Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Report Fisfdsnal1

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

GAS LEAKAGE DETECTION

SYSTEM
A Minor Project II Report
Submitted in Partial fulfillment for the award of
Bachelor of Technology in CSE-IOT

Submitted to
RAJIV GANDHI PROUDYOGIKI VISHWAVIDYALAYA
BHOPAL (M.P)

MINOR PROJECT II REPORT


Submitted by
Harmeet Singh[0103IS211046] Naveen
Yadav[0103IS211069]
Ishan Goswami[0103IS211051]

Under the supervision of


Prof. Puneet Nema
Assistant Professor

Department of CSE-IOT
Lakshmi Narain College of Technology, Bhopal (M.P.)
Session 2023-24
LAKSHMI NARAIN COLLEGE OF TECHNOLOGY, BHOPAL

DEPARTMENT OF CSE-IOT

CERTIFICATE

This is to certify that the work embodied in this project work entitled ”Gas
Leakage Detection System” has been satisfactorily completed by the
Harmeet Singh (0103IS211046), Naveen Yadav (0103IS211069) , Ishan
Goswami (0103IS211051). It is a bonafide piece of work, carried out
under the guidance in Department of CSE- IOT, Lakshmi Narain
College of Technology, Bhopal for the partial fulfillment of the
Bachelor of Technology during the academic year 2023-24.

Approved By

Prof. Puneet Nema Dr. Vivek


Richhariya
(Assistant Prof.) Prof. & Head
(Guide) Department of CSE-
IOT
LAKSHMI NARAIN COLLEGE OF TECHNOLOGY, BHOPAL

DEPARTMENT OF CSE-IOT

ACKNOWLEDGEMENT

We express our deep sense of gratitude to Prof. Puneet Nema department


of CSE-IOT L.N.C.T., Bhopal. Whose kindness valuable guidance and timely
help encouraged me to complete this project.

A special thank goes to Dr. Vivek Richhariya (HoD) who helped me in


completing this project work. He exchanged his interesting ideas &
thoughts which made this project work successful.

We would also thank our institution and all the faculty members without
whom this project work would have been a distant reality.

Harmeet Singh[0103IS211046]
Naveen Yadav[0103IS211069]
Ishan Goswami[0103IS211051]

S.NO TOPICS Page No.

1. Problem Domain 1-2

2. Literature Survey. 3-5

3. Major objective & scope of project. 6-7

4. Problem Analysis and requirement 8-9


specification
5. Detailed Design(Modeling and ERD/DFD ) 10-12

6. Hardware/Software platform environment 13-15

7. Snapshots of Input & Output 16-17

8. Coding. 18-19

9. Project limitation and Future scope. 20-21

10. References. 22

You might also like