Ga Big
Ga Big
Ga Big
PLAN A 03
02
-
-
-
-
-
-
00/00/00
00/00/00
01 - - - 00/00/00
SR. DESCRIPTION REV. BY. DATE
CATEGORY :
SHOP DRAWING
PROJECT
PROVISION OF PARKING SHED AT KAKINADA
UNDER AGE(I)(CG) VIZAG
PROJECT No.
P-1105
PROJECTION
ELEVATION - A
TENSILE CONTRACTOR
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
CATEGORY :
SHOP DRAWING
PROJECT
PROVISION OF PARKING SHED AT KAKINADA
UNDER AGE(I)(CG) VIZAG
PROJECT No.
P-1105
ELEVATION - B
PROJECTION
TENSILE CONTRACTOR
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
P-1105
BASE PLATE 450X550X16mm
SCALE DATE DRWN CHK BY
N.T.S. 17/10/2024 DAG DAG
DRAWING NO. SHEET NO. REV PRINT ON
P697 SD 001 03 OF 08 0 A3
PROJECTION
TENSILE CONTRACTOR
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
P-1105
PARTS
SCALE DATE DRWN CHK BY
N.T.S. 17/10/2024 DAG DAG
DRAWING NO. SHEET NO. REV PRINT ON
P697 SD 001 04 OF 08 0 A3
PROJECTION
TENSILE CONTRACTOR
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
ANY DISCREPANCY OR AMBIGUITY IN EITHER SHOULD 5. ANY FAILURE DUE TO USE OF POOR QUALITY OF
MATERIAL OR USE OF LESS QUANTITY OF
BE BROUGHT TO THE NOTICE OF THE ARCHITECT. STEEL/CEMENT AND ALSO DUE TO POOR
Ground Level Ground Level ASSUMED S.B.C OF SOIL 21.0 T/SQM - 1500MM DEEP WORKMANSHIP IS NOT THE RESPONSIBILITY OF
STRUCTURE CONSULTANT AND THE CONSEQUENCES
FROM ROAD LEVEL.IT IS ADVISED TO GET SOIL BEARING OF SUCH FAILURE IS THE SOLE
RESPONSIBILITY OF THE OWNER/ CLIENT.
CAPACITY REPORT FROM ANY GOVT APPROVED
AGENCY, PRIOR TO START THE WORK AND SHOULD BE 6. THE OWNER SHALL DEPUTE EXPERIENCED AND
CAPABLE CIVIL ENGINEERS TO TAKE CARE OF DAY TO
BROUGHT IN NOTICE OF THE ARCHITECT/ENGINEER. DAY SUSPENSION OF THE QUALITY AND QUANTITY OF
WORK AND CONSTRUCTION AS PER GFC DRGS. ISSUED.
USE STEEL GRADE FE-500, CONCRETE M-25 THE STRUCTURAL CONSULTANT SHALL NOT BE
DRAWING SHOULD BE VERIFIED BY ANY GOVT RESPONSIBLE FOR ANY DEFICIENCY AND
MIS-HAPPENING ARISING DURING THE
STRUCTURAL AUDIT AGENCY BEFORE EXECUTION OF CONSTRUCTIONS.
THE WORK.
PCC
L 03 - - - 00/00/00
02 - - - 00/00/00
NOTES : 01 - - - 00/00/00
1. Anchor bolts should be set accurately and held in position by SR. DESCRIPTION REV. BY. DATE
template before casting to the given dimensions and projection , with
maximum deviation of 5mm. Anchor bolt threads should be protected
during concreting operation , or thoroughly cleaned after pouring. All
templates should be removed after the anchor bolts are set in concrete
for full strength.
2. All anchor bolt diameters are in millimetres. Anchor bolt projection
must be according to design and threads to be clean.
3. The installation of Anchor Bolts and embedded items must be done
in accordance with the Code of Standard Practice for Steel Buildings of
AISC Section 7. Anchor Bolts and Foundation Bolts shall be set for
maximum CATEGORY :
allowable tolerances as follows :
SHOP DRAWING
a) 3 mm center to center or any two bolts within an Anchor Bolt group
A
PROJECT
b) 6 mm center to center of adjacent Anchor Bolt groups
PROVISION OF PARKING SHED AT KAKINADA
c) Elevation of the top of Anchor Bolts +/- 12 mm.
d) Maximum accumulation of 6 mm per 30 mtrs. along UNDER AGE(I)(CG) VIZAG
the established column line of multiple anchor bolt groups but not to
exceed a total of 25 mm. PROJECT No.
PROJECT
e) 6 mm from the center of any anchor bolt group to the established
column line through that group.
4. Anchor bolts shall be set perpendicular to the theoretical bearing P-1105
surface unless shown otherwise.
5. Anchor bolts should be embeded in concrete so that its threaded SCALE DATE DRWN CHK BY
portion should start from the top level of concrete pedestal. N.T.S. 17/10/2024 DAG DAG
6. All Dimensions are in mm or Inches
DRAWING NO. SHEET NO. REV PRINT ON
7. All reactions are in Kilo-Newton and Meter units
8. Anchor Bolt steel grade FY = 250MPa P697 SD 001 05 OF 08 0 A3
PROJECTION
TENSILE CONTRACTOR
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
ASY2 ASY5
ASY4
CATEGORY :
SHOP DRAWING
ASY1
PROJECT
PROVISION OF PARKING SHED AT KAKINADA
UNDER AGE(I)(CG) VIZAG
ASY3 PROJECT PROJECT No.
P-1105
ISOMETRIC VIEW
P697 SD 001 06 OF 08 0 A3
PROJECTION
TENSILE CONTRACTOR
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
03 - - - 00/00/00
02 - - - 00/00/00
01 - - - 00/00/00
SR. DESCRIPTION REV. BY. DATE
P-1105
PROJECTION
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI
CATEGORY :
SHOP DRAWING
PROJECT
PROVISION OF PARKING SHED AT KAKINADA
UNDER AGE(I)(CG) VIZAG
PROJECT No.
P-1105
PROJECTION
TENSILE CONTRACTOR
Weld Bend 1 & Bend 2 with 300 sleeve for stability
C.H.P. CONSTRUCTIONS
REVENUE WARD-5 1-23/19 4F-19
MADHURAWADA,VISAKHAPATNAM
ASY 3 Details - 10nos STRUCTURAL CONSULTANT
CANDIID DESIGNSS
NEW DELHI