GSTIN: 01BLRPA3437L3Z4 LIC NO: 5388-A/2021

 Turnkey EPC Contracts


 EHV Transmission Tower &
AZR ENGINEERING GROUP Allied Transmission Line Work
Experts Behind Power ...  Lighting Installation
 Outdoor & Indoor Substation.
Ref.No: AZR/RJ/NSR/106/2 Dated: -

Assistant Executive Engineer


JPDCL
Sub Division,
Nowshera,

Subject: Request for Issuance of Completion Certificate for CREATION OF 2X100KVA S/STN ALONGWITH
HT/LT NETWORK FOR WSS CHOWKIAN NARIAN IN SUB DIVISION NOWSHERA UNDER DC WORKS, LOA
No. EDR/TR/2487-2491 Dated 21-02-2024

Dear Sir,

We are writing to formally request the issuance of a Completion Certificate for the project associated with
CREATION OF 2X100KVA S/STN ALONGWITH HT/LT NETWORK FOR WSS CHOWKIAN NARIAN IN SUB
DIVISION NOWSHERA UNDER DC WORKS. LOA No. EDR/TR/2487-2491, dated 21-02-2024.

The project has been successfully completed, and all necessary work has been carried out in accordance
with the specifications and guidelines outlined in the Letter of Agreement. We have conducted thorough
inspections and ensured that all aspects of the project meet the required standards.

In order to proceed with the process of charging and TTIC, we require the official Completion Certificate.
This certificate is crucial for the further processing and formal closure of the project, as well as for
compliance with regulatory requirements.

We appreciate your prompt attention to this matter and look forward to your favourable response. Thank
you for your cooperation.

Yours sincerely,

AZR ENGINEERING GROUP


KOTE DHARA DISST RAJOURI
Pin.185132.
7006890347

Kote Dhara, Rajouri, Jammu and Kahmir,185132 7006890347,8492046681 azrengineeringgroup@gmail.com