Test Report Issued To : M/s. TARA ENGINEERING WORKS
Address : 26, T.N Chatterjce strect, Kolkata-700090
LOA N0. ER-EL WORKSHOP-KPA ELECTRICAL /EPDWCONCENTREPIVOTO72324 /00922660094688,
Reference No. : DATE 0301 2024 FOR "REPLACEMENT OF COMPLETE DEFECTIVE CENTRE PIVOT ASSEMBLY OF
WAP 4LOCOMOTIVES" ETC AS PER LOA.
Sample ld: DRD-SP-1665-23-24 Date of Sample Receiving: O1.04 2024
M/CTest Bar of 12 mm thk middle plate of Date of Testing : 02.04.2024
Sample Decription: centre pivot. Samples Stamped As: Not Samped
Sample Drawn By : The Custormer
IS: 2062-1992, Gr. Designation Fe4 10W, Date of Reporting: 03.04.2024
Material Specification : Quality-C / Environmental Condition: Temp. 246'C Humidity: 529%
P.0. No. : Nil Test Report Number : DRD-SP-1665-G-24-25
ULR No: TC!145224000000530F
Name of the Work: Chemical, Mechanical & Bend Test
(Chemical Analvsis By Spectro)
.LLLL
LLLLLL
Test Panmters (Chemical Test) Test Method Test Resut Specified Value
0.172 020 Max
S 0.291 0 40 Max
IS: 8811/98 RA 2018
0.850 1.50 Max
0.031 0.040 Max
0.027 0 040 Max
(Mechanical Test)
Test Method Test Results Specified Valee
Test Parameters (Mecbanical Test)
T5 (Nmm 490.510 410 (Min)
IS:1608Pt-1/2022 335.014
YS (Nmm) 240 (Min)
%of Elongation at5 65-So 28.627 23 (Min)
Sempie Mark Bend at Test Method Observatioa Remarks
12 mm thk middie plate 180, 2t IS 1599 2019 No crack has been found on bending Portion Satisfactory
Remarks: The above test resultis obtained conform to the specified valwe.
e Fnd of Report 0004e
Tested Sanple Returm.
Tet W.ess by
Rernara hen eert o ma reured ty eustormer to a yeatr.atlion or standard lor the test then laboratory's decNon nule wil be oppled lor thoee teete lor which
Stuleert yf vaknag has ten doimed by cAmtomer
Laborstory Decslon Rde Vhan ndng salenrertof conlormty Moa surement of uncartainty 1 taken into account lo determie whether aul paees, tats or a
idelermrete rn
PASS: To ress Menkurwatarty lat %ndenra iavel) ls wtun speakcalianhtanderd's reqremente
FAIL ke rets Mesurenert uvatarty tel 9% contdere level) excaeda speckcatan/etenderd aequurements
INDETERMKATE: fed reuts Mee urement (inatenty (a 9% conldernce leyel) overlapa apeckcatiorvtendrs requremente
Disclalmer:The lo ets relsled o he patjer sarnde ere tosed, at te are basnd on as per tandard tel method Sample are nol drawn by s Any
disuepeny in ths tets egot sd te bop 'nwA wthn 15 days fnm the dule of report aued
Report Revlewed by A. Chosh
Narme:
fa DEPARTMENT OF RESEARCH AND DEVELOPMENT
Techrilcal Manag
" The lesl res as contaned n ths teal eport elate only lo the mple teted Department of Rcsearch & ment
The lw repont ahali not te reproducad in part or in ult wahout wnten approval of the CEU of DRO
.Sarmple has not boen drawn by us (Tosting Loborato Signatory
" Labity or retum of the sunples ceaes oler thee month frorn the dale ol 6ae of the let roport
"Uncertanty 1eports on requet
DRD