Operations Letter of Railway Board
Operations Letter of Railway Board
Operations Letter of Railway Board
t 1ffi.
&
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAtLWAY BOARD)
As per retter under reference, track renewar/ track maintenance works are
to be
undertaken under rong term service contracts. one of the issues raised
by the Rairways was
regarding avairabirity of adequate sanctions for a rong period, to support
these conrracis.
Railways may note that, track renewar/ track maintenance works
are a regurar,
mandatory activity, in the interest of safety and sanctions are issued
annua[y acro-ss alr
Zonar rairways. Hence Rairways may proceed with caling tenders
and awarding contracts.
The expenditure shal be booked in the sanctioned *ork= on proportionate
basis as per
kilometres sanctioned and work executed. Sanctions for barance
kirometres wi[ be made
available in subsequent years through regurar sanction of track
renewar works. Zonal
Railways are advised to take necessary action accordingly.