BILL OF QUANTITIES OF GARAGE AREA MODIFICATION CONSTRUCTION

3/10/2024
CLIENT : Mr.Erick

Dear Sir,
We SP Home constructions (pvt) ltd, here by forward a quotation for above job. In this job, we supplied
total construction materials, with labor.
details as follows
work done
ITEM DISCREPTION UNIT RATE QTY AMOUNT
amount
1 Excavation and earth work
1.1 column base cube 8000 0.81 done 6480.00 6480.00
1.2 Column base back filing cube 9800 0.41 done 3969.00 3969.00
removing existing tile floor for
1.3 item 15000 1 done 15000.00
column base construction 15000.00
demolize existing tie beam and
1.4 item 10000 1 done 10000.00
column plaster 10000.00
1.5 excavation for trenches cube 8000 0.35 done 2760.00 2760.00

2 Concrete work
G15 for column base bottom and
2.1 cube 107800 0.15 done 16574.25
foundation trenches 16574.25
2.2 G15 for floor concreting cube 107800 0.39 done 42042.00 42042.00
2.3 G20 for column pooting cube 119500 0.2 done 24198.75 24198.75
G20 for column shaft up to dpc
2.4 cube 119500 0.23 done 26887.50
level 26887.50
2.5 G20 for dpc level tie beam cube 119500 0.06 done 6871.25 6871.25
G20 for column shaft dpc to 10 ft
2.6 cube 125000 0.34 done 42000.00
level 42000.00
2.7 G20 for colummn shaft cube 131000 0.3 done 39300.00 39300.00

3 Formwork
3.1 column pooting sqft 190 36 done 6840.00 6840.00
3.2 column shaft up to dpc level sqft 220 36 done 7920.00 7920.00
3.3 dpc level tie beam sqft 230 23 done 5290.00 5290.00
3.4 column shaft dpc to roof level sqft 255 120 done 30600.00 30600.00

4 Rainforcement
4.1 column pooting kg 635 23.13 done 14684.76 14684.76
4.2 column shaft up to dpc level kg 635 44.82 done 28463.49 28463.49
4.3 dpc level tie beam kg 635 12.48 done 7925.88 7925.88
4.4 column shaft dpc to roof level kg 635 48.8 done 30991.10 30991.10

5 MASSONARY WORK
5.1 9" THK brick wall sqft 950 36 done 34200 34200
5.2 brick wall plaster sqft 180 72 done 12960 12960
5.3 ranom rubble work for foundation cuft 590 0.43 done 254.44
254.44
5.4 column plaster - done
5.42 dpc up to roof level sqft 255 120 done 30600.00 30600.00

6 Roof and timber grill work


roof-wooden structure with Zn/Al
6.3 sqft 3200 144 ongoing 460800.00
roofing sheet including 250000.00
6.4 gutters and valance boad lft 950 12 pending 11400.00

7 Painting
external paint
7.2 ** semi rugh finish surface ,2 wall sqft 220 180 39600.00
ongoing
filler cout and 2 paint court

TAL WORK DON AMOUNAMOUNT 958612.42 696812.42