TABLE OF CONTENTS

SERIAL NO. TYPE OF DRAWINGS NO. OF SHEETS


1 TITLE COVER 1
2 TABLE OF CONTENTS 1 CONTRACTOR:

3 VICINITY MAP LOCATION 1


4 DETAILED PLAN 12 SURVEY/DESIGNED BY: CM. LINESES
CAD
DATE:

5 RISER DIAGRAM 1 CHECKED BY: D.CAINAG


CABLE ENGINEER

M.ISAIS
DATE:

DATE:
NOTED BY:

6 2
PROJECT MANAGER

MOUNTING TOOLS/DETAILS RECOMMENDED BY:

7 HORIZONTAL DISTRIBUTION 1 PROJECT TITLE

8 FIBER DESTRIBUTION 1 TYPICAL FOR


HARDIN NG ROSAS
DETAILED PLAN
IMPLEMENTATION SCHEDULE
9 1
& BILL OF QUANTITIES REVISION NO. DATE
A B C

D E F
TOTAL 21 G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

2
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

AA BUILDING DESIGN AB BUILDING DESIGN


HARDIN NG ROSAS
VICINITY MAP LOCATION

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

3
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN
NAP

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

4
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
NAP
DETAILED PLAN

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

5
21
GOING UP TO UNITS

CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN
NAP

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

6
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

NAP

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

7
21
GOING UP TO UNITS

CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
NAP
DETAILED PLAN

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

8
21
GOING UP TO UNITS

CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

NAP
D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

9
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F
NAP

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

10
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F

NAP

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

11
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F
NAP

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

12
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F

NAP G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

13
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F

G H I
NAP

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

14
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
DETAILED PLAN

REVISION NO. DATE


A B C

D E F
NAP

G H I

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

15
21
AB2 AB1 AA1 AA2 AA3 AB3
4TH
FLOOR

3RD
FLOOR

2ND
FLOOR
TO TAPPING
POINT
LCP_001
NAP 1 NAP 2 NAP 3 NAP 4 NAP 5 NAP 6 1ST
N 8 N 8 N 8 N 8 N 8 N 8
12 CORE
TRADITIONAL
FLOOR
FOC

CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

AB6 AB4 AA4 AB5 AA5 AA6 PROJECT TITLE

4TH
FLOOR

3RD HARDIN NG ROSAS


FLOOR RISER DIAGRAM
2ND
FLOOR
REVISION NO. DATE
TO TAPPING A B C
LCP_002 NAP 2 NAP 3 NAP 4 NAP 5 NAP 6 1ST
POINT NAP 1 N 8 N 8 N 8 N 8 N 8

12 CORE TRADITIONAL FOC


N 8
FLOOR
D E F

G H I

RISER DIAGRAM
SCALE: NTS # 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)
BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

16
21
CONTRACTOR:

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
MOUNTING DETAILS

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

17
21
CONTRACTOR:

METAL PULLBOX DETAILS


DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
MOUNTING DETAILS

REVISION NO. DATE


A B C

D E F

G H I

WALL MOUNTED # 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

HANGER DETAILS APPROVED BY:


WORK ORDER NO.
ENGINEERING HEAD

SHEET CONTENT
DATE:

DATE:

SHEET NO.

18
21
CONTRACTOR:

HORIZONTAL PLAN GROUNDFLOOR DATE:


SURVEY/DESIGNED BY: CM. LINESES
SCALE: NTS CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
HORIZONTAL DISTRIBUTION

REVISION NO. DATE


A B C

D E F

G H I

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

19
21
CONTRACTOR:
PROPOSED 24 CORE DROP CABLE

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:
CABLE ENGINEER

M.ISAIS DATE:
NOTED BY:
PROJECT MANAGER

RECOMMENDED BY:

PROJECT TITLE

HARDIN NG ROSAS
SPLICING DETAILS

REVISION NO. DATE


A B C

D E F

G H I

FIBER DISTRIBUTION APPROVED BY:


# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)
BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

DATE:
ENGINEERING HEAD

WORK ORDER NO. SHEET CONTENT SHEET NO.

20
21
IMPLEMENTATION SCHEDULE

ONE PENN PLACE 1ST WEEK 2ND WEEK 3RD WEEK 4TH WEEK

1 Coring Works on Slab


2 Installation of Conduit & Pullbox
3 Installation of Fiber Optic Cable
4 Installation of LCP & NAP
5 Termination and Testing CONTRACTOR:

6 Project Acceptance

DATE:
SURVEY/DESIGNED BY: CM. LINESES
CAD

D.CAINAG
DATE:
CHECKED BY:

BILLS OF QUANTITIES NOTED BY:


CABLE ENGINEER

M.ISAIS DATE:
PROJECT MANAGER

RECOMMENDED BY:

NO. BUILDING UNITS LCP 1:8 NAP 1:8 NAP 1:16 NAP 1:24
PROJECT TITLE

1 HARDIN NG ROSAS AA1 16 1


2 HARDIN NG ROSAS AA2 16 1
3 HARDIN NG ROSAS AA3 16 1
HARDIN NG ROSAS
4 HARDIN NG ROSAS AA4 16 1 SPLICING DETAILS
5 HARDIN NG ROSAS AA5 16 1
6 HARDIN NG ROSAS AA6 16 1
REVISION NO. DATE
7 HARDIN NG ROSAS AB1 16 1 A B C
8 HARDIN NG ROSAS AB2 16 1 1
D E F
9 HARDIN NG ROSAS AB3 16 1
10 HARDIN NG ROSAS AB4 16 1 G H I

11 HARDIN NG ROSAS AB5 16 1


12 HARDIN NG ROSAS AB6 16 1 1

# 99 RELIANCE CENTER E.RODRIGUEZ JR.AVE (C5)


BARANGAY UGONG, PASIG CITY,PHILIPPINES

DATE:

APPROVED BY: ENGINEERING HEAD


DATE:

WORK ORDER NO. SHEET CONTENT SHEET NO.

21
21