High Speed Rail. CHECKED BY REVIEWED BY APPROVED BY CHECKED BY REVIEWED BY APPROVED BY PRELIMINARY INFORMATION APPROVAL CONSTRUCTION NTS A1
12 11 10 9 8 7 6 5 4 3 2 1