SECTION 31 23 23.53
CEMENT STABILIZED SAND BACKFILL
PART 1 – GENERAL
1.1 DESCRIPTION
A. At the discretion of the Engineer, Cement Stabilized Sand meeting the following
specification may be allowed as trench backfill.
A. Cement-stabilized sand shall be considered a part of the backfill requirement for the unit
installed and shall be considered subsidiary to the length of the unit bid. If the cement
stabilized sand is indicated to be a separate construction item for bulk backfill then the
cement stabilized sand shall be measured per cubic yard as indicated on the plans.
1.3 SUBMITTALS
A. Mix Design
PART 2 – PRODUCTS
2.1 MATERIALS
1
Approved – 1/2009 B/CS Unified Specifications
PART 3 – EXECUTION
A. DESIGN REQUIREMENTS
Design sand-cement mixture to produce a minimum unconfined compressive strength of 50
pounds per square inch in 48 hours and 100 pounds per square inch in 7 days when
compacted to 95% in accordance to ASTM D558 and when cured in accordance with
ASTM D1632, and tested in accordance with ASTM D1633. Mix for general use shall
contain a minimum of 1-½ sacks of cement per cubic yard. Mix for use as sanitary sewer
embedment within 9 feet of waterlines shall contain 2 sacks of cement per cubic yard.
Compact mix with moisture content between 0% to 2% above optimum.
The maximum compressive strength in 7 days shall be 400 psi. Backfill that exceeds
the maximum compressive strength shall be removed by the contractor.
B. MIXING
1. Thoroughly mix sand, cement, and water in proportions specified by the Design
Requirements using a pugmill-type mixer. The plant shall be equipped with automatic
weight controls to ensure correct mix proportions.
2. Stamp batch ticket at plant with time of loading directly after mixing. Material not
placed and compacted within 4 hours after mixing shall be rejected.
C. PLACEMENT
1. Place sand-cement mixture in 8-inch-thick lifts and compact to 95% of ASTM D558
unless other specified by the engineer. The moisture content during compaction shall
be between 0% to 2% above optimum. Perform and complete compaction of sand-
cement mixture within 4 hours after addition of water at plant.
2. Do not place or compact sand-cement mixture in standing or free water.
END OF SECTION