Saadiyat Rotana Hotel & Resort Complex

INSPECTION AND TEST PLAN


Project Name : Saadiyat Rotana Hotel & Resort Complex
Client : Al Diya Hospitality Investment
Project Manager/Engineer: : EC Harris

Section: Installation of Domestic Water Pumps


Key:
R Responsible V Verify W Witness
A Approval T Test H Hold
C Collaboration I Inspection

Intervention Levels

Construction Manager
Technical Manager
Specification / Drawing Conformance Criteria, Specification and

QA/QC Engineer
Project Manager
S/N Activity Frequency Record Type Record File
No. Standard Reference

Laboratory
ECH
1 DOCUMENT REVIEW:

1.1 Materials Approval Submitted Project Specification, Material Samples Once Material Submittal R R V A Technical Department

Shop Drawing
1.2 Shop Drawing To be submitted Design Drawings, Project Specification All Drawings C R V A Technical Department
Submittal

Project Specification, Approved Shop Method Statement


1.3 Method Statement To be submitted Once R R/V A QAQC Department
Drawings Submittal

1 of 3 Form # ASK JV-155.16, Rev.00 Aug' 14


Saadiyat Rotana Hotel & Resort Complex

INSPECTION AND TEST PLAN


Project Name : Saadiyat Rotana Hotel & Resort Complex
Client : Al Diya Hospitality Investment
Project Manager/Engineer: : EC Harris

Section: Installation of Domestic Water Pumps


Key:
R Responsible V Verify W Witness
A Approval T Test H Hold
C Collaboration I Inspection

Intervention Levels

Construction Manager
Technical Manager
Specification / Drawing Conformance Criteria, Specification and

QA/QC Engineer
Project Manager
S/N Activity Frequency Record Type Record File
No. Standard Reference

Laboratory
ECH
2 RECEIVING INSPECTION:

DIV 22 Delivery Notes,


2.1 Pump Receiving 22 11 23 (Domestic Approved Material Submittal Every deliveries Material Inspection R V/I A Procurement Departmentt
Water Pumps) Request

2 of 3 Form # ASK JV-155.16, Rev.00 Aug' 14


Saadiyat Rotana Hotel & Resort Complex

INSPECTION AND TEST PLAN


Project Name : Saadiyat Rotana Hotel & Resort Complex
Client : Al Diya Hospitality Investment
Project Manager/Engineer: : EC Harris

Section: Installation of Domestic Water Pumps


Key:
R Responsible V Verify W Witness
A Approval T Test H Hold
C Collaboration I Inspection

Intervention Levels

Construction Manager
Technical Manager
Specification / Drawing Conformance Criteria, Specification and

QA/QC Engineer
Project Manager
S/N Activity Frequency Record Type Record File
No. Standard Reference

Laboratory
ECH
3 INSTALLATION:

DIV 22
Approved Shop Drawing, Method
3.1 Installation of Domestic Water Pumps 22 11 23 (Domestic Every Area ITR R I A QAQC Department
Statement
Water Pumps)

3.2

3 of 3 Form # ASK JV-155.16, Rev.00 Aug' 14