Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
21 views

Candidate Practical

Uploaded by

kairumichael44
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Candidate Practical

Uploaded by

kairumichael44
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

©2023 TVET CDACC

071306T4EEN
Electrical Engineering (Power Option) Level 6
ENG/OS/PO/CR/01/6
Perform Electrical Installation
July /August 2023

TVET CURRICULUM DEVELOPMENT, ASSESSMENT AND CERTIFICATION


COUNCIL (TVET CDACC)

PRACTICAL ASSESSMENT
TIME: 5 HOURS

INSTRUCTIONS TO CANDIDATE
Do not write on the question paper
DO NOT switch ON power without assessor’s permission
A separate plain paper will be provided
Return the question paper to the assessor at the end of practical.

This paper consists of four (4) printed pages.


Candidate should check the question paper to ascertain that all the pages are
printed as indicated and that no questions are missing.

Page 1 of 4
©2023 TVET CDACC

PROJECT 1
Figure 1 shows a layout of lighting and power circuits, carry out the following tasks:

TASK 1: Draw a wiring diagram of the final circuit

TASK 2: Carry out an electrical installation using the heavy gauge PVC conduit on the given .
Surface in such a way that:

(a) Lamp L is controlled from switches S2 and S3 through a master switch S1


(b) Socket outlets SO1 and SO2 form a ring final circuit
(c) SO3 is a spur

TASK 3: Carry out the following installation tests

a) Polarity test

b) Continuity test

300
200

S1 S2 S3

120 230 230


150

SO1 SO2

200 200

200

SO3

Page 2 of 4
©2023 TVET CDACC

PROJECT 2

The figure 2 shows a layout of a three phase induction motor

TASK 4: Draw power and forward-reverse control wiring diagrams

TASK 5: Using heavy gauge steel conduit, install and wire the motor for forward-reverse
operation

3 phase
distribution
200 board

100
280

START/STOP FORWARD / REVERSE START/STOP


FOWARD CONTACTOR REVERSE

180 170
120

TERMINAL BOX

3 phase
motor

Page 3 of 4
©2023 TVET CDACC

The following materials and tools/equipment will be provided for the assessment

TOOLS/EQUIPMENT MATERIALS

Combination pliers 4 way consumer unit

Side cutter PVC shallow patress

Ball pein hammer PVC deep patress

Termination screw driver One gang one way switch

Spirit level Two way one gang switch

Stripping Knife Wood screws

Steel conduit bender Tack nails

Hacksaw 1.5mm2 singles R/B/R

Stock and die 2.5 mm2 singles R/B/R

Bending spring 415v magnetic contactor

Meter (Ohmmeter) Start/ Stop push buttons

Tape measure Overload relay

Spacer bar saddles

PVC witch boxes

Heavy gauge PVC conduits

PVC end box

Single switched socket outlets

Intermediate switch