S/N Activity Frequency Record Type Record File
No. Standard Reference
Laboratory
ECH
1 DOCUMENT REVIEW:
1.1 Materials Approval Submitted Project Specification, Material Samples Once Material Submittal R R V A Technical Department
Shop Drawing
1.2 Shop Drawing To be submitted Design Drawings, Project Specification All Drawings C R V A Technical Department
Submittal
Intervention Levels
Construction Manager
Technical Manager
Specification / Drawing Conformance Criteria, Specification and
QA/QC Engineer
Project Manager
S/N Activity Frequency Record Type Record File
No. Standard Reference
Laboratory
ECH
2 RECEIVING INSPECTION:
Intervention Levels
Construction Manager
Technical Manager
Specification / Drawing Conformance Criteria, Specification and
QA/QC Engineer
Project Manager
S/N Activity Frequency Record Type Record File
No. Standard Reference
Laboratory
ECH
3 INSTALLATION:
DIV 22
Approved Shop Drawing, Method
3.1 Installation of Domestic Water Pumps 22 11 23 (Domestic Every Area ITR R I A QAQC Department
Statement
Water Pumps)
3.2