Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LWD-08 54 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LWD-08 54 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LWD-08 54 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23
TOTAL SHEET : 54
B B
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
COVER SHEET
3 3 INDEX SHEET X
4 4 LEGEND X
5 5 SWITCHBOARD CHARACTERISTICS X
NOTES
6 1 WIGING DIAGRAM X
7 2 WIGING DIAGRAM X
8 3 WIGING DIAGRAM X
9 4 WIGING DIAGRAM X
10 5 WIGING DIAGRAM X
B B
11 6 WIGING DIAGRAM X
LEGEND & ABBREVIATION
12 7 WIGING DIAGRAM X
13 8 WIGING DIAGRAM X
14 9 OUTLINE DIAGRAM X
15 10 OUTLINE DIAGRAM X
16 11 TERMINAL DIAGRAM X
17 12 TERMINAL DIAGRAM X
C 20 15 TERMINAL DIAGRAM X C
KEY PLAN
21 16 TERMINAL DIAGRAM X
R3
22 17 TERMINAL DIAGRAM X
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
23 18 TERMINAL DIAGRAM X
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
24 19 TERMINAL DIAGRAM X VENDOR :
34 9 TERMINAL DIAGRAM X
35 10 TERMINAL DIAGRAM X
36 11 TERMINAL DIAGRAM X
NOTES
37 12 TERMINAL DIAGRAM X
38 13 TERMINAL DIAGRAM X
39 14 TERMINAL DIAGRAM X
40 15 TERMINAL DIAGRAM X
41 16 TERMINAL DIAGRAM X
B B
42 1 WIRING DIAGRAM X
LEGEND & ABBREVIATION
43 2 WIRING DIAGRAM X
44 3 WIRING DIAGRAM X
45 4 WIRING DIAGRAM X
46 5 WIRING DIAGRAM X
47 6 WIRING DIAGRAM X
48 7 OUTLINE DIAGRAM X
C 51 10 TERMINAL DIAGRAM X C
KEY PLAN
52 11 TERMINAL DIAGRAM X
R3
53 12 TERMINAL DIAGRAM X
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
54 13 TERMINAL DIAGRAM X
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
INDEX SHEET
Plug
NO contact with Switch NO/NC contact Miniator circuit-breaker NOTES
time delay opening operated by turning two-pole
Terminal
Switch , two-pole
NO contact with Three-phase transformer
NO contact Horn
time delay closing star-star connection
B
operated by turning B
NC contact Electromechanical U
Protective circuiting of
opens and closes operating device Current transformer
a coil through a varistor
with delay relay coil
2 4N
Electromechanical H
Change-over contact Current measuring T
AS-BUILT
Electromechanical
Pushbutton NO/NC contact Voltage measuring DATE : 2017/03/12
operated by pushing
operating device of V instrument voltmeter
E.K.C
an interlock relay
C C
KEY PLAN
Electromechanical
Limit switch NO/NC contact
operating device Fluorescent lamp
mechanically operated R3
with pick-up delay
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Emergency stop switch Electromechanical
Emergency stop pushbutton operating device Heating element Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
NO / NC contact with off-delay VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
LEGEND
A A
NOTES
TECHNICAL
B ITEM DESCRIPTION DATA
B
2 INGRESS OF PROTECTION IP 42
3 COLOUR OF PANEL RAL 7032 AS-BUILT
DATE : 2017/03/12
C
4 ACCESSIBILITY FRONT E.K.C
C
KEY PLAN
5 POWER & CONTROL CABLE ENTRY BOTTOM R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
SWITCHBOARD CHARACTERISTICS
A A
NOTES
B B
IRP/23
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIGING DIAGRAM
A A
FROM EXTERNAL
-XTAC NOTES
230 VAC 1
1 3 1 3
2 4
-FH -FL Q0
32/2A 32/0.5A 6A 1 3
gG 2 4 gG 2 4
B B
1 COM
-TH -MS1
Thermostat Microswitch NC NO
2 +L N
4.1 4.1
AS-BUILT
DATE : 2017/03/12
E.K.C
1
C C
L1
-HL1 KEY PLAN
-HE1 lamp
6W
Heater 2
60W L2 R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIGING DIAGRAM
HAND SWITCH-START HAND SWITCH-STOP HAND SWITCH-STOP HAND SWITCH-START HAND SWITCH-STOP HAND SWITCH-STOP REFERENCE DOCUMENTS DOC. NO.
XHSO-2305A XHSC-2305A HS-XXXX XHSO-2305B XHSC-2305B HS-XXXX
+24V DC
A A
-XIP-101A 1
-XIP-101A 3
-XIP-101A 5
-XIP-101B 1
-XIP-101B 3
-XIP-101B 5
A1 A1 A1 A1 A1 A1
-K1 -K2 -K3 -K4 -K5 -K6 NOTES
39.11.0.024.0060 A2 39.11.0.024.0060 A2 39.11.0.024.0060 A2 39.11.0.024.0060 A2 39.11.0.024.0060 A2 39.11.0.024.0060 A2
-XIP-101A 2
-XIP-101A 4
-XIP-101A 6
-XIP-101B 2
-XIP-101B 4
-XIP-101B 6
B B
-24V DC
LEGEND & ABBREVIATION
14 14 14 14 14 14
11 /6.1 11 /6.2 11 /6.2 11 /6.3 11 /6.3 11 /6.4
12 12 12 12 12 12
HAND SWITCH-START HAND SWITCH-STOP HAND SWITCH-STOP SPARE SPARE SPARE SPARE SPARE
XHSO-2305C XHSC-2305C HS-XXXX
+24V DC AS-BUILT
DATE : 2017/03/12
E.K.C
C C
-XIP-101C 1
-XIP-101C 3
-XIP-101C 5
-XIP 1
-XIP 3
-XIP 5
-XIP 11
-XIP 18 KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
A1 A1 A1 A1 A1 A1 A1 A1
R0 14.08.2016 Issue For Approval M.M H.M M.R
-K7 -K8 -K9 -K10 -K11 -K12 -K13 -K14
39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 39.11.0.024.0060 Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
A2 A2 A2 A2 A2 A2 A2 A2
VENDOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
-24V DC
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
14 14 14 14 14 14 14 14
11 /6.2 11 /6.3 11 /6.3 11 11 11 11 11 WIGING DIAGRAM
12 12 12 12 12 12 12 12
REF. NO. : SC. : NONE
DOCUMENT NO. SIZE : A3
-XIP 7 8 9 10 13 14 15 16 17 20 COMPANY CONTRACTOR PROJECT DISCIPLINE DOC. SEQ. NO. REV. SHEET: 3 OF 20
IOOC LPGC BPD ELC DIA 027 R2 PAGE: 8 OF 54
1 2 3 4 5
1 2 3 4 5
-XO-101A 1
-XO-101A 3
-XO-101A 5
-XO-101A 7
MCC 400-23/3.12
MCC 400-23/3.12
MCC 400-23/3.12
16 22 24 19
NOTES
FROM
FROM
FROM
FROM
-X2 17
-X2 23
-X2 25
-X2 18
-XO-101A 2
-XO-101A 4
-XO-101A 6
-XO-101A 8
A1 A1 A1 A1
-K15 -K16 -K17 -K18
B 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 B
AS-BUILT
INDICATION-RUNNING STATUS INDICATION-LOCAL STATUS INDICATION-REMOTE STATUS AVAILABILITY
XI-2305B XIL-2305B XIL-2305B XA-2305B
DATE : 2017/03/12
E.K.C
4.4 / +L +L / 5.1
C C
KEY PLAN
-XO-101B 1
-XO-101B 3
-XO-101B 5
-XO-101B 7
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
-X2 -X2 -X2 -X2
MCC 400-23/3.13
MCC 400-23/3.13
MCC 400-23/3.13
MCC 400-23/3.13
16 22 24 19 R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
FROM
FROM
FROM
FROM
EPC CONTRACTOR :
INDICATION-RUNNING STATUS INDICATION-LOCAL STATUS INDICATION-REMOTE STATUS AVAILABILITY INCOMING FEEDER FAULT UPS FAILURE
XI-2305C XIL-2305C XIL-2305C XA-2305C
A 4.4 / +L +L / 5.1 A
-XO-101C 1
-XO-101C 3
-XO-101C 5
-XO-101C 7
-XO-MV3000 1
-XO-UPSP 1
MCC 400-23/4.12
MCC 400-23/4.12
MCC 400-23/4.12
16 22 24 19 23 3
MV3000-23
UPSP-23
NOTES
FROM
FROM
FROM
FROM
FROM
FROM
-X2 17
-X2 23
-X2 25
-X2 18
-X2 24
-X2 4
-XO-101C 2
-XO-101C 4
-XO-101C 6
-XO-101C 8
-XO-MV3000 2
-XO-UPSP 2
A1 A1 A1 A1 A1 A1
-K23 -K24 -K25 -K26 -K27 -K28
B 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 B
AS-BUILT
SPARE
SPARE
SPARE
SPARE
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
A A
HAND SWITCH-START HAND SWITCH-STOP HAND SWITCH-STOP HAND SWITCH-START HAND SWITCH-STOP HAND SWITCH-STOP
P-101A P-101A HS-XXXX P-101B P-101B HS-XXXX
X2 9 X2 26 X2 4 X2 9 X2 26 X2 4
TO TO
MCC 400-23/3.12 MCC 400-23/3.13
NOTES
XI-101A 1
XI-101A 3
XI-101A 5
XI-101B 1
XI-101B 3
XI-101B 5
11 11 11 11 11 11
-K1 -K2 -K3 -K4 -K5 -K6
/3.1 14 12 /3.2 14 12 /3.2 14 12 /3.3 14 12 /3.3 14 12 /3.4 14 12
B B
X2 8 X2 7 X2 3 X2 8 X2 7 X2 3
TO TO
MCC 400-23/3.12 MCC 400-23/3.13
DATE : 2017/03/12
E.K.C
X2 9 X2 26 X2 4
TO
C C
MCC 400-23/4.12
KEY PLAN
XI-101C 1
XI-101C 3
XI-101C 5 R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
11 11 11
VENDOR :
-K7 -K8 -K9
/3.1 /3.2 /3.2 ELECTRO KAVIR CO. (EKC)
14 12 14 12 14 12
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
X2 8 X2 7 X2 3
DRAWING TITLE :
TO INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
MCC 400-23/4.12 PANEL LAYOUT DIAGRAM
WIGING DIAGRAM
A A
TO PCS
-XOP-101A 1
-XOP-101A 3
-XOP-101A 5
-XOP-101A 7
NOTES
11 11 11 11
-K15 -K16 -K17 -K18
/4.1 14 12 /4.2 14 12 /4.3 14 12 /4.3 14 12
-XOP-101A 2
-XOP-101A 4
-XOP-101A 6
-XOP-101A 8
B B
TO PCS
AS-BUILT
DATE : 2017/03/12
E.K.C
-XOP-101B 1
-XOP-101B 3
-XOP-101B 5
-XOP-101B 7
C C
KEY PLAN
R3
11 11 11 11
R2 12.03.2017 AS BUILT M.M H.M M.R
-K19 -K20 -K21 -K22
R1 06.10.2016 Issue For Approval M.M H.M M.R
/4.1 14 12 /4.2 14 12 /4.3 14 12 /4.3 14 12
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIGING DIAGRAM
A A
TO PCS
-XOP-101C 1
-XOP-101C 3
-XOP-101C 5
-XOP-101C 7
NOTES
11 11 11 11
-K23 -K24 -K25 -K26
/5.1 14 12 /5.2 14 12 /5.2 14 12 /5.3 14 12
-XOP-101C 2
-XOP-101C 4
-XOP-101C 6
-XOP-101C 8
B B
TO PCS
AS-BUILT
DATE : 2017/03/12
E.K.C
-XOP-MV3000 1
-XOP-UPSP 1
C C
KEY PLAN
R3
11 11
R2 12.03.2017 AS BUILT M.M H.M M.R
-K27 -K28
R1 06.10.2016 Issue For Approval M.M H.M M.R
/5.3 14 12 /5.4 14 12
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
-XOP 1 2 3 4 5 6 7 8 9 10 PANEL LAYOUT DIAGRAM
WIGING DIAGRAM
A A
IRP/23
1750.0
1600.0 Q0
NOTES
XIP-101A XTAC
XI-101A
FL
FH
XO-101A
XIP-101B
TH
XI-101B
XIP-101C
1400.0 XO-101B
K1,K2,K3,...,K33
XI-101C
XI
XO-101C
XO-MV3000
XOP-101A
B
1200.0 B
XO-UPSP
XOP-101B
LEGEND & ABBREVIATION
XI
XOP-101C
XOP-MV3000
XO
XOP-UPSP
1000.0
XOP
800.0
AS-BUILT
600.0 E.K.C
DATE : 2017/03/12
C C
KEY PLAN
R3
400.0 R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
OUTLINE DIAGRAM
A
75 75 Floor Cutouts, Cubicle depth 600 mm A
50 50
W Cubicle Width
40
45
D - 150
Space for cables and busbar bushings in the fixing place
D
Attention: partition wall 2 mm
B
Attention: the height of the plant B
W - 100
W
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
IRP/23
600.0 R2
R1
12.03.2017
06.10.2016
AS BUILT
Issue For Approval
M.M
M.M
H.M
H.M
M.R
M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
400.0 VENDOR :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
800
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
OUTLINE DIAGRAM
A A
Placement
Placement
/6.1
/6.1
/6.2
/6.2
/6.2
/6.2
/4.1
/4.1
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
NOTES
Connection
Connection
-XO-101A:7
-XO-101A:1
-XO-101A:3
-XO-101A:5
-K1:14
-K2:14
-K3:14
-X2:26
-X2:17
-X2:23
-X2:25
-X2:18
-X2:9
-X2:4
B B
8
Connection
Connection
-K17:A1
-K18:A1
-K15:12
-K16:14
-K1:11
-K2:11
-K3:11
-X2:16
-X2:22
-X2:24
-X2:19
-X2:8
-X2:7
-X2:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-REMOTE STATUS
Description
VENDOR :
AVAILABILITY
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
/7.1
/7.1
/7.2
/7.2
/7.3
/7.3
/7.3
/7.3
NOTES
Connection
Connection
-K15:14
-K16:14
-K17:14
-K18:14
-K1:A2
-K2:A2
-K3:A2
B B
8
Connection
Connection
-K15:11
-K16:11
-K17:11
-K18:11
-K1:A1
-K2:A1
-K3:A1
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS P-101A
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/6.3
/6.3
/6.3
/6.3
/6.4
/6.4
/4.1
/4.1
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
NOTES
Connection
Connection
-XO-101A:7
-XO-101C:1
-XO-101B:1
-XO-101B:3
-K4:14
-K5:14
-K6:14
-X2:26
-X2:17
-X2:23
-X2:25
-X2:18
-X2:9
-X2:4
B B
8
Connection
Connection
-K19:A1
-K20:A1
-K21:A1
-K22:A1
-K4:11
-K5:11
-K6:11
-X2:16
-X2:22
-X2:24
-X2:19
-X2:8
-X2:7
-X2:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-REMOTE STATUS
Description
VENDOR :
AVAILABILITY
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/7.1
/7.1
/7.2
/7.2
/7.3
/7.3
/7.3
/7.3
NOTES
Connection
Connection
-K19:14
-K20:14
-K21:14
-K22:14
-K4:A2
-K5:A2
-K6:A2
B B
8
Connection
Connection
-K19:11
-K20:11
-K21:11
-K22:11
-K4:A1
-K5:A1
-K6:A1
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS P-101B
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/6.2
/6.2
/6.3
/6.3
/6.3
/6.3
/5.1
/5.1
/5.2
/5.2
/5.2
/5.2
/5.3
/5.3
NOTES
Connection
Connection
-XO-MV3000:1
-XO-101C:1
-XO-101C:3
-XO-101B:7
-K7:14
-K8:14
-K9:14
-X2:26
-X2:17
-X2:23
-X2:25
-X2:18
-X2:9
-X2:4
B B
8
Connection
Connection
-K23:A1
-K24:A1
-K25:A1
-K26:A1
-K7:11
-K8:11
-K9:11
-X2:16
-X2:22
-X2:24
-X2:19
-X2:8
-X2:7
-X2:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-REMOTE STATUS
Description
VENDOR :
AVAILABILITY
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
/8.1
/8.1
/8.2
/8.2
/8.3
/8.3
/8.3
/8.3
NOTES
Connection
Connection
-K23:14
-K24:14
-K25:14
-K26:14
-K7:A2
-K8:A2
-K9:A2
B B
8
Connection
Connection
-K23:11
-K24:11
-K25:11
-K26:11
-K7:A1
-K8:A1
-K9:A1
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS P-101C
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
Placement
Placement
/5.3
/5.3
/8.1
/8.1
/5.4
/5.4
/8.2
/8.2
/2.2
/2.2
NOTES
Connection
Connection
Connection
Connection
Connection
-XO-MV3000:1
-XO-101C:7
-K27:14
-K28:14
-X2:24
-X2:4
B B
XOP-UPSP
XO-UPSP
XTAC
1
2
Connection
Connection
Connection
Connection
Connection
-K27:A1
-K28:A1
-K27:11
-K28:11
-X2:23
-FH:1
-FH:3
-X2:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
INCOMING FEEDER FAULT
Description
Description
Description
Description
VENDOR :
UPS FAILURE
UPS FAILURE
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/8.2
/8.2
/8.2
/8.2
/8.2
/8.2
/8.2
/8.3
/8.3
/8.3
/6
/6
/6
/6
/6
/6
/6
/6
/6
/6
NOTES
Connection
Connection
B B
XOP
XI
10
10
1
9
Connection
Connection
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
Description
VENDOR :
SPARE
=
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/3.2
/3.2
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/3.4
/3.4
/5.1
/5.1
/5.2
/5.2
/5.2
/5.2
/5.3
/5.3
/5.3
/5.3
/5.4
/3
/3
/3
/3
/3
/3
/3
/3
/3
/3
NOTES
Connection
Connection
-XO-UPSP:1
-K10:A2
-K11:A2
-K12:A2
-K13:A2
-K14:A2
-XO:1
-XO:3
-XO:5
-XO:7
-X2
-X2
-X2
-X2
-X2
B B
XO
10
11
12
13
14
15
16
17
18
19
20
10
11
1
9
Connection
Connection
-K10:A1
-K11:A1
-K12:A1
-K13:A1
-K14:A1
-K29:A1
-K30:A1
-K31:A1
-K32:A1
-K33:A1
-X2
-X2
-X2
-X2
-X2
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
Description
VENDOR :
SPARE
=
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
NOTES
Connection
B B
12
13
14
15
16
17
18
19
20
Connection
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
NOTES
B B
SS1/IRP/23
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
A A
FROM EXTERNAL
-XTAC NOTES
230 VAC
1
1 3
2 4
-FL Q0
32/0.5A 6A 1 3
B gG 2 4 B
COM
-MS1 +L N
Microswitch NC NO 3.1 3.1
AS-BUILT
DATE : 2017/03/12
E.K.C
C 1 C
KEY PLAN
-HL1
lamp
6W R3
2
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
2.3 / +L +L / 3.1
A A
-XO-A01-A 1
-XO-A01-A 3
-XO-A01-A 5
-XO-A01-B 1
-XO-A01-B 3
-XO-A01-B 5
MCC 400-23-01/2.9
MCC 400-23-01/2.9
MCC 400-23-01/2.9
MCC 400-23-01/3.8
MCC 400-23-01/3.8
MCC 400-23-01/3.8
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15
FROM
FROM
FROM
FROM
FROM
FROM
NOTES
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
-XO-A01-A 2
-XO-A01-A 4
-XO-A01-A 6
-XO-A01-B 2
-XO-A01-B 4
-XO-A01-B 6
A1 A1 A1 A1 A1 A1
-K1 -K2 -K3 -K4 -K5 -K6
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
B B
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
XI-2306C XAF-2306C XA-2306C XI-2306D XAF-2306D XA-2306D
AS-BUILT
3.4 / +L +L / 4.1
DATE : 2017/03/12
E.K.C
C -XO-A01-C 1
-XO-A01-C 3
-XO-A01-C 5
-XO-A01-D 1
-XO-A01-D 3
-XO-A01-D 5
C
KEY PLAN
MCC 400-23-01/3.9
MCC 400-23-01/3.9
MCC 400-23-01/3.9
MCC 400-23-01/4.9
MCC 400-23-01/4.9
MCC 400-23-01/4.9
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15 R3
R2 12.03.2017 AS BUILT M.M H.M M.R
FROM
FROM
FROM
FROM
FROM
FROM
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14 VENDOR :
A1 A1 A1 A1 A1 A1 EPC CONTRACTOR :
-K7 -K8 -K9 -K10 -K11 -K12
39.11.8.230.0060 39.11.8.230.0060 39.11.8.230.0060 39.11.8.230.0060 39.11.8.230.0060 39.11.8.230.0060
LOLEH PEY GOSTAR CO. (LPGC)
A2 A2 A2 A2 A2 A2
PROJECT TITLE :
3.4 / N N / 4.1 BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
14 14 14 14 14 14
11 /6.1 11 /6.2 11 /6.2 11 /6.3 11 /6.3 11 /6.4
12 12 12 12 12 12 DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
3.4 / +L +L / 4.1
A A
-XO-A02-A 1
-XO-A02-A 3
-XO-A02-A 5
-XO-A02-B 1
-XO-A02-B 3
-XO-A02-B 5
MCC 400-23-01/5.8
MCC 400-23-01/5.8
MCC 400-23-01/5.8
MCC 400-23-01/5.9
MCC 400-23-01/5.9
MCC 400-23-01/5.9
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15
FROM
FROM
FROM
FROM
FROM
FROM
NOTES
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
-XO-A02-A 2
-XO-A02-A 4
-XO-A02-A 6
-XO-A02-B 2
-XO-A02-B 4
-XO-A02-B 6
A1 A1 A1 A1 A1 A1
-K13 -K14 -K15 -K16 -K17 -K18
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
B B
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
XI-2307C XAF-2307C XA-2307C XI-2307D XAF-2307D XA-2307D
AS-BUILT
4.4 / +L +L / 5.1
DATE : 2017/03/12
E.K.C
C -XO-A02-C 1
-XO-A02-C 3
-XO-A02-C 5
-XO-A02-D 1
-XO-A02-D 3
-XO-A02-D 5
C
KEY PLAN
MCC 400-23-01/6.10
MCC 400-23-01/6.10
MCC 400-23-01/6.10
MCC 400-23-01/7.10
MCC 400-23-01/7.10
MCC 400-23-01/7.10
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15 R3
R2 12.03.2017 AS BUILT M.M H.M M.R
FROM
FROM
FROM
FROM
FROM
FROM
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
VENDOR :
A1 A1 A1 A1 A1 A1 EPC CONTRACTOR :
-K19 -K20 -K21 -K22 -K23 -K24 LOLEH PEY GOSTAR CO. (LPGC)
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
PROJECT TITLE :
4.4 / N N / 5.1 BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
14 14 14 14 14 14
11 /7.1 11 /7.2 11 /7.2 11 /7.3 11 /7.3 11 /7.4 DRAWING TITLE :
12 12 12 12 12 12 INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
-XO 1
-XO 3
-XO 5
-XO 7
-XO 9
SPARE
SPARE
SPARE
SPARE
NOTES
-X2 -X2 -X2 -X2 -X2
-XO 2
-XO 4
-XO 6
-XO 8
-XO 10
A1 A1 A1 A1 A1
-K25 -K26 -K27 -K28 -K29
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
B B
-XO 11 13 15 17 19
AS-BUILT
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A01-A MIXER A01-A MIXER A01-A MIXER A01-B MIXER A01-B MIXER A01-B
A A
TO PCS
-XOM-A01-A 1
-XOM-A01-A 3
-XOM-A01-A 5
-XOM-A01-B 1
-XOM-A01-B 3
-XOM-A01-B 5
NOTES
11 11 11 11 11 11
-K1 -K2 -K3 -K4 -K5 -K6
/3.1 14 12 /3.2 14 12 /3.2 14 12 /3.3 14 12 /3.3 14 12 /3.4 14 12
-XOM-A01-A 2
-XOM-A01-A 4
-XOM-A01-A 6
-XOM-A01-B 2
-XOM-A01-B 4
-XOM-A01-B 6
B B
TO PCS
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A01-C MIXER A01-C MIXER A01-C MIXER A01-D MIXER A01-D MIXER A01-D
AS-BUILT
C C
KEY PLAN
-XOM-A01-C 1
-XOM-A01-C 3
-XOM-A01-C 5
-XOM-A01-D 1
-XOM-A01-D 3
-XOM-A01-D 5
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
11 11 11 11 11 11
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-K7 -K8 -K9 -K10 -K11 -K12 VENDOR :
/3.1 14 12 /3.2 14 12 /3.2 14 12 /3.3 14 12 /3.3 14 12 /3.4 14 12
ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
-XOM-A01-C -XOM-A01-C -XOM-A01-C -XOM-A01-D -XOM-A01-D -XOM-A01-D
2 4 6 2 4 6 LOLEH PEY GOSTAR CO. (LPGC)
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
TO PCS (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A02-A MIXER A02-A MIXER A02-A MIXER A02-B MIXER A02-B MIXER A02-B
A A
TO PCS
-XOM-A02-A 1
-XOM-A02-A 3
-XOM-A02-A 5
-XOM-A02-B 1
-XOM-A02-B 3
-XOM-A02-B 5
NOTES
11 11 11 11 11 11
-K13 -K14 -K15 -K16 -K17 -K18
/4.1 14 12 /4.2 14 12 /4.2 14 12 /4.3 14 12 /4.3 14 12 /4.4 14 12
-XOM-A02-A 2
-XOM-A02-A 4
-XOM-A02-A 6
-XOM-A02-B 2
-XOM-A02-B 4
-XOM-A02-B 6
B B
TO PCS
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A02-C MIXER A02-C MIXER A02-C MIXER A02-D MIXER A02-D MIXER A02-D
AS-BUILT
C C
KEY PLAN
-XOM-A02-C 1
-XOM-A02-C 3
-XOM-A02-C 5
-XOM-A02-D 1
-XOM-A02-D 3
-XOM-A02-D 5
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
11 11 11 11 11 11
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-K19 -K20 -K21 -K22 -K23 -K24 VENDOR :
/4.1 14 12 /4.2 14 12 /4.2 14 12 /4.3 14 12 /4.3 14 12 /4.4 14 12
ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
-XOM-A02-C -XOM-A02-C -XOM-A02-C -XOM-A02-D -XOM-A02-D -XOM-A02-D
2 4 6 2 4 6 LOLEH PEY GOSTAR CO. (LPGC)
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
TO PCS (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
A A
SS1/IRP/23 NOTES
B XTAC B
Q0
XO-A01-A
XOM-A01-A
XOM-A01-B
XO-A01-C
XOM-A01-C
K1,K2,K3,...,K29
XO-A01-D
XOM-A01-D
XO-A02-A
XOM-A02-A
XO-A02-B
XOM-A02-B
900 mm
XO-A02-C
XOM-A02-C
XO-A03-D
XOM-A02-D
AS-BUILT
XOM-...(SPARE)
XO
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
OUTLINE DIAGRAM
A A
Placement
Placement
Placement
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
NOTES
Connection
Connection
Connection
-XO-A01-D:1
-XO-A01-C:1
-XO-A01-C:1
-XO-A01-B:1
-XO-A01-B:1
-XO-A01-B:5
-XO-A01-A:1
-XO-A01-A:5
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-Q0:1
B B
XO-A01-C
XO-A01-B
XO-A01-A
6
Connection
Connection
Connection
-K1:A1
-K2:A1
-K3:A1
-K4:A1
-K5:A1
-K6:A1
-K7:A1
-K8:A1
-K9:A1
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
Description
Description
VENDOR :
AVAILABILITY
AVAILABILITY
AVAILABILITY
ALARM FAULT
ALARM FAULT
ALARM FAULT
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/4.1
/4.1
/4.2
/4.2
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
/4.4
/4.4
NOTES
Connection
Connection
Connection
-XO-A01-D:1
-XO-A01-D:5
-XO-A01-C:5
-XO-A02-C:1
-XO-A02-B:1
-XO-A02-B:1
-XO-A02-A:1
-XO-A02-A:1
-XO-A02-A:5
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
B B
XO-A02-B
XO-A02-A
1
6
Connection
Connection
Connection
-K10:A1
-K11:A1
-K12:A1
-K13:A1
-K14:A1
-K15:A1
-K16:A1
-K17:A1
-K18:A1
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
Description
Description
VENDOR :
AVAILABILITY
AVAILABILITY
AVAILABILITY
ALARM FAULT
ALARM FAULT
ALARM FAULT
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
/4.1
/4.1
/4.2
/4.2
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
/4.4
/4.4
NOTES
Connection
Connection
-XO-A02-D:1
-XO-A02-D:1
-XO-A02-C:1
-XO-A02-C:5
-XO-A02-B:5
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-XO:1
B B
6
Connection
Connection
-K19:A1
-K20:A1
-K21:A1
-K22:A1
-K23:A1
-K24:A1
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
Description
VENDOR :
AVAILABILITY
AVAILABILITY
ALARM FAULT
ALARM FAULT
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/6.1
/6.1
/6.2
/6.2
/6.2
/6.2
/6.3
/6.3
/6.3
/6.3
/6.4
/6.4
/6.1
/6.1
/6.2
/6.2
/6.2
/6.2
NOTES
Connection
Connection
Connection
-K1:14
-K2:14
-K3:14
-K4:14
-K5:14
-K6:14
-K7:14
-K8:14
-K9:14
B B
XOM-A01-C
XOM-A01-B
XOM-A01-A
6
Connection
Connection
Connection
-K1:11
-K2:11
-K3:11
-K4:11
-K5:11
-K6:11
-K7:11
-K8:11
-K9:11
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS MIXER A01-C
INDICATION-RUNNING STATUS MIXER A01-B
INDICATION-RUNNING STATUS MIXER A01-A
Description
Description
VENDOR :
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/6.3
/6.3
/6.3
/6.3
/6.4
/6.4
/7.1
/7.1
/7.2
/7.2
/7.2
/7.2
/7.3
/7.3
/7.3
/7.3
/7.4
/7.4
NOTES
Connection
Connection
Connection
-K10:14
-K11:14
-K12:14
-K13:14
-K14:14
-K15:14
-K16:14
-K17:14
-K18:14
B B
XOM-A02-B
XOM-A02-A
1
6
Connection
Connection
Connection
-K10:11
-K11:11
-K12:11
-K13:11
-K14:11
-K15:11
-K16:11
-K17:11
-K18:11
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS MIXER A01-D
Description
Description
VENDOR :
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/2.2
/2.2
/7.1
/7.1
/7.2
/7.2
/7.2
/7.2
/7.3
/7.3
/7.3
/7.3
/7.4
/7.4
NOTES
Connection
Connection
Connection
-K19:14
-K20:14
-K21:14
-K22:14
-K23:14
-K24:14
B B
XTAC
1
2
Connection
Connection
Connection
-K19:11
-K20:11
-K21:11
-K22:11
-K23:11
-K24:11
-FL:1
-FL:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS MIXER A02-D
INDICATION-RUNNING STATUS MIXER A02-C
Description
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
/5.1
/5.1
/5.2
/5.2
/5.2
/5.2
/5.3
/5.3
/5.3
/5.3
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
/5.4
NOTES
Connection
-XO-A02-D:5
-XO:1
-XO:3
-XO:5
-XO:7
-X2
-X2
-X2
-X2
-X2
B B
10
11
12
13
14
15
16
17
18
19
20
1
9
Connection
-K25:A1
-K26:A1
-K27:A1
-K28:A1
-K29:A1
-X2
-X2
-X2
-X2
-X2
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
/7
/7
/7
/7
/7
/7
/7
/7
/7
/7
NOTES
Connection
B B
10
1
9
Connection
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
NOTES
B B
SS2/IRP/23
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
A A
FROM EXTERNAL
-XTAC NOTES
230 VAC
1
1 3
2 4
-FL Q0
32/0.5A 6A 1 3
B gG 2 4 B
COM
-MS1 +L N
Microswitch NC NO 3.1 3.1
AS-BUILT
DATE : 2017/03/12
E.K.C
C 1 C
KEY PLAN
-HL1
lamp
6W R3
2
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
2.3 / +L +L / 3.1
A A
-XO-A03-A 1
-XO-A03-A 3
-XO-A03-A 5
-XO-A03-B 1
-XO-A03-B 3
-XO-A03-B 5
MCC 400-23-02/2.8
MCC 400-23-02/2.8
MCC 400-23-02/2.8
MCC 400-23-02/3.8
MCC 400-23-02/3.8
MCC 400-23-02/3.8
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15
FROM
FROM
FROM
FROM
FROM
FROM
NOTES
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
-XO-A03-A 2
-XO-A03-A 4
-XO-A03-A 6
-XO-A03-B 2
-XO-A03-B 4
-XO-A03-B 6
A1 A1 A1 A1 A1 A1
-K1 -K2 -K3 -K4 -K5 -K6
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
B B
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
XI-2308C XAF-2308C XA-2308C XI-2309A XAF-2309A XA-2309A
AS-BUILT
3.4 / +L +L / 4.1
DATE : 2017/03/12
E.K.C
C -XO-A03-C 1
-XO-A03-C 3
-XO-A03-C 5
-XO-A04-A 1
-XO-A04-A 3
-XO-A04-A 5
C
KEY PLAN
MCC 400-23-02/3.9
MCC 400-23-02/3.9
MCC 400-23-02/3.9
MCC 400-23-02/4.8
MCC 400-23-02/4.8
MCC 400-23-02/4.8
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15 R3
R2 12.03.2017 AS BUILT M.M H.M M.R
FROM
FROM
FROM
FROM
FROM
FROM
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
VENDOR :
A1 A1 A1 A1 A1 A1 EPC CONTRACTOR :
-K7 -K8 -K9 -K10 -K11 -K12 LOLEH PEY GOSTAR CO. (LPGC)
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
PROJECT TITLE :
3.4 / N N / 4.1 BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
14 14 14 14 14 14
11 /5.1 11 /5.2 11 /5.2 11 /5.3 11 /5.3 11 /5.4 DRAWING TITLE :
12 12 12 12 12 12 INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
3.4 / +L +L / 4.1
A A
-XO-A04-B 1
-XO-A04-B 3
-XO-A04-B 5
-XO-A04-C 1
-XO-A04-C 3
-XO-A04-C 5
MCC 400-23-02/5.10
MCC 400-23-02/5.10
MCC 400-23-02/5.10
MCC 400-23-02/6.10
MCC 400-23-02/6.10
MCC 400-23-02/6.10
-X2 11
-X2 17
-X2 15
-X2 11
-X2 17
-X2 15
FROM
FROM
FROM
FROM
FROM
FROM
NOTES
-X2 12
-X2 16
-X2 14
-X2 12
-X2 16
-X2 14
-XO-A04-B 2
-XO-A04-B 4
-XO-A04-B 6
-XO-A04-C 2
-XO-A04-C 4
-XO-A04-C 6
A1 A1 A1 A1 A1 A1
-K13 -K14 -K15 -K16 -K17 -K18
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
B B
C -XO 1
-XO 3
-XO 5
-XO 7
-XO 9
-XO 11 13 15 17 19
C
KEY PLAN
-X2 -X2 -X2 -X2 -X2 R3
-XO 12 14 16 18 20 R2 12.03.2017 AS BUILT M.M H.M M.R
SPARE
SPARE
SPARE
SPARE
SPARE
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-X2 -X2 -X2 -X2 -X2 VENDOR :
A1 A1 A1 A1 A1 EPC CONTRACTOR :
-K19 -K20 -K21 -K22 -K23 LOLEH PEY GOSTAR CO. (LPGC)
39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2 39.11.8.230.0060 A2
PROJECT TITLE :
4.4 / N BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
14 14 14 14 14
11 11 11 11 11 DRAWING TITLE :
12 12 12 12 12 INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A03-A MIXER A03-A MIXER A03-A MIXER A03-B MIXER A03-B MIXER A03-B
A A
TO PCS
-XOM-A03-A 1
-XOM-A03-A 3
-XOM-A03-A 5
-XOM-A03-B 1
-XOM-A03-B 3
-XOM-A03-B 5
NOTES
11 11 11 11 11 11
-K1 -K2 -K3 -K4 -K5 -K6
/3.1 14 12 /3.2 14 12 /3.2 14 12 /3.3 14 12 /3.3 14 12 /3.4 14 12
-XOM-A03-A 2
-XOM-A03-A 4
-XOM-A03-A 6
-XOM-A03-B 2
-XOM-A03-B 4
-XOM-A03-B 6
B B
TO PCS
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A03-C MIXER A03-C MIXER A03-C MIXER A04-A MIXER A04-A MIXER A04-A
AS-BUILT
C C
KEY PLAN
-XOM-A03-C 1
-XOM-A03-C 3
-XOM-A03-C 5
-XOM-A04-A 1
-XOM-A04-A 3
-XOM-A04-A 5
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
11 11 11 11 11 11
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-K7 -K8 -K9 -K10 -K11 -K12 VENDOR :
/3.1 14 12 /3.2 14 12 /3.2 14 12 /3.3 14 12 /3.3 14 12 /3.4 14 12
ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
-XOM-A03-C -XOM-A03-C -XOM-A03-C -XOM-A04-A -XOM-A04-A -XOM-A04-A
2 4 6 2 4 6 LOLEH PEY GOSTAR CO. (LPGC)
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
TO PCS (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY INDICATION-RUNNING STATUS ALARM FAULT AVAILABILITY
MIXER A04-B MIXER A04-B MIXER A04-B MIXER A04-C MIXER A04-C MIXER A04-C
A A
TO PCS
-XOM-A04-B 1
-XOM-A04-B 3
-XOM-A04-B 5
-XOM-A04-C 1
-XOM-A04-C 3
-XOM-A04-C 5
NOTES
11 11 11 11 11 11
-K13 -K14 -K15 -K16 -K17 -K18
/4.1 14 12 /4.2 14 12 /4.2 14 12 /4.3 14 12 /4.3 14 12 /4.4 14 12
-XOM-A04-B 2
-XOM-A04-B 4
-XOM-A04-B 6
-XOM-A04-C 2
-XOM-A04-C 4
-XOM-A04-C 6
B B
TO PCS
AS-BUILT
-XOM-... 1 2 3 4 5 6 7 8 9 10
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
WIRING DIAGRAM
A A
SS2/IRP/23 NOTES
XTAC
B Q0 B
XO-A03-A
XOM-A03-A
XOM-A03-B
XO-A03-C
XOM-A03-C
K1,K2,K3,...,K23
XO-A04-A
XOM-A04-A
XO-A04-B
XOM-A04-B
XO-A04-C
XOM-A04-C
900 mm
XOM-...(SPARE)
XO
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
OUTLINE DIAGRAM
PE BUSBAR LOCATED IN SIDE COMPANY CONTRACTOR PROJECT DISCIPLINE DOC. SEQ. NO. REV. SHEET: 7 OF 13
IOOC LPGC BPD ELC DIA 027 R2 PAGE: 48 OF 54
1 2 3 4 5
1 2 3 4 5
A A
Placement
Placement
Placement
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/3.1
/3.1
/3.2
/3.2
/3.2
/3.2
NOTES
Connection
Connection
Connection
-XO-A03-C:1
-XO-A03-C:1
-XO-A03-B:1
-XO-A03-B:1
-XO-A03-B:5
-XO-A03-A:1
-XO-A03-A:5
-XO-A04-A:1
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-Q0:1
B B
XO-A03-C
XO-A03-B
XO-A03-A
6
Connection
Connection
Connection
-K1:A1
-K2:A1
-K3:A1
-K4:A1
-K5:A1
-K6:A1
-K7:A1
-K8:A1
-K9:A1
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
Description
Description
VENDOR :
AVAILABILITY
AVAILABILITY
AVAILABILITY
ALARM FAULT
ALARM FAULT
ALARM FAULT
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/3.3
/3.3
/3.3
/3.3
/3.4
/3.4
/4.1
/4.1
/4.2
/4.2
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
/4.4
/4.4
NOTES
Connection
Connection
Connection
-XO-A03-C:5
-XO-A04-C:1
-XO-A04-C:1
-XO-A04-B:1
-XO-A04-B:1
-XO-A04-B:5
-XO-A04-A:1
-XO-A04-A:5
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-X2:12
-X2:16
-X2:14
-XO:1
B B
XO-A04-C
XO-A04-B
XO-A04-A
6
Connection
Connection
Connection
-K10:A1
-K11:A1
-K12:A1
-K13:A1
-K14:A1
-K15:A1
-K16:A1
-K17:A1
-K18:A1
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
-X2:11
-X2:17
-X2:15
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
INDICATION-RUNNING STATUS
Description
Description
VENDOR :
AVAILABILITY
AVAILABILITY
AVAILABILITY
ALARM FAULT
ALARM FAULT
ALARM FAULT
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
/5.1
/5.1
/5.2
/5.2
/5.2
/5.2
/5.3
/5.3
/5.3
/5.3
/5.4
/5.4
/5.1
/5.1
/5.2
/5.2
/5.2
/5.2
NOTES
Connection
Connection
Connection
-K1:14
-K2:14
-K3:14
-K4:14
-K5:14
-K6:14
-K7:14
-K8:14
-K9:14
B B
XOM-A03-C
XOM-A03-B
XOM-A03-A
6
Connection
Connection
Connection
-K1:11
-K2:11
-K3:11
-K4:11
-K5:11
-K6:11
-K7:11
-K8:11
-K9:11
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS MIXER A03-C
INDICATION-RUNNING STATUS MIXER A03-B
INDICATION-RUNNING STATUS MIXER A03-A
Description
Description
VENDOR :
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
Placement
Placement
Placement
/5.3
/5.3
/5.3
/5.3
/5.4
/5.4
/6.1
/6.1
/6.2
/6.2
/6.2
/6.2
/6.3
/6.3
/6.3
/6.3
/6.4
/6.4
/2.2
/2.2
NOTES
Connection
Connection
Connection
Connection
-K10:14
-K11:14
-K12:14
-K13:14
-K14:14
-K15:14
-K16:14
-K17:14
-K18:14
B B
XOM-A04-C
XOM-A04-B
XOM-A04-A
XTAC
1
2
Connection
Connection
Connection
Connection
-K10:11
-K11:11
-K12:11
-K13:11
-K14:11
-K15:11
-K16:11
-K17:11
-K18:11
-FL:1
-FL:3
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
INDICATION-RUNNING STATUS MIXER A04-C
INDICATION-RUNNING STATUS MIXER A04-B
INDICATION-RUNNING STATUS MIXER A04-A
Description
Description
Description
VENDOR :
=
EKC DWG. NO. : 11039-0-LWD-08
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
/4.1
/4.1
/4.2
/4.2
/4.2
/4.2
/4.3
/4.3
/4.3
/4.3
/4.4
/4.4
/4.4
/4.4
/4.4
/4.4
/4.4
/4.4
/4.4
/4.4
NOTES
Connection
-XO-A04-C:5
-XO:1
-XO:3
-XO:5
-XO:7
-X2
-X2
-X2
-X2
-X2
B B
10
11
12
13
14
15
16
17
18
19
20
1
9
Connection
-K19:A1
-K20:A1
-K21:A1
-K22:A1
-K23:A1
-X2
-X2
-X2
-X2
-X2
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM
A A
Placement
/6.1
/6.1
/6.1
/6.1
/6.1
/6.1
/6.2
/6.2
/6.2
/6.2
NOTES
Connection
B B
10
1
9
Connection
AS-BUILT
DATE : 2017/03/12
E.K.C
C C
KEY PLAN
R3
R2 12.03.2017 AS BUILT M.M H.M M.R
R1 06.10.2016 Issue For Approval M.M H.M M.R
R0 14.08.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
INTERPOSING RELAY PANEL LV SWITCHGEAR WIRING &
PANEL LAYOUT DIAGRAM
TERMINAL DIAGRAM